Everest Industries Limited

- Pan India Presence

● Established in 1934. Today an Indian MNC.

● Promoted by ACC Cements initially. Presently

major stake held by erstwhile promoters of

Ambuja Cements.

● Team of 3000+ Engineers, Designers &

detailers

● Seven manufacturing facilities across India,

Eighth facility upcoming at Dahej, GUJRAT.

● Over 6000 retail points across India

● Exports to over 25 countries over 3 continents

● Engaged in the business of

manufacturing PEBs, roofing, cladding,

walls, floors & providing complete

building solutions.

PEB - Faster, Efficient construction.

Larger Spans.

Used here for : Noble Industries, Haridwar

Complete Building Solutions

From Pre-engineered steel buildings to roofing to exterior cladding to ceiling to flooring to walls

to doors.

Smart Steel Buildings - 100% customized, great

design flexibility, resistant to moisture, adverse

weather conditions, earthquakes, termites &

fire.

Used here for: Posco Group Housing, Pune

Complete Building Solutions

Fibre Cement roofing - longer life and

greater durability

Used here for: Animal Shed, Kanpur

Solid Wall Panels - maintains

the solid effect of a

conventional brick or block wall

while 10 times faster

Used here for: Conference Hall

Financials – FASTEST GROWING BUILDING SOLUTION COMPANY In INDIA

Everest has grown 4 times in past 5 years, that makes us fastest growing Steel Building Solutions provider in India

285.1

886.9

721.6

529.5

325.8

253.1229.7

680.9

1014

0.0

200.0

400.0

600.0

800.0

1000.0

1200.0

Turn Over (` in Cr ) 229.7 253.1 325.8 285.1 529.5 680.9 721.6 886.9 1014

2004-05 2005-06 2006-07 2007-08

2008-09

(July'08 -

PEB div

2009-10 2010-11 2011-12 2012-13

Complete Building Solutions

Everest Wall boards - Double the strength.

Half the construction time.

Used here for: Swissotel Hotel , Kolkata

Access Floor - Liftable floor tiles for

housing HVAC, power, voice and data

cabling under the floor

Used here for: Commercial Spaces at

Mumbai

THE EVEREST ADVANTAGE

Over 1000 Buildings

27 States

245 Cities

Over 45 million Sq. ft. covered area

Best Brands in diverse applications: Cement to Chocolate, Spark plug to Tractor, Mobile Phone to Refrigerator, Film Studio to Engg. College

What do they say :

“Our running factory building has over 200 MT of

cranes lifting capacity. And it is easily taking these

loads. The building was designed & supplied by

Everest. "

- Mr. Kaushik Biswas, GM, Mcnally Bharat Engineering

“We really appreciate Everest Team in

achieving Safe and Timely erection of our

project. Their support and efforts were commendable”

- Mr. C. Munshi, Construction Manager, Larsen & Toubro

What do they say :

“Irrespective of natural vagaries and tight schedules,

our warehouse was ready on time without any extra

cost, all thanks to the super-efficient team at Everest,

who delivered everything without any hassles.”

- Mr. Vinod Malde (M.D.), Arham Logiparc (A premier Warehousing & Industrial Park)

“ We're impressed with the great design ability

and smart engineering by Everest. Our need for

ample loading and unloading bays was well met.”

- Mr. Anil Arora, MD, MJ Logistics (A high end 3PL Service Provider)

Why they Trust us :

We Deliver ! ON TIME. EVERY Single TIME.

• Transparent and Process- driven, hence perform Consistently

• System ensures customer is kept 'within the loop

• Having executed 1000 PEBs in diverse applications, our engineers understand those

vital aspects of industry

• Entire design, manufacturing & site operations on SAP. Entire PEB project is ONE

integrated process, hence full control over schedule

• Higher resource per project in comparison to industry standards. Ensures quality

service and comfort to our customers

Why they Trust us :

Infrastructure

PEB Manufacturing Facility - Roorkee: Brand New Facility Upcoming at DAHEJ, GUJRAT

• Area - 850000 SQ.FT

• Investment US$ 25 Million

• Work Force – 1000 nos.

• Capacity -60,000 MT per annum

(expandable to 100,000 MT)

• State-of-the-art plant, with machinery

from US, Europe, China and Taiwan)

• 2 Lines for Automatic Beam welding

• 8 Roll forming Lines for Purlins & Girts

• Versatile set of CNC / Drilling /

Cutting Machines

• Entire Operations on SAP R/3.

• Plant commissioned in record time of

5 months

Everest Design & Engineering

“A Building designed better, will naturally perform better...” Highest Design Strength* in the industry in India Two Design Offices:

New Delhi Design Office

Roorkee Design Office

* Everest Design Strength is Double the strength of any other player in Industry.

Everest Design & Engineering

AISC

American Institute of steel construction: 1989

MBMA

Metal Building Manufacturer Association: 1996

AWS

American Welding Society: 2000 Edition D1.1M

IS 800

Indian Standard 800 (for Design) : 1984 & 2007

IS 801

Indian Standard 801 (for cold formed): 1975

IS 875

Indian Standard 875 (for loads application): 1987

IS 1893

Indian standard 1893 (seismic code): Part-1 (2002)

• Headed by highly qualified professional with above 20 years experience in Design & Detailing of

steel buildings.

• Highly sophisticated design software like Everest-MBS, STAAD Pro V8i, Tekla, Auto CAD &

customized programmes for connection design/ bracing design.

• Design files internally communicated on SAP leading to fast and real time processing.

• Design as per all National and International Codes

STRENGTH

74

Project Management:

Erection Services: A well placed Projects Team at various Industrial Cities / Towns/

Sites through out the country provides an all time availability for Erection services

Everest Quality

Testing on UTM

Strict Quality Control

Ultrasonic Testing

Dye Penetration Testing

• Highly qualified team for QA & QC

• Established QAP

• Fully equipped Quality Lab at Plant

• Complete traceability of material

Project Management:

Safety & Statutory Compliance: An Integral Part of Everest Projects

• Everest has SAFETY POLICY , practiced at all Sites

• All Statutory formalities met

• All planned Activities in the Erection Schedule

analyzed in advance for Safety

• Accordingly Safety Plan made. Erection Activities

proceed as per Safety Plan

• All Workers checked for Medical Fitness

• Daily Safety Talk Must

• SAFETY AUDITS taken up at various stages of project

• Safety Calendar (Green Cross) displayed

• Safety Plan guarantees PPE (Personal Protective Equipment) usage

Project Management:

SPEED ensures following:

• Seamless integration from RFQ to project handover

• Sequential supplies, as building is divided into Lots

• Material to be dispatched First, is manufactured First

• Material to be erected First, is dispatched First

• Reduces erection time and provides faster, accurate project completion

• Real Time Reporting

• Dedicated section for uploading: All project drawings retrieval anytime for any requirement

Project Management

SPEED - Everest runs on SAP R/3.

Speed has streamlined and integrated entire design, manufacturing & project management process.

Awarded SAP ACE Award 2012 as

“Best Run Implementation” by SAP India

Completion & Handing Over of Building

Moments of Pride

Everest in Limca Book of Records for fastest construction

Ansal Institute of Management & Technology, Lucknow

Everest wins CIDC award 2010- Best Professionally Managed Co.

(From L-R) Miss Jyothi Girish from Construction Industry Dev. Council (CIDC), Mr. Raghvendra Pratap from Everest,

Dr. Pronab Sen from Planning Commission and Mr.Tarun Seal from Kolkata Works, Everest

Everest wins AESA award

ESBS has also bagged AESA Beharay Rathi Award 2013 in Non Residential Category for Creation of Ecorea & Kuroda Electric India Pvt. Ltd.

Ecorea & Kuroda Electric India Pvt Ltd Pune

Everest – Excellence in Cost Management

Everest wins 9th National Award for Excellence in Cost Management -2011 by The Institute of Cost Accounts of India for Most Cost Efficiency

Everest – Certified IGBC Member

Everest Member of IGBC (India Green Building Council)

LEED certified Green Buildings

BP ERGO, Nalagarh, Himachal Pradesh

RANBAXY Ltd, Dewas, MP

Everest selected for “PEB Project of the Year “ awards

Britannia Industries Limited

Patna (Bihar), Bhubaneswar (Odisha) & Bharuch (Gujrat) Area (sq.ft.): 5,00,000

Everest selected for “PEB Project of the Year “ awards

Nirmal Wires Kolkata

Area (sq.ft.): 2,00,000

Everest selected for “PEB Project of the Year “ awards

Shri Shubham Logistics (Kalptaru Group) Rajkot, Deesa, Alwar, Jodhpur, Ramganjmandi

Area (sq.ft.): 5,64,900

Project Gallery

Logistical Unit/ Warehouse:

Location: Dewas

Area (Sq.ft) :40,000

Ranbaxy Laboratory Ltd.

Key features

• Building with Mezzanine and Flat Roofing System

• Amalgam with different areas done with Precise accuracy

• Clear Height – 50 ft

Factory Building: Honey Warehouse

Location: Baddi, Himachal Pradesh

Area (Sq.ft) : 37,000

Dabur India Ltd

Key features

• Scheduled completion: 110 days; Actual completion: 90 days

• Special building for honey warehouse

• PUF insulated

Arham Logistics

Key features

• Two Precision engineered buildings connected with well designed PEB pathway

• Innovative clear span construction

• Span -63 ft

Logistical Units/ Warehouse

Location: Bhiwandi, Mumbai

Area (Sq.ft) : 6,10,404

Logistical Units/ Warehouse

Location: Bhiwadi, Rajasthan

Area (Sq.ft) : 1,42,032

BK Tyre

Key features

• Intricate L Shaped building, with more loading and unloading docks

• One intermediate column for both buildings EMS 1

• Clear Heights 39 ft

Logistical Units/ Warehouse

Location: Alwar, Rajkot, Jodhpur, Dessa, Ramganj Mandi

Area (Sq.ft) : 5,64,900

Shree Shubham Logistics Ltd

Key features

• Jack beam provided to increase bay space by 49 ft

• IS- Standard building with heavy collateral loading

• Multiple buildings with Ridge Vents, Louvers, Doors & Insulation

Logistical Units/ Warehouse

Location: Pune / Hissar

Area (Sq.ft) : 5,00,000

Vijay Logistics Pvt Ltd

Key features

• Very large Clear Span Building

• Clear Heights 30 ft

• Highly satisfied repeat customer

Location: Jaipur, Rajasthan

Area (Sq.ft) : 1,03,296

Usage: Warehouse

Ericsson India Pvt Ltd

Key features

• Jack beam provided to increase bay space to 49 ft

• IS: Standard building with heavy collateral loads

• Multiple buildings with Louvers, Doors, Ridge Vents and Insulation

Logistical Units/ Warehouse

Location: Kolkata

Area (Sq.ft) : 5,00,000

S B Overseas

Key features

• Span of Building 72m (EMS-II)

• Intermittent Lean-to along side-walls

• Combination of ridge vents, Turbo vents & louvers for effective ventilation

Factory Building: Biscuit manufacturing

Location:Bihar ,Odisha, Gujarat

Area (Sq.ft) : 5,00,000

Britannia Industries Limited

Key features

• Multi gable with 40 m clear span

• A foolproof design for water discharge from the roof

• A repeat customer with great satisfaction level

Factory Building: Cattle Feed Manufacturing Unit

Location: Varanasi, Kanpur, Kharagpur & Kolasib (Mizoram)

Area (Sq.ft) :10,17,384

Godrej Agrovet

Key features

• 32m high process building

• Challenging speciality cladding installation

• Amalgams of intricate shaped Buildings- high bay & low bay formation

Factory Building: Tractor Manufacturing Unit

Location: Patiala

Area (Sq.ft) : 80,000

John Deere India Pvt Ltd

Key features

• Stiff requirement for heavy Dead Loads, Deflection and jack Beam

• Large building accessories like Roll-up Doors, Louvers, Windows, Insulation,

Crane maintenance Platform and Lighting Arresters

• Unique Cladding Pattern

Factory Building: Textile Factory

Location: Barnala, Punjab

Area (Sq.ft) : 3,00,000

Lotus Tech Park

Key features

• Building designed for temperature load of + /- 30 degree

• Structure arrangement for housing Air Humidifiers

• Special arrangements to protect structure from rusting due to high humidity

Factory Building: Heavy Fabrication Factory

Location: Asansol, West Bengal

Area (Sq.ft) : 1,20,000

Mcnally Bharat Engg. Co. Ltd.

Key features

• 50 MT crane in 4 spans (total 200 MT)

• Ridge height – 77 ft

• Mezzanine, Walkway, Roof monitor and other accessories

Factory Building: Electronics Parts Manufacturing Unit

Location: Pune

Area (Sq.ft) : 74,185

Ecorea & Kuroda Electric India Pvt Ltd

Key features

• Ridge vent with S-type louvers

• Curved Eaves

• EMS-I Building with 12m high & collateral service loading

Factory Building: BOPP Manufacturing Unit

Location: Kolkata

Area (Sq.ft) : 85,810

Kalpana Industries

Key features

• 78m width

• Curved Roof

• High bay- low bay with 20m & 14m respective heights

Factory Building: Factory for Valve Manufacturing

Location: Nagpur, Maharashtra

Area (Sq.ft) : 1,25,000

NSSL Limited

Key features

• Curved Roof System

• Multiple Crane and Mezzanine System (Total 71 Cranes)

• Mezzanine floor intergrated

Factory Building: Manufacturing Units for Wires

Location: Kolkata, West Bengal

Area (Sq.ft) : 1,16,380

Nirmal Wires

Key features

• Multiple Crane System with large span

• EOT 5mt x 4 nos. with crane beams

• All secondary members are pre-galvanized

Factory Building: Manufacturing for Heavy Electricals

Location: Baroda, Gujarat

Area (Sq.ft) :75,320

Jeumont Electric India Pvt Ltd

Key features

• Heavy Cranes Load design (30MT x 4 nos., 20mt x 3 nos)

• Insulated Roof and Wall Cladding System

• Height 18 m clear

Factory Building: Factory for Automobile Filters

Location: Bawal, Haryana

Area (Sq.ft) : 95,000

Mann and Hummel Filters

Key features

• Heavy collateral load with large spans

• Stringent paint requirements for fire proofing

• Gebriet Gutter System

Multistorey Building: Classrooms-Workshop- Laboratory

Location: Mumbai

Area (Sq.ft) : 30,600

IIT, Powai

Key features

• G+3 Building

• Laboratory & Office

• EVEREST: Single point building supplier (Internal & External)

Multistorey Building: Food Processing Unit

Location: Beawar, Rajasthan

Area (Sq.ft) : 1,21,923

Kaveri Hire Purchase & Deposits Pvt Ltd

Key features

• G+4 Building

• Removable floors designed for Heavy Equipment Instllation

• Over 110MT of vessel loading

Multistorey Building: Chemicals Manufacturing Unit

Location: Sholapur, Maharashtra

Area (Sq.ft) : 23,358

O. C. Specialities Pvt Ltd

Key features

• Two nos of G+2 Industrial Buildings

• Industrial Louvers all around

• Over 1T/ sqm of Floor loading

Office/ Commercial Building: Education Institute

Location: Lucknow, Uttar Pradesh

Area (Sq.ft) : 55,000

Ansal API Limited

Key features

• 55,000 sq ft building within 90 days from the date of LOI

• Smart Steel Product of 14 x 14 m2 span

• Complete with false ceiling and partitions

Office/ Commercial Building: Retail

Location: Amritsar, Meerut, Jalandhar, Raipur & Lucknow

Area (Sq.ft) : 2,50,000

Bharti Walmart

Key features

• Standing Seam Roofing and Puff panel wall Cladding System

• Precise engineering to connect with RCC buildings

• Designed to support heavy Air Conditioning and Utility Units from roof at different locations

Office/ Commercial Building: Office

Location: Roorkee, Uttarakhand

Area (Sq.ft) : 27,987

EVEREST Design Centre

Key features

• G+2 Building

• Entirely Built from EVEREST products

• Setting an Example pf Green Building Solution

Speciality Building: Production Unit for Bearing Manufacturing

Location: Dehradun, Uttarakhand

Area (Sq.ft) : 13,944

ABC Bearings

Key features

• Double skin insulation in complete building

• Curved Eaves with ACP

• Low VOC water base paint, Certified GREEN Building

Speciality Building: Lime stone Storage unit

Location: Kolar, Karnataka

Area (Sq.ft) : 67,812

ACC Ltd

Key features

• 58m clear span

• 25m clear height

• Lower slope with Higher span

Speciality Building: Factory

Location: Nalagarh, Himachal Pradesh

Area (Sq.ft) : 1,19,320

B P Ergo

Key features

• Certified Green Building

• Full area mezzanine

• 14m clear height with curved profile