US Army Corps of EngineersBUILDING STRONG
Trinity River Corridor Project Update
Col. Charles H. Klinge
Commander, Fort Worth DistrictUS Army Corps of Engineers
Jill A. Jordan, P.E.Assistant City ManagerCity of Dallas
Dallas City Council briefingAug. 21, 2013
1
7/27/2019 Trinity River Corridor Project Update
3/95
Purpose
To provide an overview of the Trinity RiverCorridor Project
To introduce the US Army Corps of Engineers
(Corps)
To outline next steps
2
7/27/2019 Trinity River Corridor Project Update
4/95
Trinity River Corridor Project Partners
US Army Corps of Engineers (Corps) City of Dallas Dallas County North Texas Tollway Authority (NTTA)
Texas Dept. of Transportation (TxDOT) Fed. Highway Administration (FHWA) Texas Commission on
Environmental Quality (TCEQ) Environmental Protection Agency (EPA)
Federal Emergency ManagementAgency (FEMA) North Central Texas Council of
Governments (COG)
3
Federal, State and Local Partners
7/27/2019 Trinity River Corridor Project Update
5/95
Trinity River Corridor ProjectNon- Profit Partners
Trinity Trust Foundation
Trinity Commons Foundation Audubon Society Boone Family Foundation Circle Ten Boy Scouts Dallas Camera Club Dallas Running Club
Downtown Dallas EQUEST Groundwork Dallas Girl Scouts of Northeast Texas River Ranch Education Charities Ocean Conservancy Scottish Rite Hospital Student Conservation Association Texas Horse Park Foundation Trinity Bird Count Trinity Strand Trail The Mission Continues
4
7/27/2019 Trinity River Corridor Project Update
6/95
AT&T
CVS Caremark Dallas Morning News Dr. Pepper/Snapple National Fish & Wildlife/FedEx Hilton Anatole Kroger Lukes Locker Matthews Southwest Methodist Hospital Dallas Nestle Waters NorthPark Center
Oncor Reliant Energy Sprint Southwest Airlines Xerox
Wells Fargo
Trinity River Corridor ProjectPrivate Sector Partners
5
7/27/2019 Trinity River Corridor Project Update
7/95
Fort Worth DistrictUS Army Corps of Engineers
Who we are: Created 1950 after 1949 Fort Worth flood
1,200 civilian and military employees half in Fort Worth
What we do:Military Works: Support the needs of 11 Army and 5 Air Force installations
across Texas, New Mexico and Louisiana
Civil Works: Ten river basins covering 53% of the state
Levee systems in 16 Texas counties 25 lakes containing 314 parks
Corps lakes provide 30% of Texas water supply 35 current ecosystem restoration projectsOverseas contingency response: 27 employees
deployed to Afghanistan in MayEmergency response: District employees
deploy nationwide for disaster relief
6
7/27/2019 Trinity River Corridor Project Update
8/95
930 Miles
15 hrs Disaster Response
HydropowerGeneration
Land Acquisition
Flood Protection
MilitaryConstruction
(Army)
Military Construction
(Air Force)
Core Drilling
MilitaryConstruction
(Medical)
EnvironmentalRestoration/ FUDs
Water Supply
Recreation
Interagency andInternationalSupport
Fort Worth District Mission Areas
7
7/27/2019 Trinity River Corridor Project Update
9/95
Overview
8
The Trinity River corridor projects address regionalconcerns but flood risk reduction is the cornerstone.
4 inter-related components of the projects are:
I. Flood Risk ReductionII. Ecosystem Restoration
III.TransportationIV.Recreation
7/27/2019 Trinity River Corridor Project Update
10/95
200,000 people work or live behind the levees
$12.2 billion in floodplain investment
9
1989 flood40-year event
I. Flood Risk Reduction
7/27/2019 Trinity River Corridor Project Update
11/9510
Corps Lakes provideflood control, watersupply andrecreation
Benbrook Grapevine Lavon Lewisville Joe Pool Ray Roberts
Flood Risk Reduction
7/27/2019 Trinity River Corridor Project Update
12/95
Flood Risk Reduction
11
Two Corps ofEngineersprojects
DallasFloodwayExtension
DallasFloodway
7/27/2019 Trinity River Corridor Project Update
13/95
Flood Risk Reduction History
1949Fort Worth flood kills 11, flood control reservoir
construction advances (Lewisville, Grapevine, Benbrook) 1958Corps completes major Dallas Floodway upgrade
1989-1991Worst floods since 1908. 1998Dallas voters authorize record bond package $246
million for Trinity flood control, transportation and recreation.
1908Dallas flood kills 5, leaves 4,000 homeless, citywithout power for days, massive property damage
1928First levee system built in Dallas
MontgomeryWard building,1949 FortWorth flood
12
7/27/2019 Trinity River Corridor Project Update
14/95
Flood Risk ReductionDallas Floodway Project
2007 Water Resources Development Act (WRDA) Section 5141was authorized to raise the levees up to 2 feet, provide recreation(Balanced Vision Plan) and improve pump stations
2009Corps tells City it has rated Dallas Floodway unacceptable;
FEMA withdraws accreditation of levees; city begins maintenanceand construction work to re-certify levees
2010Feasibility Study and Environmental Impact Statementprocess launched to explore what actions are needed to restorecapacity of Dallas Floodway to meet a major storm event.
2011 Corps introduces Risk Assessment process, a cost-effectivemethod for assessing aging dams, to the Dallas Floodway Project. First of this type of study for levees in the Country
Determines Dallas Floodway Project Levees are more resilient and providearound 1,500-year protection
13
7/27/2019 Trinity River Corridor Project Update
15/95
Flood Risk ReductionThe Risk Assessment Process
14
Method for quantifying the risk (likelihood) of various ways a leveecan fail, and the consequences of each failure type
Identifies most cost-effective ways to reduce risk
Overtopping with breach
Successful result: Determined levees moreresilient than previously thought
Narrowed the list of 13potential failure modes to two:
Overtopping with breach ofEast or West Levee
Overtopping of the EastLevee floodwall
7/27/2019 Trinity River Corridor Project Update
16/95
Flood Risk ReductionRecommended Flood Risk Management Plan
15
Raise low spots in the levees up to 3 feet to increase flood conveyanceto 277,000 cubic feet per second. This is enough to convey floodwaters ofa major storm that has a 1/2,500 chance of happening any given year
Cost of these two changes: $6.2 million
Old abandonedAT&SF TrestlesProposed for Removal
The Trestles are on 14-foot-centers and collect debris during flooding andstack up floodwaters into the floodway. The embankment acts as a weirand impedes flow down the floodway system
7/27/2019 Trinity River Corridor Project Update
17/95
Flood Risk Reduction
16
Where leveelow spotswould be
raised
East Levee: 2.6 milesWest Levee: 1.2 miles
7/27/2019 Trinity River Corridor Project Update
18/95
7/27/2019 Trinity River Corridor Project Update
19/95
Flood Risk ReductionInterior Drainage Plan
18
Expanding pump stations, such asPavaho (completed last year),reduces neighborhood flooding. ThisWest Dallas neighborhood regularly
flooded before upgrade.
2006 Flooding near Old Pavaho
Pump Station
2012 New Pavaho Pump Station
7/27/2019 Trinity River Corridor Project Update
20/95
Concept of Able
Flood Risk ReductionInterior Drainage Plan
19
More pump stations under way
Baker Pump Station (2255 IrvingBlvd. near Design District);construction now
28 percent complete
Able Pump Station (600 S.Riverfront near Fuel City) Underdesign. Construction to beginwithin a year.
7/27/2019 Trinity River Corridor Project Update
21/95
7/27/2019 Trinity River Corridor Project Update
22/95
21
Flood Risk ReductionFiscal Year 2014
Brief the Transportation and Trinity River Project CouncilCommittee on the Dallas Floodway Project
Environmental Impact Statement and the upcoming 2014Public Meeting
Award the Upper Chain of Wetlands and Able PumpStation
Open Baker Pump Station
7/27/2019 Trinity River Corridor Project Update
23/95
II. Ecosystem Restoration
Lower Chain of Wetlandshave dual role: New wildlifehabitat in the heart of the citythat also reduces flood risk inthe Dallas Floodway
Fed by treated wastewater,the Lower Chain of Wetlandsthrive through drought and
further clean water before itflows back into Trinity RiverI. Flood Risk Reduction
II. Ecosystem RestorationIII. TransportationIV. Recreation
22
7/27/2019 Trinity River Corridor Project Update
24/95
Ecosystem Restoration
Lower Chain of Wetlands highlights Native plants selected to maximize
food supplies for birds Water levels adjusted to attractseasonal waterfowl
125 bird species have been recordedin the Lower Chain of Wetlands
23
7/27/2019 Trinity River Corridor Project Update
25/95
Ecosystem RestorationPath Forward: More wetlands
Upper Chain of Wetlands(Martin Luther King Jr.Bridge at 11th Street),Phase 1 constructioncomplete
PavahoStorm Water
PolishingWetlandsanticipatedconstructionstart this year
24
7/27/2019 Trinity River Corridor Project Update
26/95
Tire Removal, Planting andClean Up Activities
Staff, contracts and volunteer programs such as Groundwork Dallas and
Southwest Airlines Trinity Conservation Corps aim to remove tires and trashin and along the Trinity
Staff, contracts and volunteer programs plant native species vegetation
2525
7/27/2019 Trinity River Corridor Project Update
27/95
Ecosystem RestorationFiscal Year 2014 Next Steps
Brief the Transportation and Trinity River Project CouncilCommittee on the operations and maintenance for theLower Chain of Wetlands
Award the construction of the Upper Chain of Wetlands
Award a contract to remove tires in and along the TrinityRiver
Continue planting and clean up activities at variouslocations along the Trinity River and wetlands areas
26
7/27/2019 Trinity River Corridor Project Update
28/95
III. Transportation
Concept for Sylvan Bridgenow under construction
I. Flood Risk ReductionII. Ecosystem Restoration
III. TransportationIV. Recreation
27
7/27/2019 Trinity River Corridor Project Update
29/95
TransportationSylvan Avenue Bridge Under Construction
Construction start: March 2012 Re-open to traffic: Early 2014 Completion: June 2014 6 Lanes (3 in each direction),
6 foot-wide sidewalk, bikelanes, ramp to park area
TxDOT cost: Approximately$42 million
28
Transportation
7/27/2019 Trinity River Corridor Project Update
30/95
TransportationHorseshoe Project: I-30 (McDermott Bridge)
and I-35E Bridges
TxDOT awarded design-buildcontract November 2012
Construction soil tests begun Construction complete 2017 Cost: $798 million (private,
local, state & federal)
Planned Margaret McDermott Bridge (I-30)
29
7/27/2019 Trinity River Corridor Project Update
31/95
TransportationMargaret Hunt Hill Bridge
Opened March 2012 First Santiago Calatrava
vehicular bridge built in the U.S. Connects downtown Dallas to
West Dallas over the Trinity
River (Woodall RodgersFreeway to Singleton Boulevard)
30
7/27/2019 Trinity River Corridor Project Update
32/95
Transportation
Riverfront Boulevard Under Design
Continental Ave.Phase I
Commerce St.
CadizSt.
Phase 2
Phase 1 construction late this year(lasting 19 months)
Phase 2 construction to beginSpring 2014 (lasting 24 months)
6 traffic lanes, cycle track,
bioswales, landscaping Cost: $42.5 million City, County,COG
31
TransportationRiverfront
7/27/2019 Trinity River Corridor Project Update
33/95
TransportationCadiz Street
(FromRiverfrontTo Lamar)
Est. Total Cost $4.8 M (funded)Design completed in November 2012
Begin roadway const. by February 2014Complete roadway const. in August 2015
Begin Sump A bridge const. late 2015Complete Sump A bridge const. late 201632
T t ti
7/27/2019 Trinity River Corridor Project Update
34/95
TransportationBeckley/Commerce Intersection Improvements
33
Design completed in July 2013 Estimated total cost - $3.6M Construction scheduled to begin in December 2013 (15-18 month
duration)
7/27/2019 Trinity River Corridor Project Update
35/95
TransportationTrinity Parkway Under design
34
7/27/2019 Trinity River Corridor Project Update
36/95
TransportationTrinity Parkway Need and Purpose
1994-1996Trinity River Corridor CitizensCommittee recommended a levee couplet parkway
TxDOT conducted the Major TransportationInvestment Study from 1996-1998:
Looked at over 35 different scenarios for traffic relief inthis corridor
Looked at vehicular, mass transit, bicycle andpedestrian options
Recommended a variety of solutions including theTrinity Parkway
35
7/27/2019 Trinity River Corridor Project Update
37/95
7/27/2019 Trinity River Corridor Project Update
38/95
7/27/2019 Trinity River Corridor Project Update
39/95
Transportation
7/27/2019 Trinity River Corridor Project Update
40/95
39
TransportationTrinity Parkway Toll Road
Reunion Overlook View of the Parkwayfrom the Lake
7/27/2019 Trinity River Corridor Project Update
41/95
7/27/2019 Trinity River Corridor Project Update
42/95
7/27/2019 Trinity River Corridor Project Update
43/95
7/27/2019 Trinity River Corridor Project Update
44/95
IV. Recreation
43
I. Flood Risk ReductionII. Ecosystem RestorationIII. Transportation
IV.Recreation
43
7/27/2019 Trinity River Corridor Project Update
45/95
RecreationBalanced Vision Plan
In 2003 City of Dallas writes long-range Balanced VisionPlan to reclaim Trinity River as a great natural resource andunique public domain and a model of environmentalstewardship that embodies the spirit of the Kessler Planidea of nearly a century before.
44
Recreation
7/27/2019 Trinity River Corridor Project Update
46/95
45
RecreationBalanced Vision Plan
Lakes
River meanders Playing fields Multipurpose trails Canoe/kayak loop Amphitheater
Restore/expand ripariancorridor Improve aquatic habitat Riffle pool complexes Wetlands Pedestrian bridges Promenade Concession pads Boat/canoe access Picnic areas
Recreation
7/27/2019 Trinity River Corridor Project Update
47/95
46
RecreationPossible Phase I Urban Lake Under Study
Construction could begin in late 2014
Approx. 23 acres
Near MargaretMcDermott Bridge andCommerce Bridge
For reference, Lake Cliff isabout 13 acres and BachmanLake is about 120 acres
Recreation
7/27/2019 Trinity River Corridor Project Update
48/95
47
RecreationPossible Phase I West Dallas Lake Under Study
Construction could begin in late 2014
About 21 acresNear Westmoreland
For reference, Lake Cliff is 13 acresBachman Lake is 120 acres
Recreation
7/27/2019 Trinity River Corridor Project Update
49/95
48
RecreationContinental Avenue Bridge and West Dallas Gateway
Construction began June2013
Completion estimated inMay 2014
Amenities includeparking, landscaping,
bocce, chess, kids playarea and meditationzones
$10.6M ($8M donationand $2.6M from 2006bond funds)
7/27/2019 Trinity River Corridor Project Update
50/95
BUILDING STRONG
Elm Fork Greenbelt Masterplan
49
Masterplan isfunded by theBoone FamilyFoundation
Study beginsSpring 2013
Amenities beingconsideredinclude publicaccess,Interpretationopportunities,wildernessopportunities, anddestinations
Spans fromRoyal Lanesouthward to theconfluence
49
7/27/2019 Trinity River Corridor Project Update
51/95
50
RecreationElm Fork Athletic Complex
Construction completion estimated inmid- to late 2013
Estimated open for management by
FC Dallas and open for play April 1 Amenities include 10 internationalsoccer fields (lighted), 4 internationalsoccer fields (unlighted), 5 youthsoccer fields, 2 pavilions with openplay space and potential concession
areas Construction cost about $18 million
from various bond and grant funds
R ti
7/27/2019 Trinity River Corridor Project Update
52/95
RecreationDallas Wave Under Construction
Located off 8th Street & Corinth, under the
Santa Fe Trestle Trail crossing of the TrinityRiver
Construction of Wave Complete Construction of bypass channel pending
additional work 100s of kayakers currently use this feature Amenities include parking lot, main wave
and bypass channel
5151
R i
7/27/2019 Trinity River Corridor Project Update
53/95
Recreation
Construction award September2012
Located at 1825 CaliforniaCrossing Rd.
Provides portage locationsabove and below the low waterdam
Construction is estimated to becomplete in October 2013(weather permitting)
52
California Crossing Canoe Launches
Under Construction
7/27/2019 Trinity River Corridor Project Update
54/95
7/27/2019 Trinity River Corridor Project Update
55/95
RecreationMoore Park Expansion Completed in June
54
(Adjacent to Santa Fe Trestle Trail and Corinth DART rail station)
Pavilion, amphitheater, pedestrian bridge over Cedar Creek and parking
7/27/2019 Trinity River Corridor Project Update
56/95
Recreation
7/27/2019 Trinity River Corridor Project Update
57/95
56
Construction could begin in fall 2013
(pending land acquisition) at SouthCentral Park on Fellows Lane
Amenities could include: Expansion of existing park to
connect to the Trinity River Lower
Chain of Wetlands to theneighborhood Mini spray area Upgrades to the existing
basketball court Two open play areas
Additional walkway Off-street parking area
$800,000 to $900,000construction budget from2006 Bond Funds
South Central (Joppa) Gateway
Recreation
7/27/2019 Trinity River Corridor Project Update
58/95
400-acre formerlandfill
PGA quality 18-hole course
9-hole shortcourse, practicefacility
Partnership ofAT&T, SMU, city,
SMU Golf Team,First Tee ofGreater Dallasyouth group andothers
57
RecreationTrinity Forest Golf Course
Anticipated construction start: 2013; opening 2016
PGA tour site for the Byron Nelson by 2019
Recreation
7/27/2019 Trinity River Corridor Project Update
59/95
Located at 811 Pemberton Construction started Summer 2013 Estimated finish: Summer 2014 Non-profit phase includes a
therapeutic center, arenas, a camphouse and trail ride opportunities
$12 million cost from 1998 & 2006bond funds and HillcrestFoundation grants
Partners include:Equest Therapeutic Horsemanship River Ranch Educational Charities Texas Horse Park Foundation
RecreationTexas Horse Park
58
Recreation
7/27/2019 Trinity River Corridor Project Update
60/95
Location: I-20 at Dowdy Ferry Road Opened in June Pavilion, fishing piers, bathrooms,
hike/bike/equestrian trails $1 million from 1998 bond funds
RecreationGreat Trinity Forest Gateway and Horse Trails
59
7/27/2019 Trinity River Corridor Project Update
61/95
Trinity Trails Network Background
Trinity Trails Network is a subset of the Citys
Trail Network System
Extends from Royal Lane near Luna in the North
to I20 & Dowdy Ferry in the South Hard surface trails 62.7 miles planned
(8 miles in service)
Soft surface trails 18.8 miles in service
60
Elm Fork Greenbelt Trails
7/27/2019 Trinity River Corridor Project Update
62/95
Elm Fork Greenbelt Trails
61
Trinity Forest Trails
7/27/2019 Trinity River Corridor Project Update
63/95
Trinity Forest Trails
62
Santa Fe Trestle Trail
7/27/2019 Trinity River Corridor Project Update
64/95
Santa Fe Trestle Trail Two trailheads: 2295 S. Riverfront
Blvd, Dallas TX 75207 and 1837E. 8th Street, Dallas TX 75203
(DART overflow parking lot)
Trail length - .86 miles from westentrance at Moore Park (underconstruction as a separate project)to east parking lot inside floodway
63
Trinity Forest Trails
7/27/2019 Trinity River Corridor Project Update
65/95
Trinity Forest Trails
Phase 1completefrom JoppaPreserve toEco Park
Phase 2 complete linking Joppa Preserve to Trinity River Audubon Center
Trailheads, 12 wide hard
surface trail, parking and kiosks
Phase 1 Trail length 2 miles Phase 2 Trail length 2 miles
64
7/27/2019 Trinity River Corridor Project Update
66/95
William Blair Jr. Park Gateway Trailhead
7/27/2019 Trinity River Corridor Project Update
67/95
66
3000 Municipal Street, Dallas, TX 75215
AT&T Trails (Trinity Trails Phase IIIA)
7/27/2019 Trinity River Corridor Project Update
68/95
AT&T Trails (Trinity Trails Phase IIIA) Under Construction
67
Starts at the
Audubon andloops underGreat TrinityForest Way,ending at ElamRoad
Construction
will begin inSummer 2013
Could open inWinter 2014
Constructioncostapproximately$1.9M from
AT&T Donation
Trinity Forest Spine
7/27/2019 Trinity River Corridor Project Update
69/95
Trail
68
Trinity ForestSpine Trail
Study funded through a grant
from the Trinity Trust to becompleted in 2014
Connecting the southern mostboundary of the Great TrinityForest to the Dallas Arboretum
Trailheads locations include theGreat Trinity Forest Gateway &Horse Trails, Audubon Center,Bruton/Scyene DART Station,and Dallas Arboretum
Construction estimated to beapproximately $17M; Fundrasingcampaign kick off by The TrinityTrust in May 2013
Trinity Strand Trail Phase I
7/27/2019 Trinity River Corridor Project Update
70/95
Trinity Strand Trail Phase I
69
Trinity Strand Trail
Phase I from OakLawn to MedicalDistrict Drive,connecting atSylvan Avenue
Construction couldbe complete Spring2014
Amenities includeplaza at TurtleCreek, 12 concrete
trail Trinity Strand Trail
Phase II from OakLawn to Inwoodfunded through2012 BondProgram
7/27/2019 Trinity River Corridor Project Update
71/95
Trinity Floodway Trails
7/27/2019 Trinity River Corridor Project Update
72/95
Trinity Floodway Trails
71
2012 Bond Program included $6,418,400 for design & construction of Trinity Trails
Katy/Trinity Strand Trail
Connection$18M
(includes amenities)
Proposed Alignment for All Weather Joint
7/27/2019 Trinity River Corridor Project Update
73/95
To advance this trail ahead of the Corps EIS,the 2012 Bond Program proposed alignmentcould be modified and constructed as an allweather joint use maintenance road for:
Maintenance trucks and other equipment
Pedestrians
Cyclists
72
Proposed Alignment for All Weather JointUse Maintenance Road / Trinity Floodway Trails
Proposed Alignment for All Weather Joint
7/27/2019 Trinity River Corridor Project Update
74/95
Proposed Alignment for All Weather JointUse Maintenance Road / Trinity Floodway Trails
In June 2013, the Trinity River Corridor ProjectCommittee requested staff brief City Council in August:
Provide a refined, proposed alignment
Show safety recommendations
Request a recommendation to proceed with theconstruction of this alignment
Safety measures will be in place to address pedestrian,bicycle and maintenance vehicle traffic
73
7/27/2019 Trinity River Corridor Project Update
75/95
Joint-Use All Weather Facility
7/27/2019 Trinity River Corridor Project Update
76/95
75
Joint Use All Weather FacilityAlignment
Proposed Alignment for All Weather Joint
7/27/2019 Trinity River Corridor Project Update
77/95
Funds would be reserved to complete: Connections crossing outfalls following the Dallas
Floodway EIS (could begin in late 2014)
Connections to the Coombs Creek Trail at IH30 (assoon as IH30 is complete)
Connection between IH30 and IH35 followingcompletion of Horseshoe Project (2017)
76
Proposed Alignment for All Weather JointUse Maintenance Road / Trinity Floodway Trails
7/27/2019 Trinity River Corridor Project Update
78/95
7/27/2019 Trinity River Corridor Project Update
79/95
7/27/2019 Trinity River Corridor Project Update
80/95
Appendix A - History of TrinityRiver Corridor
79
7/27/2019 Trinity River Corridor Project Update
81/95
7/27/2019 Trinity River Corridor Project Update
82/95
7/27/2019 Trinity River Corridor Project Update
83/95
History (continued)1998 Cit B d P i l d P iti 11 f th T i it Ri
7/27/2019 Trinity River Corridor Project Update
84/95
83
1998 City Bond Program includes Proposition 11 for the Trinity RiverCorridor Project for $246M with multiple components
First and foremost is Flood Protection: Dallas Floodway Extension Project ($24.7M) Elm Fork Improvements, including Soccer Complex ($30M)
Other Project Components: Recreation
Chain of Lakes concept ($31.5M) Athletic fields, trails and Gateway Parks ($41.5M)
Transportation Trinity Parkway ($84M) Woodall Rodgers Extension (Margaret Hunt Hill Bridge) ($28M) Beckley/Commerce Intersection Improvements ($6M)
Environmental Restoration
Forest restoration and mitigation (part of DFE) Wetlands (part of DFE) Air Quality
Sustainable development and reinvestment in the heart of Dallas 2006 City Bond Program includes funding for flood control,
transportation and recreation projects 2007 Voters reconfirm support for the Trinity Parkway inside the
levees
2009Corps Periodic Inspection #9 occurs 2011Corps Risk Assessment determines levees are more
resilient and actually provide 1500-year flood protection 2012 City Bond Program includes funding for flood control and
trails
7/27/2019 Trinity River Corridor Project Update
85/95
Appendix B - Historical FundingPartnership City / Corps
84
1998
7/27/2019 Trinity River Corridor Project Update
86/95
Trinity RiverCorridor Project
Elm Fork Dallas FloodwayExtension (DFE)
Upper TrinityFeasibility Study
(Dallas Floodway)
Levee alongLuna Rd.
Chain of Wetlands Lamar Levee Cadillac Heights
Levee
Flood Control- Levee Raise- Levee Fattening
Recreation/Lakes
85
2006
7/27/2019 Trinity River Corridor Project Update
87/95
MiscellaneousSmall DrainageImprovements.
Elm Fork Dallas FloodwayExtension (DFE)
Upper TrinityFeasibility Study
(Dallas Floodway)
Chain of Wetlands Lamar Levee Cadillac Heights
Levee
Flood Control- Levee Raise- Levee Fattening
Recreation/Lakes
Trinity RiverCorridor Project
Interior DrainageProjects
2006 BondProgram- Able Pump
Station
- Baker PumpStation- Pavaho Pump
Station
86
2007
7/27/2019 Trinity River Corridor Project Update
88/95
MiscellaneousSmall DrainageImprovements.
Elm Fork Dallas FloodwayExtension (DFE)
Chain of Wetlands Lamar Levee Cadillac Heights
Levee
Trinity RiverCorridor Project
Interior DrainageProjects
2006 BondProgram- Able Pump
Station
- Baker PumpStation- Pavaho Pump
Station
FeasibilityStudy/EIS
Flood Control Recreation/Lakes Interior Drainage
87
7/27/2019 Trinity River Corridor Project Update
89/95
7/27/2019 Trinity River Corridor Project Update
90/95
7/27/2019 Trinity River Corridor Project Update
91/95
7/27/2019 Trinity River Corridor Project Update
92/95
F nding S mmar
7/27/2019 Trinity River Corridor Project Update
93/95
Funding Summary
Federal funds directed to the projectapproximately $225M
Private donations approximately $60M
Public Bond Programs supporting floodprotection, ecosystem restoration, transportationand recreation