SlideDDSP Pre-proposal Conference

PRE-PROPOSAL CONFERENCEfor

SP0700-05-R-7019

INSTALLATION SERVICES AT DDSP

Presented by DSCC-DR

November 10, 2005

Page 2: Pre-Proposal Conference Power Point Presentation, Sections A-C

SlideDDSP Pre-proposal Conference

Agenda

• Review DDSP Request For Proposal (RFP) in its entirety

• Questions will be addressed at conclusion of applicable sections

• Breaks

Page 3: Pre-Proposal Conference Power Point Presentation, Sections A-C

SlideDDSP Pre-proposal Conference

General Information

Information to Offerors or Quoters:

• Negotiated Request For Proposals

• 100% Small Business Set-Aside

• Telegraphic Offers are Unacceptable

• DDSP competition announced 03/04/05

• FTEs at announcement: 138

• Point of Contact

– E-Mail address: [email protected]– Fax: (614) 692-6273

Page 4: Pre-Proposal Conference Power Point Presentation, Sections A-C

SlideDDSP Pre-proposal Conference

Section A

Solicitation, Offer & Award - Standard Form 33

• Block 9: January 27, 2006 NLT 2:00 p.m.

– Volumes I: Price Proposal & Executed Request for Proposal Documents & Certifications

– Volume II: Installation Services

– Volume III: Past Performance

• Block 11: Table of Contents

• Blocks 13 through 18: Completed by Offeror

• Blocks 19 through 28: Completed by Government

Page 5: Pre-Proposal Conference Power Point Presentation, Sections A-C

SlideDDSP Pre-proposal Conference

Section C

Performance Work Statement (PWS):

• Section C-1, General Conditions & Requirements

• Section C-2, Definitions & Acronyms

• Section C-3, Government-Furnished Property, Systems, Training & Support Services

• Section C-4, SP-Furnished Equipment, Material, Supplies & Support Services

• Section C-5, Specific Tasks

• Section C-6, Applicable Directives, Publications, Instructions And Forms

• Section C-7, Technical Exhibits (TEs)

Page 6: Pre-Proposal Conference Power Point Presentation, Sections A-C

SlideDDSP Pre-proposal Conference

Scope of Work

• Provide installation support services performed at the Defense Distribution Center Susquehanna, Pennsylvania (DDSP), which includes all management, personnel, supervision, materials, tools, equipment, transportation and any other items/services not government-furnished in Section C-3

• Major functional areas include:

– Facility Maintenance and Repair– Utilities Systems Operations, Maintenance, and Repair– Grounds Maintenance and Repair– Equipment Maintenance and Repair– Mail Services– Refuse, Recycling & Hazardous Material/Waste Services

Page 7: Pre-Proposal Conference Power Point Presentation, Sections A-C

SlideDDSP Pre-proposal Conference

C-1, General Operating Conditions & Requirements

• Section C-1 Covers:– Primary Customers– Federal Holidays– Core Hours and Access to Installation– Facilities Manager Requirements– Meetings, Conferences, and Briefings– Records Management– Security– Safety

Page 8: Pre-Proposal Conference Power Point Presentation, Sections A-C

SlideDDSP Pre-proposal Conference

C-1, General Operating Conditions& Requirements

(cont’d.)

• Section C-1.8, Phase-In

– Shall not exceed 120 days

– SP to propose date when transfer of responsibility for each functional area will occur

– Phase-In Plan to be submitted, evaluated IAW with L15, and incorporated into the contract/LoO

– SP shall participate in a joint inventory of GFP

– SP shall provide weekly status reports on phase-in

• Section C-1.9, Phase-Out

Page 9: Pre-Proposal Conference Power Point Presentation, Sections A-C

SlideDDSP Pre-proposal Conference

C-2, Definitions & Acronyms

• Definitions

– Terms used throughout the document that may not be commonly used in installation services industry

• Acronyms and abbreviations

– Used throughout this PWS

• DoD Dictionary of definitions and terms web site

Page 10: Pre-Proposal Conference Power Point Presentation, Sections A-C

SlideDDSP Pre-proposal Conference

Section C-3, GFP, Systems, Training & Support

Government-Furnished Property

• GFP is regulated by FAR Part 45 and FAR 52.245

• GFP is identified in Technical Exhibits 3.1-3.9

Government Property Use

Facilities (C-3.2.1) Optional

Equipment (C-3.2.2) Optional

Material (C-3.2.5) Optional

Data Systems (C-3.3) Mandatory

Page 11: Pre-Proposal Conference Power Point Presentation, Sections A-C

SlideDDSP Pre-proposal Conference

Government-Furnished Property (GFP)

• Used only for performance under any resulting contract

• Joint inventories of GFP will be conducted pursuant to an approved Phase-In Plan

• SP shall identify and submit to Government:

– equipment to be retained – assigned government condition code– SP assigned condition code– basis of discrepancy, if any, between codes– any existing damage above normal wear & tear

Page 12: Pre-Proposal Conference Power Point Presentation, Sections A-C

SlideDDSP Pre-proposal Conference

Government-Furnished Property (GFP) (cont’d.)

• GFP is provided in an “as is” condition

• GFP accepted by the SP shall be considered to be without damage and/or in the condition listed in the TE

• Accepted GFP will be made available to the SP at the end of phase-in for the applicable functional area

• Acceptance and use of GFP does not relieve SP’s responsibility for providing all resources & material to perform requirements

Page 13: Pre-Proposal Conference Power Point Presentation, Sections A-C

SlideDDSP Pre-proposal Conference

Government-Furnished Facilities (GFF)

• Maintenance & Accountability of GFF

– Title to GFF will remain at all times with the Government

– Title to parts replaced by the SP in carrying out normal maintenance shall pass to the Government

– The SP may propose fixed improvements or alterations to GFF using the Individual Job Order (IJO) process IAW C-5.2.2.3

Page 14: Pre-Proposal Conference Power Point Presentation, Sections A-C

SlideDDSP Pre-proposal Conference

Government-Furnished Equipment (GFE)

• Maintenance & Accountability of GFE

– The SP is responsible for the maintenance of GFE IAW the requirements in Section C-5.6

– SP shall maintain inventory records and accountability of all GFE valued at $300 or greater (except furniture) through DPAS

– SP shall be responsible for the replacement of GFE under $100,000

– Government replaces equipment over $100,000

Page 15: Pre-Proposal Conference Power Point Presentation, Sections A-C

SlideDDSP Pre-proposal Conference

Government-Furnished Equipment (GFE) (cont’d.)

• SP shall notify KO or designee and return GFE to Government when no longer wanting the GFE

• Title to equipment purchased by the SP remains with the SP unless the equipment is used as a sub-component on GFE

• SP personnel shall operate GFE and SP-furnished equipment in a safe manner

• SP employees shall obtain required licensing, certification, or specialized training for operating or maintaining vehicles, MHE, or other equipment

Page 16: Pre-Proposal Conference Power Point Presentation, Sections A-C

SlideDDSP Pre-proposal Conference

GFP – Other Equipment and IT Assets

• Other Equipment:

– Government will provide tools/other equipment and office equipment (See TEs 3.4 & 3.5)

– Government-leased equipment will not be provided

• Information Technology (IT) Assets: (See TE 3.5)

– Government will: Replace or upgrade whenever Gov’t mandate requires

such replacements or upgrades Maintain furnished software systems and provide

support for problems with any mandated system Perform system administration functions Upgrade, change, and implement new technology

Page 17: Pre-Proposal Conference Power Point Presentation, Sections A-C

SlideDDSP Pre-proposal Conference

GFP – IT Assets (cont’d)

• Information Technology (IT) Assets (cont’d):

– SP shall: Perform routine and corrective maintenance Shall replace computers with new, updated

models every four years and replace printers with new, updated models every five years

SP shall document each occurrence of equipment replacement to the KO or designee within ten days

Page 18: Pre-Proposal Conference Power Point Presentation, Sections A-C

SlideDDSP Pre-proposal Conference

Government-Furnished Material (GFM)

• The type of GFM available is described in the Technical Library under On-Hand Bench Stock Items

• Government will provide GFM on hand at the start of full performance, which may not match exact types as listed in the Technical Library

• SP is responsible for determining if the GFM is suitable for use

• SP is responsible for providing all material necessary to perform the PWS requirements

Page 19: Pre-Proposal Conference Power Point Presentation, Sections A-C

SlideDDSP Pre-proposal Conference

Government-Furnished Data Systems

• Government will furnish the SP with access to data systems for performance of the PWS requirements

• Government will upgrade and maintain these government-furnished, non-commercially available systems:– Defense Property Accountability System (DPAS)– Equipment Management and Control System (EMACS)– Integrated Facility System (IFS)– Integrated Pest Management Information System (IPMIS)– Supply 2000 (S2K)– Energy Management Control Systems (EMCS)– Fuel Sentry VI System– Enterprise Brass Works (EBW) Tank Monitor System

Page 20: Pre-Proposal Conference Power Point Presentation, Sections A-C

SlideDDSP Pre-proposal Conference

Government-Furnished Training

• C-3.4, Government-Furnished Training:

– Government provides instructor at no cost to SP

– SP will be reimbursed for travel costs associated with GF Training.

– SP is responsible for any costs in excess of that allowed under FAR 31.205-46

– SP is responsible for all cost for training in excess of the required referenced frequency, or number of authorized trainees

– SP shall comply with training requirements as specified in TE 3.7

Page 21: Pre-Proposal Conference Power Point Presentation, Sections A-C

SlideDDSP Pre-proposal Conference

Government-Furnished Services

• C-3.5: Support Services provided at no cost to the SP

* For all GFE and only SP-owned equipment used to perform requirements in C-5.5.1.2 and C-5.5.2.2, Grounds

Custodial Environmental Forms

Fuels* Mail Medical

Police and Fire Radio Freq Telephone

Utilities Refuse Collection and Recycling

Page 22: Pre-Proposal Conference Power Point Presentation, Sections A-C

SlideDDSP Pre-proposal Conference

C-4, SP-Furnished

• SP shall provide all equipment, material, supplies necessary to perform the requirements of the PWS, except for GFF

• Except as provided in FAR 52.245-2(c), title to SP-furnished equipment remains with the SP

• SP shall return any residual material to the Government at the conclusion of any resultant contract

• SP shall be responsible for all services otherwise not listed in C-3

• SP shall provide training identified in TE 4.1 and any other training required to perform PWS requirements

Page 23: Pre-Proposal Conference Power Point Presentation, Sections A-C

SlideDDSP Pre-proposal Conference

C-5, Specific Tasks

5.1 General Requirements

5.2 Management and Administration

5.3 Facilities Maintenance and Repair

5.4 Utilities Systems Operation, Maintenance and Repair

5.5 Grounds Maintenance and Repair

5.6 Equipment Maintenance and Repair

5.7

5.8Mail Services

Refuse, Recycling & Hazardous Material/Waste Services

Page 24: Pre-Proposal Conference Power Point Presentation, Sections A-C

SlideDDSP Pre-proposal Conference

C-5.1, General Requirements

• C-5.1.1, Scheduled Requirements

– Preventative Maintenance (PM): The cyclic inspection and servicing of facilities and equipment as identified in the TEs designed to maintain operational capability, increase asset life and reduce life cycle costs

– SP shall perform and maintain a PM program IAW manufacturer’s specifications during warranty and thereafter IAW the schedules provided in the TEs.

– PM schedules are pre-established in EMACS for equipment and EMACS will generate an equipment work order (EWO) annotated with a “P” for PM

Page 25: Pre-Proposal Conference Power Point Presentation, Sections A-C

SlideDDSP Pre-proposal Conference

C-5.1, General Requirements (cont’d)

• C-5.1.1, Scheduled Requirements (cont’d)

– For repair actions identified by the SP during routine PM actions, the SP shall make any repairs when the total material and supplies for replacements does not exceed $500. (See 5.2.2.4.1)

– Recurring requirements include but are not limited to daily operational activities such as: operation of the wastewater treatment plant, water distribution system and heat/steam plant, daily testing of water, grass mowing and snow removal

Page 26: Pre-Proposal Conference Power Point Presentation, Sections A-C

SlideDDSP Pre-proposal Conference

C-5.1, General Requirements (cont’d)

• C-5.1.2, Unscheduled Requirements

– Service Order: repair work including, but not limited to, non-recurring maintenance, repairs, replacements and miscellaneous service calls May consist of multiple tasks or the same task several

timesMay be initiated by the KO or designee via the Work

Order Reception, or by the SP identified during scheduled PM

SOs shall not exceed $2500 in labor and materialsHistorical data on SOs by priority and by craft is

available in the Technical Library

Page 27: Pre-Proposal Conference Power Point Presentation, Sections A-C

SlideDDSP Pre-proposal Conference

C-5.1, General Requirements (cont’d)

• C-5.1.2, Unscheduled Requirements (cont’d)

– Equipment Work Order (EWO): work requirements generated by the SP through EMACS to document unscheduled equipment repair, modification or replacement work identified during the PM cycle or requested by the customer EWOs are annotated with an “E” for emergency or

“U” for unscheduled maintenanceIf within 2 weeks of a PM requirement, EMACS will

change the annotation to a “B”Historical data on EWOs is available in the Technical

Library

Page 28: Pre-Proposal Conference Power Point Presentation, Sections A-C

SlideDDSP Pre-proposal Conference

C-5.1, General Requirements (cont’d)

• C-5.1.2, Unscheduled Requirements (cont’d)

– Individual Job Order (IJO): work requirements that exceed the SO threshold of $2,500 and normally include repairs, enhancements, improvements, modifications or changes to existing facility capabilities Usually requires multiple tradesIJO requests are received on DA Form 4283 for

estimationIJOs shall not exceed $25,000 in labor & materialsHistorical data on IJOs is available in the Technical

Library

Page 29: Pre-Proposal Conference Power Point Presentation, Sections A-C

SlideDDSP Pre-proposal Conference

C-5.2, Management and Administration

• C-5.2.1, Work Order Reception

– Work orders are requests for work to be performed on facilities or equipment

– The Government will operate a Work Reception Desk to initially receive SOs, IJOs and EWOs

– Work order requests can be received both by telephonic and written means, to include SP generated requirements

– SP work orders shall be submitted within 5 days of discovery, except for emergency or priority 1 SOs which shall be submitted immediately

– Government will input and assign priorities to all approved work orders into IFS and EMACS for SP performance

Page 30: Pre-Proposal Conference Power Point Presentation, Sections A-C

SlideDDSP Pre-proposal Conference

C-5.2, (cont’d) Management and Administration

• C-5.2.2, Administration of Work Orders

– Preventative Maintenance (PM) requirements for all facilities and equipment are listed in the TEs

– PM Equipment Work Orders are received through EMACS

– SP shall use the TEs for PM schedules for facilities

– The SP shall review and provide recommended adjustments (as needed) to the PM schedules to the KO or designee for approval

Page 31: Pre-Proposal Conference Power Point Presentation, Sections A-C

SlideDDSP Pre-proposal Conference

C-5.2, (cont’d) Management and Administration

• C-5.2.2, Administration of Work Orders (cont’d)

– Service Orders (SO)All SOs are given a number in IFSSP inputs to IFS are listed in C-5.2.2.2(A)SP shall monitor SO hours and material costsIn the event the SO is expected to exceed the $2,500

threshold, the SP shall notify the KO or designee for reclassification to an IJO

Page 32: Pre-Proposal Conference Power Point Presentation, Sections A-C

SlideDDSP Pre-proposal Conference

C-5.2, (cont’d) Management and Administration

• C-5.2.2, Administration of Work Orders (cont’d)

– Emergency (Priority 1) Service OrdersImmediate action is required to mitigate life

threatening or serious injury, prevent loss or damage to Gov’t property, secure sensitive property, or to restore essential services

SP shall commence work within 30 minutes during core hours

SP shall work continuously until the emergency condition is eliminated and service is restored

Secondary work resulting from Priority 1 SOs

Page 33: Pre-Proposal Conference Power Point Presentation, Sections A-C

SlideDDSP Pre-proposal Conference

C-5.2, (cont’d) Management and Administration

• C-5.2.2, Administration of Work Orders (cont’d)

– Urgent (Priority 2) Service OrdersSOs that could become an emergency or could hinder

performance of installation activitiesSP shall commence work within 1 hour during core

hoursSP shall complete permanent remedy within 5 days of

receipt

– Routine (Priority 3) Service OrdersWork that does not pose an immediate threat to public

health, safety, property, or to mission operationsSP shall commence work within 5 days of receiptSP shall complete within 30 calendar days of receipt

Page 34: Pre-Proposal Conference Power Point Presentation, Sections A-C

SlideDDSP Pre-proposal Conference

C-5.2, (cont’d) Management and Administration

• C-5.2.2, Administration of Work Orders (cont’d)

– Individual Job Order (IJO)Limited to $25,000 per projectProjects estimated to cost more than $25,000 will be

competitively contractedSP shall prepare an IJO project package as

indicated in C-5.2.2.3(D) for approval by the KOProvide status, or the completed package at the

weekly meetingIf SP proposal is approved, task order will be issuedPerformance on the IJO shall begin within 15 days

Page 35: Pre-Proposal Conference Power Point Presentation, Sections A-C

SlideDDSP Pre-proposal Conference

C-5.2, (cont’d) Management and Administration

• C-5.2.2, Administration of Work Orders (cont’d)

– Individual Job Order (IJO) (con’t)If Gov’t non-concurs with the SP proposal, the

project package normally will be returned for revision of the estimate, or withdrawn

C-5.2.2.3(G): Differing Site Conditions, Stop Work Orders, Termination for Convenience

SP shall not perform work requiring a change order until the change order has been approved in writing by the KO

SP shall submit acceptance document to KO or designee within 10 days of project completion

Page 36: Pre-Proposal Conference Power Point Presentation, Sections A-C

SlideDDSP Pre-proposal Conference

C-5.2, (cont’d) Management and Administration

• C-5.2.2, Administration of Work Orders (cont’d)

– Equipment Work Order (EWO) All EWOs are given a number in EMACSFor repair actions under $500 in cost identified during

routine PM, SP shall proceed with repairsRepairs in excess of $500 require submission of an

estimate for KO approval prior to repair actions SP shall input EWO information into EMACS such as

work progress, cost tracking, equipment, material, and closeout information

SP shall notify KO when repair work reaches 75% of the not-to-exceed amount in Section B

Page 37: Pre-Proposal Conference Power Point Presentation, Sections A-C

SlideDDSP Pre-proposal Conference

C-5.2, (cont’d) Management and Administration

• C-5.2.2, Administration of Work Orders (cont’d)

– After Core Hours Work Order ReceptionAfter hour service calls are automatically forwarded

to the Public Safety OfficeSP shall provide a Call Out Roster of personnelSP shall arrive on-site within 60 minutes for

Emergency SOs and 3 hours for urgent SOs

• C-5.2.3, Weekly Meeting: held between KO or designee and SP to discuss workload, job status, project planning, and any issues with scheduled maintenance activities– Review: SOs approaching $2,500, IJO requests, open

EWOs, and projected 10-day work schedule

Page 38: Pre-Proposal Conference Power Point Presentation, Sections A-C

SlideDDSP Pre-proposal Conference

C-5.2, (cont’d) Management and Administration

• C-5.2.4, Customer Coordination

– SP shall establish customer support procedures and provide to the KO within 30 days of operation

– SP shall provide to all customers in writing

– Procedures shall address scheduling of work, notice of utility disruptions, notifying customers of inspection of completed work, work status, etc.

• C-5.2.5, Quality Control/Customer Satisfaction Plan (QC/CSP)

– Submitted IAW L14

– Continue to update and maintain

– Monthly reports addressing APLs

Page 39: Pre-Proposal Conference Power Point Presentation, Sections A-C

SlideDDSP Pre-proposal Conference

C-5.2, (cont’d) Management and Administration

• C-5.2.6, Property Accountability– SP shall maintain the custody and care of all GFP– SP shall be held financially liable for loss or damage caused by

negligence, willful misconduct or unauthorized use

• C-5.2.7, Indemnification and Limitation of Liability– SP shall indemnify the Gov’t and hold it harmless against claims

for injury to persons or damage to property resulting from use of GFP

• C-5.2.8, Automated Work Order Management Systems– Equipment Management and Control System (EMACS)– Integrated Facility System (IFS)– PM Database– Supply 2000 (S2K) – Energy Monitoring and Control System (EMCS)

Page 40: Pre-Proposal Conference Power Point Presentation, Sections A-C

SlideDDSP Pre-proposal Conference

C-5.2, (cont’d) Management and Administration

• C-5.2.9, Disruption of Services

– SP shall position GFE portable generators and provide temporary water supply as directed

– Planned Disruptions: coordinated 15 days in advanced

– Unplanned Disruptions: SP shall provide a verbal report ASAP to the KO or designee, but NLT 1 hour

– Coordinate with local utility company during power outages

• C-5.2.10, Warranties – Facilities and Equipment

– SP shall use warranties whenever possible for maintenance and repair

Page 41: Pre-Proposal Conference Power Point Presentation, Sections A-C

SlideDDSP Pre-proposal Conference

C-5.2, (cont’d) Management and Administration

• C-5.2.12, Permits/Clearances

– Hot Work Permit

– Confined Space Entry Permit

– Energized Electrical Work Permit

– Salvage Bird Permit

• C-5.2.13, Excavation Authorization

– SP shall coordinate with the KO prior to performing any excavations on the installation

• C-5.2.14, Lock Out/Tag

– Applicable when performing maintenance of electrical systems

Page 42: Pre-Proposal Conference Power Point Presentation, Sections A-C

SlideDDSP Pre-proposal Conference

C-5.3, Facilities Maintenance and Repair

• C-5.3.1, Scheduled Requirements– SP shall perform preventative inspection/maintenance on a

recurring basis on buildings, structures, and associated property and equipment encompassing a variety of tradesHeating, Ventilation, Air Conditioning (HVAC)Mechanical SystemsSwimming PoolInterior Electrical SystemsAlternate Power SupplyBulk FuelsAlarm SystemsFire Protection Systems MaintenancePublic Address and Mass Communication SystemsMiscellaneous Facility MaintenanceWinterization and De-winterization of Facilities

Page 43: Pre-Proposal Conference Power Point Presentation, Sections A-C

SlideDDSP Pre-proposal Conference

C-5.3, Facilities Maintenance and Repair, (cont’d)

• C-5.3.2, Unscheduled Requirements – Service Orders (SO)– SP shall perform SO work as explained in C-5.2.2.2 and

could be a combination of the following trades:Carpentry Roofing Masonry Painting

Sheet Metal Welding Electrical Systems Electronic Systems

Generators Elevator Plumbing/Pipefitting Fire Hydrants

Chlorine Systems HVAC Storm Support Pressure Washing

Appliances Sign Work Locksmith Services Fuel Distribution Systems

Alarm Systems Doors Pneumatic Document Transfer System

FH/Occupancy Lead-Based Paint, Mold, Asbestos Abatement

Page 44: Pre-Proposal Conference Power Point Presentation, Sections A-C

SlideDDSP Pre-proposal Conference

C-5.3, Facilities Maintenance and Repair, (cont’d)

• C-5.3.3, Family Housing

– This includes all work, both scheduled and unscheduled, for the family housing area covered under C-5.3.1 and C-5.3.2

• C-5.3.4, Unscheduled Requirements – Individual Job Orders (IJO)

– Work that exceeds the $2,500 threshold for SOs

– SP to provide estimate and perform IAW IJO process described in C-5.2.2.3

– The SP shall receive all VIP visits and special event requirements as an IJO

Page 45: Pre-Proposal Conference Power Point Presentation, Sections A-C

SlideDDSP Pre-proposal Conference

C-5.4, Utilities Systems Operation, Maintenance and Repair

• C-5.4, Utilities Systems Operation, Maintenance and Repair– SP shall perform preventative inspection/maintenance and

operation of the following systems: Waste Water Treatment Storm Water Water Distribution Exterior Electrical Distribution Central Steam Plant

– SP is encouraged to propose upgrades that will increase efficiency of the utility systems

– SP shall perform unscheduled tasks initiated through either a SO or approved IJO for all utility systems

Page 46: Pre-Proposal Conference Power Point Presentation, Sections A-C

SlideDDSP Pre-proposal Conference

C-5.5, Grounds Maintenance and Repair

• C-5.5.1, Scheduled Requirements: SP shall provide roads and grounds maintenance

– C-5.5.1.1, Roads, Parking Areas, and Drives Road/Paved area maintenance ensures that paved

areas are clean and provide a safe driving surface SP shall provide street sweeping services every two

weeks year round weather permitting SP shall run the magnet tractor once a month on the

main roads and parking lots and as needed in high traffic areas

Page 47: Pre-Proposal Conference Power Point Presentation, Sections A-C

SlideDDSP Pre-proposal Conference

C-5.5, Grounds Maintenance and Repair (cont’d)

• C-5.5.1.2, Grounds– SP shall maintain grounds such as lawns, bedding areas,

grass, trees, shrubs, plant beds and plants as specified for the following designation areas: Improved Unimproved

• C-5.5.1.3, Compost and Mulch– SP shall maintain compost piles– SP shall provide labor and equipment to process through

Trommel Screen– SP shall load compost for employees, housing resident

and local municipalities

Page 48: Pre-Proposal Conference Power Point Presentation, Sections A-C

SlideDDSP Pre-proposal Conference

C-5.5, Grounds Maintenance and Repair (cont’d)

• C-5.5.1.4*, Snow and Ice Control Services

– SP shall provide 24 hours per day/7 days per week operations to maintain installation operational capability at all times.

– SP shall provide regular and complete updates during a snow event to assist in decisions for delayed start times.

– Warehouse docks, ramps and transporter lines will be cleared upon receipt of a Service Order (SO).

Page 49: Pre-Proposal Conference Power Point Presentation, Sections A-C

SlideDDSP Pre-proposal Conference

C-5.5, Grounds Maintenance and Repair (cont’d)

• C-5.5.1.5, Pest Management Services

– Objective is to protect public health and installation property by controlling insects, rodents and other pests, vermin or organisms while minimizing the use of pesticides

– SP shall only use pesticides from the list of authorized chemicals and pesticides in TE 5.39

– SP pest control technicians shall be certified

– SP shall maintain pesticide application records for 2 years

– SP shall perform monthly inspections and treatments in facilities

Page 50: Pre-Proposal Conference Power Point Presentation, Sections A-C

SlideDDSP Pre-proposal Conference

C-5.5, Grounds Maintenance and Repair (cont’d)

• C-5.5.2, C-5.5.4 Unscheduled Requirements – SOs/IJOs– SP shall perform work as a result of SOs and IJOs generated as

described in the PWS for the following areas: Roads, Parking Areas (e.g. patching potholes)Improved Grounds (e.g. landscaping work)Playground and Recreational Areas (e.g. assemble playground

equipment) Tree removal and ReplacementLitter and Debris RemovalMiscellaneous Grounds Support (e.g. heavy equipment)Pest Control Service Call (e.g. wild animal control)

• C-5.5.3, Family Housing– This includes all work, both scheduled and unscheduled, for the

family housing area covered under C-5.5.1 and C-5.5.2

Page 51: Pre-Proposal Conference Power Point Presentation, Sections A-C

SlideDDSP Pre-proposal Conference

C-5.6, EquipmentMaintenance and Repair

• C-5.6, Equipment Maintenance and Repair

– Maintenance includes both preventative and corrective – DDSP has approximately 2,000 pieces of equipment– SP shall update EMACS maintenance data after each

maintenance action

• C-5.6.2, Scheduled Requirements– SP shall use EMACS to generate PM work orders– SP shall coordinate scheduling of equipment due for PM

at least 1 week in advance of the maintenance date– If the SP identifies repair work during PM that is less

than $500 in cost, SP shall proceed with the repairs*

Page 52: Pre-Proposal Conference Power Point Presentation, Sections A-C

SlideDDSP Pre-proposal Conference

C-5.6, EquipmentMaintenance and Repair (cont’d )

• C-5.6.3, Unscheduled Requirements – Misc. Repairs

– Trouble CallsSP shall respond to breakdowns within 30 minutesSP shall make repairs on site or make diagnosis within

1 hour SP shall deadline the equipment if repairs cannot be

made on site

– Small Engine Repair

– New Equipment

– Equipment Disposal

Page 53: Pre-Proposal Conference Power Point Presentation, Sections A-C

SlideDDSP Pre-proposal Conference

C-5.6, EquipmentMaintenance and Repair (cont’d )

• C-5.6.4, Equipment Work Orders (EWO)

– SP performs repairs if less than $500 without authorization

– If repairs exceed $500, SP shall provide an estimate for approval prior to performing repairs

• C-5.6.5, GSA Vehicle

– SP must be certified by GSA to maintain and repair GSA vehicles

– SP shall perform repairs up to $100 without approval

– Repairs in excess of $100 require GSA approval of a written estimate prior to repair

– SP shall perform new vehicle inspections

Page 54: Pre-Proposal Conference Power Point Presentation, Sections A-C

SlideDDSP Pre-proposal Conference

C-5.6, EquipmentMaintenance and Repair (cont’d )

• C-5.6.5, GSA Vehicle (cont’d)

– GSA vehicles are normally warranted for 3 years or 36,000 miles

– SP shall maintain GSA TDY fleet management

• C-5.6.6, Family Housing

– This includes all work, both scheduled and unscheduled, for the family housing area covered under C-5.6.2, C-5.6.3 and C-5.6.5

Page 55: Pre-Proposal Conference Power Point Presentation, Sections A-C

SlideDDSP Pre-proposal Conference

C-5.7, Mail Services

• C-5.7.1, Mail Services– SP shall operate the DDSP Mail Center to receive,

process, dispatch, and deliver incoming and outgoing mail, correspondence, and parcels

– SP shall monitor postage meter and expenditures– Military Mail Processing– SP shall provide small parcel packaging services for

customers upon request– Notify KO when additional funds are required for

the postage meter head

Page 56: Pre-Proposal Conference Power Point Presentation, Sections A-C

SlideDDSP Pre-proposal Conference

C-5.8, Refuse/Recycling/Hazardous

Material/Waste Services

• C-5.8.1, Refuse Services

– SP shall collect and dispose of all refuse from dumpsters, roll-offs, compactor units, and collection containers.

– SP shall weigh full vehicles transporting recyclable and receive a printed IN and OUT weight ticket.

– Refuse/roll off containers will be maintained. Type I Container (4, 6, and 8 CY) for refuseType II Container (20 and 30 CY) roll offsType III Container (30-40 GL) refuse collection

Page 57: Pre-Proposal Conference Power Point Presentation, Sections A-C

SlideDDSP Pre-proposal Conference

C-5.8, Refuse/Recycling/Hazardous

Material/Waste Services

• C-5.8.2, Recycling Services

– DDSP has an aggressive recycling program and utilizes various containers: Type I (4, 6, and 8 CY) designed for cardboardType II (20 & 30 CY) lined roll offsType IV (80 GL Tote Paper) some with locksType V (35 GL Bottles & Cans) plastic, glass & cansType VI (Recycling Igloo-6 hole) for plastic, glass &

cans

Page 58: Pre-Proposal Conference Power Point Presentation, Sections A-C

SlideDDSP Pre-proposal Conference

C-5.8, Refuse/Recycling/Hazardous

Material/Waste Services

• C-5.8.2, Recycling Services– Administrative and Housing Area

Weekly pickup of totesHousing o Pickup every Thursdayo Cardboard boxes upon request

– Industrial RecyclingMaintain and Replace containers for tires, cardboard,

banding, scrap metal and woodMaintain Scrap Yard

Page 59: Pre-Proposal Conference Power Point Presentation, Sections A-C

SlideDDSP Pre-proposal Conference

C-5.8, Refuse/Recycling/Hazardous

Material/Waste Services

• C-5.8.3, Hazardous Material/Waste Services– Control accumulation and provide containers and spill

response kits for satellite accumulation areas.– Open and receive waste for disposal at Bldg. 149.– Pick up and transport waste from Auto Hobby Shop and

Army Petroleum Center. – Operate the RCRA 90 day storage facility with trained

operators/two man rule.– Prepare for turn-in for disposal.– Repackage as required for turn-in– Maintain a conex container for small misc. items

Page 60: Pre-Proposal Conference Power Point Presentation, Sections A-C

SlideDDSP Pre-proposal Conference

C-6, Applicable Directives, Publications, Instructions, Forms &

Reports

• C-6.1, General Information

– SP must comply with cited regulations

– Precedence for when references conflict

• C-6.2, Deviation from Guidance

• C-6.3, Publication Changes

– Publications cited in this PWS are current as of the date the PWS was prepared.

– SP shall immediately implement changes resulting in a decrease or no change in cost of performance

– Any resulting price changes will be negotiated with the KO under the “Changes” clause

Page 61: Pre-Proposal Conference Power Point Presentation, Sections A-C

SlideDDSP Pre-proposal Conference

C-6, Applicable Directives, Publications, Instructions, Forms &

Reports

• C-6.4, Directives/Publications

• C-6.5, Forms

• C-6.6, Mandatory Reports/Plans

– Monthly, Quarterly, Annual and As Required Reports

• C-6.7, Technical Library

Page 62: Pre-Proposal Conference Power Point Presentation, Sections A-C

SlideDDSP Pre-proposal Conference

C-7, Technical Exhibits

• Technical Exhibits listed by reference are with the same force and effect as if they were in full text

• Full text can be accessed at: www.supply.dla.mil/A76

• Numbering of TEs

– First digit represents the Section which the TE is first referenced

– Second digit is simply a numerical count of the total number of TEs in that section.

Example: TE 3.1, GFF, is first referenced in Section C-3 of the PWS

Page 63: Pre-Proposal Conference Power Point Presentation, Sections A-C

SlideDDSP Pre-proposal Conference

Section B

Supplies or Services and Price/Costs

• Base Period consists of the first and second performance periods (total of 16 months)

• Option Periods (total of 4)

– Three 12-month option periods – Performance Periods 3-5

– One 8-month option period – Performance Period 6

• Total possible performance period: 5 years

Page 64: Pre-Proposal Conference Power Point Presentation, Sections A-C

SlideDDSP Pre-proposal Conference

Section B

• Line Item 0001: Phase-In Period (C-1.8)– Total phase-in to be complete NLT 120 days after

Notice To Proceed– SP to propose when they will assume responsibility

of various functions– Firm Fixed Price

• Line Item 0002 through 0008: Various Services

– Firm Fixed Price Monthly Unit Price– Includes everything except: Emergency SOs, EWOs

and IJOs – Family Housing - Funding

Page 65: Pre-Proposal Conference Power Point Presentation, Sections A-C

SlideDDSP Pre-proposal Conference

Section B

• Line Item 0009: Emergency Service Orders

– Outside Core Hours

– Time and Material

– Labor reimbursed based on labor rates in Table B-1

– Material Costs reimbursed

– NTE amounts

• Line Item 0010: Equipment Work Orders (EWOs)

– Labor costs reimbursed based on rates in Table B-1

– Material Costs reimbursed

– NTE amounts

Page 66: Pre-Proposal Conference Power Point Presentation, Sections A-C

SlideDDSP Pre-proposal Conference

Section B

• Line Item 0011: Individual Job Orders (IJOs)

– Labor costs reimbursed based on rates in Table B-1

– Material Costs reimbursed

– NTE amounts

• Line Item 0012: Travel

– No unit price or total price

– Reimbursement IAW allowable costs

• Line Item 0013: Contract Reports, C-6.6

Page 67: Pre-Proposal Conference Power Point Presentation, Sections A-C

SlideDDSP Pre-proposal Conference

Section B

• Table B-1 provides both normal and overtime rates under Service Contract Act and Davis Bacon Act

– Rates should be loaded to include fringe benefits

– Include a markup percentage to cover G&A, O/H, profit

– Wage rates will be adjusted IAW Far 52.222-41 and FAR 52.222-6

• CLINs 200X through 400X address option year pricing

• B01: Calculation of Price

• B02: Remittance Address