Project #3015022 DRB Recommendation Meeting #3 OctoRufus 2.0 - Block 19
7/27/2019 Amazon Campus Development
2/31
Project #3015022 DRB Recommendation Meeting #3 October 22, 2013
2
Purpose of Recommendation Meeting #3Table of Contents
Purpose o Recommendation Meeting #3
1 Building Form ..................................................................Catalan Pattern and MaterialsExterior Aerial ViewCatalan Evolution and ConstructionExterior Street Level View & Materials
2 Experience Along Lenora Street.........................................Model PhotographsBuilding Elevation Along Lenora
3 Ground Level Open Space ................................................Site PlanOpen Space Canopy DesignBuilding Sections Along Lenora
4 Ground Level Retail ..........................................................Retail Access PlanRetail Entry DiagramsStreet Level Views
5 Access .............................................................................Enlarged Access PlanParking Entry DiagramsStreet Level Views Along Blanchard
6 Exterior Treatment o Tower .............................................Enlarged Podium Wall SectionStreet Level View and MaterialsPrevious ElevationsCurrent Elevations and Materials
APPENDIX ..........................................................................Summary o DeparturesDeparture Diagram
2
3
7
9
13
17
23
30
Goals or Session
In our past two presentations, we have addressed the intent and purpose o the Spheres, as well as our response to the Downtown Design Guidelines reerenced by the Board as applying to the ull block project. In the meantime, we have urther advanced the design o the tower base, outdoor puand the spheres.
As part o this evenings presentation, we will describe the urther development o the design including any subsequent changes and addrePriorities and Board Recommendations rom our last Recommendation meeting on 8.20.13; these include:
BuildingBaseandBuildingFormdemonstratingourprogressindesignoftheCatalanModuleforgreaterefciency,transparencyandcons LenoraStreetPedestrianExperienceillustratingthedesignapproachastheSpheresmeetgradealongLenoraaswellasdetailingthereta
experiences at the corners o 6th and 7th Avenues DevelopmentoftheGroundLevelOpenSpaceshowingthefurtherdevelopmentofthegreenscapeontheeastsideofLenora,theplazaca
6th avenue, as well as our approach to overhead weather protection at building entries, including retail entries GroundLevelRetail ocusing on the retail expression and entry experience at the Spheres, but also providing details and dimensions
o the retail spaces in both the tower and the Spheres Accessdescribing the selected alternative to a garage entrance on Lenora Street that has been agreed upon by the design team, DPD and
SDOT ExteriorTreatmentofTowerprovidingcomparativeelevationsofthenewelevationsandtheearlierelevationsofthetowerbase
We are seeking the Boards recommendation or approval and are providing additional material to complete the members understanding o the project,
AcollageofalternativesstudiedfortheCatalangeometry Diagramsshowingtheconceptualevolutionoftheoutdoorcanopydesign Alargescalemodeloftheretailentryon7thavenuetodemonstratetheentryexperienceandhowthespheresmeetgrade Samplesectionsthroughthespheresandtowerpodiumthatshowtherelationshipbetweenindoorandoutdoorlandscaping,aswellasbet
pedestrian and sphere enclosure AdditionalperspectivesketchesoftheSpheresandtowerbasewithparticularfocusontheimprovementsonBlanchardStreet MaterialandcolorpalettefortheSpheresandtowerbase
3456
78
910-1112
131415-16
1718-2021-22
23242526-29
3031
7/27/2019 Amazon Campus Development
3/31
Project #3015022 DRB Recommendation Meeting #3 Octo
1Building Form
Catalan Pattern and MaterialsBuilding Base and Building Form:
a. The Board agreed that the evolved ormincluded a very interesting and innovative stThe Board noted the juxtaposition o the transpanelglazingsystemoftheskinwiththeintestructural system. (B-4, C-2)
The structural system o the Spheres has contto be both more elegant and ecient. The instructuralandglazingsystemmaintainsafacsupported by a reestanding interior modulaFigure 1A which outlines the current catalan1 and Figure 1C depict the updated Spheres view. The design o the Catalan will continuthe actual design o the structural module ma
b. The Board encouraged exploration omembers using varying depths to urther expdesign concept. (B-4, C-2)
By combining cast steel, rolled sections, andthecurrentcatalanstructuralmodulemaximizbenets o each manuacturing type. Cast mFigure 1A make up the geometrically compl
join the more consistently shaped rolle d stee
steel orms the rigid webbing in each moduleo the catalan module is shown in Figurescompared to the previously presented desieect o the current catalan module is visuageometrically organic and sculptural.
c. The Board encouraged the building to be asas possible in an eort to support and eninnovative architecture.
Ecient building systems are being incorporathe Spheres in order to ensure that the targrating is achieved or Block 19. See Figure 1Fmaterials being proposed in the design.
BOARD RECOMMENDSECOND RECOMMENDATION MEETING : AU
1
FIGURE 1A FIGURE 1B
1
3
2
1
3
2
Rolled Steel Tube Members
Flat Plate Steel Webbing
Cast Steel Nodes
4 Exterior Mullion & Glazing Overlay
4
7/27/2019 Amazon Campus Development
4/31
Project #3015022 DRB Recommendation Meeting #3 October 22, 2013
4
1Building Form
Exterior Aerial View
FIGURE 1C
7/27/2019 Amazon Campus Development
5/31
Project #3015022 DRB Recommendation Meeting #3 Octo
1Building Form
Catalan Evolution and Construction
FIGURE 1D FIGURE 1E
Previously presented catalanstructural module
Proposed catalan structuralmodule
Catalan structural module studies - Previously presented module shown circled
7/27/2019 Amazon Campus Development
6/31
Project #3015022 DRB Recommendation Meeting #3 October 22, 2013
6
1Building Form
Street Level View & Materials
Vision Glass White Painted SteelDark Concrete denotes Entries
Light Concrete Site Walls
White Mullion - Matches Steel
Plant Environment
FIGURE 1F
7/27/2019 Amazon Campus Development
7/31
Project #3015022 DRB Recommendation Meeting #3 Octo
Physical Model Photographs
2Experience Along Lenora Street
BOARD RECOMMENDSECOND RECOMMENDATION MEETING : AU
Lenora Street Pedestrian Experienc
a. The Board agreed that continuous overhalong Lenora would detract rom the archspheres. (C-5)
No overhead weather protection will be provithe Spheres along Lenora. See Figure 2A or the construction o the Spheres at the condand Lenora.
b. The Board elt, however, that overhead prbe provided at the entry points or at the seatLenora. The Board also encouraged enhancinprotection across Lenora on Block 14. (C-5)
Recessed alcoves provided at all entry pointsoer overhead weather protection as showAcross Lenora, continuous overhead weathprovided by canopies along the Meeting Ceshown in Figure 3A.
c. The Board was pleased with the seatinprovided along Lenora to provide pocket spaco pause and urther developing the concepwithin a park with the landscaping and se
around to the Lenora side o the block. (A-1,
Further development o the landscape plSpheres, including along Lenora, is shown in enhancement o outdoor seating opportunites
2
FIGURE 2A
7/27/2019 Amazon Campus Development
8/31
Project #3015022 DRB Recommendation Meeting #3 October 22, 2013
8
2Ground Level Open Space
Building Elevation Along Lenora
7thA
venue
Lenora Elevation
Lenora Street
FIGURE 2B
7/27/2019 Amazon Campus Development
9/31
Project #3015022 DRB Recommendation Meeting #3 Octo
3Ground Level Open Space
Site Plan
6th Avenue
Blanchard
Street
Lenora
Street
7th Avenue
FIGURE 3A
Canopies Accessible Routeo Travel
Bicycle Access Dog Park Activity Field BOARD RECOMMENDSECOND RECOMMENDATION MEETING : AU
Development of the Ground Level O
a. The Board noted that the canopy structurespheres to the tower may be too thin in compstructural members o the spheres. The Board canopy abrication system be expressed as a the spheres internal structures. (C-1, D-1, D-2
Conceptually, the canopy is born out o the idecatalan sphere. When unolded, the loads o can be supported in a much more ecient
using the heavy catalan module used inside tFigures 3B,D,E & F or diagrams showing thdirection o the canopy.
b. The Board agreed that the design o thconnecting element is elegant in the mannerovertheplazaspaceandedgesofthedogpacombination o overhead protection and visuaextending the architectural concept. (C-1, D-1,
Entryintothetowerlobbyfromtheplazaalongshited to a midblock location to allow retail toandhelpactivatetheplaza.Inresponse,thecanbeen adjusted to maintain overhead weathepeople moving between the Spheres and towFigure3A.Additionally,asignicantamountoto retail space will be covered by the glass can
c. The Board encouraged the vegetated buer perimeter o the building be less homogeneouand instead be varied to create more organic beds, as well as to respond to specic ground such as entry pathways. The Board suggesspecic locations where pedestrians can combuilding aade on hardscape, to encourage pwith the development. (C-1, D-1, D-2)
Areas are provided at each entry point o theallow anyone to stand on hardscape and Spheres close up. Due to the inwardly curvinSpheres as they meet the ground, other poinare restrictions by ADA requirements as shown
d. The Board would like to see detailed sectioexperience at the next meeting (similar to booklet) showing sidewalk, landscaped and hand building section. (C-1, D-1, D-2)
Detailed sections shown in Figures 3G and 3Hsection model shown in Figure 2A have been p
3
7/27/2019 Amazon Campus Development
10/31
Project #3015022 DRB Recommendation Meeting #3 October 22, 2013
10
3
FIGURE 3B FIGURE 3D
FIGURE 3C
Ground Level Open Space
Open Space Canopy Design
Laminated Glass with SteelFrame Canopy
Open Cell with Steel FrameCanopy
Painted Steel Structure
6-8
5-0
7/27/2019 Amazon Campus Development
11/31
Project #3015022 DRB Recommendation Meeting #3 Octo
3Ground Level Open Space
Open Space Canopy Design
FIGURE 3F
Catalan Sphere Unfolded Catalan Sphere Added Catalan ModuleAllows Repetitve PlanarPattern
Canopy Extent Tailored toSite and Faceted MullionPattern Derived FromSpheres SkinFIGURE 3E
7/27/2019 Amazon Campus Development
12/31
Project #3015022 DRB Recommendation Meeting #3 October 22, 2013
12
3Ground Level Open Space
Building Sections Along Lenora
FIGURE 3G FIGURE 3H
Lenora Street
Lenora
7/27/2019 Amazon Campus Development
13/31
Project #3015022 DRB Recommendation Meeting #3 Octo
4Ground Level Retail
Retail Access Plan
Proposed Site Access - Composite Levels G&1
Retail
Lobby
Retail Entry
Primary Building EntrySecondary Building Entry
Garage Elevator Entry
Service Vehicle Entry
Parking Garage Entry
BOARD RECOMMENDSECOND RECOMMENDATION MEETING : AU
4489 SF
629 SF
4364 SF
6319 SF
2240 SF
Total Retail:
18,041 SF
Ground Level Retail:
a.TheBoardemphasizedthatthe retailentreated with the same rigor and experiential present throughout the development. The rthe most apparent opportunities or public occur. (C-1, C-3, C-4, D-3)
A detailed rendering seen in Figure 4E showsat the corner o 7th Avenue and Lenora. Figu
enlarged plan o this entry. All retail entrancsame architectural character.
b. The Board would like to review detaassociated with the actual entry points. (C-1,
In addition to the rendering provided in Figurmodel showing the retail entry describes thedetail. See Figure 2A or model photographs. a section cut through the retail entry and Fithe retail space at the corner o 6th and Leno
c. The Board encouraged an observable garetail ceiling and the building skin as shownthe presentation booklet to allow visibility atpoints to the unique qualities o the structure
C-4, D-3)
Figure 4B depicts the condition at a typical ret
d. The Board clearly stated that the retail spwell-considered to accommodate unctionalretail activity. Part o this consideration dempinch points within the retail conguratioresolved. (C-1, C-4, D-3)
An updated retail and access plan is shown in
4
FIGURE 4A
7/27/2019 Amazon Campus Development
14/31
Project #3015022 DRB Recommendation Meeting #3 October 22, 2013
14
4Ground Level Retail
Retail Entry Diagrams
FIGURE 4B FIGURE 4C
LenoraStreet
7th Avenue
FIG. 4B
FIG. 4E
7th Avenue
7/27/2019 Amazon Campus Development
15/31
Project #3015022 DRB Recommendation Meeting #3 Octo
4Ground Level Retail
Street Level View from 6th and Lenora
FIGURE 4D
7/27/2019 Amazon Campus Development
16/31
Project #3015022 DRB Recommendation Meeting #3 October 22, 2013
16
4Ground Level Retail
Retail Elevation Diagram
FIGURE 4E
SECOND RECOMMENDATION MEETING AU
7/27/2019 Amazon Campus Development
17/31
Project #3015022 DRB Recommendation Meeting #3 Octo
5Access
Enlarged Access Plan
Blanchard Street
6t
hAve
BOARD RECOMMENDSECOND RECOMMENDATION MEETING : AU
Access:
a. The Board was very supportive o moving therom Lenora to another location. The Boardthat this is part o an on-going discussion wE-3)
Lenora remains ree o curbcuts. The propo the driveway now occurs on Blanchard Avenue. This new location is an exit only, one
See Figures 5A and 5B which show the propo
b. The Board will continue to be interested in saety and ground level engagement and visbe addressed in the revised driveway location
The Blanchard landscape plan has been redshown in Figure 5A. Additionally, each curbcushown in an enlarged plan and elevation in FD. An experiential view walking along BlanchFigure 5E along with a more wholistic night viseen in Figure 5 F.
5
FIG. 5C
FIG. 5BFIG. 5D
FIGURE 5A
5
7/27/2019 Amazon Campus Development
18/31
Project #3015022 DRB Recommendation Meeting #3 October 22, 2013
18
5Access
Parking Entry Diagram\Blanchard Street
9-6
5-6
5
6
GARAGE EXIT
12
9-910-3
FIGURE 5B
5
7/27/2019 Amazon Campus Development
19/31
5Access
Loading Entry DiagramBlanchard Street
Project #3015022 DRB Recommendation Meeting #3 Octo
6
5-6
5
9-6
28
1416
FIGURE 5C
5
7/27/2019 Amazon Campus Development
20/31
5Access
Parking Entry Diagram6th Avenue
Project #3015022 DRB Recommendation Meeting #3 October 22, 2013
20
6TH AVENUE
GARAGE ENTRY/EXIT
14
9
25
98-6
FIGURE 5D
5
7/27/2019 Amazon Campus Development
21/31
Project #3015022 DRB Recommendation Meeting #3 Octo
5Access
Street Level View Along Blanchard
FIGURE 5E
5
7/27/2019 Amazon Campus Development
22/31
Project #3015022 DRB Recommendation Meeting #3 October 22, 2013
22
5Access
Street Level View Along Blanchard
FIGURE 5F
Section Cut - Figu
6SECOND RECOMMENDATION MEETING : AU
7/27/2019 Amazon Campus Development
23/31
Project #3015022 DRB Recommendation Meeting #3 Octo
6Exterior Treatment of Tower
Podium Wall Section and Cladding Detail
BOARD RECOMMEND
Exterior Treatment of Tower:
a. The Board agreed that proposed colors provand resh palette, as well as combination otextures. (A-2, B-4, C-2)
Physical material samples and their associathe tower are shown in Figure 6C. A wall secttower podium along Blanchard Street is showand closer views showing screening elemenFigure 6B.
b. The Board would like to see additional demeeting, including elevations o the previdesign.
The previously approved building elevationsFigure 6D. Proposed building elevations are s6E,F,G & H.
6
FIGURE 6A FIGURE 6B
6
7/27/2019 Amazon Campus Development
24/31
Project #3015022 DRB Recommendation Meeting #3 October 22, 2013
24
6Exterior Treatment of Tower
Street Level View and Materials
Froste d Glass Screenwa ll Whit e La minate d Glass (3 Colors)One Side Only
Orange Laminated Glass (3 Colors)One Side Only
Aluminum Curtainwall MullionTranslucent Blue Laminated Glass Dark Spandrel GlazingOpaque White Frit Stri
FIGURE 6C
6
7/27/2019 Amazon Campus Development
25/31
Project #3015022 DRB Recommendation Meeting #3 Octo
6Exterior Treatment of TowerPrevious Tower Podium Elevations
FIGURE 6D
6th Ave Elevation Lenora Elevation - Through Plaza
7th Ave Elevation Blanchard Elevation
6
7/27/2019 Amazon Campus Development
26/31
Project #3015022 DRB Recommendation Meeting #3 October 22, 2013
26FIGURE 6E
6Exterior Treatment of TowerTower and Podium - Elevations up to 60
7th Ave Elevation
Blanchard
7th Ave
6
7/27/2019 Amazon Campus Development
27/31
Project #3015022 DRB Recommendation Meeting #3 Octo
FIGURE 6F
6Exterior Treatment of TowerTower and Podium - Elevations up to 60
6th Ave Elevation
6th Ave
Blanchard
6
7/27/2019 Amazon Campus Development
28/31
Project #3015022 DRB Recommendation Meeting #3 October 22, 2013
28FIGURE 6G
6Exterior Treatment of TowerTower and Podium - Elevations up to 60
Lenora Elevation from Midblock Open Space
6thAve
6
7/27/2019 Amazon Campus Development
29/31
Project #3015022 DRB Recommendation Meeting #3 Octo
FIGURE 6H
6Exterior Treatment of TowerTower and Podium - Elevations up to 60
Blanchard Elevation
7thAve
Blanchard
APPENDIX
7/27/2019 Amazon Campus Development
30/31
Project #3015022 DRB Recommendation Meeting #3 October 22, 2013
30
APPENDIXSummary of Development Standard Departures
Item# Development Standard Requirement Departure Amount Requested Rationale Downtown Design Guidelines Affected Diagram
1SMC 23.49.056.B.2 Upper Level
Development Standards
The maximum length of a facade without modulation
located within 15 feet of a property line is 80 feet long for
the portion of a faade that is above an elevation of 500
feet.
The maximum length of a facade without modulation located within 15 feet
of a property line is requested to be up to 95 feet long for the portion of a
faade that is above an elevation of 500 feet.
This departure would permit the faade length of the tall office tower
along Seventh Avenue to continue uninterrupted from level 4 all the way
up to the top of the building, permitting the structure to more
appropriately meet the sky
A-1 Respond to the physical environment
A-2 Enhance the skyline
B-4 Design a Well Proportioned and Unified Building
See Diagram 1
2SMC 23.49.058.F Upper Level
Setbacks
Under Upper Level Setbacks in DOC-2, along a designated
green street, a continuous upper level setback of 15 feet
shall be provided on the street frontage abutting the green
street at a height of 45 feet.
We request a departure to permit an architectural element that is approx. 18inches thick to intrude into the upper level setback zone at an elevation 45
feet above sidewalk level. This element is 5 feet deep and will be set back 10
feet from the street property line. It will extend 5'-6" into the upper level
setback zone above 45 feet at the corner of Blanchard and Seventh Avenue
and taper down to zero feet for a running distance of 112 feet along
Blanchard.
This architectural element will permit a major horizontal architectural
feature of the faade to continue uninterrupted along the entire length of
Blanchard Street.
B-2 Create a transition in bulk and scale
B-4 Design an well proportioned and unified building
C-2 Design a faade of many scales
C-3 Provide active-not blank facades
See Diagram 2
3
SMC 23.54.035.C.2 Loading Berth
Requirements and Space
Standards
The standard length of a loading berth shall be 10 feet x 35
feet.
On Block 19 at the main loading dock, two 10' x 35' deep loading berths and
two 10' x 25' deep loading berths will be provided. A design departure is
requested to permit six loading berths to be van sized spaces measuring 8'-6"
x 19'-0'. We further request that one additional van size stall measuring 8'-6"
x 19'-0" and located on level P1 of the garage be provided to service the retail
spaces on each block.
A high percentage of the deliveries made to Amazon buildings are done by
carriers such as Apex, UPS which smaller vans that do not require standard
loading berths sized at 10' x 35'. This will enable to loading dock to be
sized more efficiently to meet the true loading demands of the building
user. A more compact loading dock will also permit more space for uses
such as retail at the ground level.
A study of dock capacity and loading requirements has been prepared by
Heffron Transportation dated May 17, 2012 to support the following:
- 9 loading berths would adequate serve the peak office demand at each
of the buildings.
- 5 (or more) of those spaces could be reduced in size.
- If the building were ever converted to a multi-tenant building, theloading dock is still adequate (and in fact would probably be oversized).
C-1 Promote pedestrian interaction.
C-3 Provide active not blank facades
See Diagram 3A for layout of loading dock on
Block 19. See Diagrams 3B for proposed location
of van parking stall for retail loading on P1 level
of the garage on Block 20.
4SMC 23.49.058.C Upper Level
Width Limit
The maximum faade width for any portion of a building
above 240 feet shall be 145 feet along the North/South axis
of the site.
We request a departure to allow 10 feet of extra building width between
floors 18 to 25, or approximately 110' feet in building height.
The staggered intersecting volumes which make up the massing of the
tower have been carefully proportioned to step gracefully up to a slender
final floorplate. By adding 10 feet of floor width between levels 18 to 25
we are able to keep the top of the tower from growing bulky. Additionally,
the tower maintains a rational, vertical proportion on the lowest mass
which steps down to the midblock open space. The proposed floorplate
widths adhere to the highly efficient planning module established
throughout the project.
A-2 Enhance the skyline
B-4 Design a well proportioned and unified buildingSee Diagram 4
Previou
PreviouNot ReqPropos
Previou
Propos
Block 19
APPENDIX BOARD RECOMMENDSECOND RECOMMENDATION MEETING : AU
7/27/2019 Amazon Campus Development
31/31
Project #3015022 DRB Recommendation Meeting #3 Octo
APPENDIXDevelopment Standard Departure - Tower Width Above 240
Departure #4 Diagram
BOARD RECOMMEND
Upper Level Tower Width Limits:
This is a new departure proposed as part oeort. The Board was inclined towards such aresults in better tower massing and proportion
Departure request unchanged.
A