Transcript

WTG 05

WTG 02

WTG 41 WTG 27

WTG 28WTG 34

WTG 40

WTG 29WTG 35

WTG 26

WTG 30

WTG 18

WTG 01

WTG 42

WTG 36

WTG 31

WTG 38

WTG 48

WTG 43

WTG 12

WTG 47

WTG 44

WTG 32

WTG 33

WTG 37

WTG 19

WTG 39

WTG 21

WTG 25WTG 17

WTG 09

WTG 11

WTG 46

WTG 23

WTG 08

WTG 45

WTG 16

WTG 20

WTG 10

WTG 22

WTG 06

WTG 15

WTG 24

WTG 07

WTG 13

WTG 14

WTG 03

WTG 04

Waddamana

IDF 1

IDF 2

IDF 3

IDF 4

IDF 5

IDF 6

IDF 7

IDF 8

IDF 9

IDF 10

IDF 11

IDF 12

IDF 13

IDF 14

IDF 15

IDF 16

PROJECT

TITLE

DRAWING No. REV

Cattle Hill Wind FarmDesign Report Layout as Amended

as at 01 April 2019

LEGEND

Disclaimer:This plan was prepared for the purpose and exclusive use of Goldwind Australia.Goldwind Australia gives no warranty in relationto the data (including accuracy, reliability, completeness or suitability) and accepts no liability for any loss, damage or costs (including consequential damage) relating to any use of the data in this map.

Coordinate System: GDA94 MGA55

0 875 1,750437.5 Metres

Draft

4/04/2019

1:30,000 @ A3

STATUS

DATE

SCALE

CHWF_DES_012_01K Site Layout

J.Bembrick

C.McArlein

I.Mackey

APPROVED

PRODUCED

CHECKED

01K

Water Extraction PointWater Extraction Pad and InfrastructureWater Extraction LineProposed AccessUnderground CablingSite ExtentWaddamana SubstationExisting MetMastProposed Permanent MetMastProposed Temporary MetMast

Proposed Wind TurbineBatching PlantCrib Hut / LaydownOperation and Maintenance FacilityConstruction CompoundSubstationSpoil AreaIdentiflight StationIdentiflight Cabling

Recommended