34
MIT Lincoln Laboratory This work is sponsored by the Department of Energy, Office of Electricity Delivery and Energy Reliability under Air Force Contract #FA8721-05-C-0002. Opinions, interpretations, conclusions and recommendations are those of the author and are not necessarily endorsed by the United States Government. DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. Erik Limpaecher Microgrid Hardware-in-the-Loop Laboratory Testbed and Open Platform (HILLTOP) August 30, 2016

9.2_Microgrid Hardware-in-the-Loop Laboratory Testbed and Open Platform (HILLTOP)_Limpaecher_EPRI/SNL Microgrid Symposium

Embed Size (px)

Citation preview

Page 1: 9.2_Microgrid Hardware-in-the-Loop Laboratory Testbed and Open Platform (HILLTOP)_Limpaecher_EPRI/SNL Microgrid Symposium

MIT Lincoln Laboratory

This work is sponsored by the Department of Energy, Office of Electricity Delivery and Energy Reliability under Air Force Contract #FA8721-05-C-0002. Opinions,

interpretations, conclusions and recommendations are those of the author and are not necessarily endorsed by the United States Government.

DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited.

Erik Limpaecher

Microgrid Hardware-in-the-Loop

Laboratory Testbed and Open Platform

(HILLTOP)

August 30, 2016

Page 2: 9.2_Microgrid Hardware-in-the-Loop Laboratory Testbed and Open Platform (HILLTOP)_Limpaecher_EPRI/SNL Microgrid Symposium

Community mGrids - 2

KN 30 August 2016

Status Quo: Single-customer Microgrids

• Only economical and practical for large utility customers

– University campuses

– Hospitals

– Prisons

– Department of Defense bases

Santa Rita Jail

CERTS microgrid controller

Princeton University

15 MW cogen & thermal storage

Illinois Institute of Technology

high reliability distribution system

Page 3: 9.2_Microgrid Hardware-in-the-Loop Laboratory Testbed and Open Platform (HILLTOP)_Limpaecher_EPRI/SNL Microgrid Symposium

Community mGrids - 3

KN 30 August 2016

Community Microgrids

Single-Customer

Microgrids

Graphic credit: EPRI

Challenges

• Technical

1. Regional resilience analysis: site selection

2. Microgrid site design

3. Economical systems integration

4. Safe grid interconnection

5. Stable islanded operation

• Policy

– Coordination with public utilities commission

– Framework for utility involvement

– Financial pro forma for real estate developers Community

Microgrids

• Many recent studies…no actual deployments

– Sandia “Advanced Microgrids” study (Mar 2014)

– “Microgrids …for the Commonwealth of Massachusetts” (Feb 2014)

– “Minnesota Microgrids” (Sep 2013)

Page 4: 9.2_Microgrid Hardware-in-the-Loop Laboratory Testbed and Open Platform (HILLTOP)_Limpaecher_EPRI/SNL Microgrid Symposium

Community mGrids - 4

KN 30 August 2016

Community Microgrids

Single-Customer

Microgrids

Graphic credit: EPRI

Challenges

• Technical

1. Regional resilience analysis: site selection

2. Microgrid site design

3. Economical systems integration

4. Safe grid interconnection

5. Stable islanded operation

• Policy

– Coordination with public utilities commission

– Framework for utility involvement

– Financial pro forma for real estate developers Community

Microgrids

• Many recent studies…no actual deployments

– Sandia “Advanced Microgrids” study (Mar 2014)

– “Microgrids …for the Commonwealth of Massachusetts” (Feb 2014)

– “Minnesota Microgrids” (Sep 2013)

Page 5: 9.2_Microgrid Hardware-in-the-Loop Laboratory Testbed and Open Platform (HILLTOP)_Limpaecher_EPRI/SNL Microgrid Symposium

Community mGrids - 5

KN 30 August 2016

• High NRE to integrate systems in the field

– One vendor’s microgrid controller quote: $1M starting price

• Risk of damage to expensive equipment

– One utility-deployed microgrid: 1 year of controls testing, damaged a 750 kW transformer, required significant engineering staff support

• Interconnection behavior unknowable to utility engineers

– Controls are implemented in proprietary software

– Microgrids are a system of systems: Exhibit emergent behavior

• “Vaporware”

– No standard list of functions or performance criteria

– Difficult to validate marketing claims

• No standards verification

– IEEE P2030.7 and P2030.8 standards are on the horizon

How Do We Accelerate Microgrid Deployment? Reduce Integration Time, Cost, & Risk

Page 6: 9.2_Microgrid Hardware-in-the-Loop Laboratory Testbed and Open Platform (HILLTOP)_Limpaecher_EPRI/SNL Microgrid Symposium

Community mGrids - 6

KN 30 August 2016

Types of Power System Testbeds

Full System

Inv G

C C

Inv

Power Testbed

G

C C

Power HIL

Inv

C

G

C

Controller HIL

C

GInv

C

Simulation

GInv

CC

mC mC mC

DMS DMS

LegendG generatorInv battery or solar inverterC device controllermC microgrid controllerDMS distribution management system controller

power gridhigh-bandwidth AC-AC convertersimulation or emulation boundary

hardwarevirtual (simulated or emulated)

Matlab

SimPowerSystems

simulation

(not real-time)

Florida State CAPS

facility

Princeton University

cogeneration plant

ORNL DECC

Microgrid Lab

MIT-LL HILLTOP

System

Page 7: 9.2_Microgrid Hardware-in-the-Loop Laboratory Testbed and Open Platform (HILLTOP)_Limpaecher_EPRI/SNL Microgrid Symposium

Community mGrids - 7

KN 30 August 2016

Power Distribution Integration Platforms and Testbeds

Full System

Inv G

C C

Inv

Power Testbed

G

C C

Power HIL

Inv

C

G

C

Controller HIL

C

GInv

C

Simulation

GInv

CC

mC mC mC

DMS DMS

Testbed Cost

Test Fidelity

Test Coverage

LegendG generatorInv battery or solar inverterC device controllermC microgrid controllerDMS distribution management system controller

power gridhigh-bandwidth AC-AC convertersimulation or emulation boundary

hardwarevirtual (simulated or emulated)

Simulation Controller

HIL

Power HIL

Power Testbed

Full System

Test

Co

vera

ge

Test Fidelity

Low

Low High

High

low cost ($10k-100k)

moderate cost ($100k-300k)

high cost ($500k-$millions)

Page 8: 9.2_Microgrid Hardware-in-the-Loop Laboratory Testbed and Open Platform (HILLTOP)_Limpaecher_EPRI/SNL Microgrid Symposium

Community mGrids - 8

KN 30 August 2016

Power Distribution Integration Platforms and Testbeds

Full System

Inv G

C C

Inv

Power Testbed

G

C C

Power HIL

Inv

C

G

C

Controller HIL

C

GInv

C

Simulation

GInv

CC

mC mC mC

DMS DMS

LegendG generatorInv battery or solar inverterC device controllermC microgrid controllerDMS distribution management system controller

power gridhigh-bandwidth AC-AC convertersimulation or emulation boundary

hardwarevirtual (simulated or emulated)

low cost

moderate cost

high cost

Simulation Controller

HIL

Power HIL

Power Testbed

Full System

Te

st

Co

vera

ge

Test Fidelity

Low

Low High

High

Page 9: 9.2_Microgrid Hardware-in-the-Loop Laboratory Testbed and Open Platform (HILLTOP)_Limpaecher_EPRI/SNL Microgrid Symposium

Community mGrids - 9

KN 30 August 2016

10-5 10-4 10-3

1 ms10-2 10-1 100

1 s

Time (seconds)

HIL simulation rate

80 mS(12.5 kHz)

One AC cycle

16.7 ms(60 Hz)

User display update rate

66.7 ms(15 Hz)

Load profile & irradiance data

1 s(1 Hz)

Power converter controller response

0.5-1 ms(1-2 kHz)

Secondary control0.1-1 s

(1-10 Hz)

Power system fault transients

0.3-1 ms(1-3 kHz)

Genset protection functions0.1-0.2 s

(50-100 Hz)

• Microgrid controller HIL simulates in real-time at sub-cycle timescales

Wide Test Coverage with Real-time Simulation

Useful for:

• Steady-state

• Dynamic analysis

• Transient analyses

Page 10: 9.2_Microgrid Hardware-in-the-Loop Laboratory Testbed and Open Platform (HILLTOP)_Limpaecher_EPRI/SNL Microgrid Symposium

Community mGrids - 10

KN 30 August 2016

2016 HILLTOP Block Diagram

Modbus TCP

Communication Translation

Hardware / Firmware

COM

Microgrid Controller (Unit Under Test)

MIT-LL

Interface Box

Vendor-supplied equipment

Modbus RS485

Woodward

EasyGen 3500

#1

COM DIO AIO COM DIO AIO

Simulated

Diesel Genset

Simulated

Combined Heat and

Power System

Simulated

Battery Storage &

Power Converter

Simulated Breakers

and Loads

Simulated Distribution Grid

and Microgrid Test Feeder

Simulated

PV & Inverter

COM DIO AIOCOM DIO AIOCOM DIO AIO

Simulated

Generic

Relays

Woodward

EasyGen 3500

#2

Modbus RS485

Firewall and Network Switch

Lantronix

Intellibox 2100

TCP to RS485

Lantronix

Intellibox 2100

TCP to RS485

SEL-751 Relays

(qty 3)

Simulated

Load Meters

EPC Power

Electronics

Controller #1:

Storage

EPC Power

Electronics

Controller #2:

PV

Modbus TCP

MIT-LL

Interface Box

OPAL-RT and

Typhoon HIL

Real-time Simulation

Platforms

Microgrid

Controller

Mechanical

Enclosure

Cyber Test

C2 Proxy

Page 11: 9.2_Microgrid Hardware-in-the-Loop Laboratory Testbed and Open Platform (HILLTOP)_Limpaecher_EPRI/SNL Microgrid Symposium

Community mGrids - 11

KN 30 August 2016

2015 & 2016 Symposium Test Feeder

FY15 Symposium FY16 Symposium

Page 12: 9.2_Microgrid Hardware-in-the-Loop Laboratory Testbed and Open Platform (HILLTOP)_Limpaecher_EPRI/SNL Microgrid Symposium

Community mGrids - 12

KN 30 August 2016

Microgrid Controller Hardware-in-the-Loop Platform

MIT Lincoln Lab

Windows Server

Power Supply

Interface Box

Monitoring I/O

Analog & Digital

Opal-RT HIL

Target

Firewall and

Network Switch

Console

Woodward

easYGens

Integrated Woodward easYgen 3000

genset controllers, EPC power converter

controllers, SEL 751 relays, and SEL 2440

fast load-shed controllers

Page 13: 9.2_Microgrid Hardware-in-the-Loop Laboratory Testbed and Open Platform (HILLTOP)_Limpaecher_EPRI/SNL Microgrid Symposium

Community mGrids - 13

KN 30 August 2016

• Generator statistics

• High speed instrumentation

– 8kHz sampling

– Voltage and current

– Bias signals

CHIL Integration: Diesel Genset Model Validation

Shutdown of Generator and Model Start-up of Generator and Model

• 1 MVA

• 480Vac

• 3 phase

Page 14: 9.2_Microgrid Hardware-in-the-Loop Laboratory Testbed and Open Platform (HILLTOP)_Limpaecher_EPRI/SNL Microgrid Symposium

Community mGrids - 14

KN 30 August 2016

Device Controller Integration: Woodward easYgen 3000

Interface Box

Woodward easYgen

3000 Controller

Genset Simulation in HIL

Governor

AVR

M MCB GCB

Load

16 Vac 16 Vac

V a

b c

I a b c

16 Vac

120 Vac

0 - 1 A

120 VAC

F e e d e r

T a c h

o m

e t e

r

V a

b c

16 Vac

0 - 1 A

I a

F _ ref : 60 Hz

V _ ref : 480 V LL

± 5 V square wave

Throttle

Field

G

Legend M Motor G Generator GCB Generator Circuit Breaker MCB Mains Circuit Breaker

Signal voltage transformer

Voltage-controlled current source

Page 15: 9.2_Microgrid Hardware-in-the-Loop Laboratory Testbed and Open Platform (HILLTOP)_Limpaecher_EPRI/SNL Microgrid Symposium

Community mGrids - 15

KN 30 August 2016

2015 Microgrid Controls Symposium Boston, MA

Page 16: 9.2_Microgrid Hardware-in-the-Loop Laboratory Testbed and Open Platform (HILLTOP)_Limpaecher_EPRI/SNL Microgrid Symposium

Community mGrids - 16

KN 30 August 2016

Microgrid Operating in Real-time

Page 17: 9.2_Microgrid Hardware-in-the-Loop Laboratory Testbed and Open Platform (HILLTOP)_Limpaecher_EPRI/SNL Microgrid Symposium

Community mGrids - 17

KN 30 August 2016

Microgrid Controller Symposium

Save the Date: Thursday February 16, 2017 at MIT

• Google search for “Eventbrite: Microgrid & DER Controller Symposium”

• Hosted by Mass. Clean Energy Center and DOE-OE

– Utilities, project developers, and microgrid vendors

– MIT Campus

– Agenda is posted

• Integrating 6 microgrid controller vendors

• Demonstrations of several HIL testbeds

Page 18: 9.2_Microgrid Hardware-in-the-Loop Laboratory Testbed and Open Platform (HILLTOP)_Limpaecher_EPRI/SNL Microgrid Symposium

Community mGrids - 18

KN 30 August 2016

Vision for the Microgrid Controller HIL Platform

– 1 –

Development

Platform

– 2 –

Deployment

Platform

– 3 –

Standards Test

Platform

• Application of real-time sim. technology to power engineering

• Cost-effective engineering and project development

• Enables performance evaluation of commercial products

• Demonstrations at Mass. Microgrid Controls Symposium

• Perform controller and systems integration

• Pre-commission testing of advanced power system projects

• Test edge conditions and exercise the actual device controllers

• Technical risk reduction and confidence building for the utility

• Project enabler: South Boston microgrid

• Industry-standard test platform for new power systems

• Test against IEEE P2030.8 standard and utility requirements

– 4 –

Electric Power HIL Controls Collaborative (EPHCC) Shared Repository

Page 19: 9.2_Microgrid Hardware-in-the-Loop Laboratory Testbed and Open Platform (HILLTOP)_Limpaecher_EPRI/SNL Microgrid Symposium

Community mGrids - 19

KN 30 August 2016

Elements of the HIL Shared Repository

Microgrid Test Feeders

Validated Device Models Validated Device Controller Software

Interface Circuitry for Device Controllers

Interface Code for Device Controllers

Standard Test Stimuli

Communications Interface Translation Code

Post-processing Scripts for Test Results

HIL Target PlatformConversion Scripts

NetlistsLoad profiles, irradiance profiles,

grid outages, faults

Circuit schematics, bills of materiel

Targets: OPAL-RT, Typhoon HIL, RTDS, NI, and others

Motor-generators, power converters / inverters, and relays

Genset controllers, power converter controllers, relay

protection functions

Modbus TCP

Microgrid Test Repository

Controller-in-the-Loop

Repository

HIL Platform Repository

50

51

27

59

25

MODBUS

52

IEC 61850

GOOSEMMS

Page 20: 9.2_Microgrid Hardware-in-the-Loop Laboratory Testbed and Open Platform (HILLTOP)_Limpaecher_EPRI/SNL Microgrid Symposium

Community mGrids - 20

KN 30 August 2016

Repository Structure

• Goals:

– Multi-users

– Multi-platform

• Directory structure designed for other simulation platforms

• Unit tests for checking compatibility across tools

• Documentation

Distribution Systems

Sheriff

Banshee

ComponentsCross-platform

Translation Tools

Cable

Transformer

Passive Load

Active Load

Circuit Breaker

Motor

Relay

Genset

PV

CHP/Thermal

ESS

Bullfrog

Root

Device Model

Software Controller

ABB CHIL

EPC CHIL

Vendor-X CHIL

· Model· Stimuli· Post-Processing Scripts

· Model· Stimuli· Post-Processing Scripts

· Validation· Unit Test

· Validation· Unit Test

Page 21: 9.2_Microgrid Hardware-in-the-Loop Laboratory Testbed and Open Platform (HILLTOP)_Limpaecher_EPRI/SNL Microgrid Symposium

Community mGrids - 21

KN 30 August 2016

• Component models, distribution test feeders, and C-HIL setups are documented, tested, and publicly available

– https://github.com/PowerSystemsHIL/

• Working with DOE’s GMLC-OL program as pilot effort to hone organization and working processes

Repository is Publicly Available

Page 22: 9.2_Microgrid Hardware-in-the-Loop Laboratory Testbed and Open Platform (HILLTOP)_Limpaecher_EPRI/SNL Microgrid Symposium

Community mGrids - 22

KN 30 August 2016

Division 7

Scott van Broekhoven

Ed Corbett

Maura Custar

Elizabeth Dalli

Jason LaPenta

Erik Limpaecher

Raajiv Rekha

Bill Ross

Reynaldo Salcedo

Tammy Santora

Chris Smith

MIT

Kendall Nowocin

Summer Interns

Matt Backes, UIUC

Aidan Dowdle, MIT

Marissa Garcia, USC

Division 4

Joe Cooley

Division 6

Igor Pedan

Sejal Popat

Contributors

Collaborators

Allan Abela, EPC Power

Vijay Bhavaraju, Eaton

Ivan Celanovic, Typhoon HIL

Fran Cummings, Peregrine Group

Babak Enayati, National Grid

Mark Evlyn, Schneider

Julie Fortin-Morin, OPAL RT

Thomas Kirk, OPAL RT

Scott Manson, Schweitzer

Mirjana Marden, ARPA E

Galen Nelson, MassCEC

Luis Ortiz, Anbaric

Jim Reilly, Reilly Associates

Todd Snider, EPC Power

Travis Sheehan, Boston Redev. Authority

Tom Steber, Schneider

Brad Swing, City of Boston

Page 23: 9.2_Microgrid Hardware-in-the-Loop Laboratory Testbed and Open Platform (HILLTOP)_Limpaecher_EPRI/SNL Microgrid Symposium

Community mGrids - 23

KN 30 August 2016

Erik Limpaecher

Assistant Group Leader

Energy Systems, Group 73

781-981-4006 (lab)

781-999-2237 (cell)

[email protected]

Page 24: 9.2_Microgrid Hardware-in-the-Loop Laboratory Testbed and Open Platform (HILLTOP)_Limpaecher_EPRI/SNL Microgrid Symposium

Community mGrids - 24

KN 30 August 2016

BACK-UP SLIDES

Page 25: 9.2_Microgrid Hardware-in-the-Loop Laboratory Testbed and Open Platform (HILLTOP)_Limpaecher_EPRI/SNL Microgrid Symposium

Community mGrids - 25

KN 30 August 2016

Technical Challenges for Community Microgrids

Industrial

load

Battery

storage

Residential

load

Substation

Microgrid

Controller

Distribution

Utility

DMS

Regional

Transmission

Operator

CHP plant 1

CHP plant N

Critical load

Solar

array

= controller

Community microgrid =>

Stable off-grid operation Economical asset integration Safe interconnection Requirements

Minimize cost,

eliminate batteries

Integration of multiple assets

owned by separate entities No low-level control Challenge

Reference design: mix of

fast-responding

generation assets

Open controller standard,

HIL testbed

Islanding detection

using only sensing S&T solution

FY 16 Focus FY 16 Focus

Page 26: 9.2_Microgrid Hardware-in-the-Loop Laboratory Testbed and Open Platform (HILLTOP)_Limpaecher_EPRI/SNL Microgrid Symposium

Community mGrids - 26

KN 30 August 2016

HILLTOP Collaborations Efforts

San Nicolas Island

Page 27: 9.2_Microgrid Hardware-in-the-Loop Laboratory Testbed and Open Platform (HILLTOP)_Limpaecher_EPRI/SNL Microgrid Symposium

Community mGrids - 27

KN 30 August 2016

Industry Feedback on the Electric Power HIL System

“It would reduce our risks and costs

considerably…

The ability to perform commissioning of a

microgrid’s control systems prior to

construction would also reduce the

distribution utility’s perceived technical risk,

thereby increasing our project success rate

and reducing deployment timelines and

costs.”

– Dr. Luis Ortiz, Anbaric Microgrid

“An open source HIL library would accelerate

the entire industry, but the industry isn’t

organized well enough to make this happen.

This is a perfect role for government. We

would contribute engineering support to such

an effort.”

– Schneider Electric executive

Page 28: 9.2_Microgrid Hardware-in-the-Loop Laboratory Testbed and Open Platform (HILLTOP)_Limpaecher_EPRI/SNL Microgrid Symposium

Community mGrids - 28

KN 30 August 2016

2015 HILLTOP Block Diagram

Modbus TCP

Modbus TCP

Modbus TCP

Connection to HIL

Demonstration Platform

COM

Microgrid Controller – Unit Under Test

Interface Box

Vendor-supplied equipment

Modbus RS485

Prime Mover

Device Controller

Woodward

EasyGen 3500

#1

OPAL-RT HIL 5607

Power

COM DIO AIO COM DIO AIO

Simulated

4 MVA Genset

Simulated

1 MVA Genset

Simulated

Battery Storage &

Power Converter

Simulated Relays,

Breakers, and

Telemetry

Simulated Grid and One Line

Diagram of the Test Feeder

(~18 Buses and 17 lines)

Simulated

PV & Inverter

COM DIO AIO COM DIO AIOCOM DIO AIOCOM DIO AIO

Simulated Battery

Power Converter

Controller

Simulated PV Inverter

Controller

Simulated Protection

Controller

Prime Mover

Device Controller

Woodward

EasyGen 3500

#2

Modbus RS485

Firewall and Network Switch

Modbus TCP

Lantronix

Intellibox 2100

TCP to RS485

Lantronix

Intellibox 2100

TCP to RS485

Page 29: 9.2_Microgrid Hardware-in-the-Loop Laboratory Testbed and Open Platform (HILLTOP)_Limpaecher_EPRI/SNL Microgrid Symposium

Community mGrids - 29

KN 30 August 2016

Repo. Category Fidelity Verification Component Type Dev. Environment Real-time Platform

SW device model 0 - n/a 0 - "pre-alpha," untested Cable Matlab 2011b, SimPwrSys OPAL-RT

SW controller 1 - steady-state 1 - "beta," unverified Breaker Matlab 2014, SimPwrSys Typhoon HIL

C-HIL interface 2 - dynamic 2 - textbook implementation Relay Typhoon RTDS

P-HIL interface 3 - transient 3 - agrees with literature Other LabVIEW National Instruments

Test feeder 4 - unit tested Transformer - 3ph RSCAD Speedgoat

5 - field tested Transformer < 3ph dSPACE

Load

DG - Power Electronics

DG - Machines

Component Inventory Index

• Work continues to identify additional key components and additional industry partners

Page 30: 9.2_Microgrid Hardware-in-the-Loop Laboratory Testbed and Open Platform (HILLTOP)_Limpaecher_EPRI/SNL Microgrid Symposium

Community mGrids - 30

KN 30 August 2016

Industry Feedback and FY16 HIL Development Priorities

Blue: features

considered for 2nd

Symposium

Attendee

Priority

Devel.

Priority Development Status

1 1 Test under fault conditions

7 1 Self-healing and distribution system configurability

14 1 Test more system topologies

3 1 Integration of more DER device controllers

7 5 More formal testing / more rigorous analysis and

metrics

9 5 Compare vendors’ performance

6 5 Exercise cyber security

9 8 Integration of more microgrid controllers / vendors

2 9 Islanded operation under more dynamic conditions

9 9 More extensive demonstration sequence / functionality

4 - Integration with distribution management system (DMS)

4 - Test against industry standard(s)

9 - Support additional communication protocols

13 - Integration with ISO energy market

Not started

In progress

Done/tested

Not planned

Page 31: 9.2_Microgrid Hardware-in-the-Loop Laboratory Testbed and Open Platform (HILLTOP)_Limpaecher_EPRI/SNL Microgrid Symposium

Community mGrids - 31

KN 30 August 2016

Heads-up Display (screen 1)

Page 32: 9.2_Microgrid Hardware-in-the-Loop Laboratory Testbed and Open Platform (HILLTOP)_Limpaecher_EPRI/SNL Microgrid Symposium

Community mGrids - 32

KN 30 August 2016

CHIL Integration ‒ SEL 751 Relay

• SEL Collaboration

• Three feeder protection relays implemented in hardware

• Hardware I/O interface to PTs, CT’s, breakers

• Protection features:

– Overcurrent (50, 51)

– Over/under voltage (27, 59)

– Synchronism check (25)

– Grid-tied protection

– Islanded protection

• Modbus TCP interface

OPAL-RT INTERFACE WIRING DIAGRAM

Protection

Functions

Data Logging Registers

Mapping

Preliminary

Calculations

Page 33: 9.2_Microgrid Hardware-in-the-Loop Laboratory Testbed and Open Platform (HILLTOP)_Limpaecher_EPRI/SNL Microgrid Symposium

Community mGrids - 33

KN 30 August 2016

• Battery and PV Inverter to manufacturer validated modelled inverter

• Inverter features:

– Grid Forming

– Grid Following

• Modbus over RS485

CHIL Integration – EPC Power Inverter

EPC Inverter User Interface Manufacturer Validated Model

Page 34: 9.2_Microgrid Hardware-in-the-Loop Laboratory Testbed and Open Platform (HILLTOP)_Limpaecher_EPRI/SNL Microgrid Symposium

Community mGrids - 34

KN 30 August 2016

“…educating stakeholders.” – SoCalEdison engineer

“…test[ing] our project concepts.” – Celtic Energy

“…demonstrat[ing] standard functions and develop[ing] new functionalities.” – ABB engineer

“…certification for utility interconnection.”

“…pre-commissioning testing.”

“…evaluating the safety and reliability impact on our distribution system of NY REV projects.” – ComEd engineer

“DER vendors won’t give us their controller code to evaluate interconnection behavior. This platform could finally solve that problem.” – National Grid engineer

“…pre-deployment testing of our self-healing distribution system project, which includes more than 100 intelligent relays.” – VP of Engineering, Eversource Energy

The microgrid controller HIL platform would be helpful to my organization for…