29
Material - Asset - Yard Management RFID Based Software Solutions

20150303 smrtprojects

  • Upload
    stumico

  • View
    170

  • Download
    0

Embed Size (px)

Citation preview

1. Material - Asset - Yard Management RFID Based Software Solutions 2. How does it work Part of Integrated Solution ERP, WMS, PDM, CAD, Planning Proces Control Transparent Supply Chain Vendor, warehouse, workshop, project, client Reduction Operational Costs ROI < 1 year Life Cycle Management Overview 3. Development of our solution started 2008 in a Delft University of Technology joint industry project. Origin of the Solution 4. Read range up to 5 to 8 meters Read rate up to 100 items per second RF signals are not blocked by cardboard, wood or plastic UHF RFID commercially viable since 5 years About RFID 5. 1. Reduction of operational costs 2. Process control 3. Supply chain transparency 4. Safety 5. Stock and workflow optimization Benefits 6. More than WMS Supplier Warehouse Workshop Project Manual Search Disruptions Lost Items Administration 50% of operational hours ! 7. Where can I find my parts and assets? Is this shipment complete? What is the status of work in progress? - At item level - Any place - Any time - Accurate - At low administration costs Manufacturing Issues Manual Search Disruptions Lost Items Administration 50% of operational hours involved! 10% 8. CAD Integrated Solution PDM SMRT projects WMS ERP 9. Supply Chain ERP Oracle JD Edwards SMRT projects SMRT projects ERP Aveva MARS SMRTcloud 10. Distribution www.smrtprojects.com/movie.php 11. Manufacturing 12. Manufacturing 13. Manufacturing 14. Manufacturing 15. Construction 16. Construction 17. Construction 18. Manufacturing 19. Access Control 20. Reports 21. 3D Reports 22. Data footprint for operational improvement and analytics Visibility on production status and track of parts Identify capacity bottle necks SMRTanalytics 23. Ferry Terminal 24. Service & Maintenance Certificate expiry and update Manufacturer information at equipment Inspections + digital checklist Ordering spare parts Quality control Stock control Asset Management 25. 3 projects per year (ferries,offshore vessels, dredgers) 250.000 manhours operations, of which 100.000 hrs in outfit and commissioning 50% of outfit activities is spent on searching, solving disruptions and administration Potential savings 10% on outfit 10.000 hrs per project, 30.000 hrs per year Potential savings 1.500.000 per year In addition: Improved quality of information; objective and near real time information Use of barcode in operational environment is limited (dirt, paint, out of reach) Transparent supply chain Shipyard Case 26. Reports 27. Mobile Apps 28. Part of Integrated Solution ERP, WMS, PDM, CAD, Planning Proces Control Transparent Supply Chain Vendor, warehouse, workshop, project, client Strong Reduction Operational Costs ROI < 1 year Life Cycle Management Wrap Up Rembrandtlaan 9 - 3723 BG Bilthoven - The Netherlands - www.SMRTprojects.com +31 (0)30 7514 262