www.teekay.com Client: Statoil The Kristin filed is a gas condensate field in the Norwegian sector of the North Sea that was developed with four subsea templates tied back to a semi-submersible production facility. The gas from the Kristin field is transported in a pipeline to Åsgard and further to Kårstø. Oil and condensate are stabilised on the platform and transferred to Åsgard for storage and export. Task Direct loading to a DP shuttle tanker to ensure field production and gas export Solution During a 2,5 months fast-track project, the DP2 shuttle tankers Navion Britannia and Navion Hispania went through comprehensive preparations to meet all field specific and statutory requirements. Development and installation of field specific DP software Installation of new telemetry system and re-programming of communication systems Development of training program, using the patented DP-CAP training software Preparations of field operation manual and emergency procedures Achievement Successful vessel hook-up and continuous field production through direct loading to DP shuttle tanker until completion of export system repairs Flawless vessel arrival and hook-up to loading hose Nine days of continuous loading operation on Dynamic Positioning (DP) Immediate demobilisation of shuttle tankers and re-start of Kristin export riser KRISTIN DIRECT SHUTTLE LOADING A TAILOR MADE SOLUTION ENSURING CONTINUOUS PRODUCTION DURING EXPORT SYSTEM REPAIRS

Kristin Project

Embed Size (px)

DESCRIPTION

The Kristin filed is a gas condensate field in the Norwegian sector of the North Sea that was developed with four subsea templates tied back to a semi-submersible production facility. The gas from the Kristin field is transported in a pipeline to Åsgard and further to Kårstø. Oil and condensate are stabilised on the platform and transferred to Åsgard for storage and export.

Citation preview

Page 1: Kristin Project

w w w . t e e k a y . c o m

Client: Statoil

The Kristin filed is a gas condensate field in the Norwegian sector of the North Sea that

was developed with four subsea templates tied back to a semi-submersible production

facility. The gas from the Kristin field is transported in a pipeline to Åsgard and further

to Kårstø. Oil and condensate are stabilised on the platform and transferred to Åsgard

for storage and export.

Task

Direct loading to a DP shuttle tanker to ensure field production and gas export

Solution

During a 2,5 months fast-track project, the DP2 shuttle tankers Navion Britannia and

Navion Hispania went through comprehensive preparations to meet all field specific and

statutory requirements.

Development and installation of field specific DP software •

Installation of new telemetry system and re-programming of communication systems •

Development of training program, using the patented DP-CAP training software•

Preparations of field operation manual and emergency procedures •

Achievement

Successful vessel hook-up and continuous field production through direct loading to DP

shuttle tanker until completion of export system repairs

Flawless vessel arrival and hook-up to loading hose•

Nine days of continuous loading operation on Dynamic Positioning (DP)•

Immediate demobilisation of shuttle tankers and re-start of Kristin export riser•

k r i s T i n d i r e C T s h u T T l e l o A d i n g

A T A i l o r m A d e s o l u T i o n e n s u r i n g C o n T i n u o u s p r o d u C T i o n d u r i n g e x p o r T s y s T e m r e p A i r s

awiedenmann
Inserted Text
"...and gas export during riser repairs"
Page 2: Kristin Project

w w w . t e e k a y . c o m

GENERAL SPECIFICATIONS

Call Sign...............................C6XC9

Flag...................................... Bahamas

Hull ......................................DH

Built ..................................... 1998

Yard .....................................Astilleros

Class ....................................DNV

IMO no. ............................... 9145188

Dimensions

LOA Metres .......................... 264.68

Breadth Metres ..................... 42.5

KTM Metres .......................... 53

BCM Metres ......................... 129.8

Summer Loadline

PBL ...................................... 166.3

Draft Metres ......................... 15.65

DWT MT ............................... 124238

TPC MT ................................ 105.3

Tonnages

GRT ..................................... 72732

NRT ...................................... 38133

Suez Net .............................. 61042.21

Light Ship ............................. 28353

General P&I Club

General P&I Club ..................Gard

Capacities

Oil @ 98% Cu Mtr ............... 136604

Oil @ 98% Barrels ................. 859211.8

Sloptanks only @ 98% .......... 5083.4

Cargo

# of Pumps ........................... 4

Total M3 /HR ........................ 3000

VEC System

Fitted ................................... Yes

Hose Handling Equipment

Cranes No. x SWL .................Crane 2 x 15T

Main Engine

Make ...................................MAN B&W

(MCR) BHP ........................... 2 x 15385.88

Cargo Heating

Type .....................................Heating Coils

Material ............................... Yorkalbro