Adapting the city
Building & InfrastructureDavid HytchInformation Systems Director, Transport for Greater Manchester
Transport and Climate Change
• Transport in GM is responsible for 4m tons of CO2
• We recognise the problem
• Now to do something about it• Adapting
• Mitigating
• Business Continuity
Transport Adapting
Energy
• Green Sourced
• Managed
• Re-useable
Design & Build
• Educate
• BREEAM
• Materials
Transport MitigationNew and existing infrastructure
• Metrolink • 5 million fewer car journeys
• Cycling
• Walking
• Roads• Bus
• Freight
• Cars
• Rail
• Travel Planning
• Smart Ticketing
• Park & Ride
Transport Approach
• Change Behaviour
• Deliver best in class
• Carbon footprint emissions
Transport and Climate Change
Bus
- Hybrid Bus
- Cross City Bus
- Oxford Road Corridor
- LSM busway
Route
- Northern Hub
- HS2 – not speed but capacity local & regional
Transport and Climate MitigationRoad- Predictive Traffic Management
- Measurement Freight & Bus
- Incident Management
- Adaptive signal control
- Evidence:
- Eco driving 15%
- Adaptive cruise control 3-10%
- Satnav improvements 15%
- Speed management 20%
- Adaptive signalling 20%
Transport interventions
BusHybrid Bus
Cross city Bus including Oxford Road Corridor
LSM Busway
RailNorthern Hub
Electrification
HS2 – not speed but capacity
Transport Interventions
The Informed TravellerSmart ticketing
Mobile Apps
Trip Planners at home and on the move
In journey updates
Real time is too late
David Hytchdavid.hytch@tfgm.com
0161 244 1023
THANK YOU
Adapting the city