IBL mock-up installation. 18/03/2011. Marco Ciapetti. Actual layout in bldg 180. Building the center tower. Building the center tower. Building the center tower. Building the center tower. Shims. Shims. Shims. Shims. Adjustable feet. Adjustable feet. Adjustable feet. - PowerPoint PPT Presentation

Citation preview

IBL mock-up installation

18/03/2011

Marco Ciapetti

Actual layout in bldg 180

Building the center tower

Building the center tower

Building the center tower

Building the center tower

Shims

Shims

Shims

Shims

Adjustable feet

Adjustable feet

Adjustable feet

Heavy load rails

Heavy load rails

Heavy load rails

Special mini-van (side C)

Standard mini-vans (side C)

Long stairs

Mini-van extension

Short stairs and rot. Table rails

Folding bridges (side A)

Folding bridges (side A)

Scaffolding (side A)

Floor covers for the gap

Floor covers for the gap

Tower handrails

Tower handrails

Tower handrails

Rotation table

Pit table

IBL mock-up

IBL mock-up installed