Page 1: Integrated Campus Development Plan

Integrated Campus Development Plan (ICDP) – March 2012

Campground Rd,RondeboschCape TownT: 021 686 4066@: [email protected]: rghs.org.za

Page 2: Integrated Campus Development Plan

Integrated Campus Development Plan:

• Integrated plan caters for needs and priorities identified by school community

• Enhances character of existing school buildings and grounds as the main asset

• New-build confined only to essential needs not met by existing facilities

• Seeks to provide every full-time Educator with a classroom

• Rationalises roads and provides parking to ensure improved pedestrian safety and traffic flow

• Sets in place a logical sequence of development

• Provision for long term projects such as multi-purpose hall and/ or hostel extension

www.rghs.org.za

Page 3: Integrated Campus Development Plan

Integrated Campus Development Plan – Key Intervention Areas

Leadership Centre

Aquatic Centre

Main Entrance & parking

Maths/Science Block

www.rghs.org.za

Page 4: Integrated Campus Development Plan

Phase “0” (Completed Oct 2010) : Kemp Hall Courtyard March – October 2010

• Paving and landscaping• Sports office• Upgrading of change rooms

• Store rooms• Covered Kemp Hall verandah • Soccer field seating

Before

After

www.rghs.org.za

Page 5: Integrated Campus Development Plan

Phase 1: Maths & Science Block

www.rghs.org.za

Page 6: Integrated Campus Development Plan

Phase 2: Ground Floor – Science Laboratories• 3 x custom built laboratories• Preparation room• Exhibition/Display areas

www.rghs.org.za

Page 7: Integrated Campus Development Plan

Phase 1: First Floor – Mathematics Classrooms

• 4 x Mathematics classrooms• Bridge to adjoining School building

www.rghs.org.za

Page 8: Integrated Campus Development Plan

Artist’s Impressions

www.rghs.org.za

Page 9: Integrated Campus Development Plan

Phase 2: Leadership Centre• Life Orientation classrooms• Counselling area• ROGU office• Conference/Functions Room

www.rghs.org.za

Page 10: Integrated Campus Development Plan

First Floor

Ground Floor

www.rghs.org.za

Page 11: Integrated Campus Development Plan

www.rghs.org.za

Page 12: Integrated Campus Development Plan

RUSTENBURG HIGH SCHOOL FOR GIRLSProposed Integrated Campus Development Plan (2015 and beyond)These phases will be implemented on a needs driven and opportunity basis.

www.rghs.org.za

PHASE 3 : Aquatic Centre

1. Service road2. Heated Waterpolo Pool and Facilities

PHASE 4 : Roads, Landscaping & Tennis Courts

3. Campground Road entrance4. Entrance roadway and landscaping5. North road parking6. South road parking 7. Staff parking8. South entrance9. Realigned circular road and stop & drop

parking10. Barrier Wall and Tennis seating area11. Pedestrian access to Charlie’s Hope

9. Parking area10. Pedestrian link to fields11. Erinville Hostel crossing12. Waiting shelter13. Forecourt landscaping extension to new

road14. Soccer field seating extension15. Erinville carports

PHASE 5: Sports Fields

16. Astroturf Hockey Field

PHASE 6: Multipurpose Hall

17. Located on meadows south of Erinville