Vasco Rd.
Install Boulder Weirsto Create In-channel
PondsLocations TBD
Arms
trong
Rd.
Remove Culvert
Proposed Trail
0 150 30075Feet
¯
Spoils
Project Boundary
Phase I
Boulder Weir
Bank Laybackand Revegetate
Pond Creation
Seasonal Wetland Restoration/Creation
Road to Be Removed/Revegetated
Proposed Stream
Existing Stream
Phase II
Channel Restoration
Phase III
Staging Area
Proposed Trail
Souza II Restoration Project: Schematic of Restoration Design