1
WTG 05 WTG 02 WTG 41 WTG 27 WTG 28 WTG 34 WTG 40 WTG 29 WTG 35 WTG 26 WTG 30 WTG 18 WTG 01 WTG 42 WTG 36 WTG 31 WTG 38 WTG 48 WTG 43 WTG 12 WTG 47 WTG 44 WTG 32 WTG 33 WTG 37 WTG 19 WTG 39 WTG 21 WTG 25 WTG 17 WTG 09 WTG 11 WTG 46 WTG 23 WTG 08 WTG 45 WTG 16 WTG 20 WTG 10 WTG 22 WTG 06 WTG 15 WTG 24 WTG 07 WTG 13 WTG 14 WTG 03 WTG 04 Waddamana IDF 1 IDF 2 IDF 3 IDF 4 IDF 5 IDF 6 IDF 7 IDF 8 IDF 9 IDF 10 IDF 11 IDF 12 IDF 13 IDF 14 IDF 15 IDF 16 PROJECT TITLE DRAWING No. REV Cattle Hill Wind Farm Design Report Layout as Amended as at 01 April 2019 LEGEND Disclaimer: This plan was prepared for the purpose and exclusive use of Goldwind Australia. Goldwind Australia gives no warranty in relation to the data (including accuracy, reliability, completeness or suitability) and accepts no liability for any loss, damage or costs (including consequential damage) relating to any use of the data in this map. Coordinate System: GDA94 MGA55 0 875 1,750 437.5 Metres Draft 4/04/2019 1:30,000 @ A3 STATUS DATE SCALE CHWF_DES_012_01K Site Layout J.Bembrick C.McArlein I.Mackey APPROVED PRODUCED CHECKED 01K Water Extraction Point Water Extraction Pad and Infrastructure Water Extraction Line Proposed Access Underground Cabling Site Extent Waddamana Substation Existing MetMast Proposed Permanent MetMast Proposed Temporary MetMast Proposed Wind Turbine Batching Plant Crib Hut / Laydown Operation and Maintenance Facility Construction Compound Substation Spoil Area Identiflight Station Identiflight Cabling

Waddamana WTG 12 WTG 14 WTG 09 WTG 15...wtg 05 wtg 02 wtg 41 wtg 27 wtg 28 wtg 34 wtg 40 wtg 29 wtg 35 wtg 26 wtg 30 wtg 18 wtg 01 wt 42 wtg 36 wtg 31 wtg 38 wtg 48 wtg 4 3 wtg 12

  • Upload
    others

  • View
    8

  • Download
    0

Embed Size (px)

Citation preview

WTG 05

WTG 02

WTG 41 WTG 27

WTG 28WTG 34

WTG 40

WTG 29WTG 35

WTG 26

WTG 30

WTG 18

WTG 01

WTG 42

WTG 36

WTG 31

WTG 38

WTG 48

WTG 43

WTG 12

WTG 47

WTG 44

WTG 32

WTG 33

WTG 37

WTG 19

WTG 39

WTG 21

WTG 25WTG 17

WTG 09

WTG 11

WTG 46

WTG 23

WTG 08

WTG 45

WTG 16

WTG 20

WTG 10

WTG 22

WTG 06

WTG 15

WTG 24

WTG 07

WTG 13

WTG 14

WTG 03

WTG 04

Waddamana

IDF 1

IDF 2

IDF 3

IDF 4

IDF 5

IDF 6

IDF 7

IDF 8

IDF 9

IDF 10

IDF 11

IDF 12

IDF 13

IDF 14

IDF 15

IDF 16

PROJECT

TITLE

DRAWING No. REV

Cattle Hill Wind FarmDesign Report Layout as Amended

as at 01 April 2019

LEGEND

Disclaimer:This plan was prepared for the purpose and exclusive use of Goldwind Australia.Goldwind Australia gives no warranty in relationto the data (including accuracy, reliability, completeness or suitability) and accepts no liability for any loss, damage or costs (including consequential damage) relating to any use of the data in this map.

Coordinate System: GDA94 MGA55

0 875 1,750437.5 Metres

Draft

4/04/2019

1:30,000 @ A3

STATUS

DATE

SCALE

CHWF_DES_012_01K Site Layout

J.Bembrick

C.McArlein

I.Mackey

APPROVED

PRODUCED

CHECKED

01K

Water Extraction PointWater Extraction Pad and InfrastructureWater Extraction LineProposed AccessUnderground CablingSite ExtentWaddamana SubstationExisting MetMastProposed Permanent MetMastProposed Temporary MetMast

Proposed Wind TurbineBatching PlantCrib Hut / LaydownOperation and Maintenance FacilityConstruction CompoundSubstationSpoil AreaIdentiflight StationIdentiflight Cabling