15
Edward Bolton Assistant Administrator, NextGen Federal Aviation Administration Marke Gibson, Maj Gen (Ret) Executive Director NextGen Institute Presented by NextGen Progress Report Aerospace States Association May 2014

Asa next gen progress rpt

  • View
    221

  • Download
    1

Embed Size (px)

DESCRIPTION

 

Citation preview

Page 1: Asa next gen progress rpt

Edward BoltonAssistant Administrator, NextGenFederal Aviation Administration

Marke Gibson, Maj Gen (Ret) Executive DirectorNextGen Institute

Presented by

NextGen Progress ReportAerospace States AssociationMay 2014

Page 2: Asa next gen progress rpt

What is NextGen

NextGen is the transformation of the world's safest aviation system from ground-based radar to satellite-based surveillance. It will make air travel even safer and more efficient and reduce the impact on the environment.

It’s an investment in America and a commitment to ensure a thriving air transportation system, now and in the future.

The FAA is developing solutions to ensure that NextGen works for all users of the national airspace system, including airports, airlines and the general aviation community.

2

Page 3: Asa next gen progress rpt

NextGen Improvements

Voice Communications

Ground-Based Navigation

Radar Surveillance

Limited AutomationProcessing

Disparate Point-to-PointSystems

Legacy System NextGen

Digital & Voice Communications

Performance Based Navigation

Satellite-Based Surveillance

Improved Automation Processing and Decision Support Tools

Integrated Systems and Information Distribution

work to increase efficiency, flexibility, predictability, safety and environmental benefits

3

Page 4: Asa next gen progress rpt

National Airspace System Today• Air traffic services for the

world’s largest and busiest airspace.

• Air traffic controllers track aircraft and keep them separated as they fly between navigation aids on the ground.

• Radar periodically updates the location of aircraft.

• Controllers communicate using radios and telephones.

• Nav aids are located where geography allows and do not provide the most direct routes.

• Controllers often add distance between aircraft to ensure safety.

• Weather causes 75 percent of delays.

4

Page 5: Asa next gen progress rpt

5

Page 6: Asa next gen progress rpt

Delivering NextGenEn Route Automation Modernization

• Seamless info sharing

• Flexible routing

• Automatic flight coordination

• Enables NextGen capabilities

• In place nationwide 2015

Automation platform for NextGen operations in high-altitude airspace

Constrained Automation Flexible Automation, Decision- Support Tools

6

Page 7: Asa next gen progress rpt

Delivering NextGenAutomatic Dependent Surveillance - Broadcast

Satellite-based surveillance

Radar Surveillance Satellite-Based Surveillance

• Precision position updates

• Cockpit traffic and weather

• Safer flights

• Improved separation

• Oceanic altitude changes

• In place nationwide 2014

7

Page 8: Asa next gen progress rpt

Delivering NextGenPerformance Based Navigation (PBN)

Precision routes

• Reduced flight time and fuel

• Flexible weather reroutes

• Integrated traffic flow

• End-to-end PBN network

• Airspace deconfliction

Ground-Based Navigation Performance-Based Navigation

8

Page 9: Asa next gen progress rpt

Delivering NextGenSystem Wide Information Management (SWIM)

Data-sharing platform

Inconsistent Data from Multiple Sources Common Shared Data

• Identical information for NAS users

• Flexible and secure information management architecture

• Enables data exchange and interoperability across systems

• Supports exchange of NAS data: surface, weather, flight, etc.

Transformational Program

9

Page 10: Asa next gen progress rpt

Top Seven ProgramsAs of: April 2014

Dec-13 Mar-14 Apr-14 Sep-14 Dec-14 Mar-15 Jun-15 Sep-15 Dec-15 2016+Sep-13

En Route Automation Modernization (ERAM)

Complete Final / 20th IOCSeptember 2014

Complete Final / 20th ORDMarch 2015

Terminal Automation Modernization and Replacement (TAMR) 1 ARTS IIIE IOC (Dallas – D10) April 2013

Complete 3 ARTS IIE IOCsSept. 2014

Final ARTS IIIE IOC May 2016

System Wide Information Management (SWIM)

Complete SWIM Terminal Data Distribution System(STDDS) Implementation June 2014

Complete Flight Data PublicationIOC July 2015

Complete NextGen Capabilities Package Sep.2013

SWIM Segment 2B FID Sept.2014

NAS Voice System (NVS)Achieve Gov’t Acceptance

of two NVS Demo systems at contractor's facility

Complete Initial Demonstrations

March 2014Final Investment Decision (FID) Sept.2014

Initiate OT&EDec. 2016

Begin ATC Task & Skills Analysis (TASA)

Development Nov.2015

Automatic Dependent Surveillance–Broadcast (ADS-B)

Radio Infrastructure CompleteMarch 2014

NAS-wide Pilot Advisory Services (Traffic & Weather) April 2014

Complete Final 24 of 24 En Route IOCs Sept. 2015

Complete All Term. &Surf. IOCs 2019

ADS-B Out Rule Compliance Jan. 2020

Terminal Flight Data Manager (TFDM)

Contract AwardApril 2015

Complete Key Site IOC2017

Final Investment Decision (FID) March 2015

Initial Investment Decision (IID)March 2014

Screening Info. Request (SIR)Release Sept 2014

Surveillance

Communications

Automation

Integration

Activity is completedActivity is in progressActivity is at riskActivity is missed

Legend

Data Communication (Data Comm)Initiate DCL Tower Trials:MEM Jan.2013 &EWR April 2013

Complete DCL Tower TrialsSeptember 2014

Complete DCL Tower Service Operational Test &

Evaluation (OT&E) Nov. 2015

DCL Tower Service IOC Key Site (SLC) March 2016

En Route Services FID October 2014 First Site IOC

En Route Service 2019

Surface Visualization ToolIOC at SCT April 2014

10

Page 11: Asa next gen progress rpt

NextGen Budget Profile(FY 2007 – FY 2015)

FY 2007 En

acted

FY 2008 En

acted

FY 2009 En

acted

FY 2010 En

acted

FY 2011 En

acted

FY 2012 En

acted

FY 2013 En

acted

w/Se

q

FY 2014 En

acted

FY 2015 Pres

ident's

Budget

0

100

200

300

400

500

600

700

800

900

1000

NextGen Operations ProgramsNextGen R,E&D ProgramsOther NextGen Support:Congressional EarmarksNextGen Pre-Implementation ActivitiesNextGen Implementation ProgramsNextGen Transformational Programs

Fiscal year

Dolla

rs in

Mill

ions

127.6

212.0

695.1

867.7883.3

934.9

883.3

835.6

901.3

†Note: Does not include acceleration

11

Page 12: Asa next gen progress rpt

12

FAA Region and Center Operations

http://www.faa.gov/about/office_org/headquarters_offices/arc/ro_center/

Page 13: Asa next gen progress rpt

www.faa.gov/nextgen

13

Page 14: Asa next gen progress rpt

Backup

14

Page 15: Asa next gen progress rpt

15