Citation preview
4 6WESTGATE
RD
STRUCTURAL DESIGNTEAM 2
RYAN THOMPSONGABRIEL ROBINS
JONATHAN SOUTHGATE
4 6WESTGATE
RDINTRO UCTION
“...Appointed to design a new building tailored to the Arts, both visual & auditory, exploring the ver-tical space...”
SCHEDULE OF ACCOMMODATION
• Open Plan Gallery Spaces• Visual & Auditory Spaces• Individual studios• Toilets,• Accessible Lift• Reception area• Building services provision
4 6WESTGATE
RD
SITE & CONS RAINTS
Physical Constraints
• Existing buildings on both flanks• Vacant Plot at the rear• Existing Footpath• Front Facade line
4 6WESTGATE
RD
DATA AQUISI ION
4 6WESTGATE
RD
4 6WESTGATE
RD
PRECED NT
Huangshan Theatre
Area - 13,200sq Seats - 800Stage - 27 x 27m Cost - £23,000,000Construction - June 2011
4 6WESTGATE
RD
PRECED NT
Architects: K-architecturesLocation: Saint-Nazaire, FranceConsultants: Khephren (structure)Budget: 16.4 M€ Area: 3,900 sqmYear: 2012
LE HEATRE
4 6WESTGATE
RD
DESIGN DEVELOPM NT
4 6WESTGATE
RD
SPATIAL D SIGN
4 6WESTGATE
RDSKETCH ESIGN
4 6WESTGATE
RD
INITIAL D SIGN
4 6WESTGATE
RD
STRUCTURAL DEV LOPMENT
4 6WESTGATE
RD
FACADE DEV LOPMENT
4 6WESTGATE
RD
CURRENT D SIGN
4 6WESTGATE
RD
4 6WESTGATE
RD
GENERAL ARRANGEMENT & INTERIOR DESIGN GROUND FLOOR
4 6WESTGATE
RDSTRUCTURAL BUIL UP
4 6WESTGATE
RDSTRUCTURAL BUIL UP
4 6WESTGATE
RDSTRUCTURAL BUIL UP
4 6WESTGATE
RDSTRUCTURAL BUIL UP
4 6WESTGATE
RDSTRUCTURAL BUIL UP
4 6WESTGATE
RDSTRUCTURAL BUIL UP
4 6WESTGATE
RDSTRUCTURAL BUIL UP
4 6WESTGATE
RDSTRUCTURAL BUIL UP
4 6WESTGATE
RDSTRUCTURAL BUIL UP
4 6WESTGATE
RD
STRUCTURAL ISSU S
4 6WESTGATE
RD
SITE BARRIER
BASEMENT BARRIER
SITE BARRIER
SUPPLY ROAD
EXISTING TREES
BASEMENT BARRIER
C M
ISSUES
DEMOLITIONEXCAVATIONSITE ACCESSSAFETYFUTURE MAIN-TENANCE