MSC’s Changing Fleet
Kevin Baetsen
2 NOV 2010
UNCLAS
Military Sealift Command Mission-focused… Value-driven
TRUST
USNS Rigel
USNS Mosopelea
USNS Taluga
Other Missions: 1981 – Korean Flag Shipping Program (59
ships)1988 – Float on/Float off
1990 – NEO/HADR passenger ships (1st Gulf War)
1993 – Contract Harbor Tugs1996 – Special Cargo Transport
(DOE/NAVSEA)1998 – CLF Shuttle Ship Commercial Helo
2007 – CLF Load Management
2010 – MSC Today – 175 Ships (including Ready Reserve Force –
RRF)
SS Orion Planet
USNSGreenvi
lleVictory
*
USNS Suamic
o**
USNS GeneralDaniel
I. Sultan*
**
RRF - SS
Catawba Victo
ry
USNSMercury
USNS Kilau
ea
1949 – 1970: MSTS – ~400 Ships including Aircraft Transports, Landing Ship Tanks/Docks, Refrigeration, Forward Floating Depots, Arctic Ships and other short-
term missions
1949 to Present – More Than 20 Different Missions Entrusted to MSTS/MSC
USNSAlbert
J. Myer
USNSBowdi
tch
USNSRange Tracke
r
1971-72 1973-75 1977-80 2000-01 20031986-89 2002 2006 2007 2009-101949-52
1984 1992-971958-62
Ships & Missions
Dry Cargo Ships*, Tankers**, Troopships*** (Last Troopship retired in 1973)
Build & Charter TankersMissile Range Instrumentation Ships
Oceanographic Survey ShipsCable-Laying/Repair Ships
Fleet Replenishment OilersOcean-going Tugs
Combat Stores Ships
Ammunition ShipsDry
Cargo/Ammunition
Prepositioning ShipsReady Reserve Force (Cargo Ships 1977; Crane Ships* 1984; OPDS Ships** 1986)
Ocean Surveillance ShipsFast Sealift Ships – Surge
USNSSupply
USNSMercy
RRF - SS
Potomac**
USNS Algol
USNSStalw
art
RRF - SS
Keystone
State*
USNSShughart
USNSHaye
s
HSVWestpacExpress
USSCorona
do
JHSV, SBX, ???
Hospital ShipsAcoustic Survey Ships
Large, Medium-Speed, Roll-On/Roll-Off (LMSR)Fast Combat Support Ships
High-Speed Vessels
Command Ships
Rescue and Salvage Ships
USNS Grasp
USS Emor
y S.
LandSub Tenders
Special Warfare Support
USNS Lewis & Clark
UNCLAS
Military Sealift Command Mission-focused… Value-driven 3
T-AKE
USNS Lewis and Clark Class Dry Cargo/Ammo Ships 14 Ships (11 NFAF and 3 MPF(F))
Currently under construction at NASSCO10 ships delivered to date
Last delivery scheduled for late FY12 / early FY13
UNCLAS
Military Sealift Command Mission-focused… Value-driven 4
T-AKE Issues
• NASSCO continuing to deliver ships ahead of schedule
• Overall quality continuing to improve with each successive ship delivered
• T-AKE remains a shining star amongst current Navy ship acquisition programs
• Discussion on which ships to use for Prepo–Last 3 or first 3
• Last ship in a class is always a challenge
UNCLAS
Military Sealift Command Mission-focused… Value-driven 5
T-AGM 25
Missile Range Instrumentation ShipEventual replacement for Observation Island
Currently under construction at VT Halter Marine
UNCLAS
Military Sealift Command Mission-focused… Value-driven 6
T-AGM 25 Issues
• Delivery previously rescheduled from Jun 10 to Dec 10
–VTHM has continued to fall behind schedule and is now reporting anticipated additional slip in delivery date
• Ship to be provided as GFE to Raytheon for radar installation not later than 1 Feb 11
–PEO (IWS 2.0) contemplating towing incomplete ship to Corpus Christ in mid-Jan 11 for radar installation
–Plan for having VTHM complete ship unclear at this time
–Plan for delivering ship to MSC unclear at this time
• Significant concerns regarding quality of ship design and construction and quality of ILS documentation
UNCLAS
Military Sealift Command Mission-focused… Value-driven 7
JHSV
Joint High Speed Vessels10 ships (currently 5 Army and 5 Navy under contract)
(Possibility of 15 or more ships total for Navy)Currently being designed and built at Austal USA in Mobile, AL
Lead ship delivery scheduled for November 2011
UNCLAS
Military Sealift Command Mission-focused… Value-driven 8
JHSV CONOPs
• Primary mission: high speed intra-theater logistics/sealift capability (600 short tons of payload at 35 knots over a distance of 1200 nautical miles)
• Specialized secondary missions:
–Theater Security Cooperation
–Global Fleet Station
–Humanitarian Assistance/Disaster Relief
–Augment CLF
–Sea Base to Shore Connector
• Adaptive force packages consisting of personnel and equipment will be embarked to support specialized missions
UNCLAS
Military Sealift Command Mission-focused… Value-driven 9
JHSV Issues
• Quality of construction/workmanship thus far is good
• Concerns regarding a number of design issues–Minimal change proposals being entertained per ASN
(RD&A) direction
• Significant concerns regarding ability to sustain ships when operating in austere ports due to limited onboard spare parts and provisions
• Army and Navy senior leadership discussing possibility of MSC taking over operation of Army vessels prior to delivery of first ship of class
UNCLAS
Military Sealift Command Mission-focused… Value-driven 10
MLP
Mobile Landing Platform3 ? Ships (variant of NASSCO BP Alaska Class tanker design)
Original program of record design concept changed to FLO-FLO design conceptDetailed design currently in progress at NASSCO
UNCLAS
Military Sealift Command Mission-focused… Value-driven 11
MLP Issues
• Program is cost constrained (~$500M/ship)
• Current major concerns:–Anticipate minimal onboard spare parts
–Adequacy of anchor sizing
• Primary missions is sea base to shore connector–Use of mission modules on wet deck being considered to
increase potential mission capabilities• Pier at Sea – Allows offload at Sea
• Personnel Berthing
• Hospital Facilities
• HA/DR
• Aviation
• SPECWAR
• Irregular Warfare
UNCLAS
Military Sealift Command Mission-focused… Value-driven 12
T-AGS 66
Oceanographic Survey Ship (FY10-FY13) Design/construction contract awarded to VT Halter Marine
UNCLAS
Military Sealift Command Mission-focused… Value-driven 13
T-AGS 66 Issues
• T-AGS 63 Class variant –Addition of mid-body sonar moon pool
–Replacement of DC propulsion system with AC system
• Detailed design in progress
• Anticipate start of construction early FY11
UNCLAS
Military Sealift Command Mission-focused… Value-driven 14
T-AO(X)
Fleet Replenishment Oilers14 Ships
Accelerated acquisition program included in Navy’s POM12 submission
UNCLAS
Military Sealift Command Mission-focused… Value-driven 15
T-AO(X) Issues
• Analysis of Alternatives–Optimum cargo capacity – liquid and dry
–Potentially replace T-AOE when paired with T-AKE
–Existing commercial design (T-AO or T-AKE variant)
–Foreign “Support Ship” design
–Leasing options
• MARPOL double-hull and 12a compliant design
• Competitive procurement anticipated–Objective is to award detailed design and construction
contract in early FY14 due to industrial base considerations
UNCLAS
Military Sealift Command Mission-focused… Value-driven 16
T-AGOS (X)
• Last-minute addition to Navy’s POM 12 submission–Not related to FY22 POR for T-AGOS(X) program to
eventually replace existing T-AGOS vessels
• Single ship procurement to fulfill emergent LANT fleet requirement
–Requirement for dual mission capability (active and passive arrays) similar to T-AGOS 23
• Design alternatives being evaluated–T-AGOS 23 variant
–T-AGOS 19 Class variant
–New design
UNCLAS
Military Sealift Command Mission-focused… Value-driven 17
T-ATF/T-ARS/T-ATS
• 30 year shipbuilding plan–ATF recap officially starts in 2015
–ARS recap officially starts in 2020
• Options–Replace in kind
–Replace with enhanced capabilities
–Common hull (single ship class)
–Hybrid propulsion
–Own, lease or charter
• Navy’s POM 12 submission reflects accelerated procurement with objective of awarding detailed design and construction contract
UNCLAS
Military Sealift Command Mission-focused… Value-driven 18
Future New Construction Projects
• Additional new construction projects in current Navy 30-year shipbuilding plan
–LCC(R) – 1 Ship (FY12-FY15) – AOA ongoing• Likely to result in life extension for current LCC
–T-AGOS(X) – 5 Ships (FY20-FY28)
–T-AOE(X) – 4 Ships (FY29-FY36)• Maybe rolled into T-AO(X)
• Programs subject to change pending completion of QDR and subsequent revision of 30-year shipbuilding plan
UNCLAS
Military Sealift Command Mission-focused… Value-driven 19
AS-40 Conversion
USS FRANK CABLETransferred to MSC in FY10
Completed phase I of conversion at GSY in FY10 Phase II of conversion to be performed in Guam in FY12 (~$30M)
UNCLAS
Military Sealift Command Mission-focused… Value-driven 20
T-AOE Conversions
Fast Combat Support ShipsScheduled for CIVMOD conversions in FY12 – FY16
Control System ReplacementHeavy UNREP prototype installation
Habitability ImprovementsDrydocking
M&R / Alterations
UNCLAS
Military Sealift Command Mission-focused… Value-driven 21
MT WHITNEY SLEP
• FY service life extension availability being contemplated for FY14
UNCLAS
Military Sealift Command Mission-focused… Value-driven 22
MT WHITNEY SLEP
• MSC tasked to develop recommendations for Life Extension on Mt Whitney to 2029 (58 years)
• MSC input will be joined with NAVSEA input on USS BLUE RIDGE for a joint report
• MSC Life Extension study reveals major systemic issues
– structural deterioration
– ventilation deterioration, dirt, mold
– Galleys, laundries and fan rooms without structural fire protection
– electrical deficiencies
• MSC Life Extension Cost Estimate approximately $110 million
UNCLAS
Military Sealift Command Mission-focused… Value-driven 23
LSD 41/48 Class
• USFFC has requested MSC provide a proposal to assume operation of engineering, deck and steward department functions for 12 LSD 41/48 class vessels
• Hybrid manned ship like LCC, AS
• Transfers would tentatively commence in FY12 / FY13
UNCLAS
Military Sealift Command Mission-focused… Value-driven 24
LPD 17 Class
• USFFC requested MSC proposal to assume operation of engineering, deck and steward department functions for one LPD-17 class vessel
UNCLAS
Military Sealift Command Mission-focused… Value-driven 25
Ship Life Extensions
• Life Extension Studies conducted (generally 45-50 years):
– Fast Sealift Ships (FSS), MPS – Waterman, Maersk, and AMSEA classes, T-AGM 24 (50+ years), Wheat, Stockham, Martin, Zeus, T-AGOS 19 class
• Life Extensions Studies currently ongoing:– Mt Whitney / Blue Ridge (58 + years)
• Life Extensions Studies to be accomplished:– T-AGM 23, T-AGS 60, T-AKR 300,T-AKR 310 (45-50 years)
– T-AOE class, T-AO class, T-AH class, T-ARS, T-ATF to be done by PM1 (45-50 years)
– Possible OPNAV task for Gordon/Gilliland class, Martin, Stockham, MPS Waterman and AMSEA classes, Shughart/Yano class, and the Wheat to 60 years
UNCLAS
Military Sealift Command Mission-focused… Value-driven 26
Other Issues
• Environmental–Protective Coating Performance Standard (SOLAS II-1/3-
2) - Ballast Tank Coating Systems
–Ballast Water Management Convention• Install Ballast Water Treatment Plants
–Diesel Emission guidelines
• Energy Conservation
• Maintenance Management–Capture all maintenance planning and execution data
–USFFC and OPNAV are increasing oversight efforts on all maintenance data