65
NO COST OVERRUNS NO DELAYS NOW YOU CAN RELAX! Everest Pre Engineered Buildings

Everest Pre Engineered Buildings

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Everest Pre Engineered Buildings

NO COST OVERRUNS

NO DELAYS NOW YOU CAN RELAX!

Everest Pre Engineered Buildings

Page 2: Everest Pre Engineered Buildings

NOW YOU CAN RELAX!

Everest Pre Engineered Buildings

Page 3: Everest Pre Engineered Buildings

Everest Industries Limited

- Pan India Presence

● Established in 1934. Today an Indian MNC.

● Promoted by ACC Cements initially. Presently

major stake held by erstwhile promoters of

Ambuja Cements.

● Team of 3000+ Engineers, Designers &

detailers

● Seven manufacturing facilities across India,

Eighth facility upcoming at Dahej, GUJRAT.

● Over 6000 retail points across India

● Exports to over 25 countries over 3 continents

● Engaged in the business of

manufacturing PEBs, roofing, cladding,

walls, floors & providing complete

building solutions.

Page 4: Everest Pre Engineered Buildings

PEB - Faster, Efficient construction.

Larger Spans.

Used here for : Noble Industries, Haridwar

Complete Building Solutions

From Pre-engineered steel buildings to roofing to exterior cladding to ceiling to flooring to walls

to doors.

Smart Steel Buildings - 100% customized, great

design flexibility, resistant to moisture, adverse

weather conditions, earthquakes, termites &

fire.

Used here for: Posco Group Housing, Pune

Page 5: Everest Pre Engineered Buildings

Complete Building Solutions

Fibre Cement roofing - longer life and

greater durability

Used here for: Animal Shed, Kanpur

Solid Wall Panels - maintains

the solid effect of a

conventional brick or block wall

while 10 times faster

Used here for: Conference Hall

Page 6: Everest Pre Engineered Buildings

Financials – FASTEST GROWING BUILDING SOLUTION COMPANY In INDIA

Everest has grown 4 times in past 5 years, that makes us fastest growing Steel Building Solutions provider in India

285.1

886.9

721.6

529.5

325.8

253.1229.7

680.9

1014

0.0

200.0

400.0

600.0

800.0

1000.0

1200.0

Turn Over (` in Cr ) 229.7 253.1 325.8 285.1 529.5 680.9 721.6 886.9 1014

2004-05 2005-06 2006-07 2007-08

2008-09

(July'08 -

PEB div

2009-10 2010-11 2011-12 2012-13

Page 7: Everest Pre Engineered Buildings

Complete Building Solutions

Everest Wall boards - Double the strength.

Half the construction time.

Used here for: Swissotel Hotel , Kolkata

Access Floor - Liftable floor tiles for

housing HVAC, power, voice and data

cabling under the floor

Used here for: Commercial Spaces at

Mumbai

Page 8: Everest Pre Engineered Buildings

THE EVEREST ADVANTAGE

Page 9: Everest Pre Engineered Buildings

Over 1000 Buildings

27 States

245 Cities

Over 45 million Sq. ft. covered area

Page 10: Everest Pre Engineered Buildings

Best Brands in diverse applications: Cement to Chocolate, Spark plug to Tractor, Mobile Phone to Refrigerator, Film Studio to Engg. College

Page 11: Everest Pre Engineered Buildings

What do they say :

“Our running factory building has over 200 MT of

cranes lifting capacity. And it is easily taking these

loads. The building was designed & supplied by

Everest. "

- Mr. Kaushik Biswas, GM, Mcnally Bharat Engineering

“We really appreciate Everest Team in

achieving Safe and Timely erection of our

project. Their support and efforts were commendable”

- Mr. C. Munshi, Construction Manager, Larsen & Toubro

Page 12: Everest Pre Engineered Buildings

What do they say :

“Irrespective of natural vagaries and tight schedules,

our warehouse was ready on time without any extra

cost, all thanks to the super-efficient team at Everest,

who delivered everything without any hassles.”

- Mr. Vinod Malde (M.D.), Arham Logiparc (A premier Warehousing & Industrial Park)

“ We're impressed with the great design ability

and smart engineering by Everest. Our need for

ample loading and unloading bays was well met.”

- Mr. Anil Arora, MD, MJ Logistics (A high end 3PL Service Provider)

Page 13: Everest Pre Engineered Buildings

Why they Trust us :

We Deliver ! ON TIME. EVERY Single TIME.

• Transparent and Process- driven, hence perform Consistently

• System ensures customer is kept 'within the loop

• Having executed 1000 PEBs in diverse applications, our engineers understand those

vital aspects of industry

• Entire design, manufacturing & site operations on SAP. Entire PEB project is ONE

integrated process, hence full control over schedule

• Higher resource per project in comparison to industry standards. Ensures quality

service and comfort to our customers

Page 14: Everest Pre Engineered Buildings

Why they Trust us :

Page 15: Everest Pre Engineered Buildings

Infrastructure

Page 16: Everest Pre Engineered Buildings

PEB Manufacturing Facility - Roorkee: Brand New Facility Upcoming at DAHEJ, GUJRAT

• Area - 850000 SQ.FT

• Investment US$ 25 Million

• Work Force – 1000 nos.

• Capacity -60,000 MT per annum

(expandable to 100,000 MT)

• State-of-the-art plant, with machinery

from US, Europe, China and Taiwan)

• 2 Lines for Automatic Beam welding

• 8 Roll forming Lines for Purlins & Girts

• Versatile set of CNC / Drilling /

Cutting Machines

• Entire Operations on SAP R/3.

• Plant commissioned in record time of

5 months

Page 17: Everest Pre Engineered Buildings

Everest Design & Engineering

“A Building designed better, will naturally perform better...” Highest Design Strength* in the industry in India Two Design Offices:

New Delhi Design Office

Roorkee Design Office

* Everest Design Strength is Double the strength of any other player in Industry.

Page 18: Everest Pre Engineered Buildings

Everest Design & Engineering

AISC

American Institute of steel construction: 1989

MBMA

Metal Building Manufacturer Association: 1996

AWS

American Welding Society: 2000 Edition D1.1M

IS 800

Indian Standard 800 (for Design) : 1984 & 2007

IS 801

Indian Standard 801 (for cold formed): 1975

IS 875

Indian Standard 875 (for loads application): 1987

IS 1893

Indian standard 1893 (seismic code): Part-1 (2002)

• Headed by highly qualified professional with above 20 years experience in Design & Detailing of

steel buildings.

• Highly sophisticated design software like Everest-MBS, STAAD Pro V8i, Tekla, Auto CAD &

customized programmes for connection design/ bracing design.

• Design files internally communicated on SAP leading to fast and real time processing.

• Design as per all National and International Codes

STRENGTH

74

Page 19: Everest Pre Engineered Buildings

Project Management:

Erection Services: A well placed Projects Team at various Industrial Cities / Towns/

Sites through out the country provides an all time availability for Erection services

Page 20: Everest Pre Engineered Buildings

Everest Quality

Testing on UTM

Strict Quality Control

Ultrasonic Testing

Dye Penetration Testing

• Highly qualified team for QA & QC

• Established QAP

• Fully equipped Quality Lab at Plant

• Complete traceability of material

Page 21: Everest Pre Engineered Buildings

Project Management:

Safety & Statutory Compliance: An Integral Part of Everest Projects

• Everest has SAFETY POLICY , practiced at all Sites

• All Statutory formalities met

• All planned Activities in the Erection Schedule

analyzed in advance for Safety

• Accordingly Safety Plan made. Erection Activities

proceed as per Safety Plan

• All Workers checked for Medical Fitness

• Daily Safety Talk Must

• SAFETY AUDITS taken up at various stages of project

• Safety Calendar (Green Cross) displayed

• Safety Plan guarantees PPE (Personal Protective Equipment) usage

Page 22: Everest Pre Engineered Buildings

Project Management:

SPEED ensures following:

• Seamless integration from RFQ to project handover

• Sequential supplies, as building is divided into Lots

• Material to be dispatched First, is manufactured First

• Material to be erected First, is dispatched First

• Reduces erection time and provides faster, accurate project completion

• Real Time Reporting

• Dedicated section for uploading: All project drawings retrieval anytime for any requirement

Page 23: Everest Pre Engineered Buildings

Project Management

SPEED - Everest runs on SAP R/3.

Speed has streamlined and integrated entire design, manufacturing & project management process.

Awarded SAP ACE Award 2012 as

“Best Run Implementation” by SAP India

Page 24: Everest Pre Engineered Buildings

Completion & Handing Over of Building

Page 25: Everest Pre Engineered Buildings

Moments of Pride

Page 26: Everest Pre Engineered Buildings

Everest in Limca Book of Records for fastest construction

Ansal Institute of Management & Technology, Lucknow

Page 27: Everest Pre Engineered Buildings

Everest wins CIDC award 2010- Best Professionally Managed Co.

(From L-R) Miss Jyothi Girish from Construction Industry Dev. Council (CIDC), Mr. Raghvendra Pratap from Everest,

Dr. Pronab Sen from Planning Commission and Mr.Tarun Seal from Kolkata Works, Everest

Page 28: Everest Pre Engineered Buildings

Everest wins AESA award

ESBS has also bagged AESA Beharay Rathi Award 2013 in Non Residential Category for Creation of Ecorea & Kuroda Electric India Pvt. Ltd.

Ecorea & Kuroda Electric India Pvt Ltd Pune

Page 29: Everest Pre Engineered Buildings

Everest – Excellence in Cost Management

Everest wins 9th National Award for Excellence in Cost Management -2011 by The Institute of Cost Accounts of India for Most Cost Efficiency

Page 30: Everest Pre Engineered Buildings

Everest – Certified IGBC Member

Everest Member of IGBC (India Green Building Council)

Page 31: Everest Pre Engineered Buildings

LEED certified Green Buildings

BP ERGO, Nalagarh, Himachal Pradesh

RANBAXY Ltd, Dewas, MP

Page 32: Everest Pre Engineered Buildings

Everest selected for “PEB Project of the Year “ awards

Britannia Industries Limited

Patna (Bihar), Bhubaneswar (Odisha) & Bharuch (Gujrat) Area (sq.ft.): 5,00,000

Page 33: Everest Pre Engineered Buildings

Everest selected for “PEB Project of the Year “ awards

Nirmal Wires Kolkata

Area (sq.ft.): 2,00,000

Page 34: Everest Pre Engineered Buildings

Everest selected for “PEB Project of the Year “ awards

Shri Shubham Logistics (Kalptaru Group) Rajkot, Deesa, Alwar, Jodhpur, Ramganjmandi

Area (sq.ft.): 5,64,900

Page 36: Everest Pre Engineered Buildings

Project Gallery

Page 37: Everest Pre Engineered Buildings

Logistical Unit/ Warehouse:

Location: Dewas

Area (Sq.ft) :40,000

Ranbaxy Laboratory Ltd.

Key features

• Building with Mezzanine and Flat Roofing System

• Amalgam with different areas done with Precise accuracy

• Clear Height – 50 ft

Page 38: Everest Pre Engineered Buildings

Factory Building: Honey Warehouse

Location: Baddi, Himachal Pradesh

Area (Sq.ft) : 37,000

Dabur India Ltd

Key features

• Scheduled completion: 110 days; Actual completion: 90 days

• Special building for honey warehouse

• PUF insulated

Page 39: Everest Pre Engineered Buildings

Arham Logistics

Key features

• Two Precision engineered buildings connected with well designed PEB pathway

• Innovative clear span construction

• Span -63 ft

Logistical Units/ Warehouse

Location: Bhiwandi, Mumbai

Area (Sq.ft) : 6,10,404

Page 40: Everest Pre Engineered Buildings

Logistical Units/ Warehouse

Location: Bhiwadi, Rajasthan

Area (Sq.ft) : 1,42,032

BK Tyre

Key features

• Intricate L Shaped building, with more loading and unloading docks

• One intermediate column for both buildings EMS 1

• Clear Heights 39 ft

Page 41: Everest Pre Engineered Buildings

Logistical Units/ Warehouse

Location: Alwar, Rajkot, Jodhpur, Dessa, Ramganj Mandi

Area (Sq.ft) : 5,64,900

Shree Shubham Logistics Ltd

Key features

• Jack beam provided to increase bay space by 49 ft

• IS- Standard building with heavy collateral loading

• Multiple buildings with Ridge Vents, Louvers, Doors & Insulation

Page 42: Everest Pre Engineered Buildings

Logistical Units/ Warehouse

Location: Pune / Hissar

Area (Sq.ft) : 5,00,000

Vijay Logistics Pvt Ltd

Key features

• Very large Clear Span Building

• Clear Heights 30 ft

• Highly satisfied repeat customer

Page 43: Everest Pre Engineered Buildings

Location: Jaipur, Rajasthan

Area (Sq.ft) : 1,03,296

Usage: Warehouse

Ericsson India Pvt Ltd

Key features

• Jack beam provided to increase bay space to 49 ft

• IS: Standard building with heavy collateral loads

• Multiple buildings with Louvers, Doors, Ridge Vents and Insulation

Page 44: Everest Pre Engineered Buildings

Logistical Units/ Warehouse

Location: Kolkata

Area (Sq.ft) : 5,00,000

S B Overseas

Key features

• Span of Building 72m (EMS-II)

• Intermittent Lean-to along side-walls

• Combination of ridge vents, Turbo vents & louvers for effective ventilation

Page 45: Everest Pre Engineered Buildings

Factory Building: Biscuit manufacturing

Location:Bihar ,Odisha, Gujarat

Area (Sq.ft) : 5,00,000

Britannia Industries Limited

Key features

• Multi gable with 40 m clear span

• A foolproof design for water discharge from the roof

• A repeat customer with great satisfaction level

Page 46: Everest Pre Engineered Buildings

Factory Building: Cattle Feed Manufacturing Unit

Location: Varanasi, Kanpur, Kharagpur & Kolasib (Mizoram)

Area (Sq.ft) :10,17,384

Godrej Agrovet

Key features

• 32m high process building

• Challenging speciality cladding installation

• Amalgams of intricate shaped Buildings- high bay & low bay formation

Page 47: Everest Pre Engineered Buildings

Factory Building: Tractor Manufacturing Unit

Location: Patiala

Area (Sq.ft) : 80,000

John Deere India Pvt Ltd

Key features

• Stiff requirement for heavy Dead Loads, Deflection and jack Beam

• Large building accessories like Roll-up Doors, Louvers, Windows, Insulation,

Crane maintenance Platform and Lighting Arresters

• Unique Cladding Pattern

Page 48: Everest Pre Engineered Buildings

Factory Building: Textile Factory

Location: Barnala, Punjab

Area (Sq.ft) : 3,00,000

Lotus Tech Park

Key features

• Building designed for temperature load of + /- 30 degree

• Structure arrangement for housing Air Humidifiers

• Special arrangements to protect structure from rusting due to high humidity

Page 49: Everest Pre Engineered Buildings

Factory Building: Heavy Fabrication Factory

Location: Asansol, West Bengal

Area (Sq.ft) : 1,20,000

Mcnally Bharat Engg. Co. Ltd.

Key features

• 50 MT crane in 4 spans (total 200 MT)

• Ridge height – 77 ft

• Mezzanine, Walkway, Roof monitor and other accessories

Page 50: Everest Pre Engineered Buildings

Factory Building: Electronics Parts Manufacturing Unit

Location: Pune

Area (Sq.ft) : 74,185

Ecorea & Kuroda Electric India Pvt Ltd

Key features

• Ridge vent with S-type louvers

• Curved Eaves

• EMS-I Building with 12m high & collateral service loading

Page 51: Everest Pre Engineered Buildings

Factory Building: BOPP Manufacturing Unit

Location: Kolkata

Area (Sq.ft) : 85,810

Kalpana Industries

Key features

• 78m width

• Curved Roof

• High bay- low bay with 20m & 14m respective heights

Page 52: Everest Pre Engineered Buildings

Factory Building: Factory for Valve Manufacturing

Location: Nagpur, Maharashtra

Area (Sq.ft) : 1,25,000

NSSL Limited

Key features

• Curved Roof System

• Multiple Crane and Mezzanine System (Total 71 Cranes)

• Mezzanine floor intergrated

Page 53: Everest Pre Engineered Buildings

Factory Building: Manufacturing Units for Wires

Location: Kolkata, West Bengal

Area (Sq.ft) : 1,16,380

Nirmal Wires

Key features

• Multiple Crane System with large span

• EOT 5mt x 4 nos. with crane beams

• All secondary members are pre-galvanized

Page 54: Everest Pre Engineered Buildings

Factory Building: Manufacturing for Heavy Electricals

Location: Baroda, Gujarat

Area (Sq.ft) :75,320

Jeumont Electric India Pvt Ltd

Key features

• Heavy Cranes Load design (30MT x 4 nos., 20mt x 3 nos)

• Insulated Roof and Wall Cladding System

• Height 18 m clear

Page 55: Everest Pre Engineered Buildings

Factory Building: Factory for Automobile Filters

Location: Bawal, Haryana

Area (Sq.ft) : 95,000

Mann and Hummel Filters

Key features

• Heavy collateral load with large spans

• Stringent paint requirements for fire proofing

• Gebriet Gutter System

Page 56: Everest Pre Engineered Buildings

Multistorey Building: Classrooms-Workshop- Laboratory

Location: Mumbai

Area (Sq.ft) : 30,600

IIT, Powai

Key features

• G+3 Building

• Laboratory & Office

• EVEREST: Single point building supplier (Internal & External)

Page 57: Everest Pre Engineered Buildings

Multistorey Building: Food Processing Unit

Location: Beawar, Rajasthan

Area (Sq.ft) : 1,21,923

Kaveri Hire Purchase & Deposits Pvt Ltd

Key features

• G+4 Building

• Removable floors designed for Heavy Equipment Instllation

• Over 110MT of vessel loading

Page 58: Everest Pre Engineered Buildings

Multistorey Building: Chemicals Manufacturing Unit

Location: Sholapur, Maharashtra

Area (Sq.ft) : 23,358

O. C. Specialities Pvt Ltd

Key features

• Two nos of G+2 Industrial Buildings

• Industrial Louvers all around

• Over 1T/ sqm of Floor loading

Page 59: Everest Pre Engineered Buildings

Office/ Commercial Building: Education Institute

Location: Lucknow, Uttar Pradesh

Area (Sq.ft) : 55,000

Ansal API Limited

Key features

• 55,000 sq ft building within 90 days from the date of LOI

• Smart Steel Product of 14 x 14 m2 span

• Complete with false ceiling and partitions

Page 60: Everest Pre Engineered Buildings

Office/ Commercial Building: Retail

Location: Amritsar, Meerut, Jalandhar, Raipur & Lucknow

Area (Sq.ft) : 2,50,000

Bharti Walmart

Key features

• Standing Seam Roofing and Puff panel wall Cladding System

• Precise engineering to connect with RCC buildings

• Designed to support heavy Air Conditioning and Utility Units from roof at different locations

Page 61: Everest Pre Engineered Buildings

Office/ Commercial Building: Office

Location: Roorkee, Uttarakhand

Area (Sq.ft) : 27,987

EVEREST Design Centre

Key features

• G+2 Building

• Entirely Built from EVEREST products

• Setting an Example pf Green Building Solution

Page 62: Everest Pre Engineered Buildings

Speciality Building: Production Unit for Bearing Manufacturing

Location: Dehradun, Uttarakhand

Area (Sq.ft) : 13,944

ABC Bearings

Key features

• Double skin insulation in complete building

• Curved Eaves with ACP

• Low VOC water base paint, Certified GREEN Building

Page 63: Everest Pre Engineered Buildings

Speciality Building: Lime stone Storage unit

Location: Kolar, Karnataka

Area (Sq.ft) : 67,812

ACC Ltd

Key features

• 58m clear span

• 25m clear height

• Lower slope with Higher span

Page 64: Everest Pre Engineered Buildings

Speciality Building: Factory

Location: Nalagarh, Himachal Pradesh

Area (Sq.ft) : 1,19,320

B P Ergo

Key features

• Certified Green Building

• Full area mezzanine

• 14m clear height with curved profile

Page 65: Everest Pre Engineered Buildings

THANKS