Aurangabad Electricals Ltd.
GROUP -2 ANSUMAN | ASHOK | GAURAV | RAJNEESH | SANDEEP | VATSAL
Bagla Group
The Bagla Group - Headquartered in Aurangabad, is one of the largest auto component manufacturing entities in Western India
The Bagla Group manufactures wide range of products from Aluminum Die Casting (PDC & GDC), Fasteners, complete Wheel rims for motor cycles including brake panel assembly for automotive industry and condensers for White good industry.
Today the group has crossed 100 million dollars turnover and caters to Domestic and European/American market.
Bagla Group Companies
Aurangabad Electricals Ltd.
Aurangabad Motor Manufacturers Ltd
BG Appliances Ltd.
BG-LI-IN Pvt Ltd.
• Flagship company of Bagla Group
• Four principle business units • Auto Electricals, High
Pressure Die Casting, Wheels & Rims and Fasteners
• BG LI-IN is a joint venture between Bagla Group and LI-IN Electricals of Taiwan
• One of the largest manufacturers of magnetos in India
• One of India’s leading Electronics Manufacturing Services (EMS) Company
• Catering to the needs of consumer appliances, lighting, automotive and telecommunication industries
• Services include Product Design, PCBA Sub Contracting, Testing and value-added Assembly Services
• A division of Bagla Group• Commenced- Shafts for
domestic appliances• Diversified- rolled bond
evaporators, wire on tube condensers, skin condensers and driers for the refrigerator industry and aluminium gravity die casting parts
Customers
Aurangabad Electricals Ltd.
Principal Business
Units
Die Casting
Wheels and Brakes
High Tensile Fasteners
Auto Electricals
Auto Electricals
Aurangabad Electricals is in a relationship with Taigene Electronics, Taiwan for Magnetos, Shihlin, Taiwan for HT coils and LI-IN Electronics for relays and flashers.
Magnetos : Magneto is an electro mechanical device that produces electrical energy through mechanical movements from a magnetic field. Presently we manufacture magnetos of 60 W to 200 W, single phase and three phase.
Ignition Coil : An Ignition coil is an induction coil which is working as a step-up pulse transformer and giving high voltage output to the spark plug. We manufacture ignition coils for 2 and 3 wheeler vehicles (Iron core as well as soft ferrite core)
Relays : A relay is a Electronics / Electro mechanical switch, which protects and control the operation of headlight, starter motor etc. with a small capacity switch. We make relays for various applications required for 2,3 and 4-wheeler vehicles.
Die Casting Die Casting is wherein molten metal is poured in a mould cavity to take
the desired shape After solidification the mould is opened and base casting is retrieved
along with metal feeding paths All these process are mapped with graphic simulation depicting absolute
reality, sequence of operations in the die with respect to temperature, time, air gaps etc.
This is done to ensure high quality and consistent reliability.
Brakes and Wheels
Manufacture the entire wheel rim assembly along with the brake
drum
Completely assembled with
brake panel, brake shoe, spring
etc.
The wheel rim is manufactured by
cold forming, TIG(Tungsten Inert Gas) welding and
electroplating surface treatment
(nickel chrome plating)
Fasteners Bagla group has been diversifying according to customer requirements High Tensile Fastener manufacturing is one of the integral part of the
above process Manufacture Bolts, Screws, Studs and Nuts in various sizes and grades
from Cold Forging Process
Scope
•This mini project is taken to draw and study the current value stream of the processes at Aurangabad Electricals Ltd. This will help the management to identify the area of waste, higher lead time and scope of improvement in the current process
App
roach
•2 Plant visits•Studied the current process•Selected one component (Magneto cover) to study the VSM•Collected data pertaining to :• Process flow• Cycle time• Changeover• time• Batch size•Studied the best practices
Deliverables
•Identification of problem areas•Identification of areas of waste, higher lead time & scope of improvement in the current process•Improved VSM
PROCESS FLOWFOR
MAGNETO COVER
Raw Material - InwardTruck Capacity 9 and 12 ton (mostly 9)Unloading time 90 minNo of suppliers 9
Raw MaterialAlSi9MnMg and AlSi132MnMg
Pallet storage capacity 1000 kg
Melting Shop (Furnace)Loading time 10 min
Melting time 30 min
Pouring of molten material 5 min
Dross removal 5 min
Checking of chemical composition 5 min
Transfer of molten material 10 min
Total Cycle Time 65 min
Lift Capacity 120 kgFurnace Capaicty 1.5 ton
Casting Shop
Cycle Time 52 sec
Die Change 45 min
Batch Size 105 pcs
Transportation for next operation 2 min
No of pieces in a die 2
Shot BlastingCycle Time 2 minChangeover time 12 minRa Rz value check once in a dayReliability 100%Transfer lot size 60 pcs
Inventory 0%
Steel Shots used for blasting
Paint ShopConveyer Belt length 225 m
Belt speed 1 m/min
No of pcs in one hanger 12
Cleaning and Drying Painting (Manual spray)
Degreasing 5 minAir Spray (to remove dust)
25 minWater rinse 2 min Primer Paint
Chromotizing Tank 5 min Flash off zone
Water Tank 2 min Final Paint
DM Water Tank (Spray) 30 min Flash off zone
Water Dry over 30 minVacuum Oven (paint dry) 90 min
Normal Atmospheric Cooling 45 min
Machining, Assembly and TestingTapping and Drilling (one piece) 35 secLoading/unloading 14 secFacing and Reaming (two pieces) 66 secLeakage testing 14 secBush threading (D Kaal Box) 60 sec
Quality Check 18 sec
DispatchNo packaging, direct dispatch in bins
1 bin contains 12 pieces
Current VSM
Best Practices5S implemented in the offices
Even for keeping chairs around the table, lines of demarcation have been set-up
Also for keeping record files 5S have been implemented
Best Practices5S implemented on the shop floor
Best Practices5S & TPM implemented on the shop floor
Best Practices
For quality awareness among workers and officers they have customers’ mail’s snapshot on the shop floor near the concerned department / machine
Best Practices
Q - Alert
Q – Alert is a quality alert system used for the operator to spot some common defects occurring in the recent pastThis makes it easy for him to ensure that these defect do not get repeated
Best PracticesTPM Activity Boards in the offices
Best PracticesKaizen Boards in the offices
Best PracticesTPM Policy at Aurangabad Electricals