Transcript

The Columbia SnakeThe Columbia SnakeRiver SystemRiver System

System System Operations andOperations andInfrastructureInfrastructure

Glenn VanselowGlenn VanselowPacific Northwest Waterways AssociationPacific Northwest Waterways Association

Photo:Port of

Portland

Columbia Snake River SystemColumbia Snake River System

110 Mile 40-foot110 Mile 40-footdeep draft channeldeep draft channeloo 30 million tons 30 million tons foreign cargo foreign cargooo $13 billion cargo $13 billion cargo value value

Oregon

Washington

Chart:Columbia

RiverChannelCoalition

355 Mile 14-foot inland barge channel355 Mile 14-foot inland barge channeloo 10-12 million tons cargo 10-12 million tons cargooo $1.6-2.2 billion cargo value $1.6-2.2 billion cargo value

Columbia Snake River SystemColumbia Snake River System

Map:USACE

Map:USACE

Map:USACE

Wheat • First in the nation • 37% of U.S. exports

WheatWheat • First in the nation • 37% of U.S. exports

Graphic:Port of

Portland

Barley • First in the nation • 70% of exports

BarleyBarley • First in the nation • 70% of exports

Graphic:Port of

Portland

Corn • Second in the nation • 10% of exports

CornCorn • Second in theSecond in the nation nation • 10% of exports10% of exports

Graphic:Port of

Portland

Mineral Bulks • First on the West Coast

Mineral BulksMineral Bulks • First on the West Coast

Graphic:Port of

Portland

Containers and Autos • Serving 43 States

Containers and AutosContainers and Autos • Serving 43 States

Graphic:Port of

Portland

The Columbia Snake River SystemThe Columbia Snake River SystemOperations and Infrastructure IssuesOperations and Infrastructure Issues

O&M FundingO&M FundingPicture:

TidewaterBarge Lines

Snake River Maintenance DredgingSnake River Maintenance Dredging

The Columbia Snake River SystemThe Columbia Snake River SystemOperations and Infrastructure IssuesOperations and Infrastructure Issues

Picture:Tidewater

Barge Lines

Navigation Lock

Monolith 8

Upstream Gate

Failing InfrastructureFailing InfrastructureJohn Day Lock & DamJohn Day Lock & Dam

Picture:USACE

Failing InfrastructureFailing InfrastructureCoos Bay JettyCoos Bay Jetty

Picture:USACE

Columbia River Channel DeepeningColumbia River Channel Deepeningo From 40 to 43 feeto From 40 to 43 feeto $148 million cost, $96 million federal costo $148 million cost, $96 million federal costo $18 million in annual NED savingso $18 million in annual NED savings

Chart:Columbia

RiverChannelCoalition

Federal Hopper Dredge FleetFederal Hopper Dredge Fleet

o Low costo Low costo Timelyo Timelyo Reliableo Reliable

Picture:Port ofBandon

Snake River Dam BreachingSnake River Dam Breaching

o Uncertain fish benefitso Uncertain fish benefits (maybe none) (maybe none)o Eliminates navigationo Eliminates navigationo Eliminates hydropowero Eliminates hydropower

Picture:Port of

Lewiston

The Columbia Snake River SystemThe Columbia Snake River SystemOperations and Infrastructure IssuesOperations and Infrastructure Issues

O&M fundingO&M fundingSnake River dredgingSnake River dredgingFailing infrastructureFailing infrastructureChannel deepeningChannel deepeningFederal dredge fleetFederal dredge fleetDam breachingDam breaching

Picture:Port of

Lewiston


Recommended