Northern Region Finishing School 2009
.NET Workshop (Day2)
Siwawong W.Project Manager
2009.10.11
Get User Requirements & Analysis
Northern Region Finishing School 2009
Agenda (Day2)
09:00 – 09:15 Course Introduction
09:15 – 10:45 User Requirement Explanation
10:45 – 11:00 Break & Morning Refreshment
11:00 – 12:00 Analysis Requirements (Work Shop)
12:00 – 13:00 Lunch Break
13:00 – 14:30 Design System (Work Shop)
14:30 – 14:45 Break
14:45 – 16:00 Presentation (Work Shop)
16:00 – 17:00 Next Assignment
Northern Region Finishing School 2009
Course Introduction
Northern Region Finishing School 2009
About Me
• My Name: Siwawong Wuttipongprasert– Nick-name: Tae
• My Background: – B.Eng (Computer Engineering), Chiang Mai University.
CPE#3, Gear25
• My Career Profile: – 10+ years in IT business– 5+ years with Blue Ball Co., Ltd.– Role: Programmer, System Analysis, Consultant & Project Manager– Working Area: ERP, MRP, Retailing, Banking, Financial, E-Commerce, etc.– Working with multi-cultures: Japanese, German and Vietnamese
• Know Me More..
Northern Region Finishing School 2009
Pre-Requisition/Background
• Understand on following topics: -– C# Programming– Any R-DMBS (Prefer MS-SQL server 2005 or higher)– OOP (Object Oriented Programming)– MVC (Model-View-Controller)– UML (Unified Modeling Language)
• Required Software for Workshop– Visual Studio 2005 (with Framework 2.0)– MS-SQL server 2005– Crystal Report/MS-Reporting
Northern Region Finishing School 2009
Working Schedule
Day-2 Day-3 Day-4
• Get User Requirements• Analysis & Design
• Weekly Progress Report• Unit Test Result• Problem/issues(Communicate via e-mail/Wave)
• Code Review• Unit Test Review• SIT Review
• Project Implementation• User Training
• Bug Fixed• Improve System
Northern Region Finishing School 2009
User Requirement Explanation
Northern Region Finishing School 2009
Customer Story
HQ in BKK
• Assembly the F/G• Purchase Parts• Get Orders from customer• Send F/G to customer
Warehouse in Chiang Mai
Warehouse in Chon buri
ABC Factory has located in BKK and they has W/H in Chiang Mai & Chon Buri. Only HQ in BKK get Order, Purchase Part & assembly. The W/H outside BKK act as Depot.
Northern Region Finishing School 2009
Current Problems
• HQ in BKK can’t know Inventory On-hand on each Depot
• Information is not CENTRALIZED!
• Difficult to management Inventory On-hand on each Depot
• Always stored items on wrong places
• Difficult to find inventory item/No stored information.
• Too slow for prepare management report
• Overhead cost for communication between site is too much
Northern Region Finishing School 2009
Customer Needs
• Web-based system for share Inventory information– Prefer to implement with ASP.NET with MS-SQL server 2005.
• Support Basic Operations– Received Purchased Item from Vendor– Delivery Ordered item to Customer– Move Stock between Warehouse– Able to adjust stock QTY
• Required to finish within 1 month!
Northern Region Finishing School 2009
Our Solution
Item Master
Zone Master
Category
Goods ReceivingGoods Receiving
Goods Receiving Entry
Shelf-In Entry
Goods Receiving List
Transfer-In Entry
ShipmentShipment
Shipment Entry
Shelf-Out Entry
Shipment List
Transfer-Out Entry
InventoryInventory
In & Out Adjustment
Supplier Customer
Inventory By Category
Northern Region Finishing School 2009
Technical Requirements
• Web-Based System (ASP.NET & MS-SQL server)– C# is preferred– Implement in MVC concept
• Required to implement ORM– NHibernate is recommended
• Some Common Screens/Models– Share between modules, no need to make it’s duplicated
• General Requirements– No need to login before access the system– Provided simple main menu– Capture user’s login & Computer name from windows and stamp on
transaction
Northern Region Finishing School 2009
Understand the MVC
Controller
Controller accepts User inputs as parameters to generate the data.
View
View provides result in desired presentation format.
Model
Model queries data-source to retrieve result set for controller.
Model Queries data source based on input parameters specified by the User.
Returns result set to the controller.
Controller Enforces access control.
Accepts input parameters.
Accepts report configuration parameters.
Invokes Model to perform data query operations.
Provides View with result set returned by Model.
View Formats result set to generate report in the format specified by the User:• HTML• Comma Separated Values (CSV)• Adobe Portable Document Format (PDF)
Northern Region Finishing School 2009
List of Function Names
Module Name SEQ Function Name Page Name Remark
Inventory 1-1 Zone Master Zonemaster.aspx
1-2 Category Category.aspx
1-3 Item Master ItemMaseter.aspx Share Customer/Supplier information from other modules
1-4 In&Out Adjustment StockAdjustment.aspx
1-5 Inventory By Category StockByCat.aspx
Goods Receving
2-1 Goods Receiving Entry GREntry.aspx Share item information from
2-2 Shelf-In Entry ShelfIn.aspx Inventory
2-3 Goods Receiving List GRList.aspx
2-4 Transfer In Entry TrfIn.aspx
2-5 Supplier Data Supplier.aspx
Northern Region Finishing School 2009
List of Function Names (Con’t)
Module Name SEQ Function Name Page Name Remark
Shipment 3-1 Shipment Entry ShipEntry.aspx Share item information from
3-2 Shelf-Out Entry ShelfOut.aspx Inventory
3-3 Shipment List ShipList.aspx
2-4 Transfer Out Entry TrfOut.aspx
2-5 Customer Data Customer.aspx
Northern Region Finishing School 2009
User Requirement Specification
• Zone Master– Zone Code– Zone Description– Shelf Structure
Row, Column, Bin Defined R/C/B in Zone : Start RCB – End
RCB
• Category Master– Item Category Code & Description
• Item Master– Item Code & Item Description– UoM or Unit Of Measurement (text
description)– Supplier– Zone Code
Row/Col/Bin (under Zone Code)
• Supplier Master– Supplier Code & Supplier Name– Supplier Short Name (for search
purpose)– Address (long text is enough)– Tel.No.
• Customer Master– Customer Code & Customer Name– Customer Short Name (for search
purpose)– Address (long text is enough)– Tel.No.
Northern Region Finishing School 2009
User Requirement Specification
• Goods Receiving Entry – Input Supplier Code (manual input or search supplier)– Invoice No./Delivery No. (text input, following document from Supplier)– Input Receiving Date & Receiving Time– If above inputs are not existing in DB, system will allow user to add
new receiving items. Else, load existing data for user to edit
[Detail, multi-lines input]– Input following these information
Item Code (manual input or search item code) If found input item code Display item Description, UoM Then input, serial number & QTY
– Press save for whole document (not save line-by-line) After save complete, need to display Transaction No for further use.
(Cont’)
Northern Region Finishing School 2009
User Requirement Specification
• Shelf-In Entry – Input Transaction No of Goods Receiving (manual input or
search)– If above inputs are existing in DB, system will allow user to
input location of receiving items. Else, display error message
[Detail, multi-lines input]– Input following these information
Display item code, item Description, UoM, Default Zone Code, R/C/B (refer from master data)
Try to change Zone Code, R/C/B (if user want)
– Press save for whole document (not save line-by-line) Mark flag on each line to show that user has stored in shelf.
(Cont’)
Northern Region Finishing School 2009
User Requirement Specification
• Goods Receiving List – Input criteria to print
Supplier Code (manual or search) Period of Date (default is today date until today date) Status (Just Receiving or Stored in Shelf already)
– Output List following data to display
– Receiving Date (1st Group)– Zone Code (2nd Group)– Supplier (3rd Group)– R/C/B (Suppress if duplicated)– Item Code, Description, Delivery No., Serial No, QTY, Status
(Cont’)
Northern Region Finishing School 2009
User Requirement Specification
• Transfer-In Entry – Input Transaction No of Transfer-Out (manual input or search)– If above inputs are existing in DB, system will allow user to
input location of receiving items. Else, display error message Output
[Detail, multi-lines input]– Input following these information
Display item code, item Description, UoM, Default Zone Code, R/C/B
(refer from Transfer-Out Entry) Try to change Zone Code, R/C/B (if user want)
– Press save for whole document (not save line-by-line)
(Cont’)
Northern Region Finishing School 2009
User Requirement Specification
• Shipment Entry – Input Customer Code (manual input or search customer)– Delivery No. (text input, following document from Sales Person)– Input Shipment Date & Shipment Time– If above inputs are not existing in DB, system will allow user to add
new shipping items. Else, load existing data for user to edit
[Detail, multi-lines input]– Input following these information
Item Code (manual input or search item code) If found input item code Display item Description, UoM Then input, serial number & QTY
– Press save for whole document (not save line-by-line) After save complete, need to display Transaction No for further use.
(Cont’)
Northern Region Finishing School 2009
User Requirement Specification
• Shelf-Out Entry – Input Transaction No of Shipment (manual input or search)– If above inputs are existing in DB, system will allow user to
input location of receiving items. Else, display error message
[Detail, multi-lines input]– Input following these information
Display item code, item Description, UoM, Default Zone Code, R/C/B (refer from master data)
Try to change Zone Code, R/C/B (if user want)
– Press save for whole document (not save line-by-line) Mark flag on each line to show that user has stored in shelf.
(Cont’)
Northern Region Finishing School 2009
User Requirement Specification
• Shipment List – Input criteria to print
Customer Code (manual or search) Period of Date (default is today date until today date) Status (Preparation or take-out from Shelf already)
– Output List following data to display
– Shipment Date (1st Group)– Zone Code (2nd Group)– Customer (3rd Group)– R/C/B (Suppress if duplicated)– Item Code, Description, Delivery No., Serial No, QTY, Status
(Cont’)
Northern Region Finishing School 2009
User Requirement Specification
• Transfer-Out Entry – Input these information
Transfer-Out Date (default is today date) Source : Zone Code, R/C/B Destination: Zone Code, R/C/B
– If above inputs are existing in DB, system will allow user to transfer out QTY. Else, display error message Output
[Detail, multi-lines input]
– Input following these information Display item code, item Description, UoM, Default Zone Code, R/C/B Input Transfer-Out QTY
– Press save for whole document (not save line-by-line) Display transaction no for further use.
(Cont’)
Northern Region Finishing School 2009
User Requirement Specification
• In & Out Adjustment Entry– Input these information
Item Code (manual input or search) Specified period Date Type: In or Out
– In : Goods Receiving or Transfer-In Operation– Out: Shipment or Transfer-Out Operation
– If above inputs are existing in DB, system will allow user to input new QTY. Else, display error message Output
[Detail, multi-lines input]– Input following these information
Display item code, item Description, UoM, Default Zone Code, R/C/B Input New QTY
– Press save for whole document (not save line-by-line)
(Cont’)
Northern Region Finishing School 2009
Analysis User Requirement
Northern Region Finishing School 2009
Expected Result from Analysis Phase
• Team Organization– Tree View– Roles & Responsible
• UML diagram– Use Case Diagram– Activities Diagram– GUI design
• Micro-Plan Schedule– Until 9-Jan-10
Northern Region Finishing School 2009
Design System
Northern Region Finishing School 2009
Expected Result from Design Phase
• E-R diagram– Table structure
• Class Diagram– Controller– Model– View
Northern Region Finishing School 2009
Presentation
Northern Region Finishing School 2009
Schedule for Present
• 30 mins/Team– Display overview in Analysis Phase– Submit Design document
• Q&A– Comments
Northern Region Finishing School 2009
Next Assignment
Northern Region Finishing School 2009
Next Assignment
• Progress report on every Friday– Update progress in schedule
• Submit Unit Test Result every Friday– Tested By Tools: NUnit– Manual Test: input in result form
Northern Region Finishing School 2009
Thank you for your attention!
[email protected] [email protected]
www.blueballgroup.com