  • 1. Innovando con la Energa en los Espacios Arquitectnicos Visin internacional de la situacin de la I+D en el ahorro de energa en Edificios

2. Programas de I+D+i en el mbito Europeo e Internacional Jos Mara Campos ECBCS EeB PPP Agencia Internacional de la Energa Programa ECBCS Comisin Europea EeB PPP 3.

    • Buildings use 40 % of total EU energy consumption
    • The built environment generates 1/3 of GHG in Europe
    • Even new buildings are far from being all energy efficient
    • Replacement rate is very small (1 to 2 % per year)
    • The renovation of the existing stock is a real challenge
    • Many experiments are made but actual impacts are limited
  • Business as usual is not an option!
  • EeB PPP as first step of a longer term strategy

Where is the built environment? 4. EeB EI- Background At the end of 2005 theEuropean Construction Technology Platform (ECTP)developed itsStrategic Research Agenda(SRA ) defining priorities, around three main topics: 1.Meeting client and user requirements 2.Becoming sustainable 3.Transforming of the construction sector InJune 2007 , ECTP published an associated roadmap proposing anImplementation Action Plan . This roadmap showed a major priority onnew technologies, concepts and materials for efficient and clean buildings , a theme which initiated the E2B concepts and a significant part of E2B EI. E2B EIinitially stemmed from a group ofECTPmembers and isfully supportedby the platform as aninstrument to implement their roadmap . 5. EeB EI- Concept and objectives

    • The overall objective ofEeB EIis todeliver, implement and optimize building and district conceptsthat have the technical, economic and societal potential todrastically cut the energy consumption and reduce CO2 emissionsdue toexisting and new buildingsat the overall scale of theEuropean Union .
    • EeB EI will speed up researchon key technologies anddevelop a competitive industryin the fields of energy efficiency processes, products and services, with the main purpose toreach the goals set forth for 2020 and 2050toaddress climate change issuesand contribute toimprove EU energy independencethereby transforming this challenge into a business opportunity "

6. E2BA The European Association In2008 , the E2B A, anInternational, non-profit Industrial Associationwas created by 9 industrial stakeholders covering the Energy efficient building supply chain:

    • The E2B A currently has over 150 members.

7. E2BA: role and objectives

  • E2BA
  • The E2B Associationsmain objectivesare:
    • Prepare and manage a Public Private Partnership (PPP) with the EC
    • Seek and demonstrate industry engagement and represent
    • Coordinate members research interests within the PPP
  • E2B As aspiration is todevelop and implement a 2bn research and
  • demonstration programme over the period 2009-2019 .
  • National Liaison Points (NLPs) Network
  • NLPsare anetwork of E2B As representativesin allMember States , their role is:
    • Share nationalpriorities to the E2Bresearch agendas
    • DisseminateE2B information to the national stakeholders
    • Set up anational network of stakeholdersto increase engagement and pave the way for national follow-up actions
    • Seek national liaison points in unrepresented Member States

8. E2B roadmap 2010-2013(-2019) R&D programs Nationalprogram Nationalprogram Nationalprogram BoostResearch E2B Association EC NLP NLP NLP CreateImpact A Powerful Engine Bring National Priorities of each MS to the E2B Agenda as aprerequisitefor creating impact at EU scale = create new businessfor players involved = create new business for all stakeholders at EU scaleEI E2B E2BA The European Association 9. E2BA The European Association E2BStructure General Assembly (all E2B-A members) Indust. 9 Resear. 5 SME. 4 Clients 3 Executive Board 9 Steering Committee 30 Elected Members21 Secretary General NLP network + Eracobuild Scientific Council (min. 10) advice on scientificquality tuning ofE2B-MSpriorities election, approval

    • Five elected European technological institutes conform the Scientific Committee within the Steering Committee

10. EeB PPP: Launching COM (2008) 800- A European Economic Recovery Plan . The European Commission announces the launch of three public private partnerships (PPPs) in the framework of the plan for the economic recovery of Europe.

    • In the automobile sector, a European green cars initiative
    • In the construction sector, a European energy-efficient buildings' initiative EeB PPP (also calledE2B PPP )
    • To increase the use of technology in manufacturing, "afactories of the futureinitiative ( FoF PPP )
    • FP7 Research Budget 2010-2013

11. EeB PPP: Implementation of calls The E2B PPP calls are going to be implemented following the rules of the 7th Framework Programme (FP7) for the period 2010-13. 12. El Roadmap 13. Ad-hoc Advisory Group

    • Ad-Hoc Industrial Advisory Group: Set up in the framework of the E2BA with the purpose of answering the European Commissions request to the E2B A of providing them with priorities for 2010 -2013. Composed by the Steering Committee and the Scientific Council. Its objectives are:
    • To define the RTD priorities for 2010, 2011, 2012, 2013
    • To mobilise specific projects to answer to the EC Calls
    • To gather the inputs of E2B A members
    • To define a strategic Roadmap for the period 2010-2013

14. The industry vision (1/4) 15. The industry vision (2/4) 2010-13 Beyond 2013 Time horizon R&D challenge R&D challenge R&D challenge R&D challenge R&D challenge R&D challenge R&D challenge R&D challenge Enabling Technologies (e.g. ICT, multifunctional materials, novel processes, ) Mobilisation of the entire value and innovation chains 16. The industry vision (3/4) 17. EeB PPP as first waveof aLong Term Strategy EeB PPP 2010-13 The industry vision (4/4) 18. Public Consultations The roadmapping process 19. Research Priorities 20. The industry vision (4/4) 21. Provisional Budget WP2011 22.

    • EeB-NMP.2011-1 Materials for new energy efficient building components with reduced embodied energy
    • EeB.NMP.2011-2 New efficient solutions for energy generation, storage and use related to space heating and domestic hot water in existing buildings
    • EeB.NMP.2011-3 Energy saving technologies for buildings envelope retrofitting
    • EeB.NMP.2011-4 Geo-clusters approach to support European energy-efficiency goals
    • EeB-ICT-2011.6.4 ICT for energy-efficient buildings and spaces of public use
    • EeB-ICT-2011.6.5 ICT for energy-positive neighbourhoods

Calls WP2011 (1/2) 23.

    • EeB.ENERGY.2011 Demonstration of Very Low Energy New Buildings
    • EeB.ENV.2011.3.1.5-1 Technologies for ensuring, monitoring and/or controlling a high quality indoor environment in relation to energy efficient buildings in particular
    • Specific Support Action (SSA) with the goal to tailor the generic ILCD (International Reference Life Cycle Data System) Handbook guidance towards the specific needs and requirements of projects to be carried out within the EeB PPP

Calls WP2011 (2/2) 24. Muchas gracias!!! [email_address] [email_address] www.e2b-ei.eu