Powering the Future We Want Recognizing Innovative Practices in Energy for Sustainable Development
Abstract
The proposer, Stands Engineers is an Engineering firm specializing in Civil Designs.
This proposed project will generate 6,000-10,000 MW of Hydro-Electric power from the Nile Basin
Catchment area and the Albertine Rift, and an undetermined potential in tidal energy in a canal
channeling the two basins in Western Uganda. This will be the largest hydroelectric power plant in Africa
sister to the Grand Ethiopian Renaissance Dam (6,000 MW HPP) along Ethiopia’s Blue Nile, as well as
the 8th largest in the world once they are completed.
The preliminary Cost Benefit analysis shows a return on investment within a period of one year into
operations at normal Developer Bank’s rates.
It is aimed at igniting an Industrial revolution to a growing population of over 130 million people within
the East African region in the following aspects:
Available power supply for domestic use, industry and mining e.g. Oil pumping.
Reserve the use of coal in thermal power plants for use in steel manufacture.
Reduce cost of power in US cts/KW.
Providing employment opportunities.
The project will also provide the following:
A 70m wide and 5m deep canal offering transportation, tourism and Tidal power generating
potential over its full length.
Mitigation of the Riparian rights of the people and environmental conservation measures.
Agricultural innovation enabled through irrigation along the channel.
Flood mitigation.
The project involves channeling water from the reservoir L. Victoria which has an elevation of 1,134m
together with water from R. Nkusi to a Forebay dam which will provide a flow of between 1,200-2,000
cumec over a head of over 500m into the power generating turbines and then outflow to L. Albert
whose elevation is 615m.
Stands Engineers submit for funds to facilitate the development of this project up to the stage of
Government approval.
Powering the Future We Want Recognizing Innovative Practices in Energy for Sustainable Development
Contents.
Abstract
Literature Review……………………………………………………………………………..1
Background to Power Demand………………………………………………………….….2
Case Study……………………………………………………………..………….……….…4
Features of the Hydropower Project……………………………………………..…………6
Economic Purpose ………………………………………………………………………..…10
Socio- Economic Development……………………………………………………………..11
Implementation Plan………………………………………………………………….……...13
Organizational Experience and Capacity………………………………………………….14
Benefit and Cost Analysis……………………………………………………………………16
Conclusion ………………………………………………………………………….…………18
References………………………………………………………………………….………….19
Appendix
The Great Rift Valley……………………………………………………………..….………21
Proposed development along the Kyoga Nile…………………………..….……22
The rivers and lakes of Uganda…………………………………………..…………….23
Hydropower design and basic formulae……………………………………..…….24
The Design…………………………………………………………………………………..……25
The Nile Basin………………………………………………………………………..………….26
Powering the Future We Want Recognizing Innovative Practices in Energy for Sustainable Development
Abbreviations
EAC…………..East Africa Community
GWh…………...Giga (109) Watt Hour
JICA………..… Japan International Cooperation Agency
MW………….…Mega (106) Watt
MWh……………Mega (106) Watt hour
NEMA…………..National Environment Management Authority
NMC…………….Numerical Machining Complex
RCMRD……….Regional Center for Mapping of Resources for Development
Powering the Future We Want Recognizing Innovative Practices in Energy for Sustainable Development
1
Literature Review
East Africa’s energy solutions lie in the Great Rift Valley. These are oil, geothermal energy, wind energy
and hydroelectric power potential. Geologists explain that the 6,000 km valley was formed from a
splitting process of the African Plate into two separate plates; the African Nubian Plate and the African
Somali Plate millions of years ago. It is the Engineer’s role to make hypothesis into a reality; turning
theory into shareholder value.
Striking oil is a well calculated gamble. Geologists and Geophysicists explore a twofold condition where
first, the oil can be created and secondly, where the oil can be trapped underground. Oil is created when
marine fossils are heated under pressure and minimal oxygen supply by layers of sediment over millions
of years. Entrapment is formed when the earth movements position an impervious rock over the oil
bearing rock so as to trap the oil against displacement by underground water due to its lower density.
The Great Rift Valley provides these necessary conditions and is home to the recently discovered Oil
wells of 4.4km in the Albertine Rift, the Ugandan district of Hoima and also a 3 km deep well Ngamia 1 in
Turkana, Kenya.
The Great Rift Valley is also home to 10,000 MW Geothermal Power potential across Eastern Africa.
Kenya’s locality befalls a third of this energy. The separation of the continental plates along with the
Earth’s crust left the Earth’s mantle scantily exposed creating a wonder for tourists in the scenic
landforms enriched by volcanic signatures and hot springs whose secret is hidden deep within molten
rock, the source of geothermal energy.
Wind energy is tapped where air at high pressure areas moves to low pressure areas created by zones
with temperature differences adjacent to one another. The Great Rift Valley creates this condition. The
low lands are hot and more humid due to altitude and evaporation of the waters of the Rift Valley lakes
which creates a low pressure zone against the cold and less humid high pressure zones of the highlands.
This is the condition that creates wind energy that is converted to electric energy by wind turbines.
Hydroelectric Potential (HEP) is determined by two principle parameters; the quantity of flow and the
height of fall. Mother Nature has provided these two in the Great Rift Valley.
The Ethiopian highlands offer a large catchment area, where the Grand Ethiopian Renaissance Dam that
is currently under construction along the Blue Nile attests to, is raised against the valley providing 6,000
MW HEP.
Uganda has got an even greater potential. Civil Designer, Stands Engineers’ design is based on the full
hydropower generating potential from the waters of the Victorian Basin catchment area into the
Albertine Basin while mitigating the environmental measures. It has additionally compounded all the
hydropower potential from R. Nkusi. Further, the design opens an undetermined Tidal Power
Generation Potential by installing tidal stream turbines along the proposed 100 km long canal by
independent power producers.
Powering the Future We Want Recognizing Innovative Practices in Energy for Sustainable Development
2
UGANDA’s Hydroelectric Power Background.
Uganda has currently embarked on a new expansion project targeting approximately 3,023 MW of
hydroelectric power at a cost of US$ 10.03 Billion as tabulated below.
Site Type of Scheme Max. output
(MW)
Discharge
for the
Output
(m3/s)
Cost
(000, US$)
Kalagala Dam 330 1375 656,203
Isimba Dam 138 1375 617,940
Karuma Run of river 600 840 1,976,565
Oriang Run of river 392 840 1,754,255
Ayago Run of river 616 840 1,618,468
Kiba Run of river 292 840 2,265,578
Murchison Dam & waterway 655 840 1,137,727
Total 3,023 10,026,736
This is to meet an annual growth rate of 8%, about 20 MW. Having a present peak demand of about 400
MW the peak power demand forecast for the year 2030 is approximately 2,500 MW using the current
8% annual growth rate. However, projecting into the future, Uganda requires over 5,000 MW for their
post Vision 2040 energy demand.
Powering the Future We Want Recognizing Innovative Practices in Energy for Sustainable Development
3
Uganda stands out as a prime country for power exportation to the East African countries; Kenya,
Burundi and Rwanda, for its advantaged in the following ways;
It is centrally located.
There is an existing power line infrastructure.
The Energy Sector is one of the key sectors in the Ugandan economy with a general objective to generate
power that will be able to meet the ever-growing needs of the domestic market and a surplus that would
be exported to neighboring countries.
0
100
200
300
400
500
600
700
Max. output (MW)
Max. output (MW)
Powering the Future We Want Recognizing Innovative Practices in Energy for Sustainable Development
4
Features of the Proposed Hydropower Plant Project
The Canal
The engineering product that sparks an industrial revolution
This project’s salient feature is a canal; the second major canal in Africa. In Asia – Pacific region, the
Grand Canal, China is the longest canal at over 1,700 km length. It was manually dug by the Chinese
Dynasties as early as the 5th century BC to cut across 5 river systems and hence established the
infrastructure for economic and military supremacy. In Europe, the canals ingeniously navigated bulky
industrial coal at economically sustainable prices that lead to a myriad of canals which spread into
America. In Africa, the Suez Canal offers an alternate shipping route, similar to the Panama canal of S.
America, whose economic value is priceless to the host nations. From hindsight, the Canal can be said to
be that engineering product that sparks an industrial revolution.
Nonetheless, this project whose salient feature is the second canal in Africa will ignite an Industrial
revolution to the peoples of East Africa.
This project located in the Southwest part of Uganda, is a design based on the full hydropower
generating potential from the waters of the Victorian Basin catchment area into the Albertine Basin
while mitigating the environmental measures. It has further compounded all the hydropower potential
from R. Nkusi. Additionally, the design creates an undetermined Tidal Power Generation Potential by
installing tidal stream turbines along the proposed 100 km long canal.
River Katonga is known to flow both eastwards into L. Victoria and also westwards from L. victoria to L.
Edward. This means that hydrological studies along the river would reveal a relatively constant elevation
along its river bed for most of its length. The water will be channeled from the reservoir, L. Victoria
through that natural channel, R. Katonga, to flow westwards and through a canal which shall be
excavated between R. Katonga and R. Nkusi. This may require nominal dredging to clear up settled
sediment to provide the required dimensions of the natural channel from L. Victoria.
Design of the canal from R. Katonga to R. Nkusi will minimize the earthworks while maintaining the
required flow. The presence of the swampy area, along the designated route, indicates the presence of
impervious rocks underneath necessary to enhance water retention along the canal due to its
impervious nature. Excavated rocks will provide the necessary material for an earth dam construction in
a cut and fills procedure. Further material will be utilized for building dykes where required for flood
mitigation measures along the channel.
The Forebay dam shall be provided to retain the flow volumes from the canal and R. Nkusi. It will be
designed to the same elevations as that of L.Victoria. The dam shall also maintain water levels of the
canal for navigational purposes.
The flow from the dam to the powerhouse where power generation turbines are located shall be
directed through penstocks designed to specifications.
Powering the Future We Want Recognizing Innovative Practices in Energy for Sustainable Development
5
Thereafter, the flow from the powerhouse shall be through tail water tunnels into L. Albert also
designed to specifications.
Spillway flow will be channeled downstream of R. Nkusi into L. Albert.
The Design of the Power Plant
The waters of Lake Victoria in Uganda gradually drain into the Albertine basin via Lake Kyoga to the
North and Lake Edward to the West. However, basing on the hydrologic delineation, the Victorian Basin
is independent of the Kyoga Basin. The Victorian Nile therefore, provides a Northern drainage channel
between these two basins superimposing the Victorian Basin over the Kyoga Basin. Similarly, River
Katonga provides the Western drainage channel.
The design isolates the flow of the Victorian Basin via a canal to maximize the head and flow into L.
Albert.
Powering the Future We Want Recognizing Innovative Practices in Energy for Sustainable Development
6
Basic Analysis
= *1000 x 9.81 x (1200 to 2000) x 510+
= 6,000 - 10,000 MW
Powering the Future We Want Recognizing Innovative Practices in Energy for Sustainable Development
7
Environmental Mitigation
The Nile Basin in Uganda is comprised of the Victorian Basin and the Kyoga Basin. However, the Kyoga
Basin is independent of the Victorian Basin. The Victorian Nile provides a drainage channel between
these two basins superimposing the Victorian Basin over the Kyoga Basin. Therefore, the Kyoga Basin
has the natural capacity to retain the ecosystem within its catchment area independently of the
channeled waters of the Victorian basin.
Rainfall in this region is uniquely plenty due to the presence of L. Victoria, equatorial rain forests and the
7 year return period of the El Nino phenomena. This precipitation promises availability of water to fill
the lakes and dams for environmental sustainability and marine economics rather than major
hydroelectric power generation.
The Nalubaale dam shall control flow along the Victorian Nile to maintain the water levels of L. Victoria
and mitigate the riparian rights downstream. The Karuma dam, currently under construction, shall
similarly control drainage downstream while observing the Riparian right of the people
This mitigates all the major environmental considerations arising from this project.
Powering the Future We Want Recognizing Innovative Practices in Energy for Sustainable Development
8
CASE STUDY:
Basis of Kenya’s Power Importation.
The current peak power demand is expected to increase from 1,500 MW to 19,000 MW by 2030 and a
reserve margin of 30% totaling to over 24,000 MW.
The total installed effective capacity is 1,783.1 MW of which 1,161.1 MW or 65.1% is generated by
KenGen, 503 MW or 28.2% by Independent Power Producers and 120 MW or 6.7% is Emergency Power.
With a peak demand of 1,300MW, the reserve margin under dry hydrology is negative.
Hydro Geothermal Thermal Cogen Wind Total Proport
ion
KenGen 770 150 236 1.1 1,161 65.1%
IPPs 91 386 26 503 28.2%
Emergency 120 120 6.7%
Total 770 241 741 26 5.1 1,783.1 100%
Contribution 43.2% 13.5% 41.5% 1.5% 0.3% 100%
Power units in MW
Kenya’s electric power expansion is dependent on:
Total Installed Capacity
Hydro
Geothermal
Thermal
Cogen
Wind
Powering the Future We Want Recognizing Innovative Practices in Energy for Sustainable Development
9
Thermal Energy. Thermal electric power may be generated from
A 3,000 MW geothermal energy potential and,
Non-renewable mineral sources such as coal and petroleum.
Nuclear energy. Plans are underway to install the first Nuclear Power Plant in the country of 4,000 MW.
Importation from Ethiopia. The greatest challenge of importing power is:
High cost of power due to energy losses in the long distance supply (over 1,000km transmissivity
resistance).
Stable reliance is uncertain due to water resource conflicts between the host country and Egypt.
Power lines traversing the war torn territories of Northern Kenya.
Policy Framework
Energy supply is a flagship project for National development goals of the Kenyan Vision 2030 and the
Uganda’s Vision 2040 and the UN’s Millennium Development Goal.
The East African Community (EAC) provides a rigid foundation for professionalism and teamwork for
regional integration on economic development.
The University of Nairobi, which is a government body provides access to government ministries and
also correspondence from other regional Universities on the basis of research.
Transformational Impact
A significant economic hub shall be created in global spheres and millions of employment opportunities
for citizens following an industrialization revolution.
Sustainability of the Project
Capacity. Lake Victoria is the second largest lake in the world. This natural water reservoir in the region
has the capacity to supply a perennial constant flow, and hold additional capacity waters of the El Nino
rains.
Riparian Rights. Water regulation for the riparian rights along the Victorian Nile will be controlled at the
Nalubaale Dam and for the Kyoga Nile, control shall be provided at the Karuma dam.
Environmental Conservation. Mini dams are recommended to be constructed downstream of the
Karuma dam for environmental conservation and fish ladders for a minimum flow of 15 cumec.
The lakes system in Uganda and two major dams (Nalubaale and Karuma dams) offer a regulatory
mechanism for maximum exploitation of El Nino waters with minimum environmental degradation.
Powering the Future We Want Recognizing Innovative Practices in Energy for Sustainable Development
10
Back-Up Power Plants. The hydroelectric plants along the Victorian and Kyoga Niles shall provide back-
up power when required due to reduced flow.
Powering the Future We Want Recognizing Innovative Practices in Energy for Sustainable Development
11
Economic Purpose for the Proposed Hydroelectric Power Plant
This project proposal has a capacity range of 6,000-10,000 MW of hydroelectricity generation. This
range is based on the 7-10 year period El Nino phenomena within the region that increases the
hydrological flow capacity.
Demand for hydropower within the East African region is accelerated by the following reasons:
Steel Industry
Steel manufacture requires iron ore and coal for processing.
Kenya has vast iron ore deposits and coal which are the basic components necessary for a robust steel
industry. This will in return offer growth opportunities for steel related industries such as automobile
assembly industry, a vibrant construction industry among others within the region.
Hydropower replaces coal’s use in thermal power generation and reserves coal for steel manufacture.
Oil Extraction
Oil extraction involves pumping which in an energy requirement. Current discoveries of oil in the region
have raised the demand for power.
Population Growth
The East African region has a rising population of over 130 million (2010). Such energy is essential for
domestic electrification.
This offers a good base for education and a potential market for local and international investors in
industry.
Other Providence
Navigational Canal The project will offer water transport along its whole length for vessels with less
than 5 m deep hull. This is the cheapest means of transport for bulky loads and it shall preserve the
roads against damage between the ports of L. Victoria and the industrial district of Hoima.
Tidal Power Potential This is a relatively new technology that converts tidal energy from water currents
to electric power by the use of tidal turbines. The magnitude of Lake Victoria, the wind due to exposure
and the locality of the canal relative to the lake intimate significant amounts of tidal energy hence a
large tidal energy potential.
Water Sporting Facilities This will offer a highly exciting and unique attraction facility for local and
international tourism in Eastern Africa.
Agricultural Innovation The channel and dam shall provide water for agricultural use through irrigation.
Powering the Future We Want Recognizing Innovative Practices in Energy for Sustainable Development
12
Socio-Economic Development
This project has got significant influence in the following industries:
Construction Industry
The engineering works involved in this engineering feat are labour intensive which will provide jobs to
the local residents. This will enhance economic empowerment to the local residents.
Steel Industry
Reserving of coal for steel manufacture rather than thermal power generation in the region is a step
towards securing the sustainability of a Multi-billion dollar Steel Industry. This industry has the capacity
to employ over 3 million regional citizens directly and indirectly. These fall in the following sectors:
Mining sector for the raw materials.
Manufacturing of steel sector.
Processing of steel industries.
Construction industry using the steel products.
Other industries using steel products such as automobile assembly, shipping industry, utensils,
jua kali sector, etc.
The scrap metal industry.
Financial Service Industry
The potential further adds the value of the Ugandan Shilling and regional currency against international
currency which will have an exponential effect to the economy by adding each individual’s purchasing
power within the region.
Attracting Investors
Investors undertake logical and systematic methods of identifying, analyzing, evaluating, treating,
monitoring and communicating risks associated with investing within the region. These risks are
Reinvestment risk
Operation risk
Interest rate risk
Systematic risk
Event risk
Liquidity risk
Solvency risk
Market risk
Credit risk
Legal risk
Investor confidence shall be concretely secured in Hydropower for it is a safe and sustainable energy
source unlike the serious risks such as accidents, proliferation, terrorism and nuclear war posed by
Nuclear Power Plants.
Powering the Future We Want Recognizing Innovative Practices in Energy for Sustainable Development
13
This will be the basis for exporting power to the neighboring countries within the region.
Powering the Future We Want Recognizing Innovative Practices in Energy for Sustainable Development
14
Implementation Plan
Development of this project requires collaboration of Government, Development banks and the private
sector within the East African Community through the PPP (Public- Private Partnership) scheme.
Currently, this project has satisfied the theoretical threshold for industrial research according to the
University of Nairobi and calls upon industry for a joint collaboration with the research institution; the
University of Nairobi, the Civil Designer; Stands Engineers and the facilitator who will fund the
development of this project.
Stands Engineers applies for this grant to financially facilitate the development of this project from the
initial stage of an industrial research to the detailed status of Government approval.
This project comprises of
The canal
The foredam
The power house
The tail water system
The preliminary design of the whole project comprises of the route location, the volume of material to
be excavated, the site location of the foredam and the tail water system may be achieved through
remote sensing techniques and site visits. Remote sensing is an Engineering survey technique of
obtaining information about an area without being in actual physical contact with area based on
interpretation and analysis of data acquired by satellite sensors. Remote sensing techniques are offered
by the Regional Center for Mapping of Resources for Development in Nairobi, however, this will require
permission from the Ugandan Government (military) to allow access.
These designs shall be presented for Government approval for the design stage to the Ugandan
Government through the East African Committee.
The complete designs shall require:
Collection of actual data on the ground in Uganda i.e.
o Hydrological data
o Geotechnical data
o Engineering surveys
Tests on the samples
Consultancy
Further development of this project shall be driven by the Ugandan Government and interests of the
East African Committee based on their national development goals and the Millennium Development
goals.
Powering the Future We Want Recognizing Innovative Practices in Energy for Sustainable Development
15
Organizational Experience and Capacity
The University of Nairobi
The proposer wishes to have a collaborative research with the University of Nairobi for the University’s
capacity to undertake this project is evident in the following areas:
Qualified Staff Members The University is rich in the appropriate levels of education and
experience necessary for the various challenges to be encountered in this project.
Quantity of Staff Enough staff members to handle the project.
Laboratory Services The University has sufficient laboratory furnishing and equipment for
effective data analysis.
Capital Assets The University has the potential to provide a stable cash flow and the necessary
asset capacity such as vehicles etc. to support the project.
University’s Friendly Environment. This is evident in correspondence to other Universities in the
host country such as Makerere University and Government.
Interested Industries
Interested industries are invited on the basis of their capacity to undertake this project.
Proposer
Stands Engineers is an Engineering firm, founded by Kanyiri Andrew F. Kago, a Kenyan undergraduate in
BSc. Civil and Construction Engineering at the University of Nairobi. It specializes in creating innovative
Civil Designs for realizing economic and development goals for the East African region.
Tana Railway Bridge; a 200m bridge across R. Tana carrying 2 railway tracks, a 3m wide walkway and a
maximum of 6 (600 mm diameter) pipelines, was designed under the supervision of Dr., Eng. S. O.
Abuodha. It is a civil design proposal for a railway and pipeline link between the LAPSSET corridor and
the existing East African Railway (newly the Standard Gauge Railway) where the design concept of a
bridge to cross the Tana River was developed for the following gains:
Benefits of the Lamu-Mombasa Railway Link
• To link the Port of Lamu to Uganda and Rwanda via the new Standard Gauge Railway.
• To prevent heavy truck loading on roads in accordance to Government policy.
• To open the flexibility of choice for ports (i.e. between Lamu Port and Mombasa Port) to both
importers and exporters.
• To introduce double railway track system to ease traffic.
Powering the Future We Want Recognizing Innovative Practices in Energy for Sustainable Development
16
• To boost regional business by offering economies of scale to both importers and exporters by
making use of large ships (Super Post Panamax vessels ) with capacity of 8,000 teu which can
only dock at Lamu Port.
• To create a competitive edge over the proposed US$ 11 Billion. Bagamoyo Port project, Tanzania
who’s potential in the region threatens business in Kenyan Ports as the main regional hub.
• Railway transport offers an economical and efficient transport system to supply building
materials, labour and component parts which are necessary for the growth of Lamu’s
infrastructure as the largest port city in Africa.
• The presence of a railway offers an incentive to investors and entrepreneurs from the public and
private sector and also from the international spheres.
• To merge the two economies over the LAPSSET corridor and The East African Railway corridor
(SGR) to boost an exponential growth.
Land acquisition for railway construction in the region is economically feasible due to:
– It is partly owned by the Government.
– There are no major permanent structures on course.
– Railway reserve required is relatively less than that required for road reserve.
Benefits of the Lamu-Mombasa Pipeline Link
• To aid in funding the bridge.
• To supply refined oil from The Lamu Refinery to the existing Kenyan Pipeline Network for
storage, consumption or exportation. (This is the pipeline Network that links Mombasa to
Kisumu through Nairobi, Nakuru and Eldoret.)
• To offer Mombasa Refinery as a substitute to the Lamu Refinery during surplus or break downs.
• To provide a pipeline to supply the Aviation fuel depots between the two corridors.
• To economically supply refined petroleum products to Lamu.
• To create employment during and after its construction.
• To attract investors to the region.
Powering the Future We Want Recognizing Innovative Practices in Energy for Sustainable Development
17
Benefit and cost Analysis
Projection of the Karuma Dam Costs.
The costing of the Karuma Dam shall be used to project costs for preliminary analysis.
Item Description Cost (Million US$)
(Karuma Dam)
Projected Cost
(Million US$)
Works Preliminary and Pre-
Operative expenses
15.23 20
Land 0.37 0.0
Civil Works 99.0 99.0
Excavation of canal N/A ***
Power Plant Civil
Works
1022.50 2,000.00
Buildings 33.89 40
Plantation 0.05 0.05
Miscellaneous 13.94 N/A
Maintenance 11.22 11.22
Special T&P 0.50 0.5
Communication 10.0 10.0
Environment and
ecology
19.42 20.0
Losses on stock 2.80 N/A
Establishment 49.0 50.0
Indirect charges: audit &
Account
3.07 3.07
Electro-mechanical
Works
330.78 400
Total cost 1,677.77 2,653.84*
Powering the Future We Want Recognizing Innovative Practices in Energy for Sustainable Development
18
The asterisk `*’ on the table signifies that the cost is yet to be determined.
Benefits arising from this project shall be quantified ONLY on Electricity power sale using the current
rate in Kenya.
Power Produced` Hourly
income(US$)
Monthly
income (US$)
Annual income
(US$)
1 kWh 0.11244 80.956 984.964
1 MWh 112.45 80,955.90 984,963.75
1 GWh 112,438.80 80,955,923.60 984,963,736.70
6 GWh = 6,000 MWh 674,632.70 485,735,541.40 5,909,782,420.00
10 GWh = 10,000 MWh 1,124,387.80 809,559,235.70 9,849,637,367.00
The Data has been obtained from a Kenyan electricity bill, November 2014 at KSh 90 to
the US$.
Basing on the above analysis, an annual income of US$ 9.85 Billion can be attained against the lump
sum cost of approximately US$ 2.653* Billion exclusive of canal excavation costs.
0
100
200
300
400
500
600P
relim
inar
y an
d P
re-…
Lan
d
Civ
il W
ork
s
Exca
vati
on
of
can
al
Po
wer
Pla
nt
wo
rks
Bu
ildin
gs
Pla
nta
tio
n
Mis
cella
neo
us
Mai
nte
nan
ce
Spec
ial T
&P
Co
mm
un
icat
ion
Envi
ron
men
t an
d…
Loss
es o
n s
tock
Esta
blis
hm
ent
Ind
irec
t ch
arge
s:…
Elec
tro
-mec
han
ical
…
Cost (Million US$) (Karuma Dam)
Projected Cost (Million US$)
Powering the Future We Want Recognizing Innovative Practices in Energy for Sustainable Development
19
Conclusion
A sneak view of an economic comparison to the suggested alternative HPPs within the Nile Catchment
area is tabulated below.
HPP Maximum Output
(MW)
Cost
(US$ Billion)
Annual Income
(US$ Billion)
Seven Sites Hydropower
Master Plan by JICA
3,023 10.03 2.98
Proposed project 10,000 2.65* 9.85
*estimate cost exclusive of excavation costs.
This project is three times more economically viable against the currently proposed Seven Sites
Hydropower Master Plan by JICA and substantially less in costs and time assuming the cost of excavating
the canal to be below US$ 5 bn.0
*Benefits in tourism and transportation from the canal have not been included.
Annual Income (US$ Billion)
Seven Sites HydropowerMaster Plan by JICA 3,02310.03
Proposed project 10,0002.65*
Powering the Future We Want Recognizing Innovative Practices in Energy for Sustainable Development
20
With this objective, advantage and power demand, Uganda is persuaded to offer its citizens available
Post-2040 power requirements and a power surplus of between 3,000 – 7,000 MW for regional export
by adopting this project.
Also it is EAC’s interest to implement this proposed project which will provide the region with 6,000-
10,000 MW of hydroelectric power.
Powering the Future We Want Recognizing Innovative Practices in Energy for Sustainable Development
21
References.
Karuma HPP EIA report.
Powering the Future We Want Recognizing Innovative Practices in Energy for Sustainable Development
22
Appendix
Powering the Future We Want Recognizing Innovative Practices in Energy for Sustainable Development
23
The Great Rift Valley
Powering the Future We Want Recognizing Innovative Practices in Energy for Sustainable Development
24
Powering the Future We Want Recognizing Innovative Practices in Energy for Sustainable Development
25
The rivers and lakes of Uganda
Powering the Future We Want Recognizing Innovative Practices in Energy for Sustainable Development
26
Powering the Future We Want Recognizing Innovative Practices in Energy for Sustainable Development
27
The Design: Route Location of the canal and dam.