The STH 29 and CTH O interchange is in the background.
STH 29 & CTH O interchange looking west from the eastbound off ramp.
CTH O looking south at the STH 29 & CTH O interchange.
CTH O interchange looking north from the eastbound on ramp. The barrier wall along STH 29 can be in the median and the rock cuts along CTH O can be seen in the background.
Intersection of CTH O and 120th Connector looking south.
CTH O looking east through the rock cut.
120th Connector Road looking north from CTH O.
Beginning stages of excavation at the STH 29 and CTH O interchange.
Construction of STH 29 and CTH O interchange south of STH 29.
Embankment construction on CTH O south of STH 29.
Fill construction on the north section of CTH O.
Drilling for blasting operations on CTH O north of the new interchange.
Blasting on CTH O north of the new STH 29 and CTH O interchange.
Rock excavation on CTH O looking south toward the STH 29 and CTH O interchange
Box culvert construction at Artus Creek.
Sliding trench box that was used to facilitate box culvert construction at Artus Creek.
Grading along STH 29 including subgrade stabilization using geotextile fabric and breaker run.
Paving operations on westbound STH 29.
v
Crushing operations on CTH O north of the STH 29 and CTH O interchange.