Carlo Minini – Sales and Business Development Manager Oceania
Bioenergy Australia Conference 2015 Launceston, November 30th
member member
ORC - Organic Rankine Cycle technology for biomass and EfW cogeneration and trigeneration
Ref.: 15-COM.P-23-rev.0
member
Copyrig
ht
© –
Tu
rboden
S.r
.l. A
llrig
hts
reserv
ed
About Us
Turboden is a leading European company in development and production of ORC(Organic Rankine Cycle) turbogenerators. This state of the art equipment generatesheat and power from renewable sources and heat recovery in industrial processes.
The company was founded in 1980 in Milan by Mario Gaia, Associate Professor atPolitecnico di Milano, teaching Thermodynamics, Renewable Energy and specificallystudying ORC systems. At present Prof. Gaia is Honorary Chairman. A number of hisformer students are key persons in the Company and the whole Company ispermeated by innovative and research oriented spirit.
Turboden has always had a single mission: to design ORC turbogenerators for theproduction of heat and electrical power from renewable sources, while constantlystriving to implement ORC technical solutions.
2
Copyrig
ht
© –
Tu
rboden
S.r
.l. A
llrig
hts
reserv
ed
1984 – 40 kWe ORC turbo-generator for a solar plant in Australia
1987 – 3 kWe ORC turbo- generator for a biomass plant in Italy
2008 – 3 MWe ORC turbo-generator for heat recovery on a waste incinerator in Belgium
1988 – 200 kWe ORC geothermal plant in Zambia
2009 – First 100 plants and first installed 100 MWe
2010 – First plant overseas
2015 – Over 300 ORC plants in the world and back to Australia!
3
Experience
Copyrig
ht
© –
Tu
rboden
S.r
.l. A
llrig
hts
reserv
ed
260 biomass projects in 30 countries (5 CCHP)9 Waste to Energy projects in 6 countries
4
Copyrig
ht
© –
Tu
rboden
S.r
.l. A
llrig
hts
reserv
ed
• standard units from 200 kWe to 10 MWe
• customized solutions up to 30 MWe
electricity
heat
Biomass
Heat recovery
Geothermal
Solar
Turboden designs and develops turbogenerators based on theOrganic Rankine Cycle (ORC), a technology for the combinedgeneration of heat and electrical power from various renewablesources, particularly suitable for distributed generation
Waste to energy
“fuel”
5
What We Do
Copyrig
ht
© –
Tu
rboden
S.r
.l. A
llrig
hts
reserv
ed
Water
Small, fast moving molecules
Metal parts and blade erosion
Multistage turbine and high
speed with mechanical stress
High molecular mass fluid
Large flow rate
Larger diameter turbine with high
efficiency of the turbine (85-90%)
Slow rotation speed and few stages (2-5)
No wear of blades and metal parts
6
Water vs High Molecular Mass - Working Fluid
Copyrig
ht
© –
Tu
rboden
S.r
.l. A
llrig
hts
reserv
ed
Steam Rankine Cycle
Tem
per
atu
reEntropy
Tem
per
atu
re
Entropy
Organic Rankine Cycle (ORC)
• High enthalpy drop• Superheating needed• Risk of blade erosion
• Small enthalpy drop• No need to superheat• No supercritical pressure• No risk of blade erosion
Thermodynamic features and
consequences
• Water treatment required• Highly skilled personnel needed• High pressures and temperatures in the cycle
• Non-oxidizing working fluid with no corrosion issues• Minimal personnel and O&M (1)
• Completely automatic (2)
• No blow down
Operation and maintenance
costs
• Convenient for large plants and high temp• Low flexibility with significantly lower
performances at partial load
• High flexibility and good performances at partial load• High availability (average >98%)• Possibility to work at low temperatures (90+°C)
(1) Standard maintenance: 2-3 days per year(2) Fast start-stop procedure (ca. 20 min), partial load operation (down to 10% of nominal load)
Other features
7
ORC provides significant advantages as compared to steam
Copyrig
ht
© –
Tu
rboden
S.r
.l. A
llrig
hts
reserv
ed
ORC finds many applications in the Waste to Energy sector
Steam or hot water from incinerator boiler
1. Revamping of existing WTE plants
2. New units
Municipal Solid Waste gasification
Landfill engines exhaust gas
Primary heat conversion system - alternative to steam turbine
8
A
B
C
D
Energy can
neither be
created nor
destroyed, but it
can be wasted
’’
‘‘
Copyrig
ht
© –
Tu
rboden
S.r
.l. A
llrig
hts
reserv
ed
Heat sourceTurbo
expanderHeat
exchangers
Heat rejection system
Municipal solid waste incineration
Landfill gas Waste syngas Hot stream in WTE Other
Heat carrier loop:• Pressurized water• Saturated steam• Thermal oil1
Direct Exchange1
Electric power (or mechanical)
Cooling tower Water cooled condenser Air cooled condenser …
Potential thermal users: Process District heating Absorption chiller …
Organic Rankine Cycle Steam Rankine Cycle Other
Waste to Energy - General scheme
Flue gas cleaning
Note: 1) to be evaluated depending on exhaust gases composition
9
Copyrig
ht
© –
Tu
rboden
S.r
.l. A
llrig
hts
reserv
ed
Waste to Energy applications
Steam or hot water from incinerator/boiler
1. Bunker2. Furnace3. Heat recovery Steam generator3a. Economizer3b. District Heating Network
3c. ORC4a. ESP4b. Chemical Reactor4c. Bag Filter4d. Denox5. Chimney
3b
1. in existing plant as second user to existing district heating network2. for new installation also in power only configuration
A
34a
3a
2
1
4b 4c
4d
5
3c
10
Copyrig
ht
© –
Tu
rboden
S.r
.l. A
llrig
hts
reserv
ed
Plant type: 62,000 t/yr MSW plant, in operation since 19762 boilers of 8 MW each
Customer: MIROM
In operation since: April 2008
Heat source: hot water at 180°C (back 140°C)
Cooling source: water/air dissipation
Total electric power: 3 MW
Net electric efficiency: 16.5%
Availability: > 98%
• Example of Turboden 30 HR ORC plant for heat recovery from district heating waste to energy plant:
3 MWe installation in Roselare (Belgium)
• Good performance in a very fluctuating conditions
• Plant overall efficiency increased
Use of heat: hot water at 180°C
1. District heating from 1986: 21 customers, 7.5 km network
2. ORC from 2008, in parallel to district heating use
Waste to Energy applications
Hot water from WTEA
11
Mirom, Belgium
Copyrig
ht
© –
Tu
rboden
S.r
.l. A
llrig
hts
reserv
ed
Plant type:Heat recovery from pressurized water boiler in waste incinerator:• 2 lines of 9.5 t/h 150,000 t/yr• Production of superheated water at 200°C
130 GWh/yr to district heating, ORC in parallel
Customer: Seche Environnement Usine – Alcea(Nantes - France)
In operation since: October 2014
Heat source: hot water at 200°C (back 130°C)
Cooling source: water/air
Total electric power: 2.7 MW
Net electric efficiency: 16.5%Example of Turboden 30 HR Low temperature ORC plant for heat recovery from hot water: 2.7 MWe installation in Nantes (France)
Waste to Energy applications
Hot water from WTEA
12
Nantes, France
Copyrig
ht
© –
Tu
rboden
S.r
.l. A
llrig
hts
reserv
ed
Plant type:Heat recovery from low pressure steam in waste incinerator: • 5 t/h grate furnace of (PCI = 2200 kcal/kg)• Recovery boiler: 14 t/h steam at 350°C, 29.5 bar• Back pressure turbine of 1MW• District heating fed by steam at 4 bar with a 7 MW steam
exchanger hot water boiler
End user: UVE du SYDOM (operated by VEOLIA propreté RhinRhone) – Lons le Saunier, France
In operation since: August 2015
Heat source: low pressure steam at 4.5 bar 180°C (back 78°C)
Cooling source: air
Total electric power: 750 kW
Net electric efficiency: 13.6%
Low-pressure steamA
13
Waste to Energy applications
Lons le Saunier, France
Copyrig
ht
© –
Tu
rboden
S.r
.l. A
llrig
hts
reserv
ed
Internal combustion engine
Syngas combustion boiler
Syngas Turbine
Heat exchanger Direct Exchange Thermal oil
Mechanical/electric power
Cooling tower Water cooled condenser Air cooled condenser
Organic Rankine Cycle25 ÷ 35% additional power(1)
Note: 1) Percent of the prime mover nominal power referring to gas turbines
Municipal Solid Waste gasifier + syngas cleaning
Municipal Solid Waste gasificationB
14
Waste to Energy applications
Copyrig
ht
© –
Tu
rboden
S.r
.l. A
llrig
hts
reserv
ed
Plant type:Industrial waste synthesis gas burned in a thermal oil boiler
Customer: ITC-KA Enerji Uretim Sanayi VE TicaretA.S., Mamak (Ankara), Turkey
Started up in: 2014 and 2015
Heat source: thermal oil at 315°C from 2 boilers of 20 MWt each
Cooling source: cooling towers
Total electric power: 2 ORC units of 5.5 MWe each
Net electric efficiency: 25%
Availability: > 98%
Example of Turboden tailor-made ORC plant for heat recovery from waste gasification: 5.5 MWe installation in Ankara (Turkey)
Syngas combustion exhaustsB
15
Waste to Energy applications
Ankara, Turkey
Copyrig
ht
© –
Tu
rboden
S.r
.l. A
llrig
hts
reserv
ed
Internal combustion engine
Heat exchanger Direct Exchange Thermal oil
Mechanical/electric power
Cooling tower Water cooled condenser Air cooled condenser
Organic Rankine Cycle7 ÷ 10% additional power(1)
Note: 1) Percent of the prime mover nominal power
Landfill gasification
Landfill engines exhaust gas C
16
Waste to Energy applications
Copyrig
ht
© –
Tu
rboden
S.r
.l. A
llrig
hts
reserv
ed
Plant type:15MW engine power plant utilizing landfill gas (one of the largest facilities in Europe) 49,000 t/yr of biowaste composting
Customer: Helsinki Region Environmental Services Authority (HSY)
In operation since: October 2011
Heat source: thermal oil at 275°C from 4 MWM engines of 4 MWe each
Cooling source: air coolers
ORC electric power: 1.3 MW
Net electric efficiency: 20.6%
Availability: > 98%
Example of Turboden 14 HR ORC plant for heat recovery from landfill gasification: 1.3 MWe installation in Espoo (Finland)
Landfill gas feed enginesC
17
Waste to Energy applications
Helsinki, Finland
Copyrig
ht
© –
Tu
rboden
S.r
.l. A
llrig
hts
reserv
ed
Steam ORC
Working fluid temperature > 400°C 100 - 320°C
Working fluid pressure > 30 bar < 15 bar
Flexibility Low High
Operators needed At least 1 licensed operator 24/7 1 low-skilled 1 hour/day
Water treatment necessary not present
Turbine overhaul and/or replacement 5 – 7 years 20 years
Gross Electric Efficiency 20 – 30% 18 - 26%
Primary heat conversion system alternative to steam turbineD
18
Waste to Energy applications
Copyrig
ht
© –
Tu
rboden
S.r
.l. A
llrig
hts
reserv
ed
Ph
oto
: co
urt
esy
of
Alb
any
Co
un
ty S
ewag
e D
istr
ict
Plant type: Heat recovery from dried sewage sludge incineration(Sewer District water treatment plant)
End user: Albany County Sewer District
Site: Albany County, Menands, NY
Start-up in operation since March 2013
ORC electric power: 0.9 MW
Heat source: thermal oil at 285°C
Electrical efficiency: 19.3%
Cooling source: water/air dissipation
Dried sludge incinerationD
Multiple-hearth incineration for sewage-sludge produced in a 35 million gallon per day waste water treatment plant
Operation: 106 hours/week
1.5 dry tons per hour of sewage sludge
Exhaust gas from sludge incinerators: 538 - 677 °C
Incinerator flue gas volumetric flow rate: 17 ton/sec– 21 ton/sec
19
Waste to Energy applications
Menands, US
Copyrig
ht
© –
Tu
rboden
S.r
.l. A
llrig
hts
reserv
ed
20
CCHP – Combined Cooling Heating Power
coldwater
ABSORPTION CHILLER
hotwater
ELECTRIC POWER
DISTRICT HEATING
coldwater
COOLING SYSTEM
BIOMASS POWERED
BOILER
BIOMASS
ORC
Thermaloil
USE IN PUBLIC
BUILDINGS, HOTELS, …
Copyrig
ht
© –
Tu
rboden
S.r
.l. A
llrig
hts
reserv
ed
21
Hybrid Biomass/PV CCHP Reference Project
Client: Polytechnik for L’OREAL
Start-up: October 2014
Heat source: forestry and sawmill residues
Temperature: thermal oil at 312°C
Water temperature (in/out): 75/90°C
ORC electric power: 600 KW
Net electrical efficiency: 18%
Burgos, Spain
Copyrig
ht
© –
Tu
rboden
S.r
.l. A
llrig
hts
reserv
ed
22
Waste Biomass Reference Project
Client: Morton Seed and Grain / Unigrain
Start-up: September 2015
Heat source: oat husks
Temperature: 23 bar saturated steam
Water temperature (in/out): 27.5 - 38°C
Max electric power: 600 KW
Net electrical efficiency: 17%
Project description: The plant will convert between 6,000 and 10,000 tons of oat husk per year.The Turboden 6 HR ORC unit is fed with saturated steam instead of the traditional thermal oil and will be used at part load (60-80%) most of the time for a couple of years, taking advantage of its ability to follow variable loads and retain high part-load efficiency (e.g. at 50% load, around 90% of the nominal load efficiency).
Wagin, Western Australia
Copyrig
ht
© –
Tu
rboden
S.r
.l. A
llrig
hts
reserv
ed
23
Conclusions
Happy to answer your questions…
member membermember
Copyrig
ht
© –
Tu
rboden
S.r
.l. A
llrig
hts
reserv
ed
Back-up Slides
25
Copyrig
ht
© –
Tu
rboden
S.r
.l. A
llrig
hts
reserv
ed
ORC Partial Load Efficiency
One of the key
points in the
success of ORC
technology is the
capability to
adapt to load
variation easily
and quickly
’’
‘‘
Actual Load / Nominal Load
Part load operation down to 10% of nominal load.
Mantains 90% of cycleefficiency at 50% of load
Turboden ORC units automaticallyadapt the cycle at the ambient temperature variations
OR
C A
ctu
alEf
fici
ency
/ O
RC
No
min
alEf
fici
ency
26
Flexible and automatic
Copyrig
ht
© –
Tu
rboden
S.r
.l. A
llrig
hts
reserv
ed
Technology Pros Cons
Internal combustion engine • High conversion efficiency• Syngas cleaning system required• Frequent maintenance
Syngas turbines • Good reliability• Medium conversion efficiency• Few references
Syngas combustion boiler• Simplicity• Lower O&M costs
• Lower conversion efficiency
Municipal Solid Waste gasificationB
27
Waste to Energy applications
Copyrig
ht
© –
Tu
rboden
S.r
.l. A
llrig
hts
reserv
ed
28
Case study: off-setting site own consumption (1/2)
Client: To be announced later (Sawmill)Site: Western Canada
Project description: Biomass: waste of timber production. Existing biomass furnace and thermal oil system (spare capacity available)ORC Unit: Turboden 22 HRStatus: prospectElectric power generated: 2 MW to off-set the sawmill own consumptionKey driver of the project:• Reducing plant operating costs (energy) with no additional
personnel utilizing spare capacity of existing furnace and thermal oil system
• Reduced Capex
Copyrig
ht
© –
Tu
rboden
S.r
.l. A
llrig
hts
reserv
ed
29
Project featuresExisting biomass furnace and thermal oil system (spare capacity available)
Biomass Fuel Sawmill waste wood
ORC unit proposed Turboden 22 HR
Electric power output (net)
2000 kW
ORC electric efficiency ~ 20%
Biomass consumption ~ 5 ton/h
Cooling water temperature (in/out)
25/35°C
Annual operating hours 8000
Electricity price sensitivity analysis
Amount of investment estimation
Complete ORC installed (incl. ACC) USD 3.4M
BoP (engineering, civil works, contingencies) USD 800k
Overall CAPEX USD 4.2M
OPEX (ORC - BoP O&M) USD 80k
WACC 7%
Electricityprice (c$/kWh)
Cash flow (M$)
PBT (yr) IRR 15yrNVP 15yr
(M$)13 2.00 2.4 47.5% 14.0
12 1.84 2.6 43.6% 12.6
11 1.68 2.8 39.7% 11.1
10 1.52 3.2 35.8% 9.6
9 1.36 3.6 31.9% 8.2
8 1.20 4.2 27.9% 6.7
7 1.04 4.9 23.7% 5.3
6 0.88 6.0 19.5% 3.8
Case study: off-setting site own consumption (2/2)
Copyrig
ht
© –
Tu
rboden
S.r
.l. A
llrig
hts
reserv
ed
30
Copyrig
ht
© –
Tu
rboden
S.r
.l. A
llrig
hts
reserv
ed
31
• EXPERIENCE
• GUARANTEES
• HIGH AVAILABILITY
• REMOTELY CONTROLLED
• FULLY AUTOMATIC
• UNATTENDED
• LOADS FLEXIBILITY
• NO WATER
• MODULAR EXPANSION
PEACE OF MIND
So, what do we really offer?