20
Commercial Viability Analysis for Solar thermal Power Generation Systems under New Market and Regulatory developments in India Final Semester Major Project Report Presented by – Anudeep Yadav Roll No 10

Commercial Viability Analysis For Solar Thermal Power 2003 Pps

Embed Size (px)

Citation preview

Page 1: Commercial Viability Analysis For Solar Thermal Power 2003 Pps

Commercial Viability Analysis for Solar thermal Power

Generation Systems under New Market and Regulatory

developments in India

Final Semester Major Project Report Presented by –

Anudeep YadavRoll No 10

Page 2: Commercial Viability Analysis For Solar Thermal Power 2003 Pps

Content• Solar Energy - A Promising Energy Source for India.• Solar Thermal Power Generation-Global Achievements So Far.• Solar Thermal Power Generation-India’s Experience.• Jawaharlal Nehru National Solar Mission-Renewed focus.• Concentrated Solar Power –Commercial Tech.• Concentrated Solar Power -Indian Market & Regulatory

Proposals.• Concentrated Solar Power-Key Indian Project Proposals• Technical Issues• Economic Issues• Recommendations

Anudeep Yadav ;Roll no 10; MBA-Power Management,NPTI

Page 3: Commercial Viability Analysis For Solar Thermal Power 2003 Pps

Solar Energy - A Promising Energy Source for India

Anudeep Yadav ;Roll no 10; MBA-Power Management,NPTI

•Annual global radiation varies from 1600 to 2200 kWh/m2•The direct normal insolation(DNI) over Rajasthan varies from 1800 kWh/m2 to 2600 kWh/m2.•5 trillion kWh/year theoretical potential •Sunny areas

– Most of the country receives more than 4kWh/m2 /day– Average of 300 sunny days in the most part of the country

• Theoretically If one percent of the land is used to harness

solar energy for electricity generation at an overall efficiency of 10%;

492 x 106 MU/year electricity can be generated .

* TERI Calculations

Page 4: Commercial Viability Analysis For Solar Thermal Power 2003 Pps

Solar Thermal Power Generation-Global Achievements So Far

Anudeep Yadav ;Roll no 10; MBA-Power Management,NPTI

*Courtesy DLR- IEA 2009 Report

Total Installed Capacity ~ 600 MW Troughs- Most mature Tech.Towers Next in lineDish - Yet to be Demonstrated.

USA and Spain are the key Markets to look forward to.

*

Page 5: Commercial Viability Analysis For Solar Thermal Power 2003 Pps

Solar Thermal Power Generation-India’s ExperienceIndigenous Attempt

• By MNES ,parabolic trough collector technology (line focusing) at Gwalpahari, Gurgaon. • 50kW capacity • Commissioned in 1989 and operated till 1990 ;Shut down due to lack of spares

Anudeep Yadav ;Roll no 10; MBA-Power Management,NPTI

Integrated Solar Combined Cycle Power Plant ,140MW (Mathania) Raj. 35MW Solar

•Began the GEF work program in 1996. *• GEF contribution of US$49 million; a total financing volume of US$245 million (GoI and KfW, and executed by KfW)•Prequalification in 2001; 1 international, BHEL and L &T ( both with SOLEL).•Only BHEL , L&T remained finally. Techno economic difficulty, none submitted.

STATUS (as reported by Magazine “Project Monitor” on 3r d April 2006)• International Funds are transferred to some other project.• Project needs revised techno-economic feasibility study.• RRECL has not been able to sign Gas Supply Agreement with GAIL.

*www.Solarpaces.org

Shelved and now

Reopened Again

Page 6: Commercial Viability Analysis For Solar Thermal Power 2003 Pps

Jawaharlal Nehru National Solar Mission-Renewed focus on solar

• 3-phase approach– Up to 2012-13 as Phase 1. installed Cap - 1100 MW– From 2013-17 as Phase 2. installed Cap - 4000 MW– From 2017-22 as Phase 3. installed Cap -20000 MW

• Demonstration projects in Phase I– 50-100 MW Solar thermal plant with 4-6 hours’ storage (plant load factor up to 40%).– A 100-MW capacity parabolic trough technology based solar thermal plant.– A 100-150 MW Solar hybrid plant with coal, gas or bio-mass to address variability and

space-constraints.

• Promotion proposals.– Local demand creation, right incentives & large government pilot/demonstration

programs.– Financing & Incentives , import duty, low rate loans, priority sector lending etc

Anudeep Yadav ;Roll no 10; MBA-Power Management,NPTI

Page 7: Commercial Viability Analysis For Solar Thermal Power 2003 Pps

Concentrated Solar Power Commercial Tech• CSP Trough

– Most mature commercial technology– Latest Functional Plant– Andasol (Spain)

• 3 x 49.9 Mwe• Solar to Electrical Eff 16 %• 7.5 full load hours Storage. Annual CUF – 40 %• Investment ~ 750 million Euro ; 80 % debt financed• Approx 32 crores/MW; Tariff ~Rs 17.5/unit• 512000 m2 / 200 Ha of collectors /plant.• 50 member permanent Staff.

Anudeep Yadav ;Roll no 10; MBA-Power Management,NPTI

*Solar Millennium LLC & Flagsol

*

Page 8: Commercial Viability Analysis For Solar Thermal Power 2003 Pps

Concentrated Solar Power Commercial Tech- Contd

Anudeep Yadav ;Roll no 10; MBA-Power Management,NPTI

• Solar Tower –second most mature commercial Tech.• Latest Functional Plants – PS 10, PS20 ( Spain)

• 11 MW Sat Steam Rx, 1 hour Storage, backup NG ( 15%)

• Solar resource- 2102 KWh/m2/yr ; Land 55 Ha• Tariff – 27.12Euro cent/KWh , 25 yrs PPA.• Solar to Elect Efficiency – 21.4%.• Plant Cost – 33 Million Euro , Rs~ 19.5Crore /MW.

Page 9: Commercial Viability Analysis For Solar Thermal Power 2003 Pps

• State of Gujarat• Not available for MNRE facilitated projects.• Valid for 500MW of Capacity , min cap of 5 MW.• Valid upto March 2014.• No Fossil fuel allowed.• No Electricity duty.• Tariff of 9 Rs /unit for 12yrs.• Specifies penalty for Discom to fail meet RPO @ Rs

12/unit.

Concentrated Solar Power -Indian Market & Regulatory Proposals

• Incentives are mutually exclusive between State policies and MNRE.

• MNRE , GBI Scheme– Limited to total of 50 MW, 10 MW/state and 5 MW/ developer. Policy

limited to 1 year with revision on annual basis. – Not avail with Acc Depreciation.– No backup fuel allowed.– Max Period of 10 yr.– Connected to PPA with Utility with cap of Rs 9.5/unit.

Anudeep Yadav ;Roll no 10; MBA-Power Management,NPTI

• State of Rajasthan• Ten year Promotional Tariff ( incl. GBI) to be Rs 13.18/unit.• Plans to establish a Solar Energy Enterprises Zone

(SEEZ) in the districts of Barmer, Jaisalmer and Jodhpur by offering a package of incentives to private investors.

Back

Page 10: Commercial Viability Analysis For Solar Thermal Power 2003 Pps

Concentrated Solar Power -Indian Market & Regulatory Proposals-contd.

• CERC Solar Thermal T &C for Tariff.– Benchmark Capital Cost Norm Rs 1530 Lakhs/MW – Tariff Period- 25 yrs.– Land Costs- 0.18 crores/MW ( @ 6 Acre/MW,3L/Acre).– Loan Tenure- 10 years.– Normative CUF- 23 %– Depreciation- 7 % ( 1st 10 yrs)– RoE – 19% and 24 % – O & M Expenses 13Lakh/MW– Aux Cons – 10 %

Anudeep Yadav ;Roll no 10; MBA-Power Management,NPTI

Page 11: Commercial Viability Analysis For Solar Thermal Power 2003 Pps

Concentrated Solar Power-Indian Project Proposals

Anudeep Yadav ;Roll no 10; MBA-Power Management,NPTI

• 10 MW SOLAR THERMAL Tower Power Project Acme Telepower, (Bikaner )Rajasthan.

• Uses Esolar’s new technology.– Not yet proved. – Pilot Plant of 2.5 x2 ( 5 MW) Operational since last

year.– No Performance Data yet available.

Page 12: Commercial Viability Analysis For Solar Thermal Power 2003 Pps

Concentrated Solar Power-Indian Project Proposals- Contd

• Solar Thermal Power Plant at Bap, Jodhpur, Rajasthan based on Parabolic dish-sterling technology.

• Modular 3kW 3340 systems Total Cap . 10 MW• Land Requirement - 70 Acres.• EPC Contractor - INFINIA Corp, USA

back

Anudeep Yadav ;Roll no 10; MBA-Power Management,NPTI

Page 13: Commercial Viability Analysis For Solar Thermal Power 2003 Pps

Technical Issues• Major Cost Forecasts Base

– Sargent & Lundy Cost & Performance Forecast.Allocated cost reduction due to • Volume production (learning and improvements in manufacturing)• Plant scale-up (increasing size), and • Technology advances (RD&D)• Assumes cost in range of Rs 6/unit to Rs 4.5/unit.• Tower Plants overtake the cheapest source from trough plants

before 2010.

Anudeep Yadav ;Roll no 10; MBA-Power Management,NPTI

• Problems • Assumed increased deployment hasn’t been found to happen.• Costs in regions of SW USA or Upper EGYPT inc by at least 30 % when

in regions like India.*• Technology cost forecasts for tower are proved mistaken.• Major Costs of Tower Plants • Tech – 23%• Scale up & Volume Prod.

*Greenpeace Solar Outlook

Page 14: Commercial Viability Analysis For Solar Thermal Power 2003 Pps

Technical Issues-Contd.• Insolation Level Measurement of specific sites.• Use of New Unproved Technologies in tower

systems.• Unviable small scale plants. ( 5 – 10 MW)*• Extent of indigenization is not high.

– Structures (precision assembly)– Power Block (specialized turbine)– Receiver/ Receiver tubes(very specialized )– Mirror surfaces/heliostats- doubtful(specialized low

thickness upto 2 mm,hi reflectivity 92%,light weight)Anudeep Yadav ;Roll no 10; MBA-Power

Management,NPTI

• Unreliable Dish Stirling Systems• No utility scale plant online yet.• Highest Land requirements (10 – 20 acre/Mw) ,

even more than PV .• Infinia corp. haven't yet delivered high

efficiencies.• Major issues with maintenance, mean time

between failure is reported to be around 40 hrs in a testimony of expert before US Energy Commision.

*Expert Opinion,Sandia

Labs

Page 15: Commercial Viability Analysis For Solar Thermal Power 2003 Pps

Economic Issues• Capital Costs

– Technology of proposed projects. 1 – Capital costs – Min .15.9 Crores (w / capital subsidy)*– O & M Costs – Conn. to Capacity^; Staff Training

• Capacity Utilization – Actual values depend on

• Insolation• Extent of Storage• Backup Fuel Allowances

– Best Case Values are around 15 to 21 %

Anudeep Yadav ;Roll no 10; MBA-Power Management,NPTI

*Data on Executed Tower Project in Spain ,Aus Govt

Report on HTSP Roadmap

^ based on Experiences in US SEGS plants.

8%-to- 2 % Points Loss

Page 16: Commercial Viability Analysis For Solar Thermal Power 2003 Pps

• Effect of Land level in design of PS 10 ,Spain

Economic Issues-Contd• Hidden costs

– Land development.• Slope of land is key issue. ( 1%)• Continuous areas of sufficient solar field as per

requirement should be available.

Anudeep Yadav ;Roll no 10; MBA-Power Management,NPTI

USA CSP Resource Potential before applying filters of

•Land slope •Continuous Land availability.•DNI value

USA CSP Resource Potential After applying filters of

•Land slope <= 1%•Continuous Land availability.- 10 Kms•DNI value - 6.75 Kwh/m2/day

Page 17: Commercial Viability Analysis For Solar Thermal Power 2003 Pps

Economic Issues-Contd• Incentives mismatch

– USA– Renewable portfolio standards of 20 to 30 %– Federal Cash Grant of 30 % of expenditures, eligible to commercial

systems.– Commercial/Residential Tax Credit- not avail. With grant, income

tax liability net of local grants.– Federal Corp. Depreciation :- Accelerated upto the level of 50 % in

first year ,also called as Modified Accelerated Cost-Recovery System (MACRS), classifies several renewable projects as 5 year property.

– Federal Loan guarantee Program:- Allows guarantees for long term repayments upto 90 % useful life or

30 years.

Anudeep Yadav ;Roll no 10; MBA-Power Management,NPTI

• Incentives mismatch– Spain

– Solar thermal focused special regulations.attracted 800 Mwe Plants.

– Special mechanism of high feed in tariffs provided along with capital subsidies from state govt.s and EU

– Option 1 – fix tariff of 0.28 Euro/unit.– Option 2 – combination of market price ~ 0.16euro +premium

upto 0.26 euro /unit subject to min (0.26 euro) and max (0.35 euro), 25 yrs., then 80 %

– Allowance of Fossil Fuel backup upto 15 %.

• Incentives mismatch– India

Page 18: Commercial Viability Analysis For Solar Thermal Power 2003 Pps

Recommendations• The Actual Assumptions based on Study analysis gives

the tariff in ranges of Rs 27 – 22/unit.

– Capital costs ranging 16 to 19 crores/MW.– O &M Costs indexed to Capital costs. ( ~ 2 %).– Lower CUFs ( 18 to 21 %).– Motive to produce reliable and dispatch able capacities.

Anudeep Yadav ;Roll no 10; MBA-Power Management,NPTI

• Key Parameters having effect on tariffs are• CUF.• Loan Interest Rates.• Loan Tenure.• Capital subsidy.

• Allow Fossil fuel back up with fixed percentages(10-15%).• Provide for state support and incentives for larger scale

plants for establishing utility scale plants. • Small Scale demonstrator plants should be setup with

state as minority stakeholder to establish Life Cycle Costs to set up accurate T & C of Tariff.

• Develop a holistic approach for development of reliable power source, providing scope for storage .

• Prepare detailed DNI database for prospective Solar thermal Sites.

Page 19: Commercial Viability Analysis For Solar Thermal Power 2003 Pps

Queries are welcome !Anudeep Yadav ;Roll no 10; MBA-Power

Management,NPTI

• Ministry of New and Renewable Energy sources, http://mnes.nic.in/pdf/mission-document-JNNSM.pdf

• Central electricity regulatory commission, www.cercind.gov.in

• Various status reports of previous developments in solar thermal power generation across the world; www.osti.gov/energycitations

• Communications with Dr. Tom Mancini, CSP program Director , Sandia Labs USA

• SOLARPACES website, for detailed study reports, http://www.solarpaces.org/CSP_Technology/docs

• Concentrating Solar Power Reports, http://ec.europa.eu/energy/res/publications/doc/

• Esolar’s website; http://www.esolar.com/sierra_fact_sheet.pdf

• Estella Solar; http://www.estelasolar.eu/fileadmin/ESTELAdocs/documents

• Rajasthan Electricity regulatory commission; http://www.rerc.gov.in/Order/Tariff_for_Solar_Power_Order2APR08.pdf

• Presentations by Rainer Aringhoff, President Solar Millenium LLC, Berkley; 10 /1/2008 Final Report on “ Technical data, costs, and life cycle inventories of solar thermal power plants" by Peter Viebahn, Stefan Kronshage, Franz Trieb (DLR), Yolanda Lechon (CIEMAT) funded EU , release 2008.

• National Renewable Energy Labs online library for accessing

various reports including Sargent and Lundy's analysis; http://www.nrel.gov/csp/troughnet/pdfs/2007 to 2009.

• • Green peace report on solar thermal

http://www.greenpeace.org/raw/content/international/press/reports/concentrating-solar-power-2009.pdf

• IEA website reports on CSP; http://www.iea.org/papers/2009/CSP_Brochure.pdf

• World bank’s Global Environmental Facility Report on status of solar thermal plants, 2005.

• HIGH TEMPERATURE SOLAR THERMAL TECHNOLOGY ROADMAP for Australia, by Wyld Group Pty Ltd for Australian states of Victoria and New South wales; 2008 .

• European Commission (2007), Concentrating Solar Power: Main Projects document; Supported By The Commission, Brussels.

References

Page 20: Commercial Viability Analysis For Solar Thermal Power 2003 Pps

Major Modified Assumptions according to Real project experiences .(Tower)

• Capital Costs- 15.9 Cr/MW and more.• O &M Costs- 2% - 2.5% of Cap Costs.• C U F 19 %

back

Anudeep Yadav ;Roll no 10; MBA-Power Management,NPTI