View
218
Download
0
Category
Preview:
Citation preview
PP
EL. 200m
Lurin Water Treatweut Plant
206 km(60 km)
EL. 275 m
EL. 165 m
H = 110 mQ = 5 m3/s
(85 km)
(112 km)
San Vicentede Canete
EL. 340 mSocsi Intake
EL. 780 mZuniga Intake
Coastal Route Main Feature
Tunnels
Pipes
D=3.0 m
D=1.80 m
Sub-Total
6.0 km
139.0 km
145.0 km
D=2.0 m
D=1.60 m
D=2.8 m
Channel
Tunnel
Siphon
Pipe
Pipe
Drop
Total
70.5 km
29.3 km
19.5 km
30.4 km
19.5 km
2.8 km
172.0 km
Can
ete
Riv
er
Om
as R
iver
Hal
a R
iver
Chil
ca R
iver
PACIFIC OCEAN
LIMA
Q=5 m3/s
D=3.0 m
(146 km)
D=1.60 m
D=2.8 m
Channel
Tunnel
Siphon
Pipe
Drop
Total
125.0 km
18.0 km
8.0 km
53.0 km
2.0 km
206.0 km
Q=5 m3/s
D=3.0 m
Mountain Route-2 Main FeatureMountain Route-1 Main Feature
System
Dia
gra
m fo
r Water C
on
vey
an
ce
Altern
ativ
e Water C
on
vey
an
ce Rou
te
STU
DY
ON
INT
EG
RA
TE
D W
AT
ER
RE
SOU
RC
ES D
EV
EL
OPM
EN
TIN
TH
E C
AN
ET
E R
IVE
R B
ASIN
IN T
HE
RE
PUB
LIC
OF PE
RU
JAPA
N IN
TE
RN
AT
ION
AL
CO
OPE
RA
TIO
N A
GE
NC
Y
Fig
ure 1
.10
Recommended