  • 7/29/2019 100th HSJV Weekly Meeting Rev 8

    1/42

    BARAKAH NUCLEAR POWER PLANT PROJECT

  • 7/29/2019 100th HSJV Weekly Meeting Rev 8

    2/42

    BARAKAH NUCLEAR POWER PLANT PROJECT

    Please Turn off your

    mobile! Or Switch to

    vibration mode!

    Check! Right Now!

  • 7/29/2019 100th HSJV Weekly Meeting Rev 8

    3/42

    BARAKAH NUCLEAR POWER PLANT PROJECT

    Dont Panic1

    Switch Off All Electrical Equipment2

    Dont Run, Walk Fast!3

    Go to the Assembly Point4

    Wait for the Final Instruction5

    SCREEN

  • 7/29/2019 100th HSJV Weekly Meeting Rev 8

    4/42

    BARAKAH NUCLEAR POWER PLANT PROJECT

    http://localhost/var/www/apps/conversion/tmp/scratch_8/Safety%20Moment%20FORM%20WORKS%20ACTIVITIES.pptxhttp://localhost/var/www/apps/conversion/tmp/scratch_8/Safety%20Moment%20FORM%20WORKS%20ACTIVITIES.pptxhttp://localhost/var/www/apps/conversion/tmp/scratch_8/Dow-Safety%20Moment%20(Working%20at%20height).pptx
  • 7/29/2019 100th HSJV Weekly Meeting Rev 8

    5/42BARAKAH NUCLEAR POWER PLANT PROJECT

    1. Previous Meeting

    2. HSE Programs

    3. HSE Statistics

    Performance per Area and Total

    4. HSE Findings Summary

    Findings analysis- cause wise,

    Company, and Area

    HSE Findings by Company

    Reported Near Miss

    Evaluation by Findings Score

    5. Weekly Inspection

    6. Medical Cases

    7. Environmental Issues

    8. Action Plans

  • 7/29/2019 100th HSJV Weekly Meeting Rev 8

    6/42

    BARAKAH NUCLEAR POWER PLANT PROJECT

  • 7/29/2019 100th HSJV Weekly Meeting Rev 8

    7/42BARAKAH NUCLEAR POWER PLANT PROJECT

    NO. ITEMS ACTION PLANSACTION

    BY

    DUE

    DATESTATUS

    1Management

    Review

    The output of last management review

    meeting is summarized and presented in

    this meeting. A detailed report will be

    submitted to KEPCO.HSJV

    10 Jan.

    2013Ongoing

    2Refresher

    Training

    HSJV will conduct an in-house training

    refreshing knowledge of first aid

    personnel, emphasizing their roles and

    procedures of administering first aid.

    HSJV

    Subcon

    8-9 Jan.

    2013

    Starts

    tomorrow

    3 Site ManagerReporting

    HSE Manager pointed out reporting of

    action plans by subcontractor attaining

    high number of HSE findings. The sitemanager of subcontractor is responsible

    to report in the meeting, substitutes are

    not acceptable.

    HSJVSubcon

    Immediate Done

  • 7/29/2019 100th HSJV Weekly Meeting Rev 8

    8/42

    BARAKAH NUCLEAR POWER PLANT PROJECT

  • 7/29/2019 100th HSJV Weekly Meeting Rev 8

    9/42BARAKAH NUCLEAR POWER PLANT PROJECT

    Date : 31 December 2012

    Time : 1630 H

    Areas of Improvement :

    Fire and Rescue Leader does majority of

    emergency communication

    Some personnel inside accommodation did not

    evacuate. Emergency alarm sounds low.

    CICPA is not informed about the drill.

    Evacuation time at assembly point is not

    measured.

    Discrepancy of head count at assembly points.

  • 7/29/2019 100th HSJV Weekly Meeting Rev 8

    10/42BARAKAH NUCLEAR POWER PLANT PROJECT

    No. Company Meeting Date No. Subcontractor Meeting Date1. Jonghap (I) 06 Jan. 2013 13. Samho 07 April 20132. Younchang (I) 13 Jan. 2013 14. Jonghap (PB) 14 April 20133. Hyundai C&I 20 Jan. 2013 15. Hwa Chon 21 April 20134. Seobon 27 Jan. 2013 16. Hanlim E&C 28 April 20135. Younchang (S) 03 Feb. 2013 17. Gusan Const. 05 May 20136. Yooa 10 Feb. 2013 18. Geumhwa PSC 12 May 20137. WBG 17 Feb. 2013 19. DOW 19 May 20138. U-Well 24 Feb. 2013 20. D&I 26 May 20139. Towers Tech 03 Mar. 2013 21. Daemyung 02 June 2013

    10. Seoyong (PB) 10 Mar. 2013 22. Al Raeel 09 June 201311. Seil M.I.C 17 Mar. 2013 23. Advan 16 June 201312. Samjin Ind. 24 Mar. 2013 24. Hilalco 23 June 2013

  • 7/29/2019 100th HSJV Weekly Meeting Rev 8

    11/42BARAKAH NUCLEAR POWER PLANT PROJECT

    http://localhost/var/www/apps/conversion/tmp/scratch_8/SAFETY%20MOMENT%20SAMPLE.pptx
  • 7/29/2019 100th HSJV Weekly Meeting Rev 8

    12/42BARAKAH NUCLEAR POWER PLANT PROJECT

    Major TARGETS in 2013

    No. of RWC from 22 to 7.

    No. of MTC from 30 to 23

    New target number of high

    profile tour/inspection equal

    to 50.

    Total number of

    management review of 4.

  • 7/29/2019 100th HSJV Weekly Meeting Rev 8

    13/42BARAKAH NUCLEAR POWER PLANT PROJECT

  • 7/29/2019 100th HSJV Weekly Meeting Rev 8

    14/42

    BARAKAH NUCLEAR POWER PLANT PROJECT

  • 7/29/2019 100th HSJV Weekly Meeting Rev 8

    15/42

    BARAKAH NUCLEAR POWER PLANT PROJECT

    Legend : Ancillary Rebar Shop, Batch Plant, Paint Shop, Heavy Equipment Shop

    Power Block Cut Off Wall, Wharf Area, Concrete Block Area

    * : 41 cases (Oct- Dec. 2011), 64 cases (2012)

    ItemAncillary Area Camp Area Office Area Power Block Village 1 Village 2 HSJV Total NMDC Total

    For the

    WeekCum

    For the

    WeekCum

    For the

    WeekCum

    For the

    WeekCum

    For the

    WeekCum

    For the

    WeekCum

    For the

    WeekCum

    For the

    WeekCum

    Near Misses 0 162 0 6 0 188 1 223 0 176 0 222 1 977 0 9

    Over speeding 0 2 0 2 0 1 0 4 0 4 0 3 0 17 0 1First Aid Cases

    (FA) 0 13 0 2 0 15 0 38 0 22 1 8 1 98 2 10

    Medical

    Treatment Cases

    (MTC)0 2 0 2 0 2 0 4 0 5 0 4 0 19 0 3

    Restricted Work

    Cases (RWC) 0 0 0 0 0 2 0 2 0 0 0 0 0 4 0 0

    LTIs 0 2 0 0 0 0 0 0 0 0 0 1 0 3 0 0

    Property

    Damages 0 0 0 0 0 0 0 1 0 0 0 0 0 1 0 0Vehicle

    Accidents 0 2 0 1 0 1 0 1 0 0 0 0 0 5 0 0

    EnvironmentalRelease 0 0 0 0 0 0 0 1 0 0 0 0 0 1 0 0

    For this week Cumulative

    One Strike Policy 0 105*

    (This Week From Dec 29, 2012Jan 4, 2013)

  • 7/29/2019 100th HSJV Weekly Meeting Rev 8

    16/42

    BARAKAH NUCLEAR POWER PLANT PROJECT

  • 7/29/2019 100th HSJV Weekly Meeting Rev 8

    17/42

    BARAKAH NUCLEAR POWER PLANT PROJECT

    (This Week From Dec 29, 2012Jan 4, 2013)

    TOTAL

    Near Miss

    CAR

    OC & WF

    0 0 1 1

    1 25 177 202

    0 33 137 170

    1 58 315 374

    Findings

    Issued

    TotalKE

    P

    C

    O

    H

    S

    J

    V

    S

    U

    B

    C

    O

    N

    Status

    Open Closed

    KEPCO HSJV Subcon KEPCO SubconHSJV

    0 0 0 0 0 1

    0 6 0 1 19 177

    0 0 0 0 33 137

    0 6 0 1 52 315

  • 7/29/2019 100th HSJV Weekly Meeting Rev 8

    18/42

    BARAKAH NUCLEAR POWER PLANT PROJECT

    Company

    Dec 29, 2012

    Jan 4, 2013 CompanyDecember

    2012

    January

    2013

    TOTAL

    OPENCCAP CAR/NM

    Advan 1 Advan 1 1

    HSJV 2 D&I 2 2

    Isam Kabbani 2 Geumhwa 1 1Seobon 1 Isam Kabbani 2 2

    TOTAL 0 6 Seobon 1 1

    Seoyong 1 1

    Yoo A 1 1

    Youn Chang 2 2

    TOTAL 4 7 11

    for the Period Total Open

  • 7/29/2019 100th HSJV Weekly Meeting Rev 8

    19/42

    BARAKAH NUCLEAR POWER PLANT PROJECT

    1

    1

    2

    3

    3

    4

    4

    5

    8

    10

    15

    1617

    18

    18

    18

    20

    20

    24

    2426

    27

    40

    0 5 10 15 20 25 30 35 40 45

    LOTO

    Supervision

    Training

    Hot Works

    Excavation

    PTW

    Poor Illumination

    Environmental

    Health & Welfare

    Hand & Power Tools

    Lifting

    Working at Height

    Fire Prevention

    Waste Management

    PPE

    Electrical Safety

    Color Coding

    Fall Protection

    Signs, Barriers & barricades

    Material Management

    Scaffolding

    Plant & Equipment

    Access & Egress

    (This Week From Dec 29, 2012Jan 4, 2013)

    Source: CAR, Near Miss, Walkthrough and Observation Card

  • 7/29/2019 100th HSJV Weekly Meeting Rev 8

    20/42

    BARAKAH NUCLEAR POWER PLANT PROJECT

    Provide safe access for putty

    and painting works. (Village

    1, U-Well)

    Replace ladders having loose

    rungs. (Power Block,

    Seoyong)

    Use of standard fittings on

    ladders (Power Block,

    Hilalco)

    Set access inside rebar pit

    slab foundation. (Office

    Area, Seobon)

    Access & Egress Scaffolding

    Ensure stability at sectionswhere pipes are crossing

    scaffolding structure (Power

    Block, Advan)

    Position outriggers on firm

    ground

    (Village 1,Younchang-I)

    Scaffold should be inspected

    and tag (Village 1, Hyundai

    C&I)

    Toe boards length must not

    extend outside structure

    posing as head bump hazard.

    (RCB , Seoyong)

    Plant & Equipment

    Drip tray is in placed while

    operating compressor (Power

    Block, Hilalco)

    Movement of Dozer should be

    controlled by Flagman (Intake

    Basin, Al Raeel)

    Submit Bobcat for inspection

    before put in service (Power

    Block, WBG )

    Park Manlift at safer groundaway from excavation.

    (Village 2, Towers Tech)

    1 32

  • 7/29/2019 100th HSJV Weekly Meeting Rev 8

    21/42

    BARAKAH NUCLEAR POWER PLANT PROJECT

  • 7/29/2019 100th HSJV Weekly Meeting Rev 8

    22/42

    BARAKAH NUCLEAR POWER PLANT PROJECT

    0

    100

    200

    300

    400

    500

    600

    700

    800

    05

    101520

    2530354045

    50

    Seoyong

    Seoyong(PB)

    TowersT

    ech

    Gu

    san

    Gusan(PB)

    Eunmin

    Jonghap

    Jonghap(PB)

    YounCh

    ang

    YounChang(PB)

    How

    sys

    W

    BG

    L

    ima

    Hilalco

    Ad

    van

    Han

    lim

    Uwell

    Yo

    oA

    Hyundai

    C&I

    Sam

    jin

    Eugene

    Daemyung

    Seobon

    D&I

    AlRaeel

    DOW

    Sam

    ho

    KEPCO/HSJVSUBCON

    Manpower

    (This Week From Dec. 29, 2012 to Jan. 4, 2013)

  • 7/29/2019 100th HSJV Weekly Meeting Rev 8

    23/42

    BARAKAH NUCLEAR POWER PLANT PROJECT

    Source: CAR, Near Miss, Observation Cards and Walkthrough

    AreaNo. of

    Findings

    KEPCO &

    HSJVSUBCON

    Ancillary

    Area37 2 35

    Camp Area 0 0 0

    Office Area 45 13 32

    Power Block 223 34 189

    Village 1 35 4 31

    Village 2 34 6 28

    Total 374

    (This Week From Dec 29, 2012Jan 4, 2013)

    0

    20406080

    100120140

    160180200

    2 013

    34

    4 6

    35

    0

    32

    189

    31 28

    KEPCO & HSJV SUBCON

  • 7/29/2019 100th HSJV Weekly Meeting Rev 8

    24/42

    BARAKAH NUCLEAR POWER PLANT PROJECT

    Action Plan for Company requiring assistance and support from the system

    1. Joint Inspection will be carried out by Area Management Team.

    2. Spot Training will be given to workers about major findings

    3. Action plan will be submitted to HSJV HSE Team develop byADVAN

    0

    2

    4

    6

    8

    10

    3.2

    1

    3.7

    21

    2.4

    7.1

    3.4

    1.5

    5.6

    0.21 0.7

    Findings Score = Number of Causal x Risk(Factor Score)

    Source: CAR, Near Miss, Walkthroughand Observation Card reported by

    KEPCO & HSJV

    Legend : (I) Infra, (PB) Power Block

    BARAKAH NUCLEAR POWER PLANT PROJECT

  • 7/29/2019 100th HSJV Weekly Meeting Rev 8

    25/42

    BARAKAH NUCLEAR POWER PLANT PROJECT

  • 7/29/2019 100th HSJV Weekly Meeting Rev 8

    26/42

    BARAKAH NUCLEAR POWER PLANT PROJECT

    Top Hazards

    Cause Nos

    Access & Egress 8

    Scaffolding 5

    Control Measure Due Date

    Access ladders should be

    installed correctly and

    ensure its stability for safe

    use.

    Always

    Incomplete Scaffold should

    be provided with red scafftag to prevent personnel

    from using it.

    Always

    Total No. of Findings: 43

    Access & Egress,

    8

    Scaffolding, 5

    Fire Prevention, 4

    Health & Welfare,

    4

    Material

    Management, 4

    Electrical Safety, 3

    Housekeeping, 3

    Working at

    Height, 3

    Waste

    Management, 3

    Plant &Equipment, 2

    Fall Protection, 1hand & Power

    Tools, 1Environmental, 1

    Signs, Barriers &Barricades, 1

    Source: CAR, Near Miss, Walkthrough and Observation Card

  • 7/29/2019 100th HSJV Weekly Meeting Rev 8

    27/42

    BARAKAH NUCLEAR POWER PLANT PROJECT

    Top Hazards

    Cause Nos

    Scaffolding 4

    Housekeeping 4

    Control Measure Due Date

    Scaffolding should be

    inspected and provided

    with scaffolding tags.Always

    Standard cable hangers to

    be provided to maintain

    good cable management

    Always

    Total No. of Findings: 23 Housekeeping, 4

    Scaffolding, 4

    PPE, 2

    Working at

    Height, 2

    Fall Protection, 2

    Electrical Safety, 1

    hand & Power

    Tools, 1

    Environmental, 1

    Access & Egress, 1

    Material

    Management, 1

    Plant &

    Equipment, 1

    Color Coding, 1

    Waste

    Management, 1 Lifting, 1

    Source: CAR, Near Miss, Walkthrough and Observation Card

    BARAKAH NUCLEAR POWER PLANT PROJECT

  • 7/29/2019 100th HSJV Weekly Meeting Rev 8

    28/42

    BARAKAH NUCLEAR POWER PLANT PROJECT

  • 7/29/2019 100th HSJV Weekly Meeting Rev 8

    29/42

    BARAKAH NUCLEAR POWER PLANT PROJECT

    AREA : Power Block (WBG) December 29,2012

    CORRECTIVE ACTION:

    PLANNED SUPERVISOR PREVENTIVE ACTION

    BARAKAH NUCLEAR POWER PLANT PROJECT

  • 7/29/2019 100th HSJV Weekly Meeting Rev 8

    30/42

  • 7/29/2019 100th HSJV Weekly Meeting Rev 8

    31/42

    BARAKAH NUCLEAR POWER PLANT PROJECT

    Inspection Date Attendees Remark

    Committee inspection 2013-01-01 HSJV, KEPCO, HSE Management Team No Inspection

    Weekly Inspection 2013-01-02 HSJV HSE Team 19 Findings

  • 7/29/2019 100th HSJV Weekly Meeting Rev 8

    32/42

    BARAKAH NUCLEAR POWER PLANT PROJECT

    1

    2

    2

    3

    3

    3

    5

    0 1 2 3 4 5 6

    Unfollowed Lifting Plan

    No Checklist

    Checklist not updated

    No PTW

    Unauthorized Signature

    PTW not updated

    Incomplete JHA

    Findings per Causal

    Key item : PTW & JHA

    1 1

    6

    21

    2 2 21 1

    0

    1

    2

    3

    4

    5

    6

    7

    Advan D&I Gusan (PB) HSJV HSJV Piping Issam Kabbani Seoyong (PB) TowersTech Uwell Youn Chang

    Findings per Company Total

    BARAKAH NUCLEAR POWER PLANT PROJECT

  • 7/29/2019 100th HSJV Weekly Meeting Rev 8

    33/42

  • 7/29/2019 100th HSJV Weekly Meeting Rev 8

    34/42

    BARAKAH NUCLEAR POWER PLANT PROJECT

    No.Source of

    InjuryArea Description

    ImmediateAction

    Planned SupervisorPreventive Action

    1

    Pain, right

    ankle

    secondary to

    slipping

    Towers Tech

    Painter

    Village 2

    (Bldg. 2)

    02-01-2012

    14:20

    The worker was going

    down from the stair when

    he landed on his right

    foot and slipped thus

    causing the injury and

    pain..

    Assessment done

    Ice compress done

    Elastic bandage

    applied

    BARAKAH NUCLEAR POWER PLANT PROJECT

  • 7/29/2019 100th HSJV Weekly Meeting Rev 8

    35/42

  • 7/29/2019 100th HSJV Weekly Meeting Rev 8

    36/42

    BARAKAH NUCLEAR POWER PLANT PROJECT

    Dead Dugong was found at Inland Dike area on 3th.Jan.2013

  • 7/29/2019 100th HSJV Weekly Meeting Rev 8

    37/42

    BARAKAH NUCLEAR POWER PLANT PROJECT

    Full oil drum covered with plastic without proper storage,

    MSDS, Spill Protection & etc at power block area

    CAR # 3305

  • 7/29/2019 100th HSJV Weekly Meeting Rev 8

    38/42

    BARAKAH NUCLEAR POWER PLANT PROJECT

    Date Company Description StatusClosing

    Date

    Expiration

    DateRef. No.

    Main

    AreaSub-Area Issued By

    Issuer

    CompanyCausal

    2-Jan-13 SeobonNeglected full oil drum with

    plastic without proper storage

    Open 7-Jan-132013-

    0002

    Power

    Block

    Power Block Renato Ponce HSJVEnvironmen

    tal

  • 7/29/2019 100th HSJV Weekly Meeting Rev 8

    39/42

    BARAKAH NUCLEAR POWER PLANT PROJECT

    Legend:

    Collected - Waste from Site to Temporary Storage Area

    Disposal - Waste from Temporary Storage Area to

    Landfill Area Recycle - Treated waste ( GMET) to

    Recycling Plants

    WASTE MANAGEMENT UPDATE

    Week =27/12/2012

    02/01/2013

    WASTE TYPEThis week Last week

    Collected (m3) Disposal (m3) Recycled (m3) Recycle(%) Collected (m3) Disposal (m3) Recycled (m3) Recycle(%)

    Paper 72 0 0 40 0 0

    Metal 24 0 45 24 0 0

    Construction 104 315 0 152 405 0

    Concrete 0 0 0 0 0 0Wood(Good) 0 0 0 0 0 45

    Wood(Bad) 136 90 0 168 90 0

    Plastic 88 0 0 120 0 0

    Municipal 0 264 0 0 264 0

    Hazardous 16 16 0 0 0 0

    Total Solid Waste 440 685 45 6.50% 504 759 45 5.92%

    BARAKAH NUCLEAR POWER PLANT PROJECT

  • 7/29/2019 100th HSJV Weekly Meeting Rev 8

    40/42

  • 7/29/2019 100th HSJV Weekly Meeting Rev 8

    41/42

    BARAKAH NUCLEAR POWER PLANT PROJECT

    BARAKAH NUCLEAR POWER PLANT PROJECT

  • 7/29/2019 100th HSJV Weekly Meeting Rev 8

    42/42