View
457
Download
4
Category
Tags:
Preview:
Citation preview
1
PRODUCING AND EXPLORING
INDABA – FEBRUARY 2013
2
CAUTIONARY STATEMENT This presentation contains forward looking information, within the meaning of applicable Canadian securities legislation, and forward looking statements, within the meaning of applicable United States securities legislation, which reflects management’s expectations regarding Teranga Gold Corporation’s (“Teranga” or the “Company”) future growth, results of operations (including, without limitation, future production and capital expenditures), performance (both operational and financial) and business prospects (including the timing and development of new deposits and the success of exploration activities) and opportunities. Wherever possible, words such as “plans”, “expects”, “does not expect”, “budget”, “scheduled”, “estimates”, “forecasts”, “anticipate” or “does not anticipate”, “believe”, “intend” and similar expressions or statements that certain actions, events or results “may”, “could”, “would”, “might” or “will” be taken, occur or be achieved, have been used to identify such forward looking information. Although the forward looking information contained in this presentation reflect management’s current beliefs based upon information currently available to management and based upon what management believes to be reasonable assumptions, Teranga cannot be certain that actual results will be consistent with such forward looking information. A number of factors could cause actual results, performance or achievements to differ materially from the results expressed or implied in the forward looking information, including those listed in the “Risk Factors” section of Teranga’s Annual Information Form, dated March 28, 2012 (the “AIF”). These factors should be considered carefully and prospective investors should not place undue reliance on the forward looking information. Forward looking information necessarily involves significant known and unknown risks, assumptions and uncertainties that may cause Teranga’s actual results, performance, prospects and opportunities in future periods to differ materially from those expressed or implied by such forward looking information. Although Teranga has attempted to identify important risks and factors that could cause actual actions, events or results to differ materially from those described in the forward looking information, there may be other factors and risks that cause actions, events or results not to be as anticipated, estimated or intended. There can be no assurance that the forward looking information will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, prospective investors should not place undue reliance on such forward looking information. Teranga expressly disclaims any intention or obligation to update or revise any forward looking statements, whether as a result of new information, future events or otherwise, except in accordance with applicable securities law. Forward looking information and other information contained herein concerning mineral exploration and management’s general expectations concerning the mineral exploration industry are based on estimates prepared by management using data from publicly available industry sources as well as from market research and industry analysis and on assumptions based on data and knowledge of this industry which management believes to be reasonable. However, this data is inherently imprecise, although generally indicative of relative market positions, market shares and performance characteristics. While management is not aware of any misstatements regarding any industry data presented herein, mineral exploration involves risks and uncertainties and industry data is subject to change based on various factors. In addition, please note that statements relating to “reserves” or “resources” are deemed to be forward looking information as they involve the implied assessment, based on certain estimates and assumptions, that the resources and reserves described can be profitably mined in the future. While management has confidence in its projections based on exploration work done to date, the potential quantity and grade disclosed herein is conceptual in nature, and there has been insufficient exploration to define a mineral resource, therefore it is uncertain if further exploration will result in the targets being delineated as a mineral resource. This presentation does not constitute in any way an offer or invitation to subscribe for securities in Teranga pursuant to the Corporations Act 2001 (Cth) and has not been lodged with the Australian Securities and Investment Commission.
3
Ticker symbol: TGZ: TSX/ASX
Shares outstanding(1): 245.6M
Stock options outstanding: 17.1M
Share price (as at Jan. 25, 2013): C$2.31
Market capitalization (as at Jan. 25, 2013): C$567M
Cash position(2): US$45.0M
Project finance outstanding(3) US$60M
Mining fleet loan facility(4): Hedge balance (as at Jan. 29, 2013):
US$10.5M 38,105oz.
(1) As part of the demerger Mineral Deposits Ltd. retained 40M TGZ shares and received C$50M from the IPO proceeds
(2) Includes cash, cash equivalents and $5.3M bullion receivable as at December 31, 2012. Numbers unaudited. (3) 2-Year Project Finance Facility with Macquarie Bank – repaid on or before June 30, 2014 (4) Outstanding under the mining fleet finance loan facility with Société Générale as at December 31, 2012
FOCUSED ON GROWTH THROUGH:
GROWING RESERVES
GROWING PRODUCTION
FINANCIAL STRENGTH
CAPITALIZATION SUMMARY
4
OUR VISION
To become a preeminent gold producer in West Africa while setting the benchmark for responsible mining in Senegal Phase 1: Become a mid-tier gold producer in Senegal with 250,000 to 350,000 oz. of annual gold production leveraging off existing infrastructure
• 2011 production of 131,461oz. • 2012 production of 214,310oz. at cash costs of $627/oz. • 2013 forecast production of 190,000 – 210,000oz. at cash costs of $650-$700/oz.
Phase 2: Increase annual gold production to 400,000 to 500,000 oz. with mill expansion as reserves increase
5
SABODALA IS SENEGAL’S ONLY LARGE-SCALE GOLD MINE Population of ~12.8M
Democratic Government
• Smooth process and power transition in 2012 elections • Peaceful democracy since independence from France in 1960 • Use of the eight-country West African CFA France currency fully
guaranteed by the French treasury and pegged to the Euro (WAEMU) • Sabodala is the only large-scale gold mine in Senegal
Government has vested interest in Sabodala’s success given: • 10% free-carried interest • 3% gross production royalty • 25% income tax (after tax holiday expires in 2015) • Employment and regional development opportunities
Sovereign Long Term Credit Ratings
• One of only seven African countries rated by Moody’s and S&P • Moody’s: B1 • S&P: B+
6
TERANGA IS MINING RESPONSIBLY AND SHARING THE BENEFITS
• Corporate Social Responsibility is fundamental to the success
of our business
• Health, safety, education and sustainability are all priorities
• Developing schools, health clinics, and improving access to potable water
• Have engaged a renowned Canadian group to assist in putting together a comprehensive Regional Development Plan in partnership with the local, regional, and national government
• Committed to improving the livelihoods of those in the
communities in which we operate
• A key component of our vision is to set the benchmark for responsible mining in Senegal
7
SABODALA GOLD OPERATION IS PRODUCING CONSISTANTLY Gold Production Since 2009
• First gold pour in March ‘09 with over $500M invested to date
Well Developed Infrastructure • Located 650 km east of the capital Dakar and ~100 km north
of the town Kedougou – paved road within 56 km of mine site • 36 MW heavy fuel oil power plant located on site
Completed Mill Expansion
• New ball mill and downstream plant, secondary crusher and new stockpile/reclaim facility commissioned
• Expands annual production base to ~200,000 oz. • Mill capacity increases to ~3.5Mtpa of fresh (hard) ore or
~6Mtpa of oxide (soft) ore
Modest Incremental Sustaining Capital Going Forward • US$125M – $150M LOM
• Includes Gora, community relocations, further mobile equipment expenditure and pit delineation
8
2012 ANNUAL GUIDANCE MET WITH RECORD PRODUCTION & PROFITS Increased Gold Production
• FY‘12 214,310oz. – Company record and 63% higher than calendar year 2011 and within guidance
Reduced Total Cash Costs
• FY‘12 cash costs of $627/oz. – 20% lower than calendar year 2011 and within guidance
Reduced Gold Hedge Book
• Gold hedges reduced to 38,105oz. as at Jan. 29, 2013 • Expect position to be fully extinguished by Aug’13
Increased Cash and Cash Equivalents(1)
• $45.0M at FYE’12 as compared to $24.6M at FYE’11
(1) Includes cash, cash equivalents and $5.3M bullion receivable (unaudited).
9
CONTINUING TO STRENGTHEN THE ASSET BASE AND THE TEAM Capital Expenditure
• 2012 - $83M including mill expansion and ML exploration • 2013 - $25M-$35M planned Capex in addition to $45M -
$50M for Gora development • Capitalized deferred stripping - $35M - $40M
Larger Gold Inventory Base • Sabodala: M&I increased to 2.09 Moz. • Gora: M&I increased to 0.37 Moz. at 5.0gpt • Niakafiri: M&I increased to 0.39 Moz. • Mine Licence: Total inferred resources rose to 1.48Moz.
Added Depth to Management Team in Q4‘12 • Mark English: VP, Sabodala Gold Operations • Paul Chawrun: VP, Technical Services • Navin Dyal: VP & CFO
10
Open Pit • 26km from mill • Technical Study and ESIA complete –
initiating permitting Q1’13 • M&I of 374,000 oz. at 5.0gpt • Proven & Probable reserves of 285,000oz. at
4.2gpt. (2.1M tonnes of ore) • Estimated 4 year mine life • Stripping ratio of 19:1
Economics • Capital cost est. $45M-$50M • Est. total cash cost to average $675-$700/oz. • NPV (5%) at $1500/oz. of $105 million • IRR 69%
MOST ADVANCED SATELLITE DEPOSIT - GORA
Source – Typical section of Gora looking South West, 2012.
11
-
50,000
100,000
150,000
200,000
250,000
300,000
2011 2012 2013 2014 2015
Production Profile ('000oz.)(1)
Gora Production ML Production
FOCUSED ON GROWING PRODUCTION AND CASH MARGINS
(1) Assumes increased production from regional exploration success (2) Assumes $1600/oz. gold price and cash cost of $675/oz. after the elimination of the gold hedge position
Rate of margin expansion is a function of increasing production through regional exploration success * After eliminating hedge position
• 2012 Production Results: 214,310oz. at cash costs of $627/oz. • Jan. 29th, 2013 hedge position 38,105oz., management expects to be hedge free Aug. 2013
0
200
400
600
800
1000
2011 2012 2013* 2014 2015
Cash Margin ($/oz)(2)
12
FOCUSED ON GROWING RESERVES
(1) See pages 21/22 (2) M+I Resources are inclusive of reserves (3) Includes Sabodala, Niakafiri, Niakafiri West, Soukhoto, Diadiako, Majiva, Masato and Gora
1.59
2.87
1.67
0.00
0.50
1.00
1.50
2.00
2.50
3.00
3.50
Proven andProbable Reserves
Measured andIndicated
Resources
Inferred Resources
Moz
.
Reserves and Resources(1,2,3)
December 31, 2012
13
2013 Exploration Program(1)
Mine Licence Exploration (ML) $5-10M 13,000m RAB 32,400m RC 13,100m DD Regional Exploration (RLP) $10-15M 82,000m RAB 32,600m RC 14,500m DD
TOTAL ~$20M 2012 Exploration Program(2) Mine Licence Exploration $26M 104,400m (RC/DD)
Regional Exploration(3) $20M 62,500 RAB 42,300 RC 2,400 DD
TOTAL $46M
FOCUSED ON GROWING RESERVES
(1) Additional funding allocated on a priority basis for prospects with clear potential for reserve definition (2) Full drill results are posted at terangagold.com (3) Includes ~$3M for Gora exploration
14
Mine Licence Exploration (ML) Regional Land Package (RLP)
33km2 1,200km2
MINE LICENCE MAKES UP ~3% OF TERANGA’S TOTAL LAND PACKAGE
15
SABODALA PIT – MAIN FLAT EXTENSION /
LOWER FLAT ZONE
SAMBAYA HILL
DINKOKHONO
• Potential to expand gold inventory on ML with the objective of increasing mine life to the year 2020/25
POTENTIAL TO EXPAND THE ML GOLD MINERALIZATION INVENTORY
NIAKAFIRI / NIAKAFIRI WEST / SOUKHOTO
SUTUBA
33km2
16
SAIENSOUTOU
NINYENKO / SORETO
DIABOUGOU
TOUROKHOTO (Main and Marougou)
1,200km2
35km from Mill
PROPERTIES IN VARYING STAGES OF ASSESSMENT WITHIN RLP
GOUMBOU GAMBA
GORA
17
FOCUS IS ON CONTINUED GROWTH Focused on Growing Reserves
• To secure a reserve life to year 2020/25 • Growth through exploration • Growth through regional opportunities (JV’s, acquisitions)
Focused on Growing Production
• Phase 1: 250,000 – 350,000oz. annual production by leveraging existing mill and land package
• Phase 2: 400,000 – 500,000oz. annual production, will require another mill expansion
Focused on Building Financial Strength
• Eliminating hedge book • Expanding cash margins • Increasing cash balance • Use free cash flow to self-fund growth strategy • Focusing on the ounces that provide the best returns • Increase earning and cash flow per share (minimize dilution)
18
APPENDICES
19
OPERATING STATISTICS
(1) Gold produced includes change in gold in circuit inventory plus gold recovered during the period. (2) Total cash costs per ounce sold for 2011 were restated to comply with the Company’s new accounting policy for measuring and recording ore stockpile costs, as well as reporting total cash costs after inventory movement, in line with the Company’s accounting policies and industry standards.
Dec-12 Sep-12 Jun-12 Mar-12 Dec-11Quarter Quarter Quarter Quarter Quarter
Ore mined (‘000t) 2,038 655 2,105 1,117 1,715Waste mined (‘000t) 5,274 6,242 5,130 6,316 4,736Total mined (‘000t) 7,312 6,897 7,235 7,433 6,451Grade mined (g/t) 2.04 1.92 2.25 1.38 1.50Ounces mined (oz) 133,549 40,516 152,603 49,517 82,710Strip ratio w aste/ore 2.6 9.5 2.4 5.7 2.8Ore processed (‘000t) 725 650 491 573 604Head grade (g/t) 3.40 3.11 3.22 2.52 2.10Gold recovery (%) 90.7 84.6 89.6 90.0 89.8Gold produced(1) (oz) 71,804 55,107 45,495 41,904 36,695Gold sold (oz) 71,604 62,439 38,503 35,268 34,665Average price received $/oz 1,296 1,290 1,608 1,712 1,482Total cash costs per ounce sold (including royalties) (2) $/oz 623 594 645 673 809
20
2013 GUIDANCE
2012Actuals
Operating results Ore mined (‘000t) 5,915 4,000 - 4,500Waste mined (‘000t) 22,962 31,000 - 32,000Total mined (‘000t) 28,877 35,000 - 36,500Grade mined (g/t) 1.98 1.40 - 1.60Strip ratio w aste/ore 3.9 7.00 - 7.75Ore milled (‘000t) 2,439 3,300 - 3,400Head grade (g/t) 3.08 2.00 - 2.15Recovery rate % 88.7 89.0 - 91.0
Gold produced (oz) 214,310 190,000 - 210,000Gold sold (oz) 207,814 190,000 - 210,000
Total cash cost (incl. royalties)(1)(2) $/oz sold 627 650 - 700
Mining (cost/t mined) 2.71 2.50 - 2.70Milling (cost/t milled) 20.39 19.00 - 20.00G&A (cost/t milled) 6.16 5.00 - 6.00
Capital ExpendituresMine site $ millions 20.00 - 25.00 Capitalized reserve development $ millions 5.00 - 10.00 Gora development costs $ millions 45.00 - 50.00
Mobile equipment $ millions 30.00 - 35.00 Site development $ millions 15.00 - 20.00
Capitalized deferred stripping(2) $ millions 35.00 - 40.00
Exploration (expensed) $ millions 10.00 - 15.00
Administration expense $ millions 15.00 - 20.00
Hedge deliveries (oz)
59,789
Guidance Range2013
Year ending December 31,
(1) Total cash cost per ounce is a non-IFRS financial measure with no standard meaning under IFRS (2) For 2013, reflects impact of new IFRS standard for deferred stripping
• Mining and processing more tonnes at lower grade to maintain ~200,000oz. Production
• Gross costs have increased but unit
costs are expected to decline
21
RESOURCE ESTIMATES – YE 2012
Deposit
Measured Indicated Measured and Indicated
Tonnes Grade Au Tonnes Grade Au Tonnes Grade Au
(Mt) (g/t) (Moz) (Mt) (g/t) (Moz) (Mt) (g/t) (Moz)
Sabodala 28.06 1.24 1.12 31.47 0.96 0.97 59.53 1.09 2.09
Sutuba - - - 0.50 1.27 0.02 0.50 1.27 0.02
Niakafiri 0.30 1.74 0.02 10.50 1.10 0.37 10.70 1.12 0.39
Gora 0.49 5.27 0.08 1.84 4.93 0.29 2.32 5.00 0.37
Total 28.85 1.32 1.22 44.31 1.16 1.65 73.05 1.22 2.87
Area Inferred
Tonnes Grade Au
(Mt) g/t (Moz)
Sabodala 12.36 0.87 0.35 Niakifiri 7.20 0.88 0.21 Niakifiri West 7.10 0.82 0.19 Soukhoto 0.60 1.32 0.02 Gora 0.21 3.38 0.02 Diadiako 2.90 1.27 0.12 Majiva 2.60 0.64 0.05 Masato 19.18 1.15 0.71 Total 52.15 1.00 1.67
Note: Please see page 26 for Competent Persons Statement relating to this reserves estimate.
22
RESERVE ESTIMATES – YE 2012
Deposit
Proven Probable Proven and Probable
Tonnes Grade Au Tonnes Grade Au Tonnes Grade Au
(Mt) (g/t) (Moz) (Mt) (g/t) (Moz) (Mt) (g/t) (Moz)
Sabodala 6.55 1.5 0.315 11.07 1.24 0.443 17.62 1.34 0.758
Sutuba - - - 0.37 1.4 0.017 0.37 1.40 0.017
Niakafiri 0.23 1.69 0.013 7.58 1.12 0.274 7.81 1.14 0.287
Gora 0.57 4.07 0.074 1.53 4.27 0.21 2.1 4.22 0.284
Stockpiles 7.32 1.02 0.24 - - - 7.32 1.02 0.24
Total 14.67 1.36 0.642 20.56 1.43 0.944 35.23 1.40 1.586
Note: Please see page 26 for Competent Persons Statement relating to this reserves estimate.
23
2013 PLANNED MINE LICENCE EXPLORATION PROGRAM Target RAB
(metres) RC
(metres) DD
(metres) Sabodala Pit 3,000 9,000 1,500
Niakafiri - 1,500 2,800
Niakafiri West 5,000 5,000 3,000
Niakafiri East - 1,000 -
Dinkokhono - 6,600 -
Dinkokhono North - 800 800
Sutuba South - 2,000 1,000
Masato North - 1,500 -
Sambaya Hill - 2,500 2,500
Soukhoto 5,000 2,500 1,500
24
2013 PLANNED REGIONAL EXPLORATION PROGRAM Target
RAB (metres)
RC (metres)
DD (metres)
Goumbou gamba 6,000 3,600 1,200
Diabougou 16,000 5,000 2,000
Soreto North 22,000 3,000 2,000
Soreto 9,500 4,000 6,300
Ninyenko 5,500 3,000 2,000
Saiensoutou East 15,000 7,500 -
Tourokhoto Main 8,000 2,500 -
Tourokhoto Marougou - 4,000 1,000
25
Alan R. Hill Executive Chairman
• Mining engineer with over 20 years experience globally in project evaluations, acquisitions and mine development as Executive VP of Barrick Gold
• Currently a Director of Gold Fields • Former President and CEO of Gabriel Resources (2005 – 2009) and non-Executive Chairman of Alamos Gold
(2004 – 2007)
Richard S. Young President & CEO
• Over 10 years experience in mining finance, development, corporate development, and investor relations with Barrick Gold
• Former VP and CFO of Gabriel Resources (2005 – 2010)
Mark English VP, Sabodala Operations
• Over 24 years experience in the gold mining industry • Previously worked for several companies in Australia, East and West Africa being involved in operating mines and
development, inclusive of greenfield start-ups • Joined Mineral Deposits Ltd. in June 2006
Paul Chawrun VP, Technical Services
• Mining Engineer and geologist with over 24 years experience • Former EVP Corporate Development for Chieftain Metals • Former Director, Technical Services Detour Gold
Navin Dyal VP & CFO
• Over 13 years in finance, most recently 7 years with Barrick Gold (2005 - 2012) • Former Director of Finance, Global Copper Business Unit – Barrick Gold • Chartered Accountant – Four years at major public accounting firm
David Savarie VP, General Counsel & Corporate Secretary
• Over 10 years experience in the legal industry • Former Deputy General Counsel and Corporate Secretary of Gabriel Resources • Previously in private practice at Miller Thomson LLP
Kathy Sipos VP, Investor & Stakeholder Relations
• 10 years experience in Corporate Communications and Investor Relations with Barrick Gold (1996 – 2006) • Former VP of Corporate Communications and Investor Relations of Gabriel Resources (2006 – 2009)
Macoumba Diop General Manager & Government Relations Manager
• Geological Engineer, Master of Science in Finance with over 12 years experience in mining industry • Previously spent 11 years in a consulting business and mineral project marketing and development • Joined SGO in July 2011.
MANAGEMENT
26
COMPETENT PERSONS STATEMENT Julia Martin, P.Eng., MAusIMM (CP), with AMC Mining Consultants (Canada) Ltd., who is independent of Teranga, is a “qualified person” as defined in NI 43-101 and a “competent person” as defined in the 2004 Edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves”. Ms Martin has reviewed and accepts responsibility for the reserve estimate disclosed above. Ms Martin has consented to the inclusion of this information in the form and context in which it appears in this Quarterly Report. The technical information contained in this Quarterly Report relating to the mineral resources is based on information compiled by Ms. Patti Nakai-Lajoie, who is a member of the Association of Professional Geoscientists of Ontario. She is a Qualified Person under National Instrument 43-101 Standards of Disclosure for Mineral Projects. Ms. Nakai-Lajoie has consented to the inclusion of this information in the form and context in which it appears in this Quarterly Report. Ms.Nakai-Lajoie is a full-time employee of Teranga and not considered to be independent of Teranga. The technical information contained in this Quarterly Report relating to the regional exploration is based on information compiled by Mr. Martin Pawlitschek, who is a member of the Australian Institute of Geoscientist. He is qualified as a Competent Person as defined in the 2004 Edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves” and is a ”qualified person” as defined in NI 43-101. Mr. Pawlitschek has consented to the inclusion of this information in the form and context in which it appears in this Quarterly Report. Mr. Pawlitschek is a full-time employee of Teranga and not considered to be independent of Teranga. Generally Ms. is used in reporting, and is consistent with other sections of the document.