Upload
biocity-studio
View
6
Download
2
Embed Size (px)
DESCRIPTION
If Sydney’s water supply is consumed our agricultural industry, transport and energy will be badly effected. This presentation looks at how we solve Sydney’s water problem? Do we build a desalination plant or try to scale water on a large scale?
Citation preview
Each day Sydney Water disposes of more than 1,000 Olympic-size swimming pools of partially treated sewage through the ocean outfalls
The city has consumed more water than its dams could provide
for six out of the last ten years
Fresh water only makes up 2.78% of the World’s water
If there was to be no inflow into Sydney’s dams, the amount of
water currently would only last another four years
Since water restrictions have been put in place, water use has
decreased by 14%
9% of all water pipes operated by Sydney Water are leaking
200mls of rainfall is needed to soak the catchments before runoff is collected
Metropolitan Water Plan
Robert W. Christopherson 2004, Elemental Geosystems
www.iliveinsydney.com
www.parliament.nsw.gov.au
Tony Wong, pers.comm 11.07. 2007
Sydney Water
Metropolitan Water Plan
Primary Treatment Plants
Secondary Treatment Plants
Tertiary Treatment Plants
Legend
Compliments of Sydney Water
Within Primary treatment facilities, the wastewater is only filtered a certain
degree using grit chambers,
Secondary filters act as particle filters and further screen the waste,
whilst Tertiary plants, break down and disinfect the wastewater.
There are three phases to
Wastewater treatment, Primary,
Secondary and Tertiary.
Generally there are two types of wastewater, Domestic and Industrial,
and these two contribute to the amounts of wastewater entering treatment
everyday.
Wastewater Treatment LocationsWastewater Treatment Locations
What happens when demand exceeds supply?What happens when demand exceeds supply?
By the year 2030, what will happen when water consumption exceeds water supply with in the Sydney metropolitan region?
How would a shortfall of water affect the broader city, and the way things within the city function by the year 2030?
If there were to be a shortage of water, due to the severe drought, the effect on almost all facets of Sydney living would certainly be dramatic.
For instance, with regards to agriculture, if water is not
available to sustain crops, they simply would die leading to a shortfall within the agricultural industry.
Additionally, it is not just within agriculture that water has such a major influence on function and sustainability, other industries and
products also rely on water, that is everything ranging from food products, which sustain us to live, along with energy and the way we use
transport to import and export goods, along with traveling around in our
daily lives.
How do we prevent such a shortfall from happening thus averting such
a crisis from happening and finding a solution to a future problem in
twenty years time?
Hypothetical usage since 11.2001
Available water
% full all dams
1 year change GL(%)
20% More 830.9 32.15295.04 (11.42)
As is 1469 56.84 396.00 (15.32)
20% Less 2107.1 81.54496.96 (19.23)
50% Less 2584.3 100.00168.45(6.52)
However, quite significantly, if we cut our usage by 50%, Dam levels would rise to 100% Capacity
Warragamba, currently supplies 80% of Sydney’s water, for it to become a secondary or emergency source of water, is a realistic and viable option
If we were to use 20% more water, Dam levels would fall to
32.15%
Sydney Water DistributionSydney Water Distribution
Sydney consumes 1300 ML/Day
Sydney Household Water ConsumptionSydney Household Water Consumption
Water Smart Households – www.waterforlife.nsw.gov.au
228 mega litres / per day
209 mega litres / day
146 mega litres / day
154 mega litres / day
36 mega litres / day
127 mega litres / day
9 mega litres / day
Sydney Household Water Recycling SystemsSydney Household Water Recycling Systems
Blackwater
Re-used Greywater
On-Site Detention
http://www.aquatekltd.co.uk/products/water%20recycling%20management/Ref%20AQ1.jpg
Chili Pepper Hot Water recycling pump Cost = $500
Tank to Toilet Rain Water System Cost = $2500 (- $300 Rebate)
Low flow - AAA rated shower head Cost = $100
Bathtub - Laundry Greywater Pump Cost = $100
Wattworks Automatic Water Recycler System Cost = $2500
Flow restrictor Shower headCost = $100
Total Cost
$8720
How you can upgrade your Household
Water tank (for the Garden) Cost = $2000
Flow restrictors for all tapsCost = $20
Plumbing labour costs Cost = $1000
In 2030 Sydney will produce 1148 litres a day(assuming our average daily consumption as well as water restrictions remain in place.)
An 80% reduction means the 2.2 million homes
will be using 229 mega litres a day.
Retrofitting 2.2 million homes would cost 19.1 billion dollars assuming that:
There were no government rebates
No discounts for contracts by councils (figure could easily be halved)
This basically means that for every $1 spent 335L will be saved, long term this is a viable option
“Desalination on the scale now planned by the state government would
cost almost double that of a similar scale recycling scheme and
consume more than three times as much energy, Sydney water papers reveal”
Sydney Morning Herald, 25th November 2005
A 100 ML/day Desalination plant does not solve our water
problems by itself. It would need to run continuously, at great expense and we would still be under water restrictions for it to be remotely successful
Hypothetical since 11.2001
Available water (GL)
% full all dams
1year change GL(%)
As is 1469 56.84 396.00 (15.32)
100 ML/day 1677.5 64.91 432.40 (16.73)
500 ML/day 2511.5 97.18 578.00 (22.37)
500 ML/day when levels < 50%
1796 69.50 527.00 (20.39)
A 500 ML/day plant, would be successful, that is, whilst disregarding both the costs, financially and to the environment
Desalination Vs Large Scale Recycling Desalination Vs Large Scale Recycling
A possible solution to the 2030 water shortage is retrofitting the Malabar WWTP to a Secondary Treatment Plant. Malabar would Pump its treated water via a new tunnel
system into Prospect Water Filtration Plant .
Desalination Recycled Wastewater Expansion
500 ML Desalination Plant= $2.2 billion
500 ML Upgrade to Malabar Wastewater Treatment Plant = $ 2.1 billion
Desalination consumes 3 times more energy then recycling
Retrofit existing WWTP $ 1,770 million Reverse Osmosis Desalination (including seawater intakes and outlets) $1,860 million
Transfer to Prospect WFP $ 330 million Transfer to Water Supply $ 350 million
Total Cost Over 20 Years = $ 5.1 billion
Total Cost over 20 Years = $ 5.5 billion
Running Costs $ 3,000 million Running and Environmental Costs $ 3,300 million
(Indirect potable recycling and desalination report – Sydney Water) (Indirect potable recycling and desalination
report – Sydney Water)
In terms of the success of proposed systems, it is suggested that a
combination be established in order to fully utilize location and potential for growth.
Therefore the following has been established…
http://www.dlg.nsw.gov.au/dlg/dlghome/dlg_Regions.asp?region=SO®iontype=1
Combining the Systems Combining the Systems
By 2020, it is intended that 550, 000 existing dwellings be fully retrofitted saving a total of 20% of Sydney's total water use.
This will cost $2 billion to implement
The 500 ML / day Regional Recycling System which will add an additional 30% to Sydney's drinking water supply.
This will cost approx 5.5 billion dollars over the next 23 years to 2030.
The aim by 2030, is to reduce Sydney's water consumption by 50% which is achievable using these combinations of strategies.
The reduction of 50% of Sydney's water use will see Warragamba Dam remain at capacity and thus securing Sydney's water supply for the future.