60
604 Successful Training Implementation through a Continuous Learning Plan Maria Leggett, Textron Inc.

Successful Training Implementation through Continuous Learning

Embed Size (px)

DESCRIPTION

 

Citation preview

Page 1: Successful Training Implementation through Continuous Learning

604

Successful Training Implementation

through a Continuous Learning Plan

Maria Leggett, Textron Inc.

Page 2: Successful Training Implementation through Continuous Learning

March 24 – 26, 2010 Orlando, FL

Page 1Session 604 – Successful Training Implementation through a Continuous Learning Plan – Maria Leggett, Textron Inc.

Company Confidential

Successful Training Implementation through a Continuous Learning Plan

Maria LeggettManager, Legal Business Analysis

1

Page 3: Successful Training Implementation through Continuous Learning

March 24 – 26, 2010 Orlando, FL

Page 2Session 604 – Successful Training Implementation through a Continuous Learning Plan – Maria Leggett, Textron Inc.

Who’s Been Here?

2

I used to be able to do this in the old system.

This new system is so frustrating. It’s so complicated..

I don’t have time to learn something new.

I was told that I have to take this training.

Page 4: Successful Training Implementation through Continuous Learning

March 24 – 26, 2010 Orlando, FL

Page 3Session 604 – Successful Training Implementation through a Continuous Learning Plan – Maria Leggett, Textron Inc.

Session Objectives

In this session, you will learn:

• How to analyze and assess learner feedback

• The components of a continuous learning training strategy to develop a training plan

• Strategies to keep training relevant and continuous by providing just-in-time learning to users

• Various techniques and tools to deliver training via a variety of mediums

3

Page 5: Successful Training Implementation through Continuous Learning

March 24 – 26, 2010 Orlando, FL

Page 4Session 604 – Successful Training Implementation through a Continuous Learning Plan – Maria Leggett, Textron Inc.

Company Confidential

Determine the Training

4

Page 6: Successful Training Implementation through Continuous Learning

March 24 – 26, 2010 Orlando, FL

Page 5Session 604 – Successful Training Implementation through a Continuous Learning Plan – Maria Leggett, Textron Inc.

Survey Your Audience

5

Page 7: Successful Training Implementation through Continuous Learning

March 24 – 26, 2010 Orlando, FL

Page 6Session 604 – Successful Training Implementation through a Continuous Learning Plan – Maria Leggett, Textron Inc.

6

Find the Pain Points

Page 8: Successful Training Implementation through Continuous Learning

March 24 – 26, 2010 Orlando, FL

Page 7Session 604 – Successful Training Implementation through a Continuous Learning Plan – Maria Leggett, Textron Inc.

Delivery Methods

7

Page 9: Successful Training Implementation through Continuous Learning

March 24 – 26, 2010 Orlando, FL

Page 8Session 604 – Successful Training Implementation through a Continuous Learning Plan – Maria Leggett, Textron Inc.

Collect Feedback from the Experts

• Conduct focus group sessions with your business experts. Ask them how they envision the training.

• Create a Steering Committee of business experts and ask them to review the training plan, training materials.

8

Page 10: Successful Training Implementation through Continuous Learning

March 24 – 26, 2010 Orlando, FL

Page 9Session 604 – Successful Training Implementation through a Continuous Learning Plan – Maria Leggett, Textron Inc.

Training Plan

Prepare a training plan that answers thesequestions:

Training CurriculumAudience Needs AssessmentResources and MaterialsDelivery MethodsEvaluation and MeasurementTraining Continuum

9

Handout: Training Plan Template

Page 11: Successful Training Implementation through Continuous Learning

March 24 – 26, 2010 Orlando, FL

Page 10Session 604 – Successful Training Implementation through a Continuous Learning Plan – Maria Leggett, Textron Inc.

Training Curriculum

10

System Features

Target Audience

Preferred Delivery

Learning Blocks

Important Functionality

Competencies

Page 12: Successful Training Implementation through Continuous Learning

March 24 – 26, 2010 Orlando, FL

Page 11Session 604 – Successful Training Implementation through a Continuous Learning Plan – Maria Leggett, Textron Inc.

Continuous Training Framework

11

Break training into small modules that can be delivered in 1 to 2 hour sessions.

Page 13: Successful Training Implementation through Continuous Learning

March 24 – 26, 2010 Orlando, FL

Page 12Session 604 – Successful Training Implementation through a Continuous Learning Plan – Maria Leggett, Textron Inc.

Opportunities for Practice

12

Provide opportunities for real world practice.

Page 14: Successful Training Implementation through Continuous Learning

March 24 – 26, 2010 Orlando, FL

Page 13Session 604 – Successful Training Implementation through a Continuous Learning Plan – Maria Leggett, Textron Inc.

Company Confidential

Develop the Training

13

Page 15: Successful Training Implementation through Continuous Learning

March 24 – 26, 2010 Orlando, FL

Page 14Session 604 – Successful Training Implementation through a Continuous Learning Plan – Maria Leggett, Textron Inc.

Training Material

Variety of Materials in Different Formats

Training Manuals

Job Aids/Quick Guides

Getting Started Guides

Show Me Demonstrations

Frequently Asked Questions

Glossary

Weekly Tips

Embedded Help/EPSS

Monthly Newsletters

14

Page 16: Successful Training Implementation through Continuous Learning

March 24 – 26, 2010 Orlando, FL

Page 15Session 604 – Successful Training Implementation through a Continuous Learning Plan – Maria Leggett, Textron Inc.

Getting Started Guides

15

On-boarding document for new users.

Page 17: Successful Training Implementation through Continuous Learning

March 24 – 26, 2010 Orlando, FL

Page 16Session 604 – Successful Training Implementation through a Continuous Learning Plan – Maria Leggett, Textron Inc.

Show Me Demonstrations

16

Page 18: Successful Training Implementation through Continuous Learning

March 24 – 26, 2010 Orlando, FL

Page 17Session 604 – Successful Training Implementation through a Continuous Learning Plan – Maria Leggett, Textron Inc.

Quick Tips

17

Point out tips and tricks that even experienced users may not know.

1-2 page document outlining tips

Great take-away for learners who attend training or participate in a survey.

Page 19: Successful Training Implementation through Continuous Learning

March 24 – 26, 2010 Orlando, FL

Page 18Session 604 – Successful Training Implementation through a Continuous Learning Plan – Maria Leggett, Textron Inc.

FAQs and Glossary

18

Provide users 24x7 access to frequently asked questions.

Glossaries are helpful with complex terminology.

Page 20: Successful Training Implementation through Continuous Learning

March 24 – 26, 2010 Orlando, FL

Page 19Session 604 – Successful Training Implementation through a Continuous Learning Plan – Maria Leggett, Textron Inc.

Weekly Quick Tips

19

Keep training fresh by sending weekly quick tips via email.

Use monthly newsletter as a larger forum to discuss several topics. Post newsletters to a SharePoint or Web site for future reference.

Page 21: Successful Training Implementation through Continuous Learning

March 24 – 26, 2010 Orlando, FL

Page 20Session 604 – Successful Training Implementation through a Continuous Learning Plan – Maria Leggett, Textron Inc.

Embedded Help/EPSS

20

Provide learners with JIT in the application.

Page 22: Successful Training Implementation through Continuous Learning

March 24 – 26, 2010 Orlando, FL

Page 21Session 604 – Successful Training Implementation through a Continuous Learning Plan – Maria Leggett, Textron Inc.

Training Delivery

Deliver training via different mediums

• Classroom ILT training

• Asynchronous e-Learning

• Synchronous ILT training via collaboration tools

• On the Job Training/Mentoring

• Video/Phone Conferences

• Mobile Applications

21

Page 23: Successful Training Implementation through Continuous Learning

March 24 – 26, 2010 Orlando, FL

Page 22Session 604 – Successful Training Implementation through a Continuous Learning Plan – Maria Leggett, Textron Inc.

Company Confidential

Promote the Training

22

Page 24: Successful Training Implementation through Continuous Learning

March 24 – 26, 2010 Orlando, FL

Page 23Session 604 – Successful Training Implementation through a Continuous Learning Plan – Maria Leggett, Textron Inc.

Champion the Learning

• Secure support from key stakeholders within your organization.

– Recruit your champions to promote the learning via meetings or emails.

– Share training value with management and ask them to share with their direct reports.

23

Page 25: Successful Training Implementation through Continuous Learning

March 24 – 26, 2010 Orlando, FL

Page 24Session 604 – Successful Training Implementation through a Continuous Learning Plan – Maria Leggett, Textron Inc.

Communicate Changes Early

24

@

Page 26: Successful Training Implementation through Continuous Learning

March 24 – 26, 2010 Orlando, FL

Page 25Session 604 – Successful Training Implementation through a Continuous Learning Plan – Maria Leggett, Textron Inc.

Communicate and Promote

• Develop an organizational readiness campaign.

– Gather a team or representatives (power users, managers, anyone with who has a pulse for what the learners need) and engage them in the User Acceptance Testing.

– Recruit successful learners in a department or business unit to be the subject of a case study distributed to all learners.

25

Page 27: Successful Training Implementation through Continuous Learning

March 24 – 26, 2010 Orlando, FL

Page 26Session 604 – Successful Training Implementation through a Continuous Learning Plan – Maria Leggett, Textron Inc.

Sneak Preview

26

Preview of the software to prepare users on what they need to learn

Page 28: Successful Training Implementation through Continuous Learning

March 24 – 26, 2010 Orlando, FL

Page 27Session 604 – Successful Training Implementation through a Continuous Learning Plan – Maria Leggett, Textron Inc.

Promote Training as a Solution

27

Page 29: Successful Training Implementation through Continuous Learning

March 24 – 26, 2010 Orlando, FL

Page 28Session 604 – Successful Training Implementation through a Continuous Learning Plan – Maria Leggett, Textron Inc.

Company Confidential

Continue the Training

28

Page 30: Successful Training Implementation through Continuous Learning

March 24 – 26, 2010 Orlando, FL

Page 29Session 604 – Successful Training Implementation through a Continuous Learning Plan – Maria Leggett, Textron Inc.

Adjunct Support

• Enlist learners to continue the training momentum by delivering training to their department or business unit.

– Deliver Train-the-Trainer sessions to keep training consistent.

– Provide them with proper materials – finalized training presentations and instructor guides.

– Follow up with your adjunct support to ensure materials get feedback.

29

Page 31: Successful Training Implementation through Continuous Learning

March 24 – 26, 2010 Orlando, FL

Page 30Session 604 – Successful Training Implementation through a Continuous Learning Plan – Maria Leggett, Textron Inc.

Instructor Guide

30

Page 32: Successful Training Implementation through Continuous Learning

March 24 – 26, 2010 Orlando, FL

Page 31Session 604 – Successful Training Implementation through a Continuous Learning Plan – Maria Leggett, Textron Inc.

Training Portal

31

Page 33: Successful Training Implementation through Continuous Learning

March 24 – 26, 2010 Orlando, FL

Page 32Session 604 – Successful Training Implementation through a Continuous Learning Plan – Maria Leggett, Textron Inc.

Provide Practice Opportunities

32

Page 34: Successful Training Implementation through Continuous Learning

March 24 – 26, 2010 Orlando, FL

Page 33Session 604 – Successful Training Implementation through a Continuous Learning Plan – Maria Leggett, Textron Inc.

Create a Learning Community

33

Engage learners to learn from each other.

Start the forum with a tip and allow users to share feedback and tips.

Page 35: Successful Training Implementation through Continuous Learning

March 24 – 26, 2010 Orlando, FL

Page 34Session 604 – Successful Training Implementation through a Continuous Learning Plan – Maria Leggett, Textron Inc.

Evaluate and Revise

• Gather Voice of the Customer (VOC)

– Assess the current level of the learners and define additional follow up training at scheduled times after the initial launch.

– Conduct Level 1 – 4 evaluations.

– Talk to Managers, Steering Committee Members, and Stakeholders.

34

Page 36: Successful Training Implementation through Continuous Learning

Session 604 – Successful Training Implementation through a Continuous Learning Plan – Maria Leggett, Textron Inc.

Page 1

March 24 – 26, 2010Orlando, FL

TRAINING PLAN

[PROJECT NAME]

Page 37: Successful Training Implementation through Continuous Learning

Session 604 – Successful Training Implementation through a Continuous Learning Plan – Maria Leggett, Textron Inc.

Page 2

March 24 – 26, 2010Orlando, FL

TABLE OF CONTENTS

SECTION 1.0  PROJECT OVERVIEW............................................................................................. 3 

SECTION 2.0  BUSINESS NEEDS ..................................................................................................... 4 

SECTION 3.0 TEAM.......................................................................................................................... 5 

3.1  PERSON(S) / TEAM MEMBERS THAT ARE RESPONSIBLE FOR WRITING THE PLAN: .............................. 5 3.2  SPONSORS OF THE PLAN:.............................................................................................................. 5 3.3  KEY DEPARTMENTS / STAFF INVOLVED OR AFFECTED BY THE PLAN: .............................................. 5 

SECTION 4.0  TRAINING CURRICULUM OUTLINE.................................................................... 6 

SECTION 5.0  OTHER CONSIDERATIONS.................................................................................... 8 

SECTION 6.0 REVISION HISTORY.............................................................................................. 11 

Page 38: Successful Training Implementation through Continuous Learning

Session 604 – Successful Training Implementation through a Continuous Learning Plan – Maria Leggett, Textron Inc.

Page 3

March 24 – 26, 2010Orlando, FL

Section 1.0 Project Overview

Page 39: Successful Training Implementation through Continuous Learning

Session 604 – Successful Training Implementation through a Continuous Learning Plan – Maria Leggett, Textron Inc.

Page 4

March 24 – 26, 2010Orlando, FL

Section 2.0 Business Needs

Page 40: Successful Training Implementation through Continuous Learning

Session 604 – Successful Training Implementation through a Continuous Learning Plan – Maria Leggett, Textron Inc.

Page 5

March 24 – 26, 2010Orlando, FL

Section 3.0 Team

3.1 Person(s) / Team members responsible for writing the plan:

Name Email address Phone Number

3.2 Sponsors of the plan:

Name Email address Phone Number

3.3 Key departments / staff involved or affected by the plan:

Department Function # Staff Impacted

Page 41: Successful Training Implementation through Continuous Learning

Session 604 – Successful Training Implementation through a Continuous Learning Plan – Maria Leggett, Textron Inc.

Page 6

March 24 – 26, 2010Orlando, FL

Section 4.0 Training Curriculum Outline Training Title Competency

Addressed Suggested

Target Audience

High Level Agenda Items

Delivery Method and Availability

Priority

Page 42: Successful Training Implementation through Continuous Learning

Session 604 – Successful Training Implementation through a Continuous Learning Plan – Maria Leggett, Textron Inc.

Page 7

March 24 – 26, 2010Orlando, FL

Section 5.0 Resources and Materials Training Media PRINT MANUALS AND JOB AIDS, CBT, EPSS, FREQUENTLY ASKED QUESTIONS, BLOG, WIKI, DISCUSSION BOARD, ONLINE HELP

Page 43: Successful Training Implementation through Continuous Learning

Session 604 – Successful Training Implementation through a Continuous Learning Plan – Maria Leggett, Textron Inc.

Page 8

March 24 – 26, 2010Orlando, FL

Section 6.0 Delivery Methods CLASSROOM ILT, ASYNCHRONOUS E-LEARNING, SYNCHRONOUS ONLINE SESSION, OJT, VIDEO OR PHONE CONFERENCE, MOBILE LEARNING

Page 44: Successful Training Implementation through Continuous Learning

Session 604 – Successful Training Implementation through a Continuous Learning Plan – Maria Leggett, Textron Inc.

Page 9

March 24 – 26, 2010Orlando, FL

Section 7.0 Evaluation and Measurement Evaluation WHAT METHOD OF EVALUATION IS BEING USED TO DETERMINE THE SUCCESS OF THE OVERALL PLAN AND HOW OFTEN WILL THE EVALUATION(S) OCCUR? (Level I – Reaction, Level II – Learning, Level III – Behavior, Level IV – Results) Tracking and Reporting HOW WILL THE EDUCATION, TRAINING, DRILLS AND EXERCISES INCLUDED IN THE PLAN BE TRACKED AND REPORTED?

Page 45: Successful Training Implementation through Continuous Learning

Session 604 – Successful Training Implementation through a Continuous Learning Plan – Maria Leggett, Textron Inc.

Page 10

March 24 – 26, 2010Orlando, FL

Section 8.0 Training Continuum Sustainability HOW OFTEN WILL ASSESSMENTS BE DONE AND THE PLAN REVIEWED AND EVALUATED TO SUSTAIN THE TRAINING PLAN? Risks WHAT RISKS OR BARRIERS EXIST TO THE IMPLEMENTATION, EXECUTION AND SUSTAINABILITY OF THE TRAINING PLAN? Ongoing Course Identification Process HOW WILL FUTURE TRAINING COURSES BE IDENTIFIED FOR INCLUSION INTO THE TRAINING PLAN?

Page 46: Successful Training Implementation through Continuous Learning

Session 604 – Successful Training Implementation through a Continuous Learning Plan – Maria Leggett, Textron Inc.

Page 11

March 24 – 26, 2010Orlando, FL

Section 9.0 Revision History

Version Date Name Description

Page 47: Successful Training Implementation through Continuous Learning

Session 604 – Successful Training Implementation through a Continuous Learning Plan – Maria Leggett, Textron Inc.

Page 13

March 24 – 26, 2010Orlando, FL

TRAINING PLAN

TeamConnect 3.1 Upgrade

Page 48: Successful Training Implementation through Continuous Learning

Session 604 – Successful Training Implementation through a Continuous Learning Plan – Maria Leggett, Textron Inc.

Page 14

March 24 – 26, 2010Orlando, FL

TABLE OF CONTENTS

SECTION 1.0  PROJECT OVERVIEW........................................................................................... 15 

SECTION 2.0  BUSINESS NEEDS ................................................................................................... 15 

AUDIENCE NEEDS ASSESSMENT .......................................................................................................... 15 

SECTION 3.0 TEAM ........................................................................................................................... 17 

3.1  PERSON(S) / TEAM MEMBERS RESPONSIBLE FOR WRITING THE PLAN:............................................ 17 3.2  SPONSORS OF THE PLAN: ............................................................................................................ 17 3.3  KEY DEPARTMENTS / STAFF INVOLVED OR AFFECTED BY THE PLAN: ............................................. 17 

SECTION 4.0  TRAINING CURRICULUM OUTLINE.................................................................. 18 

SECTION 5.0  RESOURCES AND MATERIALS........................................................................... 22 

SECTION 6.0  DELIVERY METHODS........................................................................................... 23 

SECTION 8.0  TRAINING CONTINUUM....................................................................................... 25 

SECTION 9.0 REVISION HISTORY.................................................................................................. 26 

Page 49: Successful Training Implementation through Continuous Learning

Session 604 – Successful Training Implementation through a Continuous Learning Plan – Maria Leggett, Textron Inc.

Page 15

March 24 – 26, 2010Orlando, FL

Section 1.0 Project Overview The TeamConnect application needed to be moved to new and more functional servers. In addition, Mitratech released the 3.1 version of TeamConnect. This major upgrade is a huge improvement to the interface and application performance of TeamConnect. Textron needs to implement this release to improve the user experience. With the significant upgrade to the user interface, extensive re-training will be required for the attorneys and legal staff. There are also significant new features with the upgrade that require training sessions.

Section 2.0 Business Needs Textron needs to upgrade to 3.1 to improve user experience and improve platform stability and better application support. The user interface of TeamConnect has changed drastically with the new version and therefore, extensive training will need to be conducted to help users transition to the new version. In addition, business processes in TeamConnect have evolved or changed since TeamConnect was first implemented in 2004. After extensive data cleanup, the goal is to use the launch of the new version to train new and existing users on proper procedures of entering data into TeamConnect to ensure accurate, valid legal data.

Audience Needs Assessment TeamConnect currently has 225 users. The different legal process areas in TeamConnect are Legal Matters – Litigation and Non-Litigation, Intellectual Property, Legal Entities and Corporate Secretary Functions, Site Remediation, Invoicing – Manual and Electronic and the Processing of Service of Process on TeamConnect and its Business Units. TeamConnect Functions

• 59% of users enter new matter records • 48% of users update and track legal records in TeamConnect • 59% of user search for data in TeamConnect • 55% of users enter invoices • 43% of users review and approve invoices • 11% of users utilize TeamConnect for Intellectual Property information • 7% of users utilize TeamConnect for Compliance information • 13% of users create new contact records

Page 50: Successful Training Implementation through Continuous Learning

Session 604 – Successful Training Implementation through a Continuous Learning Plan – Maria Leggett, Textron Inc.

Page 16

March 24 – 26, 2010Orlando, FL

TeamConnect Level of Expertise

• 2% of users consider themselves experts • 48% of users consider themselves skilled • 41% of users consider themselves occasional users • 9% of users consider themselves new or beginner users

Methods of Learning

• 75% prefer Instructor-Led Training • 33% prefer online training • 38% prefer to use job aids and quick tip sheets • 25% prefer to use training manuals • 18% prefer to use FAQs • 11% prefer to use Online Help

Page 51: Successful Training Implementation through Continuous Learning

Session 604 – Successful Training Implementation through a Continuous Learning Plan – Maria Leggett, Textron Inc.

Page 17

March 24 – 26, 2010Orlando, FL

Section 3.0 Team

3.1 Person(s) / Team members responsible for writing the plan:

Name Email address Phone Number Maria Leggett [email protected]

3.2 Sponsors of the plan:

Name Email address Phone Number Julie Duffy [email protected]

3.3 Key departments / staff involved or affected by the plan:

Department Function # Staff Impacted

Enterprise Legal Legal administration and support, legal invoice processing

225

Page 52: Successful Training Implementation through Continuous Learning

Session 604 – Successful Training Implementation through a Continuous Learning Plan – Maria Leggett, Textron Inc.

Page 18

March 24 – 26, 2010Orlando, FL

Section 4.0 Training Curriculum Outline Training Title Competency

addressed Suggested

Target Audience

High Level Agenda Items Delivery

Method and Availability

Getting Started with TeamConnect

New Features in TeamConnect

All Users • Navigating in TeamConnect • Setting up personal preferences in

TeamConnect • Setting up Email Notifications •

Instructor-Led Webex/online tutorial/Quick Guides/Manuals

Searching in TeamConnect

Searching for data in TeamConnect

All Users • Introduction to Collections • Managing Collections • Defining Search Result Settings • Customizing Searching • Exporting Search Results

Instructor-Led Webex/online tutorial/Quick Guides/Manuals

TeamConnect Matter Records

Working with Records

All Matter Users

TeamConnect Records • Creating a New Record • Editing and Updating a Record • Cancelling Edits and Handling

Unsaved Edits • Copying a Record • Printing a Record • Record Security • Adding History Records • Working with Relations • Adding Record Assignees • Uploading Documents • Adding Involved Parties • Managing Records Expenses • Managing Tasks and Appointments

Instructor-Led Webex/online tutorial/Quick Guides/Manuals

TeamConnect Contacts

Working with Contact Records

All Users • Searching for Contacts • Viewing Contacts • Using Contact Collections • Duplicate Contacts • Creating New Contacts • Editing and Updating Contacts • Printing Contacts • Managing Address Books • Viewing and Subscribing to

Address Books • Printing Address Books

Instructor-Led Webex/online tutorial/Quick Guides/Manuals

Page 53: Successful Training Implementation through Continuous Learning

Session 604 – Successful Training Implementation through a Continuous Learning Plan – Maria Leggett, Textron Inc.

Page 19

March 24 – 26, 2010Orlando, FL

Training Title Competency addressed

Suggested Target

Audience High Level Agenda Items

Delivery Method and Availability

TeamConnect IP Records

Working with Records

All IP Users

TeamConnect IP Records • Creating a New Record • Editing and Updating a Record • Cancelling Edits and Handling

Unsaved Edits • Copying a Record • Printing a Record • Record Security • Adding History Records • Working with Relations • Adding Record Assignees • Uploading Documents • Adding Involved Parties • Managing Records Expenses • Managing Task and Appointments • Working with Patent Foreign

Filings and Trademark Countries

Instructor-Led Webex/online tutorial/Quick Guides/Manuals

TeamConnect Corporate Secretary Records

Working with Records

All Corporate Secretary Users

TeamConnect Corporate Secretary Records • Creating a New Record • Editing and Updating a Record • Cancelling Edits and Handling

Unsaved Edits • Copying a Record • Printing a Record • Record Security • Adding History Records • Working with Relations • Adding Record Assignees • Uploading Documents • Adding Involved Parties • Managing Records Expenses • Managing Task and Appointments

Instructor-Led Webex/online tutorial/Quick Guides/Manuals

Page 54: Successful Training Implementation through Continuous Learning

Session 604 – Successful Training Implementation through a Continuous Learning Plan – Maria Leggett, Textron Inc.

Page 20

March 24 – 26, 2010Orlando, FL

Training Title Competency addressed

Suggested Target

Audience High Level Agenda Items

Delivery Method and Availability

TeamConnect Invoices

Working with Invoices and Accounts

All Users Electronic Invoices • Setting Up Records for Electronic

Invoices • Reviewing Electronic Invoices • Making Adjustments to Electronic

Invoices • Approving Electronic Invoices • Rejecting Electronic Invoices • Printing Electronic Invoices • Invoice Workflows • Invoice Versions • Searching for Invoices • Marking an Invoice for Non-

Payment Manual Invoices • Creating an invoice via a Template • Adding Invoice Line Items • Editing Invoices and Line Items • Posting an Invoice • Adjusting an Invoice • Canceling an Invoice • Approving an Invoice • Rejecting an Invoice • Printing an Invoice • Uploading an Invoice Document • Searching for Invoices • Entering a Do Not Pay Invoice

Activating AP Vendors • Searching for an Active AP Vendor • Downloading the W9 Form • Requesting Vendor Activation • Confirming a Vendor is Active to

Invoice in TeamConnect

Instructor-Led Webex/online tutorial/Quick Guides/Manuals

TeamConnect Documents

Working with Documents in TeamConnnect

All Users • Searching for Documents • Uploading documents • Checking Out a Document • Checking In a Document • Creating a Document Folder • Copying a Document • Moving Documents • Generating a Document via a

Template

Page 55: Successful Training Implementation through Continuous Learning

Session 604 – Successful Training Implementation through a Continuous Learning Plan – Maria Leggett, Textron Inc.

Page 21

March 24 – 26, 2010Orlando, FL

Training Title Competency addressed

Suggested Target

Audience High Level Agenda Items

Delivery Method and Availability

TeamConnect Budgets and Reserves

Working with Budget and Reserves in TeamConnect

All Users • Creating a Record Budget • Editing and Updating a Record

Budget • Entering Reserves on a Record • Editing and Updating Reserves on a

Record • Adding Settlement Information • Reviewing Matter Account

Information • Reviewing Account Transactions

Page 56: Successful Training Implementation through Continuous Learning

Session 604 – Successful Training Implementation through a Continuous Learning Plan – Maria Leggett, Textron Inc.

Page 22

March 24 – 26, 2010Orlando, FL

Section 5.0 Resources and Materials Training Media The training materials will consist of:

• Frequently Asked Questions • TeamConnect Glossary • TeamConnect 3.1 Getting Started Guide • Quick Guides – short (1-2 page guides with steps on how to complete a specific

task or function) • Training Manuals • Weekly Show Me Demonstrations and Tips

Page 57: Successful Training Implementation through Continuous Learning

Session 604 – Successful Training Implementation through a Continuous Learning Plan – Maria Leggett, Textron Inc.

Page 23

March 24 – 26, 2010Orlando, FL

Section 6.0 Delivery Methods Based on the audience needs assessment, instructor-led training will be a large component in the delivery. With a dispersed workforce, the ITL training will consist of both classroom ILT and virtual ITL sessions. Prior to the launch of the training, demonstration sessions will be conducted to provide previews of the new system and allow for questions regarding the training delivery. Four weeks prior to the launch, learners will begin to receive email updates on the training schedule as well as information quick tips on some of the new functionality with the system.

Page 58: Successful Training Implementation through Continuous Learning

Session 604 – Successful Training Implementation through a Continuous Learning Plan – Maria Leggett, Textron Inc.

Page 24

March 24 – 26, 2010Orlando, FL

Section 7.0 Evaluation and Measurement Evaluation All evaluations will be delivered and tracked through Textron University. Class participants must complete the class evaluation in order to receive training credit through Textron University. An email with a link to the training evaluation will be generated 1 day after the class completion. Tracking and Reporting Training sessions including instructor-led Webex sessions and self-paced online learning will be administered and tracked through Textron University. A TeamConnect 3.1 Training Curriculum will be established in Textron University and courses and class sessions and online training will be set up to fulfill the training curriculum. Training communication to the TeamConnect user community will include the listing of the class session numbers in Textron University for participants to locate and register for the class on Textron University. Outcome Measurement Level 1 assessment will be fulfilled through evaluations delivered through Textron University after a class completion to determine if high-level expectations were met with the training delivery. Level 2 assessment will be fulfilled through online self-checks and quizzes delivered through Textron University. These quizzes will not be required for class completion but will be used as other vehicles to determine training effectiveness.

Page 59: Successful Training Implementation through Continuous Learning

Session 604 – Successful Training Implementation through a Continuous Learning Plan – Maria Leggett, Textron Inc.

Page 25

March 24 – 26, 2010Orlando, FL

Section 8.0 Training Continuum Sustainability A follow-up VOC survey will be conducted 1 month after launch to assess current ability with the new version and define additional follow up training. Assumptions It is assumed that learners will be motivated to register and attend training since the training is not a required activity. Risks Training plan may need to be implemented in phases particularly in the area of additional training resources due to other upgrade priorities such as user testing. Not all users will participate in the training rollout. Risk audience includes the attorneys who often are not active in the system or do not use the system properly. Gaps Given the short timeline, a complete learning assessment was not conducted prior to developing the training plan. A prior VOC survey indicates that users currently are not that experienced or familiar with TeamConnect. In addition to the new features and functionality of TeamConnect 3.1, the training plan will need to address basic system competencies such as creating matters, creating contacts, searching for records and entering and processing invoices. Ongoing Course Identification Process User surveys and course evaluations will identify current training successes as well as identify future needs.

Page 60: Successful Training Implementation through Continuous Learning

Session 604 – Successful Training Implementation through a Continuous Learning Plan – Maria Leggett, Textron Inc.

Page 26

March 24 – 26, 2010Orlando, FL

Section 9.0 Revision History

Version Date Name Description