Index2

1. Scope

2. Workplan

3. Methodology

4. Time Schedule

5. Contact info

Page 3: Task 1.1  – users and system requirements (by itene)

1. Scope3

This task aims to: Identify users that will use SLOPE tools Understand their needs of SLOPE Understand the system requirements so it is useful for users

To be developed from M1 to M3

Includes development of “D1.0.1 user requirements report” Due to Month 3.

Partners involved: all ITENE (leader), GRAPHITECH, CNR, KESLA, COAST, MHG,

BOKU, FLY, GRE, TRE

Page 4: Task 1.1  – users and system requirements (by itene)

2. Proposed Workplan4

1. Identify user groups ITENE will contact the partners to develop a join classification

based on each partners experience. : Foresters, and other decision makers also logistic operators,

brokers, end-users, and forest owners Final classification needs to be validated by consortium Ends with agreed classification.

2. Define questionnaires Questionnaires for each use group will be developed by ITENE

with the help of partners Final questionnaires needs to be validated by consortium Ends with developed questionnaries.

Page 5: Task 1.1  – users and system requirements (by itene)

2. Proposed Workplan5

3. Perform questionnaires Each partner will contact a small quantity of users

(to be defined) from different user groups.

4. Gather and analyse data By ITENE Validated by consortium

Development of D1.0.1 ITENE will ask for contribution from partners

Page 6: Task 1.1  – users and system requirements (by itene)

3. Methodology6

Partners contribution GRAPHITECH (IT): input for system requirements (3D

technologies and simulation of planning operations) CNR- Trees and Timber Institute- IVALSA (IT), input

for systems requirements, contact with end users KESLA (FI): input for system requirements(cranes,

harvester heads, strokes), contact with end users Coastway Ltd (IR): input for system requirements

(forest mapping, routes, planning requirements).

Page 7: Task 1.1  – users and system requirements (by itene)

3. Methodology7

Partners contribution MHG (Fin): system requirements (ERP material

quantity, quality and availability ) BOKU (AU): system requirements (near infrared

spectroscopic measurements and hyperspectral imaging for model-based quality control of mountain forest production)

Flyby S.r.l.(IT):system requirements (forest inventory) Greifenberg teleferiche sas (IT): system requirements

(machinery for wires, cranes )and contact with ens users

Page 8: Task 1.1  – users and system requirements (by itene)

3. Methodology8

Work will be done based on specific methodologies for data gathering i.e. Métrica v3 methodology used by MAP (Spanish

Public Management Ministry) to gather methodological needs for TIC developments

i.e. Guide to the Software Engineering Body of Knowledge (IEEE)

Page 9: Task 1.1  – users and system requirements (by itene)

3. Methodology9

Preliminary groups Logistic operators (transport of timber)

MHG Systems Land owners (own the land)

CNR- IVALSA BOKU

End users (cut down trees, sell timber and wood) KESLA, GREIFENBERG

Other?

1 questionnaire model per each group

Minimum of 5 questionnaires filled per group

Page 10: Task 1.1  – users and system requirements (by itene)

3. Methodology10

Filling the questionnaires Each SLOPE partner should:

Explain the Project to the selected user Read and explain the questionnaire to him Write down his answers

Example questions: Which information would you be interested in

receiving from the management system? What information do other platforms provide? What

do you find lacking?

Page 11: Task 1.1  – users and system requirements (by itene)

4. Time Schedule11

Page 13: Task 1.1  – users and system requirements (by itene)

13

Thanks for your attention!!!