UNIVERSITY OF WATERLOO Faculty of Engineering The Design and Analysis of a Cardboard Bridge A Report Submitted in Partial Fulfillment of the Requirements for SYDE 286 Group Number 2 William Bradbeer, 20459972, 2B Isaac Hunter, 20480938, 2B Duy Huynh, 20460022, 2B Mohammad Hossein Mayanloo, 20472285, 2B November 26, 2014. Course Instructor: Professor G. Heppler

Bridge project

Embed Size (px)

Citation preview

Page 1: Bridge project

UNIVERSITY OF WATERLOOFaculty of Engineering

The Design and Analysis of a Cardboard Bridge

A Report Submitted in Partial Fulfillmentof the Requirements for SYDE 286

Group Number 2William Bradbeer, 20459972, 2B

Isaac Hunter, 20480938, 2BDuy Huynh, 20460022, 2B

Mohammad Hossein Mayanloo, 20472285, 2BNovember 26, 2014.

Course Instructor: Professor G. Heppler

Page 2: Bridge project

TABLE OF CONTENTS

1 Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1

2 Discussion . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2

2.1 Utilization of a Beam . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2

2.2 Final Design . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2

2.3 Design Specifications . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3

2.3.1 Deck . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4

2.3.2 Webs . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5

2.3.3 Ribs . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5

2.4 Alternative Design Considerations . . . . . . . . . . . . . . . . . . . . . . . . 6

2.4.1 I-beam . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6

2.4.2 Truss . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6

2.4.3 Arch . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7

2.4.4 Box Girder Beam . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7

3 Analysis . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8

3.1 Calculations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8

3.2 Limitations of Analysis . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 21

3.3 Assumptions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 23

4 Assembly . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 25

4.1 Materials . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 25

4.2 Construction of Roadbed . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 26

4.3 Construction of Ribs . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 27

4.4 Construction of Webs . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 29

4.5 Final Bridge Construction . . . . . . . . . . . . . . . . . . . . . . . . . . . . 30

i

Page 3: Bridge project

5 Conclusion . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 32

ii

Page 4: Bridge project

LIST OF FIGURES

Figure 1 — Cross section of box girder beam. . . . . . . . . . . . . . . . . . . . . 2

Figure 2 — Cross section of pi-beam. . . . . . . . . . . . . . . . . . . . . . . . . . 3

Figure 3 — Illustration of final bridge design. . . . . . . . . . . . . . . . . . . . . 4

Figure 4 — Cross section of pi-beam used for analysis. . . . . . . . . . . . . . . . 8

Figure 5 — Free Body Diagram. . . . . . . . . . . . . . . . . . . . . . . . . . . . 9

Figure 6 — Plot of shear force. . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10

Figure 7 — Plot of bending moment. . . . . . . . . . . . . . . . . . . . . . . . . . 11

Figure 8 — Derivative of deflection relation. . . . . . . . . . . . . . . . . . . . . . 13

Figure 9 — Deflection relation of the beam. . . . . . . . . . . . . . . . . . . . . . 14

Figure 10 — Cross section for determining the neutral axis. . . . . . . . . . . . . . 15

Figure 11 — Cross section for finding I about neutral axis. . . . . . . . . . . . . . 17

Figure 12 — Cutting plan used to divide mill board. . . . . . . . . . . . . . . . . . 25

Figure 13 — Schematics for the deck (roadbed). . . . . . . . . . . . . . . . . . . . 26

Figure 14 — Schematics for the rib components of the bridge. . . . . . . . . . . . . 27

Figure 15 — Connecting a pair of rib components. . . . . . . . . . . . . . . . . . . 28

Figure 16 — Schematics for web components of bridge. . . . . . . . . . . . . . . . 29

Figure 17 — Bottom view of deck and web combination, with the nine vertical

markings indicating where the ribs would be attached. . . . . . . . . 30

Figure 18 — Isometric view of fully assembled bridge. . . . . . . . . . . . . . . . . 31

iii

Page 5: Bridge project

1 Introduction

The project involved the design, analysis, and assembly of a cardboard bridge to meet the

requirements defined for the SYDE 286 Bridge Project. The optimal bridge was defined

as one that has a maximum specific failure load and also designed to fail as close to the

predicted load as possible. The specific failure load was defined by the following equation:

Q =P

mg(1)

where P is the maximum load applied to the bridge before failure or vertical deflection of 2”

and m is the mass of the bridge.

Successful completion of the project involved application of course concepts as well as as-

sembly skills. The course concepts used relate to the latter part of the course on beams.

This builds off of concepts learned earlier in the course as well as in SYDE 181.

The main objective of the bridge project is to be able to withstand an individual force over

a 3” x 1.2” area. The bridge was supported by two points placed 18” from the center of the

bridge on both sides. Materials were limited to a 40” x 32” x 0.060” mill board and a 227mL

bottle of Weldbond white glue.

1

Page 6: Bridge project

2 Discussion

2.1 Utilization of a Beam

A bridge can be constructed with a variety of different designs ranging from trusses to

arches and beams. For the constraints and materials given for this project however, it was

determined that utilizing a beam would be the most efficient approach with regard to the

use of materials and the ease of calculations.

2.2 Final Design

After consideration of multiple designs (see Alternative Design Considerations), it was de-

termined that a design similar to a box girder beam (Figure 1) with the two webs brought

inwards towards the center of the roadbed would be the most optimal bridge to meet the

design requirements. This design, as shown in Figure 2 will be henceforth known as the

pi-beam.

Figure 1: Cross section of box girder beam.

2

Page 7: Bridge project

Figure 2: Cross section of pi-beam.

As documented by the project manual, the mill board has a high tensile to compressive

strength ratio, as it can handle tensile forces much better than compressive forces. This is

evidenced by the fact that the tensile values for elastic moduli and failure stresses for the mill

board are much larger than the corresponding values of the mill board under compressive

stress. A pi-beam bridge takes advantage of this tensile to compressive strength ratio by

utilizing two webs as its support. The stiffness of the material is enough to negate deflection

in the webs in this configuration. Further analysis of the material shall be discussed below

in the calculation sections. Also, while not discussed in class, the stiffness of the material

also prevents unwanted vibrations occurring to ensure the structural stability of the bridge.

2.3 Design Specifications

The pi-beam bridge is constructed of three major parts, a deck (flange), two webs (sides) and

nine ribs (braces). In order to sufficiently satisfy the constraints given by the project, the

length of the bridge was chosen to be 38.0” to allow for 1.00” overhang from the supports.

3

Page 8: Bridge project

Figure 3: Illustration of final bridge design.

2.3.1 Deck

The deck’s layer consisted of mill board cut to a 38.0” length and a 3.75” width. The 38.0”

length was selected to meet the basic dimension requirements for the bridge span while

minimizing the amount of material used. This is so that the bridge has a minimal weight

and therefore a maximized Q value according to equation 1. The 3.75” width was selected

to meet the minimum 3.00” width constraint and the additional width allows for a larger

second moment of inertia (I). As will be seen in the calculations I is an important parameter

for increasing the failure load.

In order to minimize the risk of failure due to the buckling of the roadbed, an additional

layer of mill board was glued to the deck. This second layer was dimensionally identical

to the original deck to ensure that the two pieces of mill board were perfectly plane with

each other and the forces were not distributed unevenly. Furthermore, initial calculations

identified the single-decked bridges failure mode would be due to compression on the deck.

An extra layer on the roadbed would increase the height of the neutral axis of the beam,

4

Page 9: Bridge project

allowing for more of the web to be in tension instead of compression.

2.3.2 Webs

The webs were constructed using two pieces of mill board cut with a 38.0” length and

4.70” height placed 2.88” apart. Webs were determined to be 4.70” high to account for the

thickness of the deck and the fold required to attach the web to the deck. Folding on the

webs on the side forces a greater surface area for deck and web to attach. With the webs

spaced 2.88” apart, the force distribution is wider and each web is directly under the each of

the applied load’s sides. In addition, having the webs spaced 2.88” apart allows for 0.06” for

the folds on the webs. The thickness of the doubled deck is 0.12” leaving 0.08” of tolerance

in case of any construction error. Tolerance for the web was relatively generous in order to

stay below the maximum height constraint of 5.00” for the bridge.

2.3.3 Ribs

The ribs serve the function of preventing the webs from buckling horizontally. With the

remaining material, there is the capability of constructing up to fourteen ribs that will form

the cross section between the webs of the pi-beam. The ribs were required to span a height of

4.70” and a width of 2.82”. Nine ribs were chosen to be used in order to reduce 100 grams of

weight and was an optimization decision based on the strength to weight ratio of the bridge.

Tolerances of 0.06” were put in place to allow room for error during the construction of the

pi-beam bridge. The width of the ribs were the most important dimension as they had the

greatest effect on the amount of room the webs had to attach to the deck. If the width of

each rib were inconsistent with each other, the side webs would have not be able to be glued

consistently. An odd-number of ribs is required to allow for symmetry where the point of

force acts as the centre of the beam with one rib placed directly underneath the applied

5

Page 10: Bridge project

force. Similarly ribs were placed to line up with the two rounded supports. The ribs were

assumed to not have any affect on the compressive force that will act on the flange or the

webs of the pi-beam.

2.4 Alternative Design Considerations

Before a final design was selected, each alternative design below was carefully considered to

identify the ideal design that met the constraints.

2.4.1 I-beam

An I-beam was considered as an alternative design. A typical I-beam consists of one web

constructed between two flanges. It was determined that a pi-beam would be preferable

due to having two webs resisting the force instead of one. Given the constraints on the

amount of mill board that can be used, the web would need to be thin, which is not optimal

especially as only one one web is utilized in an I-beam. This is disadvantageous for the

I-beam in comparison to the pi-beam design, as the pi-beam distributes the forces over two

webs instead of one. The distance between the two webs is large and the pi-beam is less

likely to fold over laterally due to possible asymmetric loading in comparison to an I-beam.

2.4.2 Truss

A truss was considered also as an alternative design. A major issue with utilizing a truss in

the scope of this project involved the number of joints that would be required to be glued

together in order to successfully implement the design correctly. Minimizing the number

of potential failure points by using as few pieces as possible is more practical with regards

to gluing and constructing the parts together. Another negative is that the truss has a

6

Page 11: Bridge project

changing cross section. The complexity of calculations due to a changing cross section

required to accurately predict the expected failure load may introduce multiple mathematical

and theoretical errors which will carry over into the implementation of the design, making

it unsuitable for the purposes of the project.

2.4.3 Arch

A bridge with an arch design was rejected as it would be difficult to construct the rounded

corners adequately. In addition, an arch requires a much larger height to width ratio than

possible with the constraints of the project.

2.4.4 Box Girder Beam

As pointed out above in the Final Design section, a box girder beam is very similar to a

pi-beam bridge. A box beam bridge is constructed by two equal size flanges and two equal

size webs put together in a way that resembles a rectangular prism. A negative of the box

beam is that having a base required more use of mill board, and this would decrease force

to weight ratio (Q). Using a pi-beam approximately saves 20% of the mill board. A more

accurate analysis would be to also theoretically determine the amount of force to weight a

box girder beam can handle and compare that value to the calculated theoretical value of

the pi-beam (found below in the calculations section).

7

Page 12: Bridge project

3 Analysis

3.1 Calculations

The following cross section will be used for analysis.

Figure 4: Cross section of pi-beam used for analysis.

Before the failure loads can be determined the loading effects must be considered separate

8

Page 13: Bridge project

from the design of the bridge. This was done using the singularity method to proceed

from the Free Body Diagram to internal shear, moment, and deflection through succesive

integration.

P (x) =F

2< x− 1 >−1 − F

1.25< x− 18.375 >0 +

F

1.25< x− 19.625 >0

+F

2< x− 37 >−1 (2)

Figure 5: Free Body Diagram.

[Assumption 1, 2, 3]

9

Page 14: Bridge project

V (x) = −F2< x− 1 >0 +

F

1.25< x− 18.375 >1 − F

1.25< x− 19.625 >1

− F

2< x− 37 >0 −C1x (3)

Figure 6: Plot of shear force.

M(x) =F

2< x− 1 >1 − F

2.5< x− 18.375 >2 +

F

2.5< x− 19.625 >2

+F

2< x− 37 >1 +C1x+ C2 (4)

10

Page 15: Bridge project

Figure 7: Plot of bending moment.

EIv′(x) =

F

4< x− 1 >2 − F

7.5< x− 18.375 >3 +

F

7.5< x− 19.625 >3

+F

4< x− 37 >2 +C1x2 + C2x+ C3 (5)

EIv(x) =F

12< x− 1 >3 − F

30< x− 18.375 >4 +

F

30< x− 19.625 >4

+F

12< x− 37 >3 +C1x

3 + C2x2 + C3x+ C4 (6)

Use BC’s and internal conditions to determine C1, C2, C3, C4

11

Page 16: Bridge project

Both free ends:

V (0) = 0 V (38) = 0

M(0) = 0 M(38) = 0

From V (0) = C1 , C1 = 0

From M(0) = C2 , C2 = 0

As the boundary conditions do not give sufficient information to solve for C3, C4, use the

internal conditions at the two simple supports.

EIv(1) = 0 0 = 0 − 0 + 0 + 0 + C3 + C4

∴ C4 = −C3

EIv(37) = 0 0 =F

12(36)3 − F

30(18.625)4

+F

30(17.375)4 + C3(34) + C4

36C3 = −2.92x103(F )

C3 = − (80.96)F

∴ C4 = 80.96F

In summary:

C1 = 0 C2 = 0 C3 = 80.96 C4 = −80.96F

These can be used to plot EIv(x) and EIv′(x)

12

Page 17: Bridge project

Figure 8: Derivative of deflection relation.

13

Page 18: Bridge project

Figure 9: Deflection relation of the beam.

In order to proceed, the location of the neutral axis must be determined. It must be assumed

that the neutral axis lays along section 3. Therefore we let ’C’ vary between 0 and 4.64.

14

Page 19: Bridge project

Figure 10: Cross section for determining the neutral axis.

[Assumption 4, 5, 7]

The portion of the cross section undergoing compression will be labeled 1 and the portion

undergoing tension will be 2. Section 1 is composed of two parts 1a (Constant centroid and

Area) and 1b (centroid and area dependent on c). Section 2 has centroid and area varying

with c. From this information we can use:

E1Y1A1 = E2Y2A2 (7)

15

Page 20: Bridge project

to find the location of the neutral axis given (Y1), (Y2) is the distance from the neutral axis

to the centroids of the sections.

Given values and relations derived from cross section:

E1 = 12183PSI E2 = 388701PSI

A1a = 0.5022in2 A1b = (4.64′′ − c)(0.12

′′)in2

Y1a = 4.76′′ − c Y1b =

(4.64′′ − c)

2

A2 = c(0.12′′) Y2 =

C

2

[Assumption 9]

The given values are substituted into equation (7) to give:

−22591c2 − 12902c+ 44861 = 0 (8)

Solving using quadratic formula gives the roots:

C1 = 1.15”,−1.72”

1.15” is selected as the neutral axis as it is within the bounds set.

Next, the moment of inertia above the neutral axis (compression) and below tension will be

calculated .

16

Page 21: Bridge project

Figure 11: Cross section for finding I about neutral axis.

Given values for compression:

A1 = 0.45 in2 A2 = 0.05225 in2 A3 = 0.4185 in2

Y1 = 3.60” Y2 = 3.52” Y3 = 1.74”

where Y is the distance between the neutral axis and the centroids of sections.

All sections are rectangular, therefore:

17

Page 22: Bridge project

I =bh3

12(9)

I1 = 5.4x10−4 I2 = 1.579x10−5 I3 = 0.424

Use the parallel axis theorem to determine I for top section about NA:

INAC =3∑

n=1

(In + Y 2nAn) (10)

INAC = 8.20 in4 (11)

For tension (INAT )

AT = 0.138 in2 YT = 0.576 in

IT =bh3

12= 0.0153 in4 (12)

Using Parallel Axis Theorem again:

INAT = IT + Y 2TAT (13)

INAT = 0.0612 in4 (14)

The sum of the two moment of inertia’s can be written as follows:

INA = INAT + INAC (15)

18

Page 23: Bridge project

INA = 8.26 in4 (16)

In order to determine failure loads the weighted flexural rigidity (EI) must be calculated.

EI = ET IT + ECIC (17)

Given as material properties along the grain:

ET = 388701 PSI EC = 12183 PSI

From above,

IT = 0.0612in4 IC = 8.20in4

EI = 123696.2 = 1.236 × 105Pin2 (18)

The formulas for flexural stress in composite materials will be used to determine failure

loads.

σx1 =−ME1y

EI, σx2 =

−ME2y

EI(19)

To evaluate this expression we must determine Mmax in terms of F, the applied force.

The distance X along the length at which the maximum moment occurs can be visually

inspected from the M(X) plot or from the V (X) plot where V (X) = 0,

M(19) = Mmax

=F

2(19 − 1) − F

2.5(19 − 18.375)2

= F (8.843)

(20)

19

Page 24: Bridge project

For maximum tension,

YT = C = 1.15′′ (21)

Given σT = 6120PSI

Flexure formula becomes,

6120PSI =−8.843 × F × 388701 ×−1.15

1.236 × 105(22)

∴ The force needed for failure due to tension is F = 191.3lbs

Similarly for maximum compression,

YC = 3.67′′ (23)

Given σC = 1180PSI

[Assumption 8]

−1180PSI =−8.843 × F × 12183 × 3.67

1.236 × 105(24)

∴ The force needed for failure due to compression is F = 367.1lbs

Given a deflection restriction of 2”, a failure load can be calculated.

Minimum failure load occurs at maximum deflection. From inspection of the EIv(x) graph

and its derivative EIv′(X), it can be established that the maximum deflection occurs at x

= 19.

EIv(19) =F

12(19 − 1)3 − F

30(19 − 18.375)4 + 80.96 − 80.96 × 19 (25)

20

Page 25: Bridge project

V (19) =F

EI× (−971.2) (26)

Substituting in restriction and EI,

2 =F (−971.2)

1.236 × 105(27)

∴ After solving for F, the force needed for failure due to deflection is F = 254.5 lbs.

Based on our restrictions, design, and material properties, we select the smallest failure load

F = 191.3lbs

∴The designed bridge is failing due to tension at 191 lbs.

[Assumption 6, 8, 10]

3.2 Limitations of Analysis

The calculations above attempt to approximate the failure load of the designed bridge.

Several simplifications were made that limit the accuracy of the results. Some of these

limitations are due to an imperfect building process while the rest come from simplified

physical relations.

All analysis was done on the bridge as it was designed. Imperfections in the assembly would

change the dimensions and introduce additional failure modes. A lack of symmetry about

the X-Y plane would introduce torsion, something that has not been included in the analysis.

Joints that have not properly been attached can create stress concentrations and fail at levels

below the calculated value. The errors due to assembly are random and therefore difficult

21

Page 26: Bridge project

to account for in the analysis. Measurement of the assembled structure could be performed

to reduce this, although that is not feasible for full scale models and introduces additional

error.

The analysis performed was focused on the cross section of the beam and its relation to

the internal forces and moments. A consistent cross section was used to simplify this con-

siderably. The bridge designed has an inconsistent cross section however. It is piecewise

consistent over the length. The method used does not easily allow for inconsistent cross

sections. Any modifications to do this are outside the scope of the course. In this way the

analysis is limited to a constant cross section and assumptions must be made in order to

include other designs.

The analysis performed does not include analysis of failure due to shear. Given a consistent

cross section, and a relationship between V(x) and F, shear flow could be calculated. How-

ever, as a failure shear force was not given a failure load could not be calculated. Assumptions

need to be made to dismiss this failure mode.

The analysis performed does not include analysis of effects due to Poisson’s ratio. This was

not done for two reasons. One, the analysis used does not allow for the simple inclusion of

the Poisson effect. Second, no Poissons ratio was given.

Using the analysis presented in SYDE 286 not all failure modes could be considered. The

beam is considered to be rigid in all dimensions other than along X. However, there would

be deflection in the webs (bowing in or out) when a vertical forces is applied. This could

not be considered as a failure mode as the analysis is outside the scope of the course. Only

macroscopic properties of the material could be presented using the course analysis. Failure

modes due to inconsistencies in the material were not considered.

22

Page 27: Bridge project

3.3 Assumptions

1. It was assumed that the mass of the bridge was negligible and not a component of the

Free Body Diagram. The applied force is significantly larger than the weight of the

bridge (hundreds of pounds versus less than two pounds. This was necessary as the

exact weight of the bridge could not be calculated from the design.

2. It was assumed that the two round supports react point forces. This was necessary

as the contact surface between the support and the bridge is dependent on analysis

outside the scope of this course. This is valid assumption as the supports have a small

radius relative to the length of the bridge.

3. It was assumed that the load will be placed evenly in center for all dimensions. This

implies that there will be symmetry across the x-y and z-y plane. This was necessary

as an error in load placement cannot be predicted. It also removes the difficulty of

analyzing for torsion.

4. It was assumed that the ribs have no effect on resistance to internal forces and moments.

Therefore they do not have to be included in the cross section. This was necessary

due to the discontinuous nature of the ribs. No analysis of discontinuous cross section

beams has been done in SYDE 286 and therefore this assumption can not be validated.

5. It was assumed that the ribs would stop all deflections of the webs in the z-direction. An

inability to account for the webs buckling was a limitation requiring this assumption.

The ribs were place sufficiently close together in order to validate this assumption.

6. It was assumed that the bridge would not fail due to a shear force. This implies

that shear flow in all sections of the design is less than the failure stress. This was a

necessary assumption as the failure stress due to shear was not given. The resistance

due to shear was increased in the design through rib placement. ribs were placed to

23

Page 28: Bridge project

line up with the load and the two reaction forces. It is very unlikely that the bridge

will shear through the rib due to the large cross section.

7. It was assumed that the glue provides no height and is a perfect seal. This assumption

allows for a simple cross section without separations due to glue. It allows for treating

the bridge like a bi-modulus beam and not some more complicated composite. This is

a valid assumption as only a very thin layer of glue is needed to bond the mill board.

Furthermore, all glued surfaces will be compressed together during construction.

8. It was assumed that the glue will not shear. This allows for discounting that as a

possible failure mode. This is a valid assumption as the dried glue has is much stronger

in shear than the mill board.

9. It was assumed that the material is a standard uniform homogeneous mill board. This

was necessary to perform the analysis with the material properties given. Sufficient

quality control of the product makes this a valid assumption.

10. It was assumed that the Poisson’s ratio of the mill board was zero. This is necessary

as the Poisson effect was not included in the analysis.

24

Page 29: Bridge project

4 Assembly

4.1 Materials

As per the design constraints, the bridge was assembled with the limitation of using only one

mill board sheet of dimensions 40” x 32” x 0.060” and a 227mL bottle of Weldbond white

glue. To aid in the drafting and assembly of the bridge, a set of coloured markers, a 40”

straight edge, a box cutter, and a guillotine shear were employed. To ensure that the glue

was properly adhered to the bridge, the use of heavy compresses were necessary. Ideally, this

would require the use of a c-clamp, but due to the limitation of materials available, binder

clips and a set of textbooks were used instead.

AutoCAD was utilized to generate a cutting plan for the final bridge design (Figure 12).

Figure 12: Cutting plan used to divide mill board.

The mill board was marked to follow the cutting plan outlined above as well as each individual

25

Page 30: Bridge project

part’s construction drawings. Markings following the entirety of the length of the board were

aided by a 40” straight edge. For the design of this bridge, another mill board was found

practical for this task. Lines that were intended to be cut were marked by solid lines, and

lines intended that were to be scored for easy folding were marked by dashed lines. To ensure

that the extra mill board was not mistakenly used in the final design, the unused areas were

marked hatched.

Afterwards, a guillotine shear was used to ensure a straight cut along the solid lines and

a box cutter was lightly applied to the dashed lines to score the material. The extra mill

board pieces left over were not disposed, as it could be found useful in the event a bridge

component needs reinforcement.

4.2 Construction of Roadbed

Figure 13: Schematics for the deck (roadbed).

After the two deck components were cut out (d-01 and d-02), a moderate amount of glue

was applied to the planar face of d-01. The glue was applied to the border of the deck and

in an ”X” pattern in the middle to ensure that it would be highly adhesive. The second

26

Page 31: Bridge project

deck component d-02 was then placed symettrically on top of d-01, and binder clips were

used to keep the two deck components clamped. The binder clips were connected along the

outside edges of the deck with equal distances in between to ensure that the two deck pieces

were compressed properly. The deck was then stowed away and left to dry for six hours. If

available, a vacuum chamber would be the ideal environment for the deck to dry in order to

minimize any environmental factors.

4.3 Construction of Ribs

Figure 14: Schematics for the rib components of the bridge.

After the rib components were cut out and scored, the individual (r-xx) were folded along

the score lines by lightly applying a box-cutter. Glue was applied to the outside of the folded

edges of the rib components. A rib component was paired off with another rib component,

and it was ensured that the longer folding arm of one rib component (with a width of 0.5”)

was attached to the longer folding arm of the other rib component. The same was repeated

for the shorter folding arm (0.44”) the two rib components were attached as illustrated below

in Figure 15.

27

Page 32: Bridge project

Figure 15: Connecting a pair of rib components.

Textbooks were utilized as heavy compresses to keep the glue sealed while the rib components

were drying. The ribs were left to dry for four hours.

The cutting plan allowed for 14 ribs to be constructed in total. As only nine ribs were

necessary for the final bridge design, each of the rib were individually inspected to ensure

that the best nine ribs were selected for the bridge. Due to any errors that may have occurred

during cutting or gluing the rib components, some ribs were not optimal in length or had

other underlying issues and were not used in the final bridge design. However, they were not

disposed of, as it may be necessary to use a substitute in case one of the ribs used in the

bridge break.

28

Page 33: Bridge project

4.4 Construction of Webs

Figure 16: Schematics for web components of bridge.

The web (w-01) as outlined in Figure 16 was folded at a 0.435” distance from the width. Glue

was applied along the outside of this fold, and this flat end was connected along the length

of the deck. Textbooks were pushed against the web’s outside edges (facing away from the

deck) and inner edges (facing towards the deck) to maintain a 90◦angle, and weights were

used to apply pressure to the folds glued to the deck. This assembly was left to dry for six

hours.

29

Page 34: Bridge project

4.5 Final Bridge Construction

Figure 17: Bottom view of deck and web combination, with the nine vertical markings

indicating where the ribs would be attached.

The double-layered deck (d-01 + d-02) and web (w-01) assembly were marked to follow the

schematic in Figure 17 above. Textbooks were placed on the outside edge of the web to apply

pressure in order for the web to maintain a 90◦angle with the deck. Glue was placed on one

length and width of each of the ribs, and the nine ribs were carefully positioned individually

to attach onto the markings on the deck-web assembly. A compress was placed on top of

each of the ribs and in front of the ribs, normal to the glue’s application, in order to keep

the piece in place. This assembly was set out to dry and cure for six hours.

Afterwards, the second web (w-02) was folded along the scored edge similar to the first web

(w-01) in Section 4.4. Glue was applied to the outside fold of web w-02 and the exposed

lengths of each of the nine ribs. The second web was carefully placed symmetrically to the

first web. Compresses (textbooks) applied pressure to the outside edge of the web as well

as the folded edge to help keep the glue in place. This final assembly was left to dry for six

hours.

30

Page 35: Bridge project

The final bridge is composed of two deck pieces, two webs, and nine ribs. The bridge is

assembled to appear as shown in Figure 18.

Figure 18: Isometric view of fully assembled bridge.

31

Page 36: Bridge project

5 Conclusion

The predicted failure mode is failure due to tension with a load of 191 lbs. An actual failure

load different from this can be due to multitude of reasons. As discussed in the limitations,

these can arise from simplifications or assembly errors. Several assumptions were made in

order for the analysis to be performed using course concepts. These limited the failure modes

to internal tension, internal compression, and deflection. If the failure mode is something

other than these three, then the predicted value will be meaningless. Assumptions were also

made to simplify the cross section and ignore the effects of the ribs. Collectively, limitations

of the analysis will produce deviations from the predicted values.

32

Page 37: Bridge project

References

Craig, R. R., 1996. Mechanics of Materials. 3rd Edition, Danvers: John Wiley & Sons.

Heppler, G. R., 2014. Design Project, University of Waterloo., Waterloo ON.

33