1 Hydro Power Technology Development in Indonesia Lessons learned from developing local capability of designing, building and operating Hydro power plants up to 200kW capacity in Indonesia International Workshop Smart village workshop, Kuching- Malaysia

Kuching | Jan-15 | Hydro Power Technology Development in Indonesia Lessons learned

Embed Size (px)

Citation preview

Page 1: Kuching | Jan-15 | Hydro Power Technology Development in Indonesia Lessons learned

1

Hydro Power Technology

Development in Indonesia

Lessons learned from developing

local capability of designing,

building and operating Hydro

power plants up to 200kW

capacity in Indonesia

International Workshop

Smart village workshop, Kuching- Malaysia

Page 2: Kuching | Jan-15 | Hydro Power Technology Development in Indonesia Lessons learned

2

Hydro Power Technology

TransfertoHOW do this

Bottom up approach of building up MHP

Capacity in the private sector

Page 3: Kuching | Jan-15 | Hydro Power Technology Development in Indonesia Lessons learned

3

Technology Transfer in Indonesia 1992 - 2015

Successful technology transfer requires a sustained input to achieve tangible impacts.

Page 4: Kuching | Jan-15 | Hydro Power Technology Development in Indonesia Lessons learned

4

The key for the sustainable introduction

of a technology is:

Learning by doing

WHY

MA

RK

ET

TR

AIN

ING

RE

AL

PR

OJE

CT

HOW WHAT

Page 5: Kuching | Jan-15 | Hydro Power Technology Development in Indonesia Lessons learned

5

Conditions for MHP capacity building

MHP capacity building in the private sector

– is market driven (hydro potential, energy price)

– can only be developed by project implementation

– is directly connected to energy policy

- is hydro power competitive with subsidised public

power supply

- is there a regulation to make MHP attractive

(feed in law, subsidy)

– requires a reliable, predictable future perspective

Projects must generate profit to re-invest into the

enterprises

Page 6: Kuching | Jan-15 | Hydro Power Technology Development in Indonesia Lessons learned

6

Giz Technology Transfer Activities 1992-2012

Activities:

1. Turbine technology transfer (Cross flow, propeller,….) in design, manufacturing, installation & commissioning

2. Development and introduction of standardized civil structure designs

3. Development of Control Technology (DTC, ELC, IGC…)

4. Various appropriate technology for productive end-use activities

5. Institutional aspects

Page 7: Kuching | Jan-15 | Hydro Power Technology Development in Indonesia Lessons learned

7

Example: Cross-flow turbines

Cross-flow turbines: Simple, affordable

• The runner can easily be adapted to the flow, by changing

its width. Thus it is easily possible to build the turbine to fit

precisely the site conditions.

• The simple design allows good standardisation and

manufacturing without

sophisticated manufacturing

facilities.

• The costs are low compared

with other turbine designs.

Page 8: Kuching | Jan-15 | Hydro Power Technology Development in Indonesia Lessons learned

8

40kW rural electrification MHP (village based)

Page 9: Kuching | Jan-15 | Hydro Power Technology Development in Indonesia Lessons learned

9

Manufacturing of Housing

The introduction of

precision jigs for

fabrication of the housing

etc improved quality

considerably

Page 10: Kuching | Jan-15 | Hydro Power Technology Development in Indonesia Lessons learned

10

Quality control and stock

• Standardization combined with

quality control is a precondition

for:

• stock production

• cost reduction

• spare part delivery.

Page 11: Kuching | Jan-15 | Hydro Power Technology Development in Indonesia Lessons learned

11

PT Heksa Hydro (Bandung)

Page 12: Kuching | Jan-15 | Hydro Power Technology Development in Indonesia Lessons learned

12

CV. Cihanjuang Inti Teknik (Bandung)

Page 13: Kuching | Jan-15 | Hydro Power Technology Development in Indonesia Lessons learned

13

PT Kramatraya (Bandung)

Page 14: Kuching | Jan-15 | Hydro Power Technology Development in Indonesia Lessons learned

14

All over Indonesia

Besides the

MHP sector in

Bandung several

manufacturers,

consultants and

NGOs are active

in JAVA,

SUMATRA,

SULAWESI and

PAPUA

Page 15: Kuching | Jan-15 | Hydro Power Technology Development in Indonesia Lessons learned

15

Application Range T15-300 “Standard”

Application Limits T14-300

0.0

10.0

20.0

30.0

40.0

50.0

60.0

50 100 150 200 250 300 350 400 450 500 550 600 650 700 750 800

Discharge Q (l/s)

ne

t h

ead

H (

m)

b0=1000mm

b0=400mm

b0=300mm

b0=200mm

b0=100mm

b0=50mmb0=500mm

50kW

75kW

P= 100kW

40kW

30kW

20kW

10kW

125kW

150kW

b0=500mm

Coupling on

Turbine Shaft

required

Not recommended or

special design T14-

300

Flat Belt on

Turbine Shaft

Page 16: Kuching | Jan-15 | Hydro Power Technology Development in Indonesia Lessons learned

17

Summary installed turbines 98-2010

Specification Quantity

Operating sites with T12 70

Operating sites with T15 280

local Sumatra+Sulawesi 200

Propeller 80

Total 644

Page 17: Kuching | Jan-15 | Hydro Power Technology Development in Indonesia Lessons learned

18

Total installed capacity in Indonesia (Cross flow turbines T12 and T15)

-

2,000

4,000

6,000

8,000

10,000

12,000

14,000

To

tal k

W .

.

Year

electro- mechanical equipment of about 400 power plants was produced in the

last 10 years and implemented all over Indonesia and other countries like

England, Swiss, Philippines, Nepal, Malaysia, Madagascar, Ethiopia, Uganda,

Tanzania, Papua New Guinea, Cameroon, Zaire, Kyrgystan Mozambique etc.

Page 18: Kuching | Jan-15 | Hydro Power Technology Development in Indonesia Lessons learned

19

ASEAN HYCOMA Regional Hydropower Competence

Centre

offering Training, Development and

Research Assistance to the Small-scale

Hydropower Sector

2014

Page 19: Kuching | Jan-15 | Hydro Power Technology Development in Indonesia Lessons learned

20

Build up Phase: HYCOM Public Private Partnership (PPP)

HYCOM was build and is operated by: PT.

Entec Indonesia and TEDC, Technical Education

Development Centre, Bandung, Indonesia, forming

a consortium for the HYCOM project

HYCOM is supported by:

• REPIC (Swiss government)

• German international Cooperation giz: ASEAN-

German Mini Hydro Project (AGMHP-giz),

• the ASEAN Center for Energy (ACE)

Page 20: Kuching | Jan-15 | Hydro Power Technology Development in Indonesia Lessons learned

21

Models of Pelton turbine, Kaplan Francis turbine)

HYCOM (ASEAN HYCDOM POWER COMPETENCE CENTRE)

Page 21: Kuching | Jan-15 | Hydro Power Technology Development in Indonesia Lessons learned

22

HYCOM (Cross Flow turbine)

Page 22: Kuching | Jan-15 | Hydro Power Technology Development in Indonesia Lessons learned

23

HYCOM Training Modules

The various training modules offered comprise comprehensive

knowledge of and practical exercises on the following topics:

• 01 – Introduction to MHP & Best Practices

• 02 – Management of MHP Projects

• 03 – MHP Project Development

• 04 – Operation and Maintenance of MHP Schemes

• 05 – Site Identification for MHP

• 06 – MHP Feasibility Study

• 07 – Equipment and Turbine Fabrication for MHP

• (see www.hycom.info )

Page 23: Kuching | Jan-15 | Hydro Power Technology Development in Indonesia Lessons learned

24

Why to establish HYCOM in

Bandung/Indonesia?

Page 24: Kuching | Jan-15 | Hydro Power Technology Development in Indonesia Lessons learned

25

In Bandung about 400

qualified people

represent a experience

of

4000 Man/Years in all aspects of

building and operating

MHP in the range up to

500kW

Page 25: Kuching | Jan-15 | Hydro Power Technology Development in Indonesia Lessons learned

26

Introduction of Renewable Energy in Indonesia

2007 Pt. Entec /TEDC prepare the introduction of Hydro

Power in vocational schools

Page 26: Kuching | Jan-15 | Hydro Power Technology Development in Indonesia Lessons learned

27

Introduction of Renewable Energy in Indonesia

2008 Pt. Entec /TEDC prepare the introduction of Photo

Voltaic in vocational schools

Page 27: Kuching | Jan-15 | Hydro Power Technology Development in Indonesia Lessons learned

28

Introduction of Renewable Energy in Indonesia

2009 Pt. Entec /TEDC prepare the introduction of Wind

energy in vocational schools

Page 28: Kuching | Jan-15 | Hydro Power Technology Development in Indonesia Lessons learned

29

Exchange of MHP know how and turbine manufacturer training

2008 Ethiopia-Indonesia:

Page 29: Kuching | Jan-15 | Hydro Power Technology Development in Indonesia Lessons learned

30

Exchange of MHP know how and turbine

manufacturer training

2009 Pakistan-Indonesia:

Page 30: Kuching | Jan-15 | Hydro Power Technology Development in Indonesia Lessons learned

31

Exchange of MHP know how and turbine manufacturer training

2009 Nigeria-Indonesia:

Page 31: Kuching | Jan-15 | Hydro Power Technology Development in Indonesia Lessons learned

32

2012 Asean MHP Training at HYCOM

Page 32: Kuching | Jan-15 | Hydro Power Technology Development in Indonesia Lessons learned

33

ASEAN MHP TRAINING

Page 33: Kuching | Jan-15 | Hydro Power Technology Development in Indonesia Lessons learned

34

ASEAN MHP TRAINING

Page 34: Kuching | Jan-15 | Hydro Power Technology Development in Indonesia Lessons learned

35

Operator Training for Bhutan Power Company

Page 35: Kuching | Jan-15 | Hydro Power Technology Development in Indonesia Lessons learned

36

MoU with NASENI (National Agency for Science and Engineering)

for MHP implementation in Nigeria

Page 36: Kuching | Jan-15 | Hydro Power Technology Development in Indonesia Lessons learned

37

Java power CSR Training in Hydro Power

Page 37: Kuching | Jan-15 | Hydro Power Technology Development in Indonesia Lessons learned

38

Operator training

Page 38: Kuching | Jan-15 | Hydro Power Technology Development in Indonesia Lessons learned

39

Open training

Page 39: Kuching | Jan-15 | Hydro Power Technology Development in Indonesia Lessons learned

40

Training KPDT

Page 40: Kuching | Jan-15 | Hydro Power Technology Development in Indonesia Lessons learned

41

Workshop with Japanese and Indonesian Industry and

Universities

Page 41: Kuching | Jan-15 | Hydro Power Technology Development in Indonesia Lessons learned

42

Training ESDM staff

Page 42: Kuching | Jan-15 | Hydro Power Technology Development in Indonesia Lessons learned

43

Inhouse training TEDC

Page 43: Kuching | Jan-15 | Hydro Power Technology Development in Indonesia Lessons learned

44

Inhouse training TEDC

Page 44: Kuching | Jan-15 | Hydro Power Technology Development in Indonesia Lessons learned

45

Cross flow turbine license training UNIDO

Tansania (PT entec)

Page 45: Kuching | Jan-15 | Hydro Power Technology Development in Indonesia Lessons learned

46

Cross flow turbine license training UNIDO

Tansania (PT entec)

Page 46: Kuching | Jan-15 | Hydro Power Technology Development in Indonesia Lessons learned

47

Cross flow turbine license training UNIDO

Tansania (PT entec)

Page 47: Kuching | Jan-15 | Hydro Power Technology Development in Indonesia Lessons learned

48

Cooperation with Swiss German University (Jakarta)

Page 48: Kuching | Jan-15 | Hydro Power Technology Development in Indonesia Lessons learned

49

MOU University Gaja Mata Yogyakarta – HYCOM (Insist Program)

Page 49: Kuching | Jan-15 | Hydro Power Technology Development in Indonesia Lessons learned

50

Responsible use of natural resources….

Page 50: Kuching | Jan-15 | Hydro Power Technology Development in Indonesia Lessons learned

51

… for the benefit of people

Page 51: Kuching | Jan-15 | Hydro Power Technology Development in Indonesia Lessons learned

52

Terima kasih – thank you