    BARAKAH NUCLEAR POWER PLANT PROJECT

    P ease Turn o your

    mobile! Or Switch to

    vibration mode!

    BARAKAH NUCLEAR POWER PLANT PROJECT

    Check! Right Now!

  • 7/29/2019 127th HSJV Weekly Meeting

    2/27

    7/14/20

    SCREEN

    Dont Panic11

    Switch Off All Electrical Equipment22

    BARAKAH NUCLEAR POWER PLANT PROJECT

    Dont Run, Walk Fast!33

    Go to the Assembly Point44

    Wait for the Final Instruction55

    1. Safety Moment

    2. Previous Meeting

    1. Safety Moment

    2. Previous Meeting

    7. Weekly Inspection

    Committee Inspection

    Weekly Inspection

    7. Weekly Inspection

    Committee Inspection

    Weekly Inspection

    . rograms

    4. HSE Statistics

    Performance per Area and Total

    5. HSE Findings Summary

    HSE Findings by Company

    . rograms

    4. HSE Statistics

    Performance per Area and Total

    5. HSE Findings Summary

    HSE Findings by Company

    8. Incident Reports

    9. Medical Cases

    10.Environmental Issues

    11.Action Plans

    Ujin

    8. Incident Reports

    9. Medical Cases

    10.Environmental Issues

    11.Action Plans

    Ujin

    BARAKAH NUCLEAR POWER PLANT PROJECT

    va ua on y n ngs core6. Findings Analysis per Discipline

    va ua on y n ngs core6. Findings Analysis per Discipline

    Seoyong (Infra)

    Hilalco

    Seoyong (Infra)

    Hilalco

  • 7/29/2019 127th HSJV Weekly Meeting

    3/27

    7/14/20

    BARAKAH NUCLEAR POWER PLANT PROJECT

    BARAKAH NUCLEAR POWER PLANT PROJECT

  • 7/29/2019 127th HSJV Weekly Meeting

    4/27

    7/14/20

    NO.NO. ITEMSITEMS ACTIONACTION PLANSPLANS ACTION BYACTION BYDUEDUE

    DATEDATESTATUSSTATUS

    A comparison was made on number of findings

    reported by every Subcontractor and findings raised by

    HS V KEPCO. Both Seo on and Hilalco failed to Hilalco Next

    Findings

    .

    exceed number of HSE findings. Both companies are

    requested to prepare action plans and report on next

    meeting.

    Seoyong

    MeetingDone

    2InjuryCases

    Preventive

    Actions

    Medical cases reported by subcontractors should

    include preventive actions to be taken by immediate

    supervisor.

    HSJVNext

    MeetingDone

    A letter should be issued to UJ IN requesting

    BARAKAH NUCLEAR POWER PLANT PROJECT

    3Attendance

    explanation on their absent from HSE meeting. Medical

    case from UJ IN will be reported again on next meeting.

    UJIN

    MeetingDone

    BARAKAH NUCLEAR POWER PLANT PROJECT

  • 7/29/2019 127th HSJV Weekly Meeting

    5/27

    7/14/20

    BARAKAH NUCLEAR POWER PLANT PROJECT

    Descript ionDescript ion

    Al l vehic les leavi ng Gate 3 should tak e roundab out at wes t par t of BNPPAl l vehic les leavi ng Gate 3 should tak e roundab out at wes t par t of BNPP

    before proceeding to Gate 1. Speed l imit at service r oad is set at maximumbefore proceeding to Gate 1. Speed l imit at service r oad is set at maximum

    of 60of 60 kphkph, and overtaking is prohib ited on this road., and overtaking is proh ibited on this ro ad.

    ConstructionTeam

    prepareswork

    plan,includes

    PlanforTomorroworHolidaywork

    TodaysNightwork

    Managersignsthe

    WorkPlan

    before4:30PMdailyat

    HSJVHSE

    HSJVHSEManagerConstructionTeamHSJVHSETeam

    BARAKAH NUCLEAR POWER PLANT PROJECT

    s gns

    t e

    or

    an

    Planto

    Site.

    WorkPlan

    Descript ionDescript ion

    As par t of work prep ar at ion ev er y Su bcontrac tor must prep ar e an d submitAs par t of work prep ar at ion ev er y Su bcontrac tor must prep ar e an d submit

    dai ly wor k plan to HSE Department. Night w ork and hol i day shal l bedai ly wor k plan to HSE Department. Night w ork and hol i day shal l be

    includ ed on this form. This wi l l ease monitoring act iv i t ies at s i te.includ ed on this form. This wi l l ease monitoring act iv i t ies at s i te.

  • 7/29/2019 127th HSJV Weekly Meeting

    6/27

    7/14/20

    Descript ionDescript ion

    n c u s ve a es : ~ u g.n c u s ve a es : ~ u g.

    Training Provider : TAPROOT, U.S.ATraining Provider : TAPROOT, U.S.A

    Training Part ic ipants :Training Part ic ipants :

    HSJVHSJV, KEPCO,, KEPCO, SubcontractorsSubcontractors

    Benefi ts :Benef i ts :

    BARAKAH NUCLEAR POWER PLANT PROJECT

    incident and prevent ingincident and prevent ing

    recurrence of such case.recurrence of such case.

    Incident from safety or q ual i ty.Incident from safety or q ual i ty.

    BARAKAH NUCLEAR POWER PLANT PROJECT

  • 7/29/2019 127th HSJV Weekly Meeting

    7/27

    7/14/20

    ItemAncil lary Ar ea Camp Area Offic e Area Power Bloc k Village 1 Village 2 HSJV Total

    For theWeek

    CumFor theWeek

    CumFor theWeek

    CumFor theWeek

    CumFor theWeek

    CumFor theWeek

    CumFor theWeek

    Cum

    Near Misses 0 0 0 0 0 2 0 18 0 0 0 0 0 20

    Over speeding 0 0 0 0 0 0 0 0 0 1 0 0 0 1

    (This Week From July 6 July 12, 2013)

    First Aid Cases (FA) 0 4 0 0 3 10 0 45 0 7 0 3 3 68

    Medical TreatmentCases (MTC) 0 3 0 1 0 5 0 12 0 0 0 1 0 22

    Restricted Work

    Cases (RWC) 0 3 0 1 0 0 0 4 0 0 0 0 0 8

    LTIs 0 0 0 0 0 0 0 3 0 0 0 0 0 3

    Property/Vehicle

    Accid ents 0 4 0 1 0 4 0 7 0 2 0 1 0 19

    Environmental

    BARAKAH NUCLEAR POWER PLANT PROJECT

    Legend : Ancill ary Rebar Shop, Batch Plant, Paint Shop, Heavy Equipm ent Shop

    Power Block Cut Off Wall, Wharf Area, Concrete Block Area

    * : 41 cases (Oc t- Dec. 2011), 64 cases (2012), 27 (2013)

    Release

    Forthisweek Cumulative

    OneStrike Policy 2 133*

    BARAKAH NUCLEAR POWER PLANT PROJECT

  • 7/29/2019 127th HSJV Weekly Meeting

    8/27

    7/14/20

    (This Week From July 6 July 12, 2013)

    Issued

    NearMissNearMiss

    CARCAR

    0 0 1 1

    12 15 164 191

    Findings TotalKE

    P

    C

    O

    H

    S

    J

    V

    S

    U

    B

    C

    O

    N

    Open Closed

    KEPCO HSJV Subcon KEPCO SubconHSJV

    0 0 0 0 0 1

    12 5 0 0 10 164

    BARAKAH NUCLEAR POWER PLANT PROJECT

    TOTALTOTAL

    OC&WFOC&WF 0 56 266 322

    12 71 431 514

    0 0 0 0 56 266

    12 5 0 0 66 431

    3131

    3334

    35

    Access&Egress

    ElectricalSafety

    Health&Welfare

    Plant&Equipment

    Scaffolding

    (This Week From July 6 July 12, 2013)

    1112

    1313

    151919

    2122

    2626

    2730

    Environmental

    WorkingatHeight

    PoorIllumination

    HotWorks

    Signs,Barriers&barricades

    MaterialManagement

    Lifting

    WasteManagement

    Hand&PowerTools

    FirePrevention

    PPE

    FallProtection

    ColorCoding

    BARAKAH NUCLEAR POWER PLANT PROJECT

    00

    12

    67

    88

    0 5 10 15 20 25 30 35 40

    SteelErection

    LOTO

    RoadSafety

    ConfinedSpace

    Documents

    PTW

    Training

    Supervision

    Source: CAR, Near Miss, Walkthrough and Observation Card

  • 7/29/2019 127th HSJV Weekly Meeting

    9/27

    7/14/20

    Ensure continuous supply of

    water in the workplace.

    Ensure scaffold have guard

    rail, supervisor to check

    com leteness

    Banks men should control

    ground personnel movement

    1 32

    (RCB,(RCB, SamjinSamjin))

    Sufficient amount of ORSshould be on hand for heat

    stress prevention (Power(Power

    Block,Block, AdvanAdvan))

    Maintain minimum stock of

    medical items in the first aid

    ki t (TGB1, D&I)(TGB1, D&I)

    (CWDC,(CWDC, GusanGusan))

    Clear scaffold pl atform of

    unnecessary materials

    (ADB,(ADB, SeobonSeobon))

    Scaffold inspectors to

    thoroughly check for

    damaged section(STC, Hanlim E&C)(STC, Hanlim E&C)

    (Office Area,(Office Area, JonghapJonghap))

    Install operational reverse

    alarm for tanker

    (CWDC, WBG)(CWDC, WBG)

    Ensure motor chain are

    installed with safety guards

    (Batch Plant, Eugene)(Batch Plant, Eugene)

    BARAKAH NUCLEAR POWER PLANT PROJECT

    Ensure condition of water is

    cold and drinkable

    (STC, Hyundai C&I)(STC, Hyundai C&I)

    Use of standard scaffold

    materials in railings and

    platform (CWIS,(CWIS, Hilalc oHilalco))

    ns a w p c ec arres o r

    and fire extinguisher

    available in air compressor.

    (CWIC, Hilalco )

    Scaffolding Health and WelfarePlant and Equipment

    BARAKAHNUCLEARPOWERPLANTPROJECT

  • 7/29/2019 127th HSJV Weekly Meeting

    10/27

    7/14/20

    AncillaryAreaVillage1

    48

    FindingsperArea

    (This Week From July 6 July 12, 2013)

    Arch(I)Mech

    Piping

    21

    FindingsperDiscipline

    65

    13%CampArea

    2

    0%

    OfficeArea

    93

    19%

    10%96

    19%

    Elec

    61

    12%

    42

    9%

    4

    BARAKAH NUCLEAR POWER PLANT PROJECT

    PowerBlock

    288

    58%

    Arch(PB)

    132

    27%

    Civil

    14429%

    (This Week From July 6 July 12, 2013)

    4046

    149

    2120

    30

    40

    50

    FindingsperCompany(ArchPB)

    41

    55

    Signs,Barriers&Barricades

    Training

    WasteManagement

    WorkingatHeight

    FindingsperCause(ArchPB)

    1 2

    0

    10

    Advan D&I DOW Isam

    Kabbani

    Seobon Seoyon