  • 2. Statements The information in this presentation is provided without charge and must be used solely for information purposes. The contents of this presentation cannot be used without the express authorization of Metanor Resources Inc. Any use, copy, transmission or retransmission by a person who is not the intended recipient of this presentation may constitute a violation of the law and is strictly forbidden. Some of the statements made in this presentation may be considered forward-looking. Forward-looking statements are associated with known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements of the Company to differ materially from any future results, performance or achievements expressed or implied by those projected in the forward-looking statements. The reader is warned against the risk of attributing excessive credibility to these forward-looking statements.
  • 3. The Company Metanor is a Canadian based advanced stage exploration company Metanor is also a NEAR TERM GOLD PRODUCER in Mining Friendly Quebec (LOW GEOPOLITICAL RISK) PERMITTED >$150M infrastructure (1,200tpd Capacity) which has proven production capabilities (over 40,000 oz poured) Total Gold Resource of OVER 1.6 MILLION OZ (all categories) 3 rd Party Validations by SANDSTORM, STANTEC and SGS GEOSTAT With recent financings totaling $35M, Metanor is FULLY FUNDED to bring Bachelor Lake into production Beginning in 2012, the Bachelor Lake Mine and Mill will ramp up to 60,000 oz annual production
  • 4. Corporate Structure Stock symbol MTO (TSX-V) Shares outstanding 201.7 M Fully diluted 264.6M Insider ownership ~ 5 % Institutional ownership ~ 45 % Market capitalization ~ $ 60 M Shareholders Equity(Book Value) 1 $ 56.4 M 1 As of December 31, 2010, Unaudited Replacement value of assets $ 150 200 M
  • 5. Recent 3rd Party Validations-Bachelor BACHELOR LAKE PROJECT VALIDATION $20M US Financing via Gold Stream Sale to SANDSTORM Sandstorm effectively pays $1,037US/oz for 20% of the initial mine life production of 186,122 oz then $500 US/oz for their 20% of Life of Mine (LOM) production STANTEC STATES BACHELOR LAKE HAS ROBUST IRR 85% Prefeasibility Study shows Average LOM Cash Costs $464/oz Initial 3 yr mine life has expectation for increase due to prospectivity at depth and along strike Inferred resource of close to 100,000 oz not included in mine life
  • 6. Recent 3rd Party Validations-Barry BARRY OPEN PIT -NI43-101 shows 781,450 oz resource all categories-avg 1.3g/t SGS GEOSTAT states As a larger tonnage with lower grade with an onsite mill, Barry has the potential to become a significant low grade high tonnage deposit similar to the Osisko (Malartic) and Detour Gold (Detour) The gold is in the system, the mineralized fluids have circulated in the major shear.
  • 7. Company Highlights FOCUS ON GOLD OPERATIONS IN QUEBEC >$150M permitted infrastructure in place Functional 1,200 tpd capacity mill (proven production capabilities) Presently sinking shaft to access high grade ore at Bachelor 5,000t bulk sample Q-4 2011, Production ramp up Q-1 & Q-2 2012 Q-3 2012 60,000 oz annual production EXPERIENCED MANAGEMENT TEAM EXPANDING GOLD RESOURCES Developing a high tonnage low grade open pit at Barry Extensive drill campaign at Barry to significantly increase resource Investigate large IP anomalies at Barry Begin an exploration campaign at Bachelor Lake
  • 8. Management Team Serge Roy Chairman & CEO
    • Over 20 years experience in negotiating and operating projects
    • Previously with Construction G.P.M., Stabell Resources Inc. and Ovaltex Consultant inc. (mining services company) and Pyrinor Resources Inc.
    Ghislain Morin President & COO
    • Over 35 years experience in mine operations
    • Lead manager in charge of building the BHP Billiton Mill at Selbaie mine and subsequently expanding it from 1,500 to 8,500 TPD
    • Founder and key executive of quipement Minier GRM, a mining services company
    Andr Tremblay, P. Eng. Vice President Exploration
    • Over 35 years experience in mining and exploration
    • Held senior roles at several mining companies (Ressources minieres Coleraine, GeoNova Explorations, Gestion S.R.C., Groupe Minier O, Mines Camchib, Campbell Resources)
    Pascal Hamelin Director-Operations
    • Over 20 years experience in mine operations
    • Held senior roles at several mining companies (Alexis Minerals, Century mining corp., Inco mine)
    Ronald Perry Vice President & Treasurer
    • Over 30 years experience in accounting and finance
    • Founder of Briolijor Corporation, a financial consulting company
  • 9. Board of Directors Robert C. Bryce 50 years of mine construction and operations, member of Quebec Order of Engineers and of the Institute of Mining and Metallurgy, held senior positions in well known mining companies including Falconbridge, Aur Resources and Selbaie Mines and has served on the boards of several public mining companies Tristram Robert (Tris) Coffin Over 40 years experience in the optical industry, Owner of Tris Coffin, Meunier Rosenthal Asselin Optometrists/Opticians, one of Canadas most prestigious optical operations early in his career, he worked in the brokerage business and helped bring companies public Raymond Couture Holds a Masters Degree in Public Administration and a Bachelor of Arts Degree from ENAP and Laval University respectively, was General Manager Of College Saint Charles-Garnier (1992-95) and of various school boards(1974-95). He has served on the boards of several public companies Serge Roy Chairman and CEO See page 6 Ghislain Morin President and COO See page 6 Ronald Perry Vice President and Treasurer See page 6
  • 10. Gold Operations in Quebec
    • Excellent infrastructure
    • Generous subsidies from the Quebec government (up to $0.47 / $1.00)
    • Qualified staff available (workers, geologists, engineers)
    Bachelor Lake/Hewfran 4 837.56 ha. Barry 7 335.00 ha. Nelligan 2 881.00 ha. Dubuisson 432.11 ha. Wahnapitei 130.00 ha.
  • 11. Increasing Shareholder Value
    • Accessing the high grade Bachelor Lake and Hewfran ore (7.38 g/t fully diluted) presently implementing the final phase-
    • sink shaft a further 536ft.(60% complete )
    • level 13 & 14 development already in progress
    • then commence a 15,000m drill campaign from level 15
    • Consolidating/expanding gold resources in and around the Bachelor Lake Mill:
      • Portfolio of properties: 1,601,374 oz of resources (NI 43-101)
      • Potential of a further 1.5M oz in a radius of 100 km of the mill (historical resources not compliant with NI 43-101)
    Commence next phase 2011 Barry drilling campaign to target anomalies (some larger than the existing pit 18Mt - 781,450 oz) and the extensions to substantially increase the existing resources
  • 12. Summary of Resources Historical resources (not compliant with NI 43-101) Property Resource Category Tonnes Grade (g/t) Contained Gold (oz) Bachelor Lake 43-101 Measured & Indicated Inferred 841,591 426,148 7.79 6.52 210,857 89,366 Hewfran Indicated Inferred 110,100 206,900 6.47 5.66 22,900 37,656 Barry 43-101 Indicated Inferred 7,701,000 10,411,000 1.25 1.41 309,500 471,950 Dubuisson 43-101 Indicated Inferred 166,076 3,245,222 4.82 4.15 26,150 432,995 Total Measured & Indicated Total Inferred 569,407 1,031,967 Total Targeted Area Surrounding Bachelor Lake Mine 8,900,000 5.3 1,500,000
  • 13. Bachelor Lake Property STANTEC STATES BACHELOR LAKE HAS ROBUST IRR 85% Average LOM Cash Costs $464/oz (fully diluted) Initial 3 yr mine life has expectation to MORE THAN DOUBLE due to prospectivity-OPEN IN ALL DIRECTIONS AND AT DEPTH Also Zones A & C only scratched the surface Inferred resource of close to 100,000 oz not included in mine life 10 MONTH PAYBACK ON INVESTMENT Begin 15,000m drill campaign from last level BACHELOR LAKE PROJECT VALIDATION $20M US Gold Stream Sale to SANDSTORM
  • 14. Bachelor Lake Exploration Potential at Depth
  • 15. Bachelor Lake Property Exploration Potential at Depth
  • 16. Bachelor Lake Property Resource Status Note : The above blue zones ARE NOT included in the 43-101 Resources Calculation.
  • 17. Barry Open Pit-Highlights
    • From 2007 to 2010, with only 20,000m of drilling, resource tonnage increased by 1,240% and contained ounces rose by 336%
    • Mining and exploration at the pit has led to very good understanding of the structure
    • Present resources: 18M tonnes - 781,450 oz with only 50,000m of diamond drilling
    • In perspective, Osisko has conducted an enormous drill campaign of approximately $80M and over 800,000m of diamond drilling to arrive at their resource
    • Barry requires an extensive(1 st phase) drill program over 75,000m to target similar anomalies and extensions to extend the strike length to significantly increase resources . As a result of recent internal discussions, management has decided to investigate the possibility of strategic partners for Barry
    • Increased exploration activity all around the Barry property by Bonterra Resources, Eagle Hill Exploration and Amseco Exploration
  • 18. Barry Open Pit Presently 1 KM Strike
  • 19. Longitudinal Barry Deposit
  • 20. Main Zone 43 Zone -100m -300m -400m East Pit Sector Central Zone -200m Barry Gold Deposit Exploration Potential at Depth
  • 21. Investment Overview
    • BACHELOR LAKE/HEWFRAN PROPERTY
      • Develop the higher grade Bachelor underground(sink shaft 536ft- 60% complete)
      • Continue identifying and upgrading the potential gold resources at depth commence 15,000m drill campaign to extend mine life to 7-9 years.
      • Commence production (2012) from Bachelor underground 60,000 oz annual
    • BARRY PROPERTY
      • Expand & Upgrade current gold resources (781,450 oz. at avg.1.3 g/t)
      • Complete IP coverage and continue an extensive drill program
      • Target the large IP anomalies and extensions
    • STRATEGIC ACQUISITION
      • Investigate a potential acquisition of an advanced project near the Bachelor Lake Mine (within a 100 km radius- a potential of 1.5 M oz)
    Emerging Gold Producer + Expand Gold Resources
  • 22. 2872, Sullivan Road, suite 2 P.O. Box 420, Sullivan PO Val-d'Or, Quebec, Canada J9P 0B8 Phone: (819) 825-8678 Fax: (819) 825-8224 www.metanor.ca
  • 23. Bachelor Lake Infrastructure Bachelor Lake Mine Mill capacity 1,200 tpd
  • 24. Bachelor Lake Expansion New Rod Mill New 10 ft. Hoist
  • 25. Bachelor Lake Significant Drill Results Drill Hole Core Length (m) Gold g/t ZONE B 12-40 12-42 12-44 12-46 12-48 12-50 12-53 12-60 12-66 12-68 12-77 12-86 12-80 12-89 12-102 12-106 12-112 2.70 1.53 2.29 1.90 3.77 1.58 1.50 1.85 1.25 3.48 1.60 4.55 2.80 5.05 1.95 2.75 1.95 23.83 23.68 24.54 13.72 22.19 16.57 13.59 11.75 27.43 10.50 22.30 6.20 12.35 8.07 15.64 26.50 25.12 Drill Hole Core Length (m) Gold g/t MAIN ZONE 12-40 12-42 12-44 12-46 12-50 12-56 12-59 12-61 12-68 12-83 12-88 12-90 12-93 12-110 12-114 2.40 1.26 1.40 2.78 4.70 1.80 1.75 2.15 9.95 4.10 6.10 3.65 6.05 2.40 7.05 26.26 18.58 14.77 27.49 18.81 17.90 11.08 12.22 6.33 14.26 12.90 14.90 12.48 15.40 7.40
  • 26. Barry & Nelligan Significant Drill Results Drill Hole Core Length (m) Gold g/t BARRY (open pit) MB-09-385 30.15 3.04 Incl. 7.65 10.40 MB-09-413 10.5 6.08 MB-09-434 15.0 4.24 MB-09-481 16.63 4.02 MB-09-479 Incl. 45.6 12.0 3.49 11.16 MB-09-409 7.75 7.71 MB-09-483 22.4 3.42 MB-09-423 33.00 9.24 Incl. 22.50 13.38 MB-09-410 12.00 5.53 Incl. 5.20 13.31 MB-09-412 9.90 3.53 Incl. 3.20 10.20 MB 09-459 12.60 3.00 NELLIGAN (6km from Bachelor Lake Mine) NE-09-02 4.54 28.06 (Uncut)