6
SHAIK MOHAMMAD KARIMULLA Email: [email protected] Mobile: +971 55 2596976 / +91 9885275048 Personal Details PROFESSION : Senior Electrical Engineer NATIONALITY : Indian Date of Birth : 16-07-1985 Passport : H5168208 Skype ID : shaikmohammadkarimulla Marital status : Married LANGUAGES: English, Urdu, Hindi, Telugu and Arabic(Basic) EDUCATION: B.E in Electrical Engineering in the year 2006, Post-Graduation Diploma in Project Management 2012. KEY EXPERIENCE : Complete Erection, installation, earthing, testing of Electrical equipment’s, panels, transformers and implementing the Substations, Power plants & Traffic signals. Handel the projects, and supervising the team of technicians. Meeting with Consultants / clients for resolving site issues technically to reach the standards. Cable Laying, Jointing, termination and testing of HV/LV Power cables, control and power cables. Study and execution of project specification and BOQ of materials. Handling of Electrical & Civil Works from Initial stage to Final stage of the project. Analyzing the site and plan according to the material availability. Implementation of the Inspection/ Test plans and confirmation with the specification requirements.

Kareem cv updated

Embed Size (px)

Citation preview

Page 1: Kareem cv  updated

SHAIK MOHAMMAD KARIMULLA Email: [email protected]

Mobile: +971 55 2596976 / +91 9885275048

Personal Details

PROFESSION : Senior Electrical Engineer

NATIONALITY : Indian

Date of Birth : 16-07-1985

Passport : H5168208

Skype ID : shaikmohammadkarimulla

Marital status : Married

LANGUAGES: English, Urdu, Hindi, Telugu and Arabic(Basic)

EDUCATION: B.E in Electrical Engineering in the year 2006,Post-Graduation Diploma in Project Management 2012.

KEY EXPERIENCE:

Complete Erection, installation, earthing, testing of Electrical equipment’s, panels, transformers and implementing the Substations, Power plants & Traffic signals.

Handel the projects, and supervising the team of technicians. Meeting with Consultants / clients for resolving site issues technically to reach the standards. Cable Laying, Jointing, termination and testing of HV/LV Power cables, control and power cables. Study and execution of project specification and BOQ of materials. Handling of Electrical & Civil Works from Initial stage to Final stage of the project. Analyzing the site and plan according to the material availability. Implementation of the Inspection/ Test plans and confirmation with the specification

requirements. Operation and Maintenance of HV, MV, LV electrical equipments and utility systems (Authorized

O&M Engineer). Conduct all Routine tests for transformer as per Customer specifications Review of Submittals/Shop drawings and As-built drawings. Study and execution of project specification and checking/ approving bills. Maintain project correspondences/ documentations and produce for auditing as required. Coordinates with the inspection procedures along with (Abu Dhabi Distribution Company) ADDC

Engineers. Prepare the documents for carrying out the approval of drawings and finally achieving the

connection from ADDC for the electrical systems.

Page 2: Kareem cv  updated

PROFESSIONAL HISTORY

DEC 2014 – PRESENT ELECTRO MECHANICAL CO L.L.C (Agents for SIEMENS), ABU DHABI,U.A.E

SENIOR ELECTRICAL ENGINEER

NOV 2013 – NOV 2014 MEGHA ENGINEERING & INFRASTRUCTURE LTD, HYDERABAD, INDIA

SITE MANAGER

JAN 2011 – OCT 2013 PnU ENGINEERING PVT LTD, HYDERABAD, INDIASENIOR ELECTRICAL ENGINEER

AUG 2008 – DEC 2010 SRI RAYALASEEMA GREEN ENERGY LTD, ANDHRA PRADESH, INDIA

TESTING ENGINEER

JUN 2006 – JUL 2008 THULASI PROJECTS PVT LTD, HYDERABAD, INDIASITE ENGINEER-ELECTRICAL

DETAILED EXPERIENCE

DEC 2014 – PRESENT ELECTRO MECHANICAL CO L.L.C (Agents for SIEMENS), ABU DHABI,U.A.E

SENIOR ELECTRICAL ENGINEER

Projects: Infrastructure works at Saadiyat Island phase I&II, Al Raha Beach Development, Al Dana Phase II- Abu Dhabi

Project Details:

Cultural District, Marina District, Al Raha & Al Dana- Infrastructure works - Intelligent Transportation Systems (ITS), Distribution substations. Supply, Erection, installation, testing, commissioning & energization of Traffic signals- C900V controller, change over, FEC, UPS system & CCTV cameras, distribution substations- (22/0.415KV) complete with distribution transformers,22KV switchgears (9 panel arrangement), LV switchgears, telephone outlets, auxiliary AC and DC power supplies, DMS interface, grounding, lighting, ventilation, 415volt, 8ways feeder pillars, associated civil work and all required accessories, 22KV/415V cable laying including joints and termination. Construction, testing and commissioning of traffic signals, distribution substations. Testing commissioning and Plug in termination of 22KV cables to the primary substations. Fiber optic cable laying (FOC) connecting all junctions and from primary substations to distribution 22KV substations, splicing and terminations to the FOTB. Street lighting works – 10m, 14m and high mast light poles LED luminaries with dimmer controller technology.

Responsibilities:

Study and execution of project specification and checking BOQ of material. Review of Submittals/Shop drawings according to the specifications/standards. Ensure the work is being performed at the most compliance to specification, international

standards and time schedule. Promote and ensure the use of safe work practices to provide a safe work environment to all

personnel as well as equipment’s.

Page 3: Kareem cv  updated

Prepare and communicate work progress reports.

Providing the safety reports weekly Spot and immediately report any deviations to the engineering-specifications, inputs or targets,

plan corrective actions and realize them in co- operation with all the related staff. Inspect materials, work activities and witness testing and commissioning. Recognize and communicate scope and design changes promptly. Provide on-site technical assistance as needed. Coordinate work activities with other staff members, contractors and end users. Produce new and modified technical applications for the progress of work. Prepare snag list and ensure the snag clearance. Check and correct Bills of payment and Record drawings. Develop schematics, equipment layouts, procedures and schedules for the smooth handing

over of project. Familiarize with the client’s expectations, scope, budget, and schedule for assigned tasks.  Prepare the Documentations for carrying out Abu Dhabi Distribution Company (ADDC) Approval

procedures. Co-ordinates with the Inspection Procedures along with Abu Dhabi Distribution Company

(ADDC) Engineers.

NOV 2013 – NOV 2014 MEGHA ENGINEERING & INFRASTRUCTURE LTD, HYDERABAD, INDIA

SITE MANAGER

Project Details:

765/400/220 KV SS at WUPPTCL Project, Greater Noida- Substation Supply, Erection, Installation, Cabling, Earthing, Testing & Commissioning of 220/400/765 KV SS with AIS Equipment’s like CT, CVT, LA, ISO, Shunt reactors, Wave trappers & Transformers. Supervision and quality checking of all civil activities.

JAN 2011 – OCT 2013 PnU ENGINEERING PVT LTD, HYDERABAD, INDIASENIOR ELECTRICAL ENGINEER

Project Details:

220KV-15 Bay Switch Yard & 3X75MW Aluminum Refinery/Power plant at Anrak Aluminum Ltd – Supply, Erection, Installation, Cabling, Testing & Commissioning of 220 KV SS 15 Bay with AIS Equipment’s like CT, CVT, LA, ISO, Wave trappers & Transformers.

110kV SS Bay Extension at AERL 12X8.75 Gas Based Cyclic power Plant – Supply, Erection, Installation, Cabling, and Testing & Commissioning of 110 KV SS with AIS Equipment’s like CT, CVT, LA and ISO.

132kV SS Bay Extension & 50MW Thermal Power Plant at Raasi Cements (ICL) - Supply, Erection, Installation, Cabling, Testing & Commissioning of 132 KV SS Bay extension with AIS Equipment’s like CT, CVT, LA, ISO & Transformer. 50 MW TPP HT Cable laying, Termination, Erection & Installation of Electrical Panels, HT Bus bars, Bus Ducts and Transformers erection, Installation & Commissioning.

11/33kv ss at 128 MW Wind Energy at Fortune Five Hydel Projects, Bijapur – Supply,

Page 4: Kareem cv  updated

Erection, Installation, caballing, Testing & Commissioning of 11/33 KV SS Equipment’s like Kiosk Panels equipped with CT, PT, Breaker and C&R panel. LA, ISO and Transformers are out door.

Responsibilities:

Major work is to manage the site comfortably by fulfilling the site requirements and reporting customer for the daily work progress.

Complete erection work in a 765/400/220/132/110/33KV Switch yard in Substation (Including Equipment Erection and Installation, Earthling, Cable laying, panel, Transformer, Shunt Reactors erection, etc.)

Main responsibility is to inspect the site for clearance and update our daily progress to the HO. Arranging manpower from Sub contractor for successful completion of AIS installation and

testing of AIS equipment’s like the Current Transformer SF-6 gas (Siemens), Control Panels (Siemens), Capacitor Voltage Transformer (CGL), Capacitor Voltage Transformer (SIEMENS), Wave or Line trap (Areva), Capacitor Voltage Transformer (Areva), Circuit Breaker SF-6 gas (SIEMENS), Isolators and alignments (SIEMENS), Terminal clamps and connectors as per erection key drawings.

Reviewing the site drawings, before starting a job any modification of erection that discussed with design engineer/project manager and ensuring corrective action to sub-contractor.

Stringing insulator for twin moose ACSR conductor and quad moose ACSR conductor as per drawings.

Single suspension insulators for twin moose ACSR conductor and quad moose ACSR conductor as per drawings.

Installation of the Auxiliary Earth mat and Main mat Throughout Substation and Arranging the Earthling for the all Equipment as Per Design.

Installation of the Lightning Protection and Earth pit for the Substation as per Design. Coordinating the all power and Control Cable Laying work for the all Equipment as per scheme

requires. Assisting to testing and pre-commissioning activities of various systems in conjunction with

customer. To determine and estimate the needs of additional resources. To prepare measurement sheet for conductor and aluminum pipe. Prepare BOM for handover the spares as per technical specification. Preparing of Cables Schedule as per schematics. Preparing BOQ for the earth rod, GI & MS earth flat etc., Handling of Civil & Electrical Works from Initial stage to Final stage at all Sub Stations Analyzing the site and plan according to the material availability. Erection of Cable Trench, Tray Erection, Cable Laying, Installing joint kits & Termination. Transformer erection, testing and commissioning.

AUG 2008 – DEC 2010 SRI RAYALASEEMA GREEN ENERGY LTD, ANDHRA PRADESH, INDIA

TESTING ENGINEERProject Details:

Transformer Divison-Worked as Testing Engineer from August-2008 to Dec-2010. Having 3 years rich experience in transformer testing Done the testing of the transformers as per IS 2026 – 1997 Conduct all Routine tests for transformer as per Customer specifications Tested All Ratings of Distribution Transformers & Power Transformers Handling all type of test Equipment Prepare Final Inspection Plan according to delivery schedule

Page 5: Kareem cv  updated

Inspecting All transformers before offering for Final Inspection Attended Joint inspection of the Departmental & Third Party at factory Preparing Joint Inspection Reports & Calculation Sheets Maintain Calibration Records for test equipment & precious instruments

JUN 2006 – JUL 2008 THULASI PROJECTS PVT LTD, HYDERABAD, INDIASITE ENGINEER-ELECTRICAL

Project Details: Corporation Worked as Site Engineer In charge of High Voltage Distribution System (HVDS) at Rajampet Division-II of Kadapa Dist., from june-2006 to july-2008 and acquired Knowledge in execution of the works in connection with conversion of LT Network into HT and erection of 3phase 16/25 KVA Distribution Transformers for individual Agricultural Services in Southern Power Distribution Limited

OUTSTANDING ACHIEVEMENTS

CERTIFICATION: Development of PLC Application programme through SCADA. (ECIL-Electronics Corporation of India Ltd)Description- This application programme includes motion control of motors etc., SCADA technology results in time-saving and efficient performance. Today PLC’s deliver a wide range of complex networking. PLC’s used to monitor and control a plant or a process distributed over a large geographic area such as power distribution network.

Holding UAE Driving License.

COMPUTER PROFICIENCY Packages: MS Office, Auto-CAD. Operating systems: MS DOS, MS WINDOWS, WINDOWS VISTA & 7. System trouble shooting, Software/ Hardware Installations & Networking.

DECLARATION

I hereby declare that above stated information is true and correct with best of my knowledge and belief.

Date: Yours Truly,

Place: (Shaik Mohammad Karimulla)