49
Dr f Dejahang (BSc CEng, BSc (Hons) Construction Mgmt, MSc, MCIOB, PhD) 017 PRECAST BRIDGES http://www.cpi-team.com

Bridges precast

Embed Size (px)

Citation preview

Page 1: Bridges precast

Dr f Dejahang (BSc CEng, BSc (Hons) Construction Mgmt, MSc, MCIOB, PhD)

 

017

PRECAST BRIDGES

http://www.cpi-team.com

Page 2: Bridges precast

Science Art Religion Politics Scholarly Articles For Mathematics and Productivity

http://www.twitlonger.com/show/n_1sp9pjo?new_post=trueMICROSOFT OneDrive PPT’s PDF’s BOOK LESSONS

Dr f Dejahang BSc CEng, BSc (Hons) Construction Mgmt, MSc, PhD

Page 3: Bridges precast

PRECAST BRIDGES

ABC Precast Concrete County Bridge Construction - YouTube.htm

construction of bridge - YouTube.htm

Bridge-arch installation 02.VOB - YouTube.htm

Bridge-Construction - Macrete FlexiArch Bridge System - YouTube.htm

Page 4: Bridges precast

PRECAST CONCERTE BRIDGES

Low Initial CostPrecast prestressed concrete

bridges are usually lower in first cost than other types of bridges.

Savings in maintenance, precast bridges offer maximum economy.

Page 5: Bridges precast

PRECAST CONCERTE BRIDGES

Minimum MaintenanceThe overall economy of a structure is

measured in terms of life-cycle costs. These include the initial cost of the

structure plus the total expected maintenance costs.

The lifetime cost of repainting steel bridges can amount to 10 to 20% of the original cost of the original cost of the bridge.

Page 6: Bridges precast

PRECAST CONCRETE BRIDGES

Page 7: Bridges precast

PRECAST CONCERTE BRIDGES

Page 8: Bridges precast

PRECAST CONCERTE BRIDGESPrecast prestressed concrete bridges built in

accordance with provincial government requirements should require very little if any maintenance.

They are constructed using high quality materials to exacting manufacturing tolerances.

Fatigue problems are minimal because traffic loads induce only minor stresses.

Page 9: Bridges precast

PRECAST CONCERTE BRIDGESFast Easy Construction

Precast prestressed bridge girders require minimal lead times because they are locally manufactured in standard shapes and sizes.

The precast components are easy to erect in any weather.

Simple connections join the deck girders to the substructure.

Page 10: Bridges precast

PRECAST CONCERTE BRIDGES

Formwork for the superstructure can be eliminated when the tops of girders are placed together to form the entire deck slab.

Page 11: Bridges precast

PRECAST CONCERTE BRIDGES

Ties between adjacent units often consist of a grouted keyway and welded or transverse post-tensioned connections.

Page 12: Bridges precast

PRECAST CONCERTE BRIDGES

For logging or low volume secondary roads, traffic can run directly on the girder deck.

Page 13: Bridges precast

PRECAST CONCERTE BRIDGESCarefully planned details will speed the construction

process and save money.Minimum Traffic InterruptionMaintaining traffic and eliminating detours are difficult

problems for bridge owners.Precast prestressed concrete integral deck bridges can

minimize traffic interruptionThis is because of the availability of long span, plant-

produced sections and the speed of erecting a bridge

Page 14: Bridges precast

PRECAST CONCERTE BRIDGES

In emergencies, precast girders can be rush ordered and a bridge reopened in a matter of days or weeks using standard components.

Page 15: Bridges precast

PRECAST CONCERTE BRIDGES

Page 16: Bridges precast

PRECAST CONCERTE BRIDGESSimple span precast bridge deck girders can be

pinned to the abutments to resist horizontal earth pressures

Or designed as integral abutments to eliminate troublesome expansion joints

Multi-span bridges can be made continuous for a smoother ride and to reduce the number of expansion joints

Page 17: Bridges precast

Minimum Span/Depth Ratio

Page 18: Bridges precast

PRECAST CONCERTE BRIDGES

Page 19: Bridges precast

Assured Plant Quality

Page 20: Bridges precast

Assured Plant Quality

Page 21: Bridges precast

Assured Plant Quality

Page 22: Bridges precast

Durable

Page 23: Bridges precast

Durable

Page 24: Bridges precast

Durable

Page 25: Bridges precast

PRECAST BRIDGES

Page 26: Bridges precast

PRECAST BRIDGES

Page 27: Bridges precast

PRECAST BRIDGES

Page 28: Bridges precast

PRECAST BRIDGES

Page 29: Bridges precast
Page 30: Bridges precast
Page 31: Bridges precast

PRECAST CONCERTE BRIDGES

Page 32: Bridges precast

Precast concrete structural elementsFactory site

Page 33: Bridges precast

PRECAST CONCERTE BRIDGES

Page 34: Bridges precast

PRECAST CONCERTE BRIDGES

Page 35: Bridges precast

Stockpiled in Advance

PRECAST BRIDGES

Page 36: Bridges precast

PRECAST BRIDGES

Page 37: Bridges precast

Supply and Chain- Just-In-TimePRECAST BRIDGES

Page 38: Bridges precast

PRECAST BRIDGES

Page 39: Bridges precast

PRECAST BRIDGES

Page 40: Bridges precast

PRECAST CONCERTE BRIDGES

Page 41: Bridges precast

PRECAST CONCERTE BRIDGES

Page 42: Bridges precast

PRECAST CONCERTE BRIDGES

Page 43: Bridges precast

PRECAST CONCERTE BRIDGES

Page 44: Bridges precast

PRECAST BRIDGES

PRECAST BRIDGES

Page 45: Bridges precast

Piers can be made of precast concrete pieces quickly assembled in the field.

Page 46: Bridges precast

PRECAST CONCERTE BRIDGESAttractivePrecast prestressed concrete bridges can be designed to

elegantly blend harmoniously with their surroundingsIt can offer an attractive view from above, beside and below.StrongToughDurableCan be constructed using the low depth/span ratios possible

using high strength precast prestressed concrete and the simple clean shapes of locally available sections.

Page 47: Bridges precast

Bridge deck erection gantries for pre-cast concrete viaducts

Page 48: Bridges precast

Bridge deck erection gantries for pre-cast concrete viaducts

Concrete bridge deck erection gantry Picture shows one of the self launching bridge

deck erection gantry for erection of precast concrete segments on the 75m approach spans

Used for Sutong cable stayed bridgeThe gantry was designed to handle precast

concrete segments weighing up to 160 tonnes each

Page 49: Bridges precast

Bridge deck erection gantries for pre-cast concrete viaductswhich were erected by the balanced cantilever

methodand to suspend a half span of segments adjacent

to deck movement joints weighing up to 1100 tonnes.

The gantry was designed to handle deck longitudinal gradients of +/- 3%, deck plan minimum curvature of 950m and to skid sideways to erect adjacent box girders.