20
LOGISTICS AND PUBLIC DEVELOPMENT POLICIES IN 2007-2013: FINDINGS OF AN OBSERVATORY ON CONVERGENCE REGIONS CONVERGENCE REGIONS Alessandro Panaro University of Cagliari May 10, 2012

Panaro input 2012

Embed Size (px)

DESCRIPTION

Alessandro Panaro on "Logistics and Public Development Policies in 2007-2013: Findings of an Observatory on Convergence Regions"

Citation preview

Page 1: Panaro   input 2012

LOGISTICS AND PUBLIC DEVELOPMENT POLICIES IN

2007-2013: FINDINGS OF AN OBSERVATORY ON

CONVERGENCE REGIONSCONVERGENCE REGIONS

Alessandro Panaro

University of Cagliari May 10, 2012

Page 2: Panaro   input 2012

Objectives of the paper

1) Monitor the performance of funds in terms ofpayments

2) Analyze the results achieved in terms of2) Analyze the results achieved in terms ofphysical implementation and problems observed

3) Compare the 2000-2006 and 2007-2013programming

Page 3: Panaro   input 2012

Observational instruments

� National Operational Programs (NOPs)

� Regional Operational Programs (ROPs)

for programming 2000-2006 and 2007-2013

Page 4: Panaro   input 2012

Methodology

1) Analysis of Final Execution Report (FER) – lastavailable

2) Analysisof AnnualExecutionReport(RAE) – last2) Analysisof AnnualExecutionReport(RAE) – lastavailable

Area analyzed:Objective 1 Regions (2000-2006)Convergence Regions (2007-2013)

Page 5: Panaro   input 2012

SRM reports the results of this

observatory in any research observatory in any research

dedicated to transport

Page 6: Panaro   input 2012

Structure of the presentation

�Comparison OPTransport 2000-2006 and OPNetworksandMobility 2007-2013NetworksandMobility 2007-2013

�Comparison Regional OPs

Page 7: Panaro   input 2012

NOP 2000-2006 and 2007-2013:the reference areas

OP Transport: Objective 1 Regions(Basilicata, Calabria, Campania, Apulia,Sardinia, Sicily)

OP Networks and Mobility: ConvergenceRegions (Calabria, Campania, Sardinia,Sicily)

Page 8: Panaro   input 2012

OP 2000-2006 and 2007-2013:the total cost

4.000

5.000Million €

- 39,2%

Source: SRM elaborations on OP T 2000-2006 and OP N&M 2007-2013 data

4.520

2.749

0

1.000

2.000

3.000

OP Transport 2000-2006 OP Network and Mobility 2007-2013

- 39,2%

Page 9: Panaro   input 2012

OP 2000-2006 and 2007-2013: the resources for inhabitant

120

160

200€

Source: SRM elaborations on OP T 2000-2006 data, OP N&M 2007-2013 data and ISTAT data (2011)

174,1 162,9

0

40

80

120

OP Transport 2000-2006 OP Network and Mobility 2007-2013

Resources/people

Page 10: Panaro   input 2012

OP 2000-2006 and 2007-2013:the resources for sq. km

25.000

30.000

35.000

40.000

45.000€

Source : SRM elaborations on OP T 2000-2006 data, OP N&M 2007-2013 data and ISTAT data (2011)

41.921,737.286,1

0

5.000

10.000

15.000

20.000

25.000

OP Transport 2000-2006 OP Network and Mobility 2007-2013

Resources/sq.km

Page 11: Panaro   input 2012

OP 2000-2006 and 2007-2013:the resources by type of work

1.500

2.000

2.500Million €

Source: SRM elaborations on OP T 2000-2006 data, OP N&M 2007-2013 data and their Execution Report

2.179

1.407

273566

56

774

279 188 41 320

500

1.000

Railways Highways e national roads

Ports Airports Inter and multimodal transport

OP T OP N&M

-64,5%

-92,7%-31,1%-80,1% -43,1%

Page 12: Panaro   input 2012

OP 2000-2006 and 2007-2013:the share of resources by region

30%

40%

Source: SRM elaborations on OP T 2000-2006 data, OP N&M 2007-2013 data and their Execution Report

16%

38%

15% 16%20% 18%

28%34%

0%

10%

20%

Calabria Campania Apulia Sicily

OP T OP N&M

Page 13: Panaro   input 2012

OP 2000-2006 and 2007-2013:the progress*

25%

30%

35%

40%

45%

*The data refer to Monitoring to 29/02/2012 for the OP N&M and 28/02/2005 for the OP TSource: MEF - RGS, 2012

38,8%

26,8%

41,8%

16,4%

0%

5%

10%

15%

20%

25%

Funding Payments

OP T 2000-2006 OP N&M 2007-2013

Page 14: Panaro   input 2012

ROPs 2000-2006 and 2007-2013*:the total cost

+45,3%

+526,5%

+82,2%

800

1.000

1.200

1.400

1.600Million €

* Were considered only the 4 regions of Convergence Area with respect to specific measures for transport for theperiod 2000-2006 and the Axis specific for 2007-2013Source: SRM elaborations on ROPs 2000-2006 data, ROPs 2007-2013 data and their Execution Report

6,50%

0

200

400

600

800

Calabria Campania Apulia Sicily

ROP 2000-2006 ROP 2007-2013

Page 15: Panaro   input 2012

ROPs 2000-2006 and 2007-2013:the resources for inhabitant

+7,3%

+43,1%

+519%

+80,5%

200

250

300€

Source: SRM elaborations on ROPs2000-2006 data, ROPs 2007-2013 data and their Execution Report and ISTAT data (2011)

0

50

100

150

Calabria Campania Apulia Sicily

2000-2006 2007-2013

Page 16: Panaro   input 2012

ROP 2000-2006 and 2007-2013:the resources for sq. km

+45,4%

+526,5% +82,2%60.000

75.000

90.000€

Source: SRM elaborations on ROPs 2000-2006 data, ROPs 2007-2013 data and their Execution Report and ISTAT data (2011)

+6,6%

0

15.000

30.000

45.000

Calabria Campania Apulia Sicily

2000-2006 2007-2013

Page 17: Panaro   input 2012

OPs FESR of the Convergence Regions 2007-2013:the progress to 29/02/2012

Funding Payments

Calabria 43,1% 16,7%

Source: MEF - RGS, 2012

Calabria 43,1% 16,7%

Campania 40,5% 11,6%

Apulia 59,3% 22,8%

Sicily 41,7% 12,4%

Page 18: Panaro   input 2012

Some causes of delays

� The “changing of the guard”Il “cambio della guardia”

� Works bound at the exit of the programming documentsOpere vincolate all’uscita di documenti di programmazioneOpere vincolate all’uscita di documenti di programmazione

� “Ordinary” bureaucratic delays“Ordinari” rallentamenti burocratici

� Design problemsProblemi progettuali

� Complaints and disputesRicorsi e contenziosi

Page 19: Panaro   input 2012

Conclusions

� Homogenization of the objectives for comparabilityOmogeneizzare degli obiettivi per confrontabilità

�Improving the critical informationMigliorare l’informazione criticaMigliorare l’informazione critica

�Revisiting the structures of AERRivisitare la struttura dei RAE

�Align the AERAllineare l’uscita dei RAE

Page 20: Panaro   input 2012

Thanks for your attention

www.sr-m.it