Practical legal aspects for implementation of biogas projects under “green” tariff danevychlaw.com Practical aspects of production and use of biogas in Ukraine. German-Ukrainian dialogue on biogas 26 September 2013 Kyiv, Ukraine

Presentation by Maksym Sysoiev for Biogas conference_September 2013_english

Embed Size (px)

Citation preview

Page 1: Presentation by Maksym Sysoiev for Biogas conference_September 2013_english

Practical legal aspects for implementation of biogas projects under “green” tariff

danevychlaw.com

Practical aspects of production and use of biogas in Ukraine.

German-Ukrainian dialogue on biogas

26 September 2013Kyiv, Ukraine

Page 2: Presentation by Maksym Sysoiev for Biogas conference_September 2013_english

Legislative incentives for development of biogas projects in Ukraine

Rates of “green” tariff for electricity from biogas

Rates change/decrease in the future

Local content for “green” tariff projects

Procedure and main requirements/conditions for getting “green” tariff

danevychlaw.com

CONTENT

Page 3: Presentation by Maksym Sysoiev for Biogas conference_September 2013_english

Strong international focus

Actively involved into green energy legal environment

IFC expert on “green” tariff mapping in Ukraine

Legal expert and partner of Ukrainian Bioenergy Association and Ukrainian Wind Energy Association

We are proud to provide Clients with services which make the environment better and the economy of Ukraine stronger

danevychlaw.com

DANEVYCH law firm

Page 4: Presentation by Maksym Sysoiev for Biogas conference_September 2013_english

Tax incentives under the Tax Code exemption from import VAT and customs dutiesdecrease of land tax for bioenergy power plants by 75%limits for rental payments for lands lease from state and municipal authorities by 3% of appraisal valueexemption from CPT of

profit from main activity of companies in the energy sphere which produces electricity only from renewable till 2021profit from simultaneous production of electricity and heat and/or heat from biofuels till 2020

Possibility to use JI under Kyoto Protocol for biomass/biogas energy projects

The mechanism of the "green" tariff (GT)

danevychlaw.com

Incentives for development of biogas projects

Page 5: Presentation by Maksym Sysoiev for Biogas conference_September 2013_english

All alternative energy sources, except for blast furnace and coke oven gas, and hydroelectric power plants over 10 MW

However, only certain alternative energy sources have a legally guaranteed level of “green” tariff, including biogas and biomass (table below)

For all other alternative energy sources, e.g. household wastes, e.g. coal bed methane, NERC sets “green” tariff at its discretion at substantiated level

a relatively low level

danevychlaw.com

The coverage of «green» tariff

Page 6: Presentation by Maksym Sysoiev for Biogas conference_September 2013_english

GT rate for bioenergy

Categories eligible to

GT

Rate of the tariff (€ / kW) depending on commissioning date

 

till 31.03.201

3 inclusively

from 01.04.2013

till 31.12.2014

from 01.01.201

5 till 31.12.201

9

from 01.01.202

0 till 31.12.202

4

from 01.01.202

5 till 31.12.202

9

Electricity from

biomass 0,12386 0,12386 0,11147 0,09908 0,0867

Electricity from

biogas - 0,12386 0,11147 0,09908 0,0867

Page 7: Presentation by Maksym Sysoiev for Biogas conference_September 2013_english

In the middle of 2009 the core legislation on the current feed-in tariff scheme (GT) was enacted

As of beginning of September 2013 GT is established for 105 companies operating 163 power plants

danevychlaw.com

Current statistics

Why not so much as it could be?!

142358 86

Page 8: Presentation by Maksym Sysoiev for Biogas conference_September 2013_english

NERC approves minimal fixed GT rates only for bioenergy power plants (BPPs) using solely biomass/biogas!!!

Combined use of biomass/biogas and conventional energy sources make BPPs ineligible to minimal fixed GT rate for biogas regardless of biogas share

There is no minimal fixed GT rate for biogas installations commissioned till 1.04.2013!!!

danevychlaw.com

Combined use and GT, biogas and GT

Page 9: Presentation by Maksym Sysoiev for Biogas conference_September 2013_english

Term «biomass» silage, energy willow and other energy crops are not covered only biodegradable component of wastes covered

Biogas is a gas formed from biomass

State Classifier on Wastes as a guidance

If you are using energy crops, you can’t obtain GT!

danevychlaw.com

Definitions of biomass and biogas

Page 10: Presentation by Maksym Sysoiev for Biogas conference_September 2013_english

Its rates are not tied to retail rates or average rates for producers of electricity

They are fixed as of January 1, 2009 in EUR and linked to EUR/UAH exchange rate (if more than 10.86)

The State guarantees GT application to commissioned power plants and purchase of all electricity produced by them

danevychlaw.com

Guarantee of GT application in the future

Page 11: Presentation by Maksym Sysoiev for Biogas conference_September 2013_english

Wholesale Electricity Market of Ukraine (WEM) represented by State Enterprise “Energorynok”

State guarantee of purchase of all electricity under GT

Direct sales of electricity to consumers Legislative limitations Absence of economic and administrative incentives

Changes of the mechanism of sales in the future in the draft law No. 0916 of 12.12.2012 (as of 01.09.13)

guaranteed purchaser responsibility for imbalanceadditional permit if installation ≥ 5 MWexpected to enter into force in 2017

danevychlaw.com

Purchase of electricity at GT rates

Page 12: Presentation by Maksym Sysoiev for Biogas conference_September 2013_english

If a construction began in 2012 or later, the rates of the local component depends on the year of commissioning and shall be for biogas:

since 01.04.2013 till 01.07.2013, 15% (old calculation approach)since 2014 - 30%since 2015 - 50%

NERC will itself determine Ukrainian content based on certificates of origin, legal documents, etc.

danevychlaw.com

Local contentrequirement (from 1.04.2013)

Page 13: Presentation by Maksym Sysoiev for Biogas conference_September 2013_english

The fixed shares since 2014

danevychlaw.com

LCR for biogas power plants (since 1.07.2013)

Elements of local content Operations should be taken in Ukraine Fixed share, %

Bioreactor for hydrolysis manufacturing 35

Cogenerator manufacturing 35

Construction works performance 30

Total   100

Page 14: Presentation by Maksym Sysoiev for Biogas conference_September 2013_english

According to the order of calculation of the LCR of the NERCIf developer has 100% of one of the element of Ukrainian origin from the table, it can use this element regardless of the value to fulfill the respective share from the table, e.g. in the case of biogas

100 of construction works by a Ukrainian EPC – 30%100% of the cogenerator manufactured in Ukraine – 25 %

As a result, ≥ 50% of LCR is fulfilled!!?Practical problem!!!

most of the equipment is not produced in Ukraine, or produced not enough and won’t be produced enough incorrect terminology unclear the approach of the CCI for an issuance ofcertificates of origin non-exhaustive list of documents for LCR

proceduredanevychlaw.com

LCR and fixed shares

Page 15: Presentation by Maksym Sysoiev for Biogas conference_September 2013_english

Rates of GT shall be approved by NERC for each producer after filing the application and the required package of documents regarding the constructed and commissioned WF

Term for passing a decision by NERC: Consideration of documents package– 30 calendar days Approval by NERC’s meeting– 15 calendar days

GT documentation in the respective NERC’s Resolution

GOOD NEWS! You can ask for GT, License and LCR together

danevychlaw.com

Approval of GT (currently)

Page 16: Presentation by Maksym Sysoiev for Biogas conference_September 2013_english

Set up of a company Electricity producer licenseLCR procedureConnection to the grid Participation in WEM and signing WEM Agreement Conclusion of agreement for sales of electricity with State Enterprise “Energorynok” Execution of documentation for power plants construction

documents on the use of land plots project documentationcommissioning etc.

danevychlaw.com

Conditions for GT ProjectsImplementation

Page 17: Presentation by Maksym Sysoiev for Biogas conference_September 2013_english

State Standard on Class of Consequences (Responsibility) and Complexity Category of Construction Objects (effective since September 1, 2013)

heightened environmental hazard objects are V category complexity construction objects = harsh requirements!!!

The list of heightened environmental hazard objects (effective since July 27, 1995)

production of electricity and heat based on organic fuel

Biogas installations are of V category?

Unclear legislation and not persuasive argumentation in the Standard and other acts in this regard

biogas no really organic fuel heightened environmental hazard objects does not

necessarily = V category danevychlaw.com

Class V category issue

Page 18: Presentation by Maksym Sysoiev for Biogas conference_September 2013_english

danevychlaw.com

Conditions for GT ProjectsImplementation

Set up of a company (charter shall provide that

the company produces

electricity) )

Acquisition of rights in land

Construction

Registration of ownership

Registration of leases

Registration of easements and

superficies

Change of designated purpose

License for electricity

production

Receipt of electricity producer’s

license

Receipt of a license for CHP

Joining WEM and Signing WEM Agreement

Conclusion of agreement with

Energorynok

GT approval by NERC + LCR procedure

Tax and customs duties breaks

Exemption from import VAT and customs duties

25% of required land tax

Maximal annual lease payments – 3% of appraisal value

Exemption from corporate profit tax till 2021

Receipt of initial data

Receipt of technical

conditions

Development of project

documentation

Examination of PD, if necessary

Registration of declaration re preparatory

works, if necessary

Registration of declaration re beginning of construction

Receipt of permission r e

construction works

Issue of Certificate on readiness for

exploitation

Registration of declaration on

readiness

Registration of ownership

Connection to the grid

Page 19: Presentation by Maksym Sysoiev for Biogas conference_September 2013_english

Main legislative barriers for development of GT projects

state guarantee

local content requirement

definition of "biomass“

no possibility to combine the use of biomass/biogas and traditional energy sources

overall investment climate and state support

danevychlaw.com

Legislative barriers

Page 20: Presentation by Maksym Sysoiev for Biogas conference_September 2013_english

CONTACTS

t +38 044 596 46 36 f +38 044 596 46 35e [email protected] a 10 B, Vozdvyzhenska Street, Office 8, Kyiv, 04071 Ukrainewww.danevychlaw.com

MAKSYM SYSOIEV, LL.M., Attorney-at-law, Senior Associate of DANEVYCH law firm