Page 1: Matthew Lennon - CPB Samsung John Holland JV

Matt Lennon

WCX1B Construction

Overview

Page 2: Matthew Lennon - CPB Samsung John Holland JV

2

Page 3: Matthew Lennon - CPB Samsung John Holland JV

3

Project Overview

Page 4: Matthew Lennon - CPB Samsung John Holland JV

Project overviewKey information

4

Value approx: $2.7 billion

Contract start date: 3 June 2015

Planning approval: 11 February 2016

Completion: Early 2019

Page 5: Matthew Lennon - CPB Samsung John Holland JV

Project overviewConstruction snapshot

5

Project length: 6.5 km

Expected vehicles upon opening: more than 100,000 per day

Tunnel speed limit: 80km/hr

Ramp speed limit: 60km/hr

Tunnel height: 5.3 metres

Lanes: 3 lanes in each direction

Ramp grades: The entry ramps into the tunnel are designed to a

maximum grade of 8% and the exit ramps out of the tunnels are a

maximum grade of 6%

Peak employment: Greater than 1400 people at project peak

Page 6: Matthew Lennon - CPB Samsung John Holland JV

6

Western connection to the widened M4 Homebush

Page 7: Matthew Lennon - CPB Samsung John Holland JV

7

Western connection to the widened M4 Homebush - artist’s impression, eastbound view

Page 8: Matthew Lennon - CPB Samsung John Holland JV

8

Western entry/exit point to M4 East tunnels Homebush

Page 9: Matthew Lennon - CPB Samsung John Holland JV

9

Western entry/exit point to M4 East tunnels Homebush - artist’s impression eastbound view

Page 10: Matthew Lennon - CPB Samsung John Holland JV

10

Concord Interchange

Page 11: Matthew Lennon - CPB Samsung John Holland JV

11

Concord InterchangeArtist’s impression - eastbound view

Page 12: Matthew Lennon - CPB Samsung John Holland JV

12

City West Link Interchange Haberfield

Page 13: Matthew Lennon - CPB Samsung John Holland JV

13

City West Link Interchange Haberfield - artist’s

impression, looking north east along Wattle Street

Page 14: Matthew Lennon - CPB Samsung John Holland JV

14

Parramatta Road Interchange Ashfield

Page 15: Matthew Lennon - CPB Samsung John Holland JV

15

Parramatta Road Interchange Ashfield

Page 16: Matthew Lennon - CPB Samsung John Holland JV

Parramatta Vent Facility

16

Page 17: Matthew Lennon - CPB Samsung John Holland JV

3 x 30m diameter

interconnected shafts

1 x Inlet shaft (shared with

future Stage 3)

2 x Exhaust shafts.

Average 43m depth

7 x connecting ventilation

tunnels (totalling 750m), cross-

section up to 150m2

Page 18: Matthew Lennon - CPB Samsung John Holland JV
Page 19: Matthew Lennon - CPB Samsung John Holland JV

Tunnel

19

Page 20: Matthew Lennon - CPB Samsung John Holland JV

SitesOverview

4 tunnelling sites

Decline access primarily with shaft access from the western portal

20

UNDERWOOD

CONCORD

CINTRA

NORTHCOTE

Page 21: Matthew Lennon - CPB Samsung John Holland JV

Underwood Site

21

• Up to 3 roadheaders• Tunnelling only• 12 month operation• M&E access

Page 22: Matthew Lennon - CPB Samsung John Holland JV

Concord Site

22

• Up to 4 roadheaders• Tunnelling & Civil fitout• 18 month operation

Page 23: Matthew Lennon - CPB Samsung John Holland JV

Concord Site

23

Page 24: Matthew Lennon - CPB Samsung John Holland JV

Cintra Site

24

• Up to 4 roadheaders• Tunnelling & Civil fitout• 24 month operation• M&E Access

Page 25: Matthew Lennon - CPB Samsung John Holland JV

Northcote Site

25

• Up to 10 roadheaders• Tunnelling & Civil fitout• 24 month operation• M&E Access

Page 26: Matthew Lennon - CPB Samsung John Holland JV

Northcote Site

26

Page 27: Matthew Lennon - CPB Samsung John Holland JV

Excavation General Arrangement

27

14.4m

29m

8m

9m

Page 28: Matthew Lennon - CPB Samsung John Holland JV

Fit for purpose water resisting treatment

Entire tunnel space proofed for secondary lining with

membrane

Installation of appropriate linings where needed to meet

project specified inflows and waterproofing requirements

All critical M&E spaces treated with a membrane

Waterproofing strategy

28

Page 29: Matthew Lennon - CPB Samsung John Holland JV

Main PlantRoadheaders

29

5 x Sandvik (3 x MT520, 2 x MT720)8 x Mitsui SLB3005 x Refurbished Mitsui SLB3001 x Mitsui S200VMT Guidance Systems

Page 30: Matthew Lennon - CPB Samsung John Holland JV

Main PlantBolters / Jumbo

30

11 x Robodrill1 x Tamrock QuasarVMT Guidance Systems

Page 31: Matthew Lennon - CPB Samsung John Holland JV

Main PlantShotcrete

31

8 x Meyco Potenza1 x Jacon Maxijet

Page 32: Matthew Lennon - CPB Samsung John Holland JV

Construction Innovations

32

Page 33: Matthew Lennon - CPB Samsung John Holland JV

Pendular Bolter

Mechanical installation of cable bolts up to 9m long.

Page 34: Matthew Lennon - CPB Samsung John Holland JV

Dual Cab Roadheader

Enables on the job roadheader operator training.

Page 35: Matthew Lennon - CPB Samsung John Holland JV

Questions?