S2S Cycleway & Footway Interim Works (Bull Road to Causeway Road)
Presentation to Elected Members
11th November 2015
S2S Cycleway & Footway Interim Works 1
Cycleway and
Footpaths
Flood Defence
New Watermain
S2S Interim scheme
OVERVIEW OF THE SCHEME
2
Part 8 Planning Approval May 2013
BENEFITS OF COMBINING SCHEMES
3
Cycleway Required New
Sections of Seawall
New watermain laid during excavation
Sea Defence Element Added to
Seawalls
Results in Greater Efficiency in
Planning / Design / Procurement
Less Disruption to the SAC / SPA and Residents
Better Value for Money
Western Carriageway (St. Anne’s Park/Properties side)
• Kerb realignment and footpath works on the western side. Eastern Carriageway (Seaward Side)
• 2km of cycle and pedestrians facilities on the eastern side of the existing carriageway (4.0m wide two-way cycle track and 2m wide concrete footpath);
• Improved flood defences along route and two new sections of retaining wall and works to improve existing seawall;
• Proposed services include improved drainage system, watermain and upgraded public lighting.
Overall
• Streetscape improvement – new road surface, footpaths, traffic signals, cycle track and upgraded public lighting throughout the scheme;
• Renovation of Dollymount Tram Shelter;
• Enlarged and upgraded public car park at St. Anne’s Park;
• Estimated Program Duration: 16+ months;
• Projected completion date: Q4 2016.
Overview of Scheme
Missing link in an overall 8km cycle track around North Dublin Bay
4
Public Consultation Undertaken
Advertised:
- Dublin City Council website
- Irish Times Fri 14th Dec 2012.
- 14 Site Notices Erected
Plans and particulars available for public inspection for a 6 week period up to 4th February 2013 at :
• Dublin City Council, Public Counter, Planning Department.
• Raheny Library, Howth Road.
Presented to the North Central Area
Committee:
- 17th September 2012
- 19th November 2012
5
Public Consultation Undertaken
Public information Meeting:
- 15th January 2013 at 7.30 p.m. in Belgrove Girls School Hall.
Hosted by the Clontarf Residents Association and attended by circa 180 people.
Engineers present with drawings of scheme to answer questions from members of the public.
Follow-up meeting:
- 10th May 2013 in Northside Civic Centre, Coolock.
Engineers present and dealt with any additional or new queries that had not been addressed in the consultation process.
Planning Approval
13th May 2013.
6
7
TYPICAL CROSS-SECTION OF SCHEME
8
TYPICAL CROSS-SECTION OF SCHEME
9
UNUSED SPACE OVERLOOKING DUBLIN BAY
10
RECLAIMING AND REUSING SPACE
11
AMENITY IMPROVEMENTS
Improved Access along Shoreline
Tourism & Recreation
Renovation of Tram Shelter
12
STREETSCAPE ENVIRONMENT IMPROVEMENTS
Energy Efficient LED Lighting
Reduced Noise Pollution
Vulnerable Road Users
13
ST ANNE’S PARK
NEW QUADRANT ENTRANCE DESIGN
IMPROVE VIEW AND ACCESS TO TREE OF LIFE SCULPTURE - SCULPTURE RECOMMENCING SPRING 2016
14
PARKING PROVISIONS
COMPENSATORY PARKING AT WOODEN BRIDGE DUE TO LOSS OF PARKING ON CARRIAGWAY
15
PARKING PROVISIONS
• INCREASE IN PARKING SPACES FROM BAY RESTAURANT UP TO DOLLYMOUNT AVENUE
• REMOVAL OF DOUBLE YELLOW ON CARRIAGEWAY AND PART OF DOLLYMOUNT AVENUE SIDE ROAD
16
PARKING PROVISIONS
• UPGRADE OF ST. ANNES PARK CAR PARK • NEW STREET PARKING PROVIDED
17
CURRENTLY UNDER CONSTRUCTION FOOTPATH / CYCLEWAY & ROAD PAVEMENT STILL TO BE CONSTRUCTED
SEA WALL CONSTRUCTION
18
• CURRENTLY UNDER CONSTRUCTION • UNFINISHED ARTICLE • WALL FINISH OPTIONS UNDER REVIEW
SEA WALL CONSTRUCTION
19
• CURRENTLY UNDER CONSTRUCTION • UNFINISHED ARTICLE • WALL FINISH OPTIONS UNDER REVIEW
SEA WALL CONSTRUCTION
20
• CURRENTLY UNDER CONSTRUCTION • UNFINISHED ARTICLE • WALL FINISH OPTIONS UNDER REVIEW
SEA WALL CONSTRUCTION
21
• CURRENTLY UNDER CONSTRUCTION • UNFINISHED ARTICLE • WALL FINISH OPTIONS UNDER REVIEW
SEA WALL CONSTRUCTION
22
• CURRENTLY UNDER CONSTRUCTION • UNFINISHED ARTICLE • WALL FINISH OPTIONS UNDER REVIEW
SEA WALL CONSTRUCTION
23
• CURRENTLY UNDER CONSTRUCTION • UNFINISHED ARTICLE • WALL FINISH OPTIONS UNDER REVIEW
SEA WALL CONSTRUCTION
24
Proposed Sea Wall Finishes
Proposed wall finishes are as follows:
• At sections of poured concrete wall
– Smooth F4 concrete finish with new coping.
• At all other sections of wall (both where existing wall is rebuilt or raised, and where new masonry wall is built)
– Ready mixed smooth render finish with new coping.
• Options currently being looked at to amend design to improve aesthetics of the newly completed wall.
25
Wall Heights between Junctions along Route Wall height adjustments are as follows:
• Bull Island Junction to Seafield Road East Junction: Level adjustment of up to 276mm (11 inches). First 25m no level change. New average wall height = 540mm (21 inches).
• Seafield Road East Junction to Dollymount Park Junction: Level adjustment up to 120mm (5 inches) and new wall construction. New average wall height = 580mm (23 inches).
• Dollymount Park Junction to Doyle’s Lane Junction: New wall construction to match existing wall heights. New average wall height = 690mm (27 inches).
• Doyle’s Lane Junction to Dollymount Avenue Junction: New wall construction for 55 metres to match existing levels, no level adjustment to retained wall. New average wall height = 450mm (18 inches).
• Dollymount Avenue Junction to The Oaks Junction: Wall level relatively unchanged with new coping to be installed. New average wall height = 700mm (28 inches) with maximum wall height = 975mm (39 inches) – same as existing.
• The Oaks Junction to Mount Prospect Avenue Junction: No level change. New average wall height = 800mm (32 inches).
• Mount Prospect Avenue Junction – Naniken Stream: Level adjustment of 450mm-690mm (18-27 inches). New average wall height = 840mm (33 inches) with maximum wall height = 1,138mm (45 inches) including 75mm (3 inch) coping.
• Note: the section of wall just south of Mount Prospect Avenue which is not being adjusted is currently at a height up to 975mm (38.4 inches). The max height of our current wall north of this is 1,063mm (42 inches) excluding coping, which would be 1,138mm (45 inches) allowing for a 75mm (3 inch) coping.
26
• TIMBER BATTENS SET OUT ON SITE • BLUE SPRAY MARK = FINISHED FOOTPATH LEVEL • TOP OF BATTEN = COMPETED WALL HEIGHT
SEA WALL HEIGHT
27
SEA WALL HEIGHT
Opposite St. Anne's Park Lodge
28
SEA WALL HEIGHT
Mount Prospect Ave Junction
29
• WALL HEIGHT RELATIVE TO COMPLETED FOOTPATH LEVEL • 300m WITH NO RELATIVE INCREASE • ILLUSTRATES WALL HIGHER ADJACENT ST. ANNES PARK • MAX =1.138M • MIN = 0.410M
SEA WALL HEIGHT (RELATIVE TO FOOTPATH)
30
SEA WALL HEIGHT (RELATIVE TO FOOTPATH)
31
SEA WALL HEIGHT (RELATIVE TO FOOTPATH)
32
SEA WALL HEIGHT (RELATIVE TO FOOTPATH)
33
SEA WALL HEIGHT (RELATIVE TO FOOTPATH)
34
SEA WALL HEIGHT (RELATIVE TO FOOTPATH)
35
Howth Road to Baldoyle Road - Old Sea Wall Height for Comparison
Distance from Howth Road to Baldoyle Road is 2.1km (1.3 miles) – almost identical in length to this scheme.
Old sea wall is 0.7m (27.6 inches) to 1m (39.4 inches) high along the 2.1km length.
Depending on the relative road level the wall does restrict views of the foreshore at times although Howth is clearly visible.
This length of road is much straighter and does not have a bend or camber on the road like there near the pond at St. Anne’s Park that would restrict views for car drivers even further.
36
Average Wall Height Chart
37
16%
26%
34%
8%
Average Wall Height 0.4m - 0.6m (16 - 24 inches): 16%
Average Wall Height 0.6m - 0.8m (24 – 32 inches): 26%
Average Wall Height 0.8m – 1.0m (32 – 40 inches): 34%
Average Wall Height 1.0m – 1.138m (40 – 45 inches): 8%
• ROAD SURFACE LOWER THAN FOOTPATH LEVELS (AVG. 140mm). • 150m SECTION ON BEND AT ST. ANNES PARK SUPERELEVATED RESULTING
IN ROAD SURFACE LOWER RELATIVE TO FOOTPATH / WALL (Max = 0.5m). • 460m SECTION OF ROAD WHERE DRIVER EYE HEIGHT LOWER THAN WALL . • 33 SECONDS AT 50KPH.
SEA WALL HEIGHT (RELATIVE TO ROAD SURFACE)
38
SAFETY BENEFITS – COLLISION STATISTICS
1996 – 2011: 163 accidents 50% of Serious and Fatal Accidents involved Pedestrians
39
SAFETY BENEFITS
SAFETY
Reduced Carriageway
Width (2 x 3m)
Upgraded Junctions
along route
Improved Driver
Behaviour
Reduced speed limit at
north end 60km/h →
50km/h
Reduced speeds - 85%ile
currently 57.3km/h
Removal of Driver/Cyclist
Conflict
40
SAFETY BENEFITS
Reasons for Buildouts:
• Improve visibility and safety for
pedestrians crossing junctions.
• Improve visibility for drivers entering
or exiting side streets.
• Make it easier for visually and mobility
impaired people to cross the junction,
as well as people will child buggies.
• Prevent drivers from parking too close
to corners thereby blocking visibility
for pedestrians and other drivers.
41
Environmental Measures
• Appropriate Assessment carried out for the scheme
• Environmental Clerk of Works appointed by DCC
• Project Ecologist engaged by Contractor
– Environmental Management Plan
– Grassland Management Plan
– Method Statements for Works on Lagoon
– Ongoing environmental monitoring
• Liaison with NPWS and BirdWatch Ireland
• Mitigation Measures Implemented
– Screen erected between Works and Lagoon
– No Lagoon Works during winter to facilitate wintering birds
42
43
Impacts of Climate Change
-60
-40
-20
0
20
40
60
80
100
20
00
20
01
20
02
20
03
20
04
20
05
20
06
20
07
20
08
20
09
20
10
20
11
20
12
20
13
20
14
20
15
MSL
in m
m O
DM
Dublin Annual Mean Sea Level 2000 – 2013 (Provisional)
Observed Annual …
44
Bull Island (Extract from Draft Development Plan Strategic Flood Risk Assessment SFRA)
Flood Zone A Dark Green; no wave action modelled.
Flood Zone B Lighter Green; no wave action modelled. 45