Click here to load reader

IBM Collaborative Lifecycle Management

  • View
    1.915

  • Download
    2

Embed Size (px)

DESCRIPTION

IBM Rational Next Generation Application Lifecycle Management workshop in Brisbane on 3 Nov 2011.

Text of IBM Collaborative Lifecycle Management

  • 1. An IBM Proof of TechnologyAlan KanRational Technical ManagerIBM New [email protected] Rational Solution forCollaborative Lifecycle Management 2011 IBM Corporation
  • 2. IBM SoftwareWelcome to the Hands On Workshop Restrooms Emergency Exits Smoking Policy Breakfast/Lunch/Snacks location and time2 IBM Rational Solution f or Collaborative Lifecycle Management 2011 IBM Corporation
  • 3. IBM SoftwareAgenda Introduction to Collaborative Lifecycle Management Lab Overview Module 1: Aligning plans Module 2: Responding to a requirement change Module 3: Planning an iteration Module 4: Completing a story Module 5: Testing and fixing a story Module 6: Stabilizing an iteration Session Summary3 IBM Rational Solution f or Collaborative Lifecycle Management 2011 IBM Corporation
  • 4. IBM SoftwareObjectivesExplore how the IBM Rational Solution from Collaborative Lifecycle Management: Enables teams to collaborate in real time in the context of the work they are doing, especially in globally diverse environments. Enables projects to be managed more effectively by providing visibility into accurate project health information drawn directly from actual work. Automates traceability and auditability by managing artifacts and their inter- relationships across the lifecycle, empowering teams to deliver more value. Provide a hands on experience using IBM Rational Requirements Composer, IBM Rational Team Concert and IBM Rational Quality Manager to automate the software delivery process.4 IBM Rational Solution f or Collaborative Lifecycle Management 2011 IBM Corporation
  • 5. An IBM Proof of TechnologyIntroduction toCollaborative Lifecycle Management(CLM) 2011 IBM Corporation
  • 6. IBM SoftwareALM is about connecting the disciplinesProject/Planning Requirements Development TestingBusiness Use Cases TDD Scenario-Drivers Nonfunctional Build Driven AutomationIterations Sign-off ManagementSign-off Static Analysis Exploratory Contract TestContract BVT Risk Assess UserRisk Assess Threat Model Source InvolvementUser Management Test ContractInvolvement Requirements Pair Validation Programming/ Code Review Continuous Learning and Feedback Source: Gartner Application Architecture, Development & Integration Summit Presentation, The Future and Present of AD, Thomas E. Murphy, December 20086 IBM Rational Solution f or Collaborative Lifecycle Management 2011 IBM Corporation
  • 7. IBM SoftwareCriteria for effective lifecycle management: ALM imperatives 1.Real-time planning 2.Lifecycle traceability 3.In-Context collaboration 4.Development intelligence 5.Continuous process improvement7 IBM Rational Solution f or Collaborative Lifecycle Management 2011 IBM Corporation
  • 8. IBM SoftwareImperative 1: Real-time planning Tasks Tasks Complete Planned Dont Do Have plans that live outside of ALM environment where Plan across the entire team, not silos, by linking and requirements, development and test plans are populating development and test plans from disconnected and managed separately, or not at all. requirements. Rely on manual, error-prone updates. Practice continuous planning using lifecycle queries and project dashboards to respond to changing events. Have plans that are separate from team activities and Use plans that are fully integrated with execution where assignments. updating time spent directly from the work item makes8 IBM Rational Solution f or Collaborative Lifecycle Management easy to keep accurate plans. 2011 IBM Corporation
  • 9. IBM SoftwareImperative 2: Lifecycle traceability Spreadsheets Glossaries Folders Stories Defects Models Hyperlinks Emails Data Sprint Code Documents DB DB Images Test Scripts Builds Dont Do Create silos of information with disconnected and Link deliverables and connect the dots so every incompatible tooling and terminology deliverable has the proper upstream and downstream relationship Email copies of deliverables to remote team members Share links to deliverables with related deliverables and break linkages context including reviews and comments from other team members Integrate by replicating data Link critical project deliverable so that the entire team have access to the latest version of the truth9 IBM Rational Solution f or Collaborative Lifecycle Management 2011 IBM Corporation
  • 10. IBM SoftwareImperative 3: In-Context collaboration Dont Do Unified teams share linked data providing visibility into Create an environment of silod teams and disconnected each others work. data Manually collect status reports or Collaboration is also about knowing what is going on wait

Search related