City of Lebanon, NH CSO Contract 11 Community Conversation March 23, 2015 Sacred Heart Church

Downtown Lebanon Visioning Study and Tunnel Project

Embed Size (px)

Citation preview

Page 1: Downtown Lebanon Visioning Study and Tunnel Project

City of Lebanon, NHCSO Contract 11

Community ConversationMarch 23, 2015

Sacred Heart Church

Page 2: Downtown Lebanon Visioning Study and Tunnel Project

Agenda

• Introductions• Conversation Goals• CSO Overview• General Project Overview• Small Group Sessions• Q&A

Page 3: Downtown Lebanon Visioning Study and Tunnel Project

Conversation Goals

• Collect information from residentsSewer backupsLocalized flooding (street, yard, basements)Sidewalk locations (current vs. desired)Pavement widthsParking needs (existing vs. desired)Curbing (vertical vs. sloped)Tree/planting/landscaping concernsCurb cuts (existing vs. desired)

Page 4: Downtown Lebanon Visioning Study and Tunnel Project

CSO Terminology

CSO = Combined Sewer Overflow

CB = Catch Basin

CD = Consent Decree

Combined Sewer = pipe w/ storm and sanitary flow

Purpose of sewer separation project is to provide separate sanitary pipe and separate storm drain pipe.

Page 5: Downtown Lebanon Visioning Study and Tunnel Project

CSO Program Overview• September 1998 – Draft CSO Master Plan• 2000 – Administrative Order from EPA• December 2005 – CSO Engineering Study• April 2009 – CD Issued

Nov 2018 – Complete Contract 11 Sewer SeparationDec 2020 – Eliminate All CSOs

Page 6: Downtown Lebanon Visioning Study and Tunnel Project

CSO Contract 11 Area (feet)• Mechanic Street (2,000)• Mascoma Street (840)• High Street (600)• Worthen Street (500)• Cameron Avenue (500)• Mason Street (520)• West Street (1,070)• Child Street (590)• Granite Street (1,015)• Young Street (1,300)• Guyer Street (1,160)• Bliss Street (370)• Light Street (600)

Page 7: Downtown Lebanon Visioning Study and Tunnel Project

• Bank Street Extension (1,000)• Cooper Street (250)• Bank Street Near Bank Street Extension (200)

Page 8: Downtown Lebanon Visioning Study and Tunnel Project

• Bank Street Near East Park Street (250)

Page 9: Downtown Lebanon Visioning Study and Tunnel Project

March 23, 2015 Meeting Area• Mason Street (520)• West Street (1,070)• Child Street (590)• Granite Street (1,015)• Young Street (1,300)• Guyer Street (1,160)• Bliss Street (370)• Light Street (600)

Page 10: Downtown Lebanon Visioning Study and Tunnel Project

General Project Overview

• New sanitary, storm, and water pipes• Maintain esplanade configuration• Maintain sidewalk configuration• Retaining walls may be needed• Add curbing and catch basins

vertical vs. sloped curb

• May modify vertical profile• Constant roadway width

Page 11: Downtown Lebanon Visioning Study and Tunnel Project

Protection of Trees

• Walkabout with arborist will be conducted.

• Invites via mailing will be forthcoming.

• Contact City staff if you have a concern about a particular tree or planting.

Page 12: Downtown Lebanon Visioning Study and Tunnel Project

Schedule• House-To-House Inspections – January 2015

• Virtual Walkabouts – March 2015*

• CCVT/Smoke Testing – March 2015

• Project Area Survey – April 2015

• Preliminary Design – July 2015*

• 75% Design – September 2015*

• Final Construction Documents – March 2016*

• Bid Period – April 2016

• Start Construction – June 2016• End Construction – December 2017

* Public Meeting

Page 13: Downtown Lebanon Visioning Study and Tunnel Project

Project Contacts• Christina Hall, City Engineer

[email protected]

603.448.3112

• Mike Lavalla, Director of Public [email protected]

603.448.3112

• LebAlertalert.lebnh.net

• Ryan Wingard, Wright-Pierce Project [email protected]

603.430.3728

Page 14: Downtown Lebanon Visioning Study and Tunnel Project

Small Group Sessions

Page 15: Downtown Lebanon Visioning Study and Tunnel Project

Mason StreetYoung to Granite

Approx. ProposedComponent Existing For Discussion

Width 25’ 24’

Esplanade yes (north) yes (north)

Sidewalk yes (north) yes (north)

Drainage CBs Vert. Curb/CBs

Page 16: Downtown Lebanon Visioning Study and Tunnel Project

West StreetYoung to Granite

Approx. ProposedComponent Existing For DiscussionWidth 22’-25’ 22’

Esplanade yes (north) yes (north)

Sidewalk yes (north) yes (north)

Drainage CBs Vert. Curb/CBs

Page 17: Downtown Lebanon Visioning Study and Tunnel Project

West StreetGranite to High

Approx. ProposedComponent Existing For DiscussionWidth 20’-25’ 20’

Esplanade None None

Sidewalk None None

Drainage CBs Slope Curb/CBs

Page 18: Downtown Lebanon Visioning Study and Tunnel Project

Child StreetYoung to Granite

Approx. ProposedComponent Existing For DiscussionWidth 18’-20’ 20’

Esplanade None None

Sidewalk None None

Drainage CBs Slope Curb/CBs

Page 19: Downtown Lebanon Visioning Study and Tunnel Project

Granite StreetMason to Mascoma

Approx. ProposedComponent Existing For DiscussionWidth 20’ – 35’ 24’

Esplanade Yes (west) Yes (west)

Sidewalk Yes (west) Yes (west)Partial (east) None

Drainage CBs Curb/CBs

Page 20: Downtown Lebanon Visioning Study and Tunnel Project

Young StreetHough to Worthen

Approx. ProposedComponent Existing For DiscussionWidth 18’ – 26’ 22’

Esplanade None None

Sidewalk Partial (west) NoneDrainage CBs Curb/CBs

Page 21: Downtown Lebanon Visioning Study and Tunnel Project

Guyer StreetYoung to Granite

Approx. ProposedComponent Existing For DiscussionWidth 20’ – 22’ 22’

Esplanade Yes (north) Yes (north)

Sidewalk Yes (north) Yes (north)

Drainage CBs Curb/CBs

Page 22: Downtown Lebanon Visioning Study and Tunnel Project

Guyer StreetGranite to Mascoma

Approx. ProposedComponent Existing For DiscussionWidth 15’ – 20’ 20’

Esplanade None None

Sidewalk None None

Drainage CBs Slope Curb/CBs

Page 23: Downtown Lebanon Visioning Study and Tunnel Project

Bliss Avenue/StreetYoung to Guyer

Approx. ProposedComponent Existing For Discussion

Width 12’-16’ 16’

Esplanade None None

Sidewalk None None

Drainage CBs Slope Curb/CBs

Page 24: Downtown Lebanon Visioning Study and Tunnel Project

Light StreetGranite to High

Approx. ProposedComponent Existing For Discussion

Width 10’-18’ 12’

Esplanade none none

Sidewalk none none

Drainage CBs Curb/CBs