5

open_jicareport.jica.go.jpopen_jicareport.jica.go.jp/pdf/11679578_30.pdf · 145.0 km D=2.0 m D=1.60 m D=2.8 m Channel Tunnel Siphon Pipe Pipe Drop Total 70.5 km ... 206.0 km Q=5 m3/s

  • Upload
    phamnhi

  • View
    218

  • Download
    0

Embed Size (px)

Citation preview

Page 1: open_jicareport.jica.go.jpopen_jicareport.jica.go.jp/pdf/11679578_30.pdf · 145.0 km D=2.0 m D=1.60 m D=2.8 m Channel Tunnel Siphon Pipe Pipe Drop Total 70.5 km ... 206.0 km Q=5 m3/s
Page 2: open_jicareport.jica.go.jpopen_jicareport.jica.go.jp/pdf/11679578_30.pdf · 145.0 km D=2.0 m D=1.60 m D=2.8 m Channel Tunnel Siphon Pipe Pipe Drop Total 70.5 km ... 206.0 km Q=5 m3/s
Page 3: open_jicareport.jica.go.jpopen_jicareport.jica.go.jp/pdf/11679578_30.pdf · 145.0 km D=2.0 m D=1.60 m D=2.8 m Channel Tunnel Siphon Pipe Pipe Drop Total 70.5 km ... 206.0 km Q=5 m3/s
Page 4: open_jicareport.jica.go.jpopen_jicareport.jica.go.jp/pdf/11679578_30.pdf · 145.0 km D=2.0 m D=1.60 m D=2.8 m Channel Tunnel Siphon Pipe Pipe Drop Total 70.5 km ... 206.0 km Q=5 m3/s

PP

EL. 200m

Lurin Water Treatweut Plant

206 km(60 km)

EL. 275 m

EL. 165 m

H = 110 mQ = 5 m3/s

(85 km)

(112 km)

San Vicentede Canete

EL. 340 mSocsi Intake

EL. 780 mZuniga Intake

Coastal Route Main Feature

Tunnels

Pipes

D=3.0 m

D=1.80 m

Sub-Total

6.0 km

139.0 km

145.0 km

D=2.0 m

D=1.60 m

D=2.8 m

Channel

Tunnel

Siphon

Pipe

Pipe

Drop

Total

70.5 km

29.3 km

19.5 km

30.4 km

19.5 km

2.8 km

172.0 km

Can

ete

Riv

er

Om

as R

iver

Hal

a R

iver

Chil

ca R

iver

PACIFIC OCEAN

LIMA

Q=5 m3/s

D=3.0 m

(146 km)

D=1.60 m

D=2.8 m

Channel

Tunnel

Siphon

Pipe

Drop

Total

125.0 km

18.0 km

8.0 km

53.0 km

2.0 km

206.0 km

Q=5 m3/s

D=3.0 m

Mountain Route-2 Main FeatureMountain Route-1 Main Feature

System

Dia

gra

m fo

r Water C

on

vey

an

ce

Altern

ativ

e Water C

on

vey

an

ce Rou

te

STU

DY

ON

INT

EG

RA

TE

D W

AT

ER

RE

SOU

RC

ES D

EV

EL

OPM

EN

TIN

TH

E C

AN

ET

E R

IVE

R B

ASIN

IN T

HE

RE

PUB

LIC

OF PE

RU

JAPA

N IN

TE

RN

AT

ION

AL

CO

OPE

RA

TIO

N A

GE

NC

Y

Fig

ure 1

.10

Page 5: open_jicareport.jica.go.jpopen_jicareport.jica.go.jp/pdf/11679578_30.pdf · 145.0 km D=2.0 m D=1.60 m D=2.8 m Channel Tunnel Siphon Pipe Pipe Drop Total 70.5 km ... 206.0 km Q=5 m3/s