    Project #3015022 DRB Recommendation Meeting #3 OctoRufus 2.0 - Block 19

  • 7/27/2019 Amazon Campus Development

    2/31

    Project #3015022 DRB Recommendation Meeting #3 October 22, 2013

    2

    Purpose of Recommendation Meeting #3Table of Contents

    Purpose o Recommendation Meeting #3

    1 Building Form ..................................................................Catalan Pattern and MaterialsExterior Aerial ViewCatalan Evolution and ConstructionExterior Street Level View & Materials

    2 Experience Along Lenora Street.........................................Model PhotographsBuilding Elevation Along Lenora

    3 Ground Level Open Space ................................................Site PlanOpen Space Canopy DesignBuilding Sections Along Lenora

    4 Ground Level Retail ..........................................................Retail Access PlanRetail Entry DiagramsStreet Level Views

    5 Access .............................................................................Enlarged Access PlanParking Entry DiagramsStreet Level Views Along Blanchard

    6 Exterior Treatment o Tower .............................................Enlarged Podium Wall SectionStreet Level View and MaterialsPrevious ElevationsCurrent Elevations and Materials

    APPENDIX ..........................................................................Summary o DeparturesDeparture Diagram

    2

    3

    7

    9

    13

    17

    23

    30

    Goals or Session

    In our past two presentations, we have addressed the intent and purpose o the Spheres, as well as our response to the Downtown Design Guidelines reerenced by the Board as applying to the ull block project. In the meantime, we have urther advanced the design o the tower base, outdoor puand the spheres.

    As part o this evenings presentation, we will describe the urther development o the design including any subsequent changes and addrePriorities and Board Recommendations rom our last Recommendation meeting on 8.20.13; these include:

    BuildingBaseandBuildingFormdemonstratingourprogressindesignoftheCatalanModuleforgreaterefciency,transparencyandcons LenoraStreetPedestrianExperienceillustratingthedesignapproachastheSpheresmeetgradealongLenoraaswellasdetailingthereta

    experiences at the corners o 6th and 7th Avenues DevelopmentoftheGroundLevelOpenSpaceshowingthefurtherdevelopmentofthegreenscapeontheeastsideofLenora,theplazaca

    6th avenue, as well as our approach to overhead weather protection at building entries, including retail entries GroundLevelRetail ocusing on the retail expression and entry experience at the Spheres, but also providing details and dimensions

    o the retail spaces in both the tower and the Spheres Accessdescribing the selected alternative to a garage entrance on Lenora Street that has been agreed upon by the design team, DPD and

    SDOT ExteriorTreatmentofTowerprovidingcomparativeelevationsofthenewelevationsandtheearlierelevationsofthetowerbase

    We are seeking the Boards recommendation or approval and are providing additional material to complete the members understanding o the project,

    AcollageofalternativesstudiedfortheCatalangeometry Diagramsshowingtheconceptualevolutionoftheoutdoorcanopydesign Alargescalemodeloftheretailentryon7thavenuetodemonstratetheentryexperienceandhowthespheresmeetgrade Samplesectionsthroughthespheresandtowerpodiumthatshowtherelationshipbetweenindoorandoutdoorlandscaping,aswellasbet

    pedestrian and sphere enclosure AdditionalperspectivesketchesoftheSpheresandtowerbasewithparticularfocusontheimprovementsonBlanchardStreet MaterialandcolorpalettefortheSpheresandtowerbase

    3456

    78

    910-1112

    131415-16

    1718-2021-22

    23242526-29

    3031

  • 7/27/2019 Amazon Campus Development

    3/31

    Project #3015022 DRB Recommendation Meeting #3 Octo

    1Building Form

    Catalan Pattern and MaterialsBuilding Base and Building Form:

    a. The Board agreed that the evolved ormincluded a very interesting and innovative stThe Board noted the juxtaposition o the transpanelglazingsystemoftheskinwiththeintestructural system. (B-4, C-2)

    The structural system o the Spheres has contto be both more elegant and ecient. The instructuralandglazingsystemmaintainsafacsupported by a reestanding interior modulaFigure 1A which outlines the current catalan1 and Figure 1C depict the updated Spheres view. The design o the Catalan will continuthe actual design o the structural module ma

    b. The Board encouraged exploration omembers using varying depths to urther expdesign concept. (B-4, C-2)

    By combining cast steel, rolled sections, andthecurrentcatalanstructuralmodulemaximizbenets o each manuacturing type. Cast mFigure 1A make up the geometrically compl

    join the more consistently shaped rolle d stee

    steel orms the rigid webbing in each moduleo the catalan module is shown in Figurescompared to the previously presented desieect o the current catalan module is visuageometrically organic and sculptural.

    c. The Board encouraged the building to be asas possible in an eort to support and eninnovative architecture.

    Ecient building systems are being incorporathe Spheres in order to ensure that the targrating is achieved or Block 19. See Figure 1Fmaterials being proposed in the design.

    BOARD RECOMMENDSECOND RECOMMENDATION MEETING : AU

    1

    FIGURE 1A FIGURE 1B

    1

    3

    2

    1

    3

    2

    Rolled Steel Tube Members

    Flat Plate Steel Webbing

    Cast Steel Nodes

    4 Exterior Mullion & Glazing Overlay

    4

  • 7/27/2019 Amazon Campus Development

    4/31

    Project #3015022 DRB Recommendation Meeting #3 October 22, 2013

    4

    1Building Form

    Exterior Aerial View

    FIGURE 1C

  • 7/27/2019 Amazon Campus Development

    5/31

    Project #3015022 DRB Recommendation Meeting #3 Octo

    1Building Form

    Catalan Evolution and Construction

    FIGURE 1D FIGURE 1E

    Previously presented catalanstructural module

    Proposed catalan structuralmodule

    Catalan structural module studies - Previously presented module shown circled

  • 7/27/2019 Amazon Campus Development

    6/31

    Project #3015022 DRB Recommendation Meeting #3 October 22, 2013

    6

    1Building Form

    Street Level View & Materials

    Vision Glass White Painted SteelDark Concrete denotes Entries

    Light Concrete Site Walls

    White Mullion - Matches Steel

    Plant Environment

    FIGURE 1F

  • 7/27/2019 Amazon Campus Development

    7/31

    Project #3015022 DRB Recommendation Meeting #3 Octo

    Physical Model Photographs

    2Experience Along Lenora Street

    BOARD RECOMMENDSECOND RECOMMENDATION MEETING : AU

    Lenora Street Pedestrian Experienc

    a. The Board agreed that continuous overhalong Lenora would detract rom the archspheres. (C-5)

    No overhead weather protection will be provithe Spheres along Lenora. See Figure 2A or the construction o the Spheres at the condand Lenora.

    b. The Board elt, however, that overhead prbe provided at the entry points or at the seatLenora. The Board also encouraged enhancinprotection across Lenora on Block 14. (C-5)

    Recessed alcoves provided at all entry pointsoer overhead weather protection as showAcross Lenora, continuous overhead weathprovided by canopies along the Meeting Ceshown in Figure 3A.

    c. The Board was pleased with the seatinprovided along Lenora to provide pocket spaco pause and urther developing the concepwithin a park with the landscaping and se

    around to the Lenora side o the block. (A-1,

    Further development o the landscape plSpheres, including along Lenora, is shown in enhancement o outdoor seating opportunites

    2

    FIGURE 2A

  • 7/27/2019 Amazon Campus Development

    8/31

    Project #3015022 DRB Recommendation Meeting #3 October 22, 2013

    8

    2Ground Level Open Space

    Building Elevation Along Lenora

    7thA

    venue

    Lenora Elevation

    Lenora Street

    FIGURE 2B

  • 7/27/2019 Amazon Campus Development

    9/31

    Project #3015022 DRB Recommendation Meeting #3 Octo

    3Ground Level Open Space

    Site Plan

    6th Avenue

    Blanchard

    Street

    Lenora

    Street

    7th Avenue

    FIGURE 3A

    Canopies Accessible Routeo Travel

    Bicycle Access Dog Park Activity Field BOARD RECOMMENDSECOND RECOMMENDATION MEETING : AU

    Development of the Ground Level O

    a. The Board noted that the canopy structurespheres to the tower may be too thin in compstructural members o the spheres. The Board canopy abrication system be expressed as a the spheres internal structures. (C-1, D-1, D-2

    Conceptually, the canopy is born out o the idecatalan sphere. When unolded, the loads o can be supported in a much more ecient

    using the heavy catalan module used inside tFigures 3B,D,E & F or diagrams showing thdirection o the canopy.

    b. The Board agreed that the design o thconnecting element is elegant in the mannerovertheplazaspaceandedgesofthedogpacombination o overhead protection and visuaextending the architectural concept. (C-1, D-1,

    Entryintothetowerlobbyfromtheplazaalongshited to a midblock location to allow retail toandhelpactivatetheplaza.Inresponse,thecanbeen adjusted to maintain overhead weathepeople moving between the Spheres and towFigure3A.Additionally,asignicantamountoto retail space will be covered by the glass can

    c. The Board encouraged the vegetated buer perimeter o the building be less homogeneouand instead be varied to create more organic beds, as well as to respond to specic ground such as entry pathways. The Board suggesspecic locations where pedestrians can combuilding aade on hardscape, to encourage pwith the development. (C-1, D-1, D-2)

    Areas are provided at each entry point o theallow anyone to stand on hardscape and Spheres close up. Due to the inwardly curvinSpheres as they meet the ground, other poinare restrictions by ADA requirements as shown

    d. The Board would like to see detailed sectioexperience at the next meeting (similar to booklet) showing sidewalk, landscaped and hand building section. (C-1, D-1, D-2)

    Detailed sections shown in Figures 3G and 3Hsection model shown in Figure 2A have been p

    3

  • 7/27/2019 Amazon Campus Development

    10/31

    Project #3015022 DRB Recommendation Meeting #3 October 22, 2013

    10

    3

    FIGURE 3B FIGURE 3D

    FIGURE 3C

    Ground Level Open Space

    Open Space Canopy Design

    Laminated Glass with SteelFrame Canopy

    Open Cell with Steel FrameCanopy

    Painted Steel Structure

    6-8

    5-0

  • 7/27/2019 Amazon Campus Development

    11/31

    Project #3015022 DRB Recommendation Meeting #3 Octo

    3Ground Level Open Space

    Open Space Canopy Design

    FIGURE 3F

    Catalan Sphere Unfolded Catalan Sphere Added Catalan ModuleAllows Repetitve PlanarPattern

    Canopy Extent Tailored toSite and Faceted MullionPattern Derived FromSpheres SkinFIGURE 3E

  • 7/27/2019 Amazon Campus Development

    12/31

    Project #3015022 DRB Recommendation Meeting #3 October 22, 2013

    12

    3Ground Level Open Space

    Building Sections Along Lenora

    FIGURE 3G FIGURE 3H

    Lenora Street

    Lenora

  • 7/27/2019 Amazon Campus Development

    13/31

    Project #3015022 DRB Recommendation Meeting #3 Octo

    4Ground Level Retail

    Retail Access Plan

    Proposed Site Access - Composite Levels G&1

    Retail

    Lobby

    Retail Entry

    Primary Building EntrySecondary Building Entry

    Garage Elevator Entry

    Service Vehicle Entry

    Parking Garage Entry

    BOARD RECOMMENDSECOND RECOMMENDATION MEETING : AU

    4489 SF

    629 SF

    4364 SF

    6319 SF

    2240 SF

    Total Retail:

    18,041 SF

    Ground Level Retail:

    a.TheBoardemphasizedthatthe retailentreated with the same rigor and experiential present throughout the development. The rthe most apparent opportunities or public occur. (C-1, C-3, C-4, D-3)

    A detailed rendering seen in Figure 4E showsat the corner o 7th Avenue and Lenora. Figu

    enlarged plan o this entry. All retail entrancsame architectural character.

    b. The Board would like to review detaassociated with the actual entry points. (C-1,

    In addition to the rendering provided in Figurmodel showing the retail entry describes thedetail. See Figure 2A or model photographs. a section cut through the retail entry and Fithe retail space at the corner o 6th and Leno

    c. The Board encouraged an observable garetail ceiling and the building skin as shownthe presentation booklet to allow visibility atpoints to the unique qualities o the structure

    C-4, D-3)

    Figure 4B depicts the condition at a typical ret

    d. The Board clearly stated that the retail spwell-considered to accommodate unctionalretail activity. Part o this consideration dempinch points within the retail conguratioresolved. (C-1, C-4, D-3)

    An updated retail and access plan is shown in

    4

    FIGURE 4A

  • 7/27/2019 Amazon Campus Development

    14/31

    Project #3015022 DRB Recommendation Meeting #3 October 22, 2013

    14

    4Ground Level Retail

    Retail Entry Diagrams

    FIGURE 4B FIGURE 4C

    LenoraStreet

    7th Avenue

    FIG. 4B

    FIG. 4E

    7th Avenue

  • 7/27/2019 Amazon Campus Development

    15/31

    Project #3015022 DRB Recommendation Meeting #3 Octo

    4Ground Level Retail

    Street Level View from 6th and Lenora

    FIGURE 4D

  • 7/27/2019 Amazon Campus Development

    16/31

    Project #3015022 DRB Recommendation Meeting #3 October 22, 2013

    16

    4Ground Level Retail

    Retail Elevation Diagram

    FIGURE 4E

    SECOND RECOMMENDATION MEETING AU

  • 7/27/2019 Amazon Campus Development

    17/31

    Project #3015022 DRB Recommendation Meeting #3 Octo

    5Access

    Enlarged Access Plan

    Blanchard Street

    6t

    hAve

    BOARD RECOMMENDSECOND RECOMMENDATION MEETING : AU

    Access:

    a. The Board was very supportive o moving therom Lenora to another location. The Boardthat this is part o an on-going discussion wE-3)

    Lenora remains ree o curbcuts. The propo the driveway now occurs on Blanchard Avenue. This new location is an exit only, one

    See Figures 5A and 5B which show the propo

    b. The Board will continue to be interested in saety and ground level engagement and visbe addressed in the revised driveway location

    The Blanchard landscape plan has been redshown in Figure 5A. Additionally, each curbcushown in an enlarged plan and elevation in FD. An experiential view walking along BlanchFigure 5E along with a more wholistic night viseen in Figure 5 F.

    5

    FIG. 5C

    FIG. 5BFIG. 5D

    FIGURE 5A

    5

  • 7/27/2019 Amazon Campus Development

    18/31

    Project #3015022 DRB Recommendation Meeting #3 October 22, 2013

    18

    5Access

    Parking Entry Diagram\Blanchard Street

    9-6

    5-6

    5

    6

    GARAGE EXIT

    12

    9-910-3

    FIGURE 5B

    5

  • 7/27/2019 Amazon Campus Development

    19/31

    5Access

    Loading Entry DiagramBlanchard Street

    Project #3015022 DRB Recommendation Meeting #3 Octo

    6

    5-6

    5

    9-6

    28

    1416

    FIGURE 5C

    5

  • 7/27/2019 Amazon Campus Development

    20/31

    5Access

    Parking Entry Diagram6th Avenue

    Project #3015022 DRB Recommendation Meeting #3 October 22, 2013

    20

    6TH AVENUE

    GARAGE ENTRY/EXIT

    14

    9

    25

    98-6

    FIGURE 5D

    5

  • 7/27/2019 Amazon Campus Development

    21/31

    Project #3015022 DRB Recommendation Meeting #3 Octo

    5Access

    Street Level View Along Blanchard

    FIGURE 5E

    5

  • 7/27/2019 Amazon Campus Development

    22/31

    Project #3015022 DRB Recommendation Meeting #3 October 22, 2013

    22

    5Access

    Street Level View Along Blanchard

    FIGURE 5F

    Section Cut - Figu

    6SECOND RECOMMENDATION MEETING : AU

  • 7/27/2019 Amazon Campus Development

    23/31

    Project #3015022 DRB Recommendation Meeting #3 Octo

    6Exterior Treatment of Tower

    Podium Wall Section and Cladding Detail

    BOARD RECOMMEND

    Exterior Treatment of Tower:

    a. The Board agreed that proposed colors provand resh palette, as well as combination otextures. (A-2, B-4, C-2)

    Physical material samples and their associathe tower are shown in Figure 6C. A wall secttower podium along Blanchard Street is showand closer views showing screening elemenFigure 6B.

    b. The Board would like to see additional demeeting, including elevations o the previdesign.

    The previously approved building elevationsFigure 6D. Proposed building elevations are s6E,F,G & H.

    6

    FIGURE 6A FIGURE 6B

    6

  • 7/27/2019 Amazon Campus Development

    24/31

    Project #3015022 DRB Recommendation Meeting #3 October 22, 2013

    24

    6Exterior Treatment of Tower

    Street Level View and Materials

    Froste d Glass Screenwa ll Whit e La minate d Glass (3 Colors)One Side Only

    Orange Laminated Glass (3 Colors)One Side Only

    Aluminum Curtainwall MullionTranslucent Blue Laminated Glass Dark Spandrel GlazingOpaque White Frit Stri

    FIGURE 6C

    6

  • 7/27/2019 Amazon Campus Development

    25/31

    Project #3015022 DRB Recommendation Meeting #3 Octo

    6Exterior Treatment of TowerPrevious Tower Podium Elevations

    FIGURE 6D

    6th Ave Elevation Lenora Elevation - Through Plaza

    7th Ave Elevation Blanchard Elevation

    6

  • 7/27/2019 Amazon Campus Development

    26/31

    Project #3015022 DRB Recommendation Meeting #3 October 22, 2013

    26FIGURE 6E

    6Exterior Treatment of TowerTower and Podium - Elevations up to 60

    7th Ave Elevation

    Blanchard

    7th Ave

    6

  • 7/27/2019 Amazon Campus Development

    27/31

    Project #3015022 DRB Recommendation Meeting #3 Octo

    FIGURE 6F

    6Exterior Treatment of TowerTower and Podium - Elevations up to 60

    6th Ave Elevation

    6th Ave

    Blanchard

    6

  • 7/27/2019 Amazon Campus Development

    28/31

    Project #3015022 DRB Recommendation Meeting #3 October 22, 2013

    28FIGURE 6G

    6Exterior Treatment of TowerTower and Podium - Elevations up to 60

    Lenora Elevation from Midblock Open Space

    6thAve

    6

  • 7/27/2019 Amazon Campus Development

    29/31

    Project #3015022 DRB Recommendation Meeting #3 Octo

    FIGURE 6H

    6Exterior Treatment of TowerTower and Podium - Elevations up to 60

    Blanchard Elevation

    7thAve

    Blanchard

    APPENDIX

  • 7/27/2019 Amazon Campus Development

    30/31

    Project #3015022 DRB Recommendation Meeting #3 October 22, 2013

    30

    APPENDIXSummary of Development Standard Departures

    Item# Development Standard Requirement Departure Amount Requested Rationale Downtown Design Guidelines Affected Diagram

    1SMC 23.49.056.B.2 Upper Level

    Development Standards

    The maximum length of a facade without modulation

    located within 15 feet of a property line is 80 feet long for

    the portion of a faade that is above an elevation of 500

    feet.

    The maximum length of a facade without modulation located within 15 feet

    of a property line is requested to be up to 95 feet long for the portion of a

    faade that is above an elevation of 500 feet.

    This departure would permit the faade length of the tall office tower

    along Seventh Avenue to continue uninterrupted from level 4 all the way

    up to the top of the building, permitting the structure to more

    appropriately meet the sky

    A-1 Respond to the physical environment

    A-2 Enhance the skyline

    B-4 Design a Well Proportioned and Unified Building

    See Diagram 1

    2SMC 23.49.058.F Upper Level

    Setbacks

    Under Upper Level Setbacks in DOC-2, along a designated

    green street, a continuous upper level setback of 15 feet

    shall be provided on the street frontage abutting the green

    street at a height of 45 feet.

    We request a departure to permit an architectural element that is approx. 18inches thick to intrude into the upper level setback zone at an elevation 45

    feet above sidewalk level. This element is 5 feet deep and will be set back 10

    feet from the street property line. It will extend 5'-6" into the upper level

    setback zone above 45 feet at the corner of Blanchard and Seventh Avenue

    and taper down to zero feet for a running distance of 112 feet along

    Blanchard.

    This architectural element will permit a major horizontal architectural

    feature of the faade to continue uninterrupted along the entire length of

    Blanchard Street.

    B-2 Create a transition in bulk and scale

    B-4 Design an well proportioned and unified building

    C-2 Design a faade of many scales

    C-3 Provide active-not blank facades

    See Diagram 2

    3

    SMC 23.54.035.C.2 Loading Berth

    Requirements and Space

    Standards

    The standard length of a loading berth shall be 10 feet x 35

    feet.

    On Block 19 at the main loading dock, two 10' x 35' deep loading berths and

    two 10' x 25' deep loading berths will be provided. A design departure is

    requested to permit six loading berths to be van sized spaces measuring 8'-6"

    x 19'-0'. We further request that one additional van size stall measuring 8'-6"

    x 19'-0" and located on level P1 of the garage be provided to service the retail

    spaces on each block.

    A high percentage of the deliveries made to Amazon buildings are done by

    carriers such as Apex, UPS which smaller vans that do not require standard

    loading berths sized at 10' x 35'. This will enable to loading dock to be

    sized more efficiently to meet the true loading demands of the building

    user. A more compact loading dock will also permit more space for uses

    such as retail at the ground level.

    A study of dock capacity and loading requirements has been prepared by

    Heffron Transportation dated May 17, 2012 to support the following:

    - 9 loading berths would adequate serve the peak office demand at each

    of the buildings.

    - 5 (or more) of those spaces could be reduced in size.

    - If the building were ever converted to a multi-tenant building, theloading dock is still adequate (and in fact would probably be oversized).

    C-1 Promote pedestrian interaction.

    C-3 Provide active not blank facades

    See Diagram 3A for layout of loading dock on

    Block 19. See Diagrams 3B for proposed location

    of van parking stall for retail loading on P1 level

    of the garage on Block 20.

    4SMC 23.49.058.C Upper Level

    Width Limit

    The maximum faade width for any portion of a building

    above 240 feet shall be 145 feet along the North/South axis

    of the site.

    We request a departure to allow 10 feet of extra building width between

    floors 18 to 25, or approximately 110' feet in building height.

    The staggered intersecting volumes which make up the massing of the

    tower have been carefully proportioned to step gracefully up to a slender

    final floorplate. By adding 10 feet of floor width between levels 18 to 25

    we are able to keep the top of the tower from growing bulky. Additionally,

    the tower maintains a rational, vertical proportion on the lowest mass

    which steps down to the midblock open space. The proposed floorplate

    widths adhere to the highly efficient planning module established

    throughout the project.

    A-2 Enhance the skyline

    B-4 Design a well proportioned and unified buildingSee Diagram 4

    Previou

    PreviouNot ReqPropos

    Previou

    Propos

    Block 19

    APPENDIX BOARD RECOMMENDSECOND RECOMMENDATION MEETING : AU

  • 7/27/2019 Amazon Campus Development

    31/31

    Project #3015022 DRB Recommendation Meeting #3 Octo

    APPENDIXDevelopment Standard Departure - Tower Width Above 240

    Departure #4 Diagram

    BOARD RECOMMEND

    Upper Level Tower Width Limits:

    This is a new departure proposed as part oeort. The Board was inclined towards such aresults in better tower massing and proportion

    Departure request unchanged.

    A