London Borough of Brent highways&[email protected] Roadworks/Events/Festivals 0208 937 5600 Network Management Team September Start 18:00 22/09/2018 22/09/2018 1 Days Confirmed Event Day Road Closures www.wembleystadium.com Kick off 20:00 03/09/2018 03/09/2018 1 Days Confirmed Event Day Road Closures www.wembleystadium.com Kick Off 15:00 06/10/2018 06/10/2018 1 Days Confirmed Event Day Road Closures www.wembleystadium.com Kick off 18:00 14/10/2018 14/10/2018 1 Days Confirmed Event Day Road Closures www.wembleystadium.com Kick Off 14:30 21/10/2018 21/10/2018 1 Days Confirmed Event Day Road Closures www.wembleystadium.com Kick off 13:30 28/10/2018 28/10/2018 1 Days Confirmed Event Day Road Closures www.wembleystadium.com Kick off 20:00 29/10/2018 29/10/2018 1 Days Confirmed Event Day Road Closures www.wembleystadium.com Kick off 20:00 06/11/2018 06/11/2018 1 Days Confirmed Event Day Road Closures www.wembleystadium.com Kick off 19:45 15/11/2018 15/11/2018 1 Days Confirmed Event Day Road Closures www.wembleystadium.com Kick Off 14:00 18/11/2018 18/11/2018 1 Days Confirmed Event Day Road Closures www.wembleystadium.com Kick off 14:00 25/11/2018 25/11/2018 1 Days Confirmed Event Day Road Closures www.wembleystadium.com Kick off 20:00 28/11/2018 28/11/2018 1 Days Confirmed Event Day Road Closures www.wembleystadium.com Road Area Location Description Works Type From To Proposed/Started Footway/Carriageway Permit Number Utility ABBEYDALE ROAD WEMBLEY left of stairs to polish bakery abbeydale road Fit Stop Tap / Boundary Box - WORKING IN FOOTWAY MINOR 20/09/2018 24/09/2018 5 Days PROPOSED WORKS SOME C/W INCURSION MX044-10024380 Affinity Water 01707 679 623 ABERDEEN ROAD LONDON 8 - 8 opp new customer water supply 1x25mm MDPE mtrd, works in the footway and inCarriageway. Our intention is to complete the Permanent Reinstatement inthe same phase STANDARD 19/09/2018 24/09/2018 6 Days IN PROGRESS SOME C/W INCURSION MU307-000806285630045-001 Thames Water 0800 316 9800 ABERDEEN ROAD LONDON outside 34 to opposite the Junction of Lancaster Road CUSTOMER CONNECTION NEW RESIDENTIAL SUPPLY. CLEAR BLOCKED DUCT and REPAIR BLOCKAGES IF FOUND FOOTWAY WORKS ONLY MINOR 22/09/2018 25/09/2018 4 Days PROPOSED WORKS NO C/W INCURSION NK100-/SSERRE/13984266J9 Virgin Media 0870 8883117 ABERDEEN ROAD LONDON ABERDEEN ROAD, WHOLE STREET FROM JUNCTION OF BURNLEY ROAD IMGA192012. ABANDON 298M X 4'/6' MAIN AND INSERT 75MM/125MM PE AND RELAYAND TRANSFER SERVICES MAJOR 15/10/2018 30/11/2018 47 Days PROPOSED WORKS SOME C/W INCURSION AZ007-1000724488 Cadent Gas Limited 0800 111 999 ACTON LANE LONDON OPP GREENHILL PARK Works in footway and carriageway to carry out Service pipe relay between the existing Water main and Harlseden Primary School boundary, as part of Thames Water's Lead Pipe Replacement Project. STANDARD 22/10/2018 26/10/2018 5 Days PROPOSED WORKS MULTI-WAY SIGNALS MU276-IA/AMP6/SCH/BRE/009 Thames Water 0800 316 9800 ALBERT ROAD LONDON whole road TTRO/18/021 - Proposed Temporary Traffic Order to change Albert Road j/w Salusbury Road from two way road direction to one way road direction. Including Single yellow line with time plate Mon - Sat, 8 HIGHWAYS ACT PERMITS 01/09/2018 29/02/2020 547 Days PROPOSED WORKS LANE CLOSURE AW888-L-MAIN-00000932 LONDON BOROUGH OF BRENT 020 8937 5600 ALEXANDER AVENUE LONDON 16 ALEXANDER AVENUE, LONDON, NW10 3QS Service Pipe Repair<33mm Fway in Footway. Our intention is tocomplete the Permanent Reinstatement in the same phase MINOR 25/09/2018 27/09/2018 3 Days PROPOSED WORKS SOME C/W INCURSION MU301-000031158856-001 Thames Water 0800 316 9800 ALEXANDER AVENUE LONDON F/P O/S 32 ALEXANDER AVENUE, LONDON, NW10 3QS GAS SERVICE DISCONNECTION WITH EXCAVATION UNDER OUR MANDATORYOBLIGATION TO COMPLY WITH THE GAS SAFETY REGULATION 1994. EXCAVATE AND DISCONNECT DOMESTIC GAS SUPPLY AND REINSTATE MINOR 02/10/2018 04/10/2018 3 Days PROPOSED WORKS NO C/W INCURSION AZ007-1000757316 Cadent Gas Limited 0800 111 999 ALEXANDER AVENUE LONDON whole road WORKS METHODOLOGY: WORKING ON BEHALF OF THAMES WATER - NOTIFICATION OF POTENTIAL WORKS TO CARRY OUT MAINS REPLACEMENT SCHEME MAJOR 18/10/2018 28/11/2018 42 Days PROPOSED WORKS SOME C/W INCURSION MU821-H208/MBIW07/Z020 Thames Water 0800 316 9800 ALL SOULS AVENUE LONDON 124 S81 PLANNED COVER REPLACEMENT--WORKS INTENDED TO INCLUDE FIRST TIME PERMANENT REINSTATEMENT WITHIN SAME PHASE MINOR 01/10/2018 01/10/2018 1 Days PROPOSED WORKS TWO-WAY SIGNALS MU026-003156SPYG--000001 Thames Water 0800 316 9800 ALL SOULS AVENUE LONDON whole road WORKS METHODOLOGY: WORKING ON BEHALF OF THAMES WATER - NOTIFICATION OF POTENTIAL WORKS TO CARRY OUT MAINS REPLACEMENT SCHEME MAJOR 13/11/2018 22/01/2019 71 Days PROPOSED WORKS SOME C/W INCURSION MU821-H208/MBIW07/Z004 Thames Water 0800 316 9800 ALRIC AVENUE LONDON FROM JUNCTION WITH BRUCE ROAD TO JUNCTION WITH SELWYN ROAD WORKS METHODOLOGY: WORKING ON BEHALF OF THAMES WATER TO CARRY OUT MAINS REPLACEMENT SURFACE LOCATION: CW AND FW MAJOR 03/09/2018 23/10/2018 51 Days IN PROGRESS SOME C/W INCURSION MU821-H553/MSUL03/I002 Thames Water 0800 316 9800 AMERY GARDENS LONDON whole road WORKS METHODOLOGY: WORKING ON BEHALF OF THAMES WATER - NOTIFICATION OF POTENTIAL WORKS TO CARRY OUT MAINS REPLACEMENT SCHEME MAJOR 24/09/2018 05/10/2018 12 Days PROPOSED WORKS SOME C/W INCURSION MU821-H208/MBIW07/Z010 Thames Water 0800 316 9800 ASHDON ROAD LONDON S/O 83 Boundary Box Exchange Fway in Footway. Our intention is to complete thePermanent Reinstatement in the same phase IMMEDIATE (URGENT) 14/09/2018 20/09/2018 7 Days IN PROGRESS SOME C/W INCURSION MU301-000031148101-001 Thames Water 0800 316 9800 ASHFORD ROAD LONDON JUNCTION WITH OLIVE ROAD WORKING ON BEHALF OF THAMES WATER TO CARRY OUT MAINS REPLACEMENT MAJOR 22/10/2018 09/11/2018 19 Days PROPOSED WORKS MULTI-WAY SIGNALS MU821-H553/MBIW04/I010 Thames Water 0800 316 9800 ASHFORD ROAD LONDON FROM JUNCTION WITH OLIVE ROAD TO JUNCTION WITH LARCH ROAD WORKS METHODOLOGY: WORKING ON BEHALF OF THAMES WATER TO CARRY OUT MAINS REPLACEMENT SURFACE LOCATION: CW AND FW MAJOR 12/11/2018 30/11/2018 19 Days PROPOSED WORKS ROAD CLOSURE MU821-H553/MBIW04/I004 Thames Water 0800 316 9800 Premiership Football Spurs vs Manchester City October Chamjpions League Spurs vs Barcelona Spurs vs Cardiff NFL Seattle Seahawks @ Oakland Rainers Contact details Estimated End Date Event Description Duration PLEASE NOTE: WORKS THAT ARE SHOWN AS PROPOSED MAY BE RESCHEDULED TO COMMENCE BEFORE OR AFTER THE DATE SHOWN OR EVEN CANCELLED. WE ALSO RESERVE THE RIGHT TO AMEND START AND END DATES IN ACCORDANCE WITH PREVAILING CONDITIONS. NFL Philadelphia Eagles @ Jacksonville Jaguars Month Duration For the Week Commencing 24th September 2018 Traffic Management Notes Works Status Start Date Anthony Joshua v Alexander Povetkin for the Wold Heavyweight Championship. November Champions League Spurs vs PSV Champions League Spurs vs Inter Milan NFL Tennessee Titans @ Los Angeles Chargers England vs USA (International Friendly) England vs Croatia (Nations League) EE Cup

London Borough of Brent · London Borough of Brent ... Kick off 20:00 03/09/2018 03/09/2018 1 Days Confirmed Event Day Road Closures ... Works in footway and carriageway to carry

  • Upload
    others

  • View
    8

  • Download
    0

Embed Size (px)

Citation preview

Page 1: London Borough of Brent · London Borough of Brent ... Kick off 20:00 03/09/2018 03/09/2018 1 Days Confirmed Event Day Road Closures ... Works in footway and carriageway to carry

London Borough of Brent

highways&[email protected] Roadworks/Events/Festivals

0208 937 5600 Network Management Team

September Start 18:00 22/09/2018 22/09/2018 1 Days Confirmed Event Day Road Closures www.wembleystadium.com

Kick off 20:00 03/09/2018 03/09/2018 1 Days Confirmed Event Day Road Closures www.wembleystadium.com

Kick Off 15:00 06/10/2018 06/10/2018 1 Days Confirmed Event Day Road Closures www.wembleystadium.com

Kick off 18:00 14/10/2018 14/10/2018 1 Days Confirmed Event Day Road Closures www.wembleystadium.com

Kick Off 14:30 21/10/2018 21/10/2018 1 Days Confirmed Event Day Road Closures www.wembleystadium.com

Kick off 13:30 28/10/2018 28/10/2018 1 Days Confirmed Event Day Road Closures www.wembleystadium.com

Kick off 20:00 29/10/2018 29/10/2018 1 Days Confirmed Event Day Road Closures www.wembleystadium.com

Kick off 20:00 06/11/2018 06/11/2018 1 Days Confirmed Event Day Road Closures www.wembleystadium.com

Kick off 19:45 15/11/2018 15/11/2018 1 Days Confirmed Event Day Road Closures www.wembleystadium.com

Kick Off 14:00 18/11/2018 18/11/2018 1 Days Confirmed Event Day Road Closures www.wembleystadium.com

Kick off 14:00 25/11/2018 25/11/2018 1 Days Confirmed Event Day Road Closures www.wembleystadium.com

Kick off 20:00 28/11/2018 28/11/2018 1 Days Confirmed Event Day Road Closures www.wembleystadium.com

Road Area Location Description Works Type From To Proposed/Started Footway/Carriageway Permit Number Utility

ABBEYDALE ROAD WEMBLEY left of stairs to polish bakery abbeydale road Fit Stop Tap / Boundary Box - WORKING IN FOOTWAY MINOR 20/09/2018 24/09/2018 5 Days PROPOSED WORKS SOME C/W INCURSION MX044-10024380Affinity Water

01707 679 623

ABERDEEN ROAD LONDON 8 - 8 opp

new customer water supply 1x25mm MDPE mtrd, works in the footway and

inCarriageway. Our intention is to complete the Permanent Reinstatement inthe

same phase

STANDARD 19/09/2018 24/09/2018 6 Days IN PROGRESS SOME C/W INCURSION MU307-000806285630045-001Thames Water

0800 316 9800

ABERDEEN ROAD LONDON outside 34 to opposite the Junction of Lancaster RoadCUSTOMER CONNECTION NEW RESIDENTIAL SUPPLY. CLEAR BLOCKED

DUCT and REPAIR BLOCKAGES IF FOUND FOOTWAY WORKS ONLYMINOR 22/09/2018 25/09/2018 4 Days PROPOSED WORKS NO C/W INCURSION NK100-/SSERRE/13984266J9

Virgin Media

0870 8883117

ABERDEEN ROAD LONDONABERDEEN ROAD, WHOLE STREET FROM

JUNCTION OF BURNLEY ROAD

IMGA192012. ABANDON 298M X 4'/6' MAIN AND INSERT 75MM/125MM PE AND

RELAYAND TRANSFER SERVICESMAJOR 15/10/2018 30/11/2018 47 Days PROPOSED WORKS SOME C/W INCURSION AZ007-1000724488

Cadent Gas Limited

0800 111 999

ACTON LANE LONDON OPP GREENHILL PARK

Works in footway and carriageway to carry out Service pipe relay between the

existing Water main and Harlseden Primary School boundary, as part of Thames

Water's Lead Pipe Replacement Project.

STANDARD 22/10/2018 26/10/2018 5 Days PROPOSED WORKS MULTI-WAY SIGNALS MU276-IA/AMP6/SCH/BRE/009Thames Water

0800 316 9800

ALBERT ROAD LONDON whole road

TTRO/18/021 - Proposed Temporary Traffic Order to change Albert Road j/w

Salusbury Road from two way road direction to one way road direction. Including

Single yellow line with time plate Mon - Sat, 8

HIGHWAYS ACT PERMITS 01/09/2018 29/02/2020 547 Days PROPOSED WORKS LANE CLOSURE AW888-L-MAIN-00000932LONDON BOROUGH OF BRENT

020 8937 5600

ALEXANDER AVENUE LONDON 16 ALEXANDER AVENUE, LONDON, NW10 3QSService Pipe Repair<33mm Fway in Footway. Our intention is tocomplete the

Permanent Reinstatement in the same phaseMINOR 25/09/2018 27/09/2018 3 Days PROPOSED WORKS SOME C/W INCURSION MU301-000031158856-001

Thames Water

0800 316 9800

ALEXANDER AVENUE LONDONF/P O/S 32 ALEXANDER AVENUE, LONDON, NW10

3QS

GAS SERVICE DISCONNECTION WITH EXCAVATION UNDER OUR

MANDATORYOBLIGATION TO COMPLY WITH THE GAS SAFETY

REGULATION 1994. EXCAVATE AND DISCONNECT DOMESTIC GAS SUPPLY

AND REINSTATE

MINOR 02/10/2018 04/10/2018 3 Days PROPOSED WORKS NO C/W INCURSION AZ007-1000757316Cadent Gas Limited

0800 111 999

ALEXANDER AVENUE LONDON whole road

WORKS METHODOLOGY: WORKING ON BEHALF OF THAMES WATER -

NOTIFICATION OF POTENTIAL WORKS TO CARRY OUT MAINS

REPLACEMENT SCHEME

MAJOR 18/10/2018 28/11/2018 42 Days PROPOSED WORKS SOME C/W INCURSION MU821-H208/MBIW07/Z020Thames Water

0800 316 9800

ALL SOULS AVENUE LONDON 124S81 PLANNED COVER REPLACEMENT--WORKS INTENDED TO INCLUDE

FIRST TIME PERMANENT REINSTATEMENT WITHIN SAME PHASEMINOR 01/10/2018 01/10/2018 1 Days PROPOSED WORKS TWO-WAY SIGNALS MU026-003156SPYG--000001

Thames Water

0800 316 9800

ALL SOULS AVENUE LONDON whole road

WORKS METHODOLOGY: WORKING ON BEHALF OF THAMES WATER -

NOTIFICATION OF POTENTIAL WORKS TO CARRY OUT MAINS

REPLACEMENT SCHEME

MAJOR 13/11/2018 22/01/2019 71 Days PROPOSED WORKS SOME C/W INCURSION MU821-H208/MBIW07/Z004Thames Water

0800 316 9800

ALRIC AVENUE LONDONFROM JUNCTION WITH BRUCE ROAD TO JUNCTION

WITH SELWYN ROAD

WORKS METHODOLOGY: WORKING ON BEHALF OF THAMES WATER TO

CARRY OUT MAINS REPLACEMENT SURFACE LOCATION: CW AND FWMAJOR 03/09/2018 23/10/2018 51 Days IN PROGRESS SOME C/W INCURSION MU821-H553/MSUL03/I002

Thames Water

0800 316 9800

AMERY GARDENS LONDON whole road

WORKS METHODOLOGY: WORKING ON BEHALF OF THAMES WATER -

NOTIFICATION OF POTENTIAL WORKS TO CARRY OUT MAINS

REPLACEMENT SCHEME

MAJOR 24/09/2018 05/10/2018 12 Days PROPOSED WORKS SOME C/W INCURSION MU821-H208/MBIW07/Z010Thames Water

0800 316 9800

ASHDON ROAD LONDON S/O 83Boundary Box Exchange Fway in Footway. Our intention is to complete

thePermanent Reinstatement in the same phaseIMMEDIATE (URGENT) 14/09/2018 20/09/2018 7 Days IN PROGRESS SOME C/W INCURSION MU301-000031148101-001

Thames Water

0800 316 9800

ASHFORD ROAD LONDON JUNCTION WITH OLIVE ROADWORKING ON BEHALF OF THAMES WATER TO CARRY OUT MAINS

REPLACEMENTMAJOR 22/10/2018 09/11/2018 19 Days PROPOSED WORKS MULTI-WAY SIGNALS MU821-H553/MBIW04/I010

Thames Water

0800 316 9800

ASHFORD ROAD LONDONFROM JUNCTION WITH OLIVE ROAD TO JUNCTION

WITH LARCH ROAD

WORKS METHODOLOGY: WORKING ON BEHALF OF THAMES WATER TO

CARRY OUT MAINS REPLACEMENT SURFACE LOCATION: CW AND FWMAJOR 12/11/2018 30/11/2018 19 Days PROPOSED WORKS ROAD CLOSURE MU821-H553/MBIW04/I004

Thames Water

0800 316 9800

Premiership Football

Spurs vs Manchester City

October

Chamjpions League

Spurs vs Barcelona

Spurs vs Cardiff

NFL Seattle Seahawks @ Oakland Rainers

Contact detailsEstimated

End DateEvent Description

Duration

PLEASE NOTE: WORKS THAT ARE SHOWN AS PROPOSED MAY BE RESCHEDULED TO COMMENCE BEFORE OR AFTER THE DATE SHOWN OR EVEN CANCELLED. WE ALSO RESERVE THE RIGHT TO AMEND START AND END DATES IN ACCORDANCE WITH PREVAILING CONDITIONS.

NFL Philadelphia Eagles @ Jacksonville Jaguars

Month Duration

For the Week Commencing 24th September 2018

Traffic Management NotesWorks StatusStart Date

Anthony Joshua v Alexander Povetkin

for the Wold Heavyweight Championship.

November

Champions League

Spurs vs PSV

Champions League

Spurs vs Inter Milan

NFL Tennessee Titans @ Los Angeles Chargers

England vs USA (International Friendly)

England vs Croatia (Nations League)

EE Cup

Page 2: London Borough of Brent · London Borough of Brent ... Kick off 20:00 03/09/2018 03/09/2018 1 Days Confirmed Event Day Road Closures ... Works in footway and carriageway to carry

London Borough of Brent

highways&[email protected] Roadworks/Events/Festivals

0208 937 5600 Network Management Team

Contact detailsEstimated

End DateEvent DescriptionMonth Duration

For the Week Commencing 24th September 2018

Traffic Management NotesWorks StatusStart Date

ASHFORD ROAD LONDONFROM THE JUNCTION WITH OLIVE ROAD TO

JUNCTION WITH LARCH ROAD

WORKING ON BEHALF OF THAMES WATER TO CARRY OUT MAINS

REPLACEMENTMAJOR 12/11/2018 30/11/2018 19 Days PROPOSED WORKS ROAD CLOSURE MU821-H553/MBIW04/I011

Thames Water

0800 316 9800

ASHFORD ROAD LONDON j/w Olive RoadProposed Temporary Traffic Order for a road closure at Ashford Road j/w Olive

Road to carrying out mains replacement worksHIGHWAYS ACT PERMITS 12/11/2018 30/11/2018 19 Days PROPOSED WORKS ROAD CLOSURE AW888-L-MAIN-00000931

LONDON BOROUGH OF BRENT

020 8937 5600

ATHERTON HEIGHTS WEMBLEY 22 ATHERTON HEIGHTS, WEMBLEY, BRENT Relay Short Service Pipe - WORKING IN VERGE MINOR 20/09/2018 24/09/2018 5 Days PROPOSED WORKS GIVE & TAKE MX044-10025016Affinity Water

01707 679 623

BARNINGHAM WAY LONDONS/O 470 CHURCH LANE, BARNINGHAM WAY,

LONDON, BRENT

DS0014110 - MAINS INSTALLATION TO NEW DEVELOPMENT ON BEHALF OF

AFFINITY WATER ND - CW/FW - STANDARD SLG - FW CLOSURE, PEDS

WALKWAY PROVIDED - ROAD CLOSURE

MAJOR 17/09/2018 27/09/2018 11 Days IN PROGRESS ROAD CLOSURE MX043-215ND499Affinity Water

01707 679 623

BARNINGHAM WAY LONDON j/w Church LaneProposed Temporary Traffic Order for a road closure at Barningham Way j/w Church

Lane for a new water mains installation. Our ref: TTRO/18/014HIGHWAYS ACT PERMITS 17/09/2018 27/09/2018 11 Days PROPOSED WORKS ROAD CLOSURE AW888-L-MAIN-00000916

LONDON BOROUGH OF BRENT

020 8937 5600

BARRETTS GREEN ROAD LONDONJUNCTION OF ACTION LANE TO THE SIDE OF THE

MACHINE SHOP E: 520714 N: 183114

Deployment of new roadside superfast broadband cabinet and associated

connections to BT and LV power supply.STANDARD 02/10/2018 15/10/2018 14 Days PROPOSED WORKS NO C/W INCURSION ZC001-00003164 202/01454

BEAMES ROAD LONDON 37 - 55 s/o

new customer watr supply 1x90mm BP BULK supply, works in the fotway andin

Carriageway. Our intention is to complete the PermanentReinstatementin the same

phase

STANDARD 17/09/2018 28/09/2018 12 Days IN PROGRESS TWO-WAY SIGNALS MU307-000804995910060-001Thames Water

0800 316 9800

BEAUMONT AVENUE WEMBLEY 42 BEAUMONT AVENUE, WEMBLEY BRENT Relay Short Service Pipe - WORKING IN FOOTWAY MINOR 21/09/2018 25/09/2018 5 Days PROPOSED WORKS GIVE & TAKE MX044-10025219Affinity Water

01707 679 623

BELTON ROAD LONDON o/s 12. f\w.

Network Operations Distribution:Install / Replace / Remove electrical link

box:Replace a very poor condition Link Box in the footway. Part of HSE Initiative to

replace all Identified High Risk Link Bo

STANDARD 26/09/2018 03/10/2018 8 Days PROPOSED WORKS SOME C/W INCURSION EC400-10752671London Power Networks plc

0800 0280709

BELTON ROAD LONDON J/W HIGH ROAD WILLESDEN-BOTH DIRECTIONS Stores Compound - Welfare and storage facilities MAJOR 19/05/2018 30/11/2018 196 Days PROPOSED WORKS SOME C/W INCURSION AW042-309939LONDON BOROUGH OF BRENT

020 8937 5600

BERESFORD AVENUE WEMBLEYBERESFORD AVENUE, JUNC NORTH CIRCULAR

ROAD, WEMBLY , BRENTBURST MAIN - WORKING IN FOOTWAY IMMEDIATE (URGENT) 17/09/2018 20/09/2018 4 Days IN PROGRESS NO C/W INCURSION MX044-10025721SS

Affinity Water

01707 679 623

BERESFORD AVENUE WEMBLEY North Circular Road/Beresford road London NW10 7UD Repair Water Main - working in footway IMMEDIATE (URGENT) 17/09/2018 20/09/2018 4 Days IN PROGRESS SOME C/W INCURSION MX044-10025721KBAffinity Water

01707 679 623

BERESFORD AVENUE WEMBLEYopp junction of Craigmuir Park, Beresford Avenue,

Wembley HA0 1NY. f\w.

Network Operations Distribution:Install / Replace / Remove electrical link box:2-way

link box excavation, replacement& reinstatement. Footway closed - Pedestrians to

be diverted to opp F/W via means o

STANDARD 16/10/2018 22/10/2018 7 Days PROPOSED WORKS SOME C/W INCURSION EC300-34802198London Power Networks plc

0800 0280709

BERTIE ROAD LONDON S/O 271-279 HIGH ROAD IN BERTIE ROADBoundary Box Exchange Fway in Footway. Our intention is to complete

thePermanent Reinstatement in the same phaseIMMEDIATE (URGENT) 19/09/2018 25/09/2018 7 Days IN PROGRESS SOME C/W INCURSION MU301-000031158174-001

Thames Water

0800 316 9800

BEVERLEY DRIVE EDGWAREQUEENSBURY STATION PARADE TO WIMBORNE

DRIVE

FOOTWAY RECONSTRUCTION PROGRAMME- RESERVE SCHEME- 2018/19-

PEDESTRIAN SIGNING AND GUARDING-FOOTWAY CLOSURE, SOME C/W

INCURSION, CHAPTER 8

MAJOR 04/07/2018 01/10/2018 90 Days PROPOSED WORKS SOME C/W INCURSION AW042-292288LONDON BOROUGH OF BRENT

020 8937 5600

BLOCKLEY ROAD WEMBLEY Junction Pasture Road Short Section Footway Relay STANDARD 01/10/2018 12/10/2018 12 Days PROPOSED WORKS SOME C/W INCURSION AW999-S000000000387LONDON BOROUGH OF BRENT

020 8937 5600

BOWRONS AVENUE WEMBLEY OUTSIDE NO.1 REMOVE FOOTWAY BLOCKAGE TO ALLOW CUSTOMER CONNECTION MINOR 28/09/2018 29/09/2018 2 Days PROPOSED WORKS SOME C/W INCURSION NK100-/SCLJBU/107085/LBCVirgin Media

0870 8883117

BOWRONS AVENUE WEMBLEY OUTSIDE NO.33 REMOVE FOOTWAY BLOCKAGE TO ALLOW CUSTOMER CONNECTION MINOR 28/09/2018 29/09/2018 2 Days PROPOSED WORKS SOME C/W INCURSION NK100-/SCLJBU/107085/LBC1Virgin Media

0870 8883117

BOYCROFT AVENUE LONDON 162, BOYCROFT AVENUE, LONDON, BRENT COMMUNICATION PIPE - REPLACE; 25 MDPE; 4' CI; 1 OF 1 MINOR 24/09/2018 26/09/2018 3 Days PROPOSED WORKS SOME C/W INCURSION MX044-285144600Affinity Water

01707 679 623

BRAEMAR AVENUE LONDONRESHELL PCP38, S/O 492 NEASDEN LANE NORTH,

BRAEMAR AVENUE

Erect/Renew 1 PCP cabinet and base (600mm x 300mm x 1000mm),Install 1m of 3

poly ducts in Footway,Provide 3 core drill(s) into jointbox or buildingMINOR 24/09/2018 26/09/2018 3 Days PROPOSED WORKS NO C/W INCURSION BC006-TI001LC500269181400

BT

03301 233753

BRAMPTON GROVE WEMBLEY Outside 24 - 26 Short Section Footway Relay STANDARD 17/09/2018 28/09/2018 12 Days IN PROGRESS SOME C/W INCURSION AW999-S000000000388LONDON BOROUGH OF BRENT

020 8937 5600

BRENTFIELD ROAD LONDON Shackleton House, Stonebridge Park Water meter pit installation in footway MINOR 03/10/2018 05/10/2018 3 Days PROPOSED WORKS NO C/W INCURSION MU039-MGJV/BULK/200402Thames Water

0800 316 9800

BRENTVALE AVENUE WEMBLEY outside 71 to 73CLEAR BLOCKED TEE and REPAIR BLOCKAGES IF FOUND FOOTWAY WORKS

ONLYMINOR 25/09/2018 26/09/2018 2 Days PROPOSED WORKS NO C/W INCURSION NK100-/SSERRE/14004968J9A

Virgin Media

0870 8883117

BRONDESBURY PARK LONDON OUTSIDE NO.NW2 5JL REMOVE CARRIAGEWAY BLOCKAGE MINOR 08/10/2018 10/10/2018 3 Days PROPOSED WORKS SOME C/W INCURSION NK100-/SCLJFI/96706/LSME1Virgin Media

0870 8883117

BRONDESBURY VILLAS LONDON 101A CUSTOMER SIDE LEAKAGE REPAIR MINOR 27/09/2018 01/10/2018 5 Days PROPOSED WORKS NO C/W INCURSION MU356-003156SJSV--000001Thames Water

0800 316 9800

BROOK ROAD LONDON 25 CUSTOMER SIDE LEAKAGE SUPPLY PIPE REPLACEMENT MINOR 24/09/2018 26/09/2018 3 Days PROPOSED WORKS NO C/W INCURSION MU356-003156STNL--000001Thames Water

0800 316 9800

BROOKFIELD CRESCENT HARROW whole roadFOOTWAY RECONSTRUCTION PROGRAMME 2018/19-PEDESTRIAN SIGNING

AND GUARDING-FOOTWAY CLOSURE, SOME C/W INCURSION, CHAPTER 8MAJOR 17/09/2018 30/11/2018 75 Days IN PROGRESS SOME C/W INCURSION AW042-325265

LONDON BOROUGH OF BRENT

020 8937 5600

BURGESS AVENUE LONDONoutside Side of 157 Townsend Lane on Burgess

Avenue to 66 Burgess Avenue

CLEAR BLOCKED TEE and REPAIR BLOCKAGES IF FOUND FOOTWAY WORKS

ONLYMINOR 22/09/2018 25/09/2018 4 Days PROPOSED WORKS NO C/W INCURSION NK100-/SSERRE/14040747J9A

Virgin Media

0870 8883117

BURNSIDE CRESCENT WEMBLEY WHOLE ROAD

FOOTWAY RECONSTRUCTION PROGRAMME- RESERVE SCHEME- 2018/19-

PEDESTRIAN SIGNING AND GUARDING-FOOTWAY CLOSURE, SOME C/W

INCURSION, CHAPTER 8

MAJOR 04/07/2018 01/10/2018 90 Days PROPOSED WORKS SOME C/W INCURSION AW042-292330LONDON BOROUGH OF BRENT

020 8937 5600

CAMPDEN CRESCENT WEMBLEY WHOLE ROAD

FOOTWAY RECONSTRUCTION PROGRAMME- RESERVE SCHEME- 2018/19-

PEDESTRIAN SIGNING AND GUARDING-FOOTWAY CLOSURE, SOME C/W

INCURSION, CHAPTER 8

MAJOR 04/07/2018 01/10/2018 90 Days PROPOSED WORKS SOME C/W INCURSION AW042-292337LONDON BOROUGH OF BRENT

020 8937 5600

CARDINAL HINSLEY CLOSE LONDON whole road

WORKS METHODOLOGY: WORKING ON BEHALF OF THAMES WATER -

NOTIFICATION OF POTENTIAL WORKS TO CARRY OUT MAINS

REPLACEMENT SCHEME

MAJOR 08/11/2018 16/11/2018 9 Days PROPOSED WORKS SOME C/W INCURSION MU821-H208/MSUL40/Z001Thames Water

0800 316 9800

CARLISLE ROAD LONDON 21 OUTSIDE STOP VALVE REPLACEMENT IN FOOTWAY - LEAK REPAIR MINOR 19/09/2018 21/09/2018 3 Days PROPOSED WORKS NO C/W INCURSION MU260-CSL-MGJV-200141Thames Water

0800 316 9800

Page 3: London Borough of Brent · London Borough of Brent ... Kick off 20:00 03/09/2018 03/09/2018 1 Days Confirmed Event Day Road Closures ... Works in footway and carriageway to carry

London Borough of Brent

highways&[email protected] Roadworks/Events/Festivals

0208 937 5600 Network Management Team

Contact detailsEstimated

End DateEvent DescriptionMonth Duration

For the Week Commencing 24th September 2018

Traffic Management NotesWorks StatusStart Date

CARLTON VALE LONDON j/w Kilburn Park Road Sewer surveys - night work - no excavation HIGHWAYS ACT PERMITS 20/09/2018 21/09/2018 2 Days PROPOSED WORKS MULTI-WAY SIGNALS AW888-L-MAIN-00000940LONDON BOROUGH OF BRENT

020 8937 5600

CARLYON ROAD WEMBLEY s/o 255 Ealing Road

Proposed Temporary Traffic Order for a footway closure in Carlyon Road o/s new

development 255 Ealing Road to allow construction to be carried out. Our ref:

TTRO/18/001

HIGHWAYS ACT PERMITS 30/04/2018 17/12/2018 232 Days PROPOSED WORKS NO C/W INCURSION AW888-L-MAIN-00000886LONDON BOROUGH OF BRENT

020 8937 5600

CEDAR ROAD LONDONFROM JUNCTION WITH MORA ROAD TO JUNCTION

WITH IVY ROAD

WORKS METHODOLOGY: WORKING ON BEHALF OF THAMES WATER TO

CARRY OUT MAINS REPLACEMENT SURFACE LOCATION: CW AND FWMAJOR 03/09/2018 28/09/2018 26 Days IN PROGRESS SOME C/W INCURSION MU821-H553/MBIW04/I005

Thames Water

0800 316 9800

CENTRAL ROAD WEMBLEY FROM OPP NO.1 TO J/O DISTRICT ROAD IMGA192406. ABANDON 45M X 4' CI MAIN AND INSERT 75MM PE MAJOR 21/09/2018 11/10/2018 21 Days PROPOSED WORKS SOME C/W INCURSION AZ007-1000740451Cadent Gas Limited

0800 111 999

CENTRAL ROAD WEMBLEY CENTRAL ROAD, S/O NO.101 DISTRICT ROAD IMGA192406. STORAGE / COMPOUND / MUCK AND SPOIL AREA MAJOR 03/08/2018 12/10/2018 71 Days IN PROGRESS NO C/W INCURSION AZ007-1000732033Cadent Gas Limited

0800 111 999

CHADWICK ROAD LONDON footpath o/s 8 Trace, then excavate to repair gas escape and reinstate where possible IMMEDIATE (EMERGENCY) 17/09/2018 25/09/2018 9 Days IN PROGRESS NO C/W INCURSION AZ007-1000757401Cadent Gas Limited

0800 111 999

CHAMBERLAYNE ROAD LONDONChamberlayne Road from junction of Mostyn Road to

junction ofWakemanRoad

IMGA182254. replace approx 140m of 30in Medium Pressure CI GasMainwithNew

PE main by means of insertion. Includes 2 connectionsandremoval of a bendMAJOR 10/09/2018 04/10/2018 25 Days IN PROGRESS MULTI-WAY SIGNALS AZ007-1000754675

Cadent Gas Limited

0800 111 999

CHAMBERLAYNE ROAD LONDON j/w Banister RoadMajor Gas works - 3 way temp lights at Banister Road junction. Mortimor Road and

Harvist Road will be closed at the junction of Chamberlayne Road for the duration.HIGHWAYS ACT PERMITS 10/09/2018 07/10/2018 28 Days PROPOSED WORKS MULTI-WAY SIGNALS AW888-L-MAIN-00000926

LONDON BOROUGH OF BRENT

020 8937 5600

CHAMBERLAYNE ROAD LONDONIN THE NEARSIDE FOOTWAY OUTSIDE 153

CHAMBERLAYNE ROAD

ALTER AND RELAY 2X DOMESTIC SERVICE 3M FROM 75MM PE MAIN IN

NEARSIDEFOOTWAYMINOR 16/10/2018 18/10/2018 3 Days PROPOSED WORKS TWO-WAY SIGNALS AZ007-1000756403

Cadent Gas Limited

0800 111 999

CHANDOS ROAD LONDON TK1 - Flank wall of No.97 Melrose Av.. f\w.Connections Highway Services:Works on behalf of local authority (Works For Road

Purposes) :Pay and display scheme on behalf of LBB - Valji SenganiSTANDARD 21/09/2018 26/09/2018 6 Days PROPOSED WORKS SOME C/W INCURSION EC400-10753439

London Power Networks plc

0800 0280709

CHANDOS ROAD LONDONCHANDOS ROAD, WHOLE STREET, FROM C/O

NO.97 MELROSE AVENUE TO C/O CHANDOSHOUSE

IMGA192010 ABANDON 229M X 4' CI MAIN AND INSERT 75MM PE AND RELAY

ORTRANSFER SERVICES.MAJOR 19/11/2018 21/12/2018 33 Days PROPOSED WORKS SOME C/W INCURSION AZ007-1000747624

Cadent Gas Limited

0800 111 999

CHAPLIN ROAD LONDON TK2 - Flank wall of 13 Belton RD. f\w.Connections Highway Services:Works on behalf of local authority (Works For Road

Purposes) :Pay and display scheme on behalf of LBB - Valji SenganiSTANDARD 21/09/2018 26/09/2018 6 Days PROPOSED WORKS SOME C/W INCURSION EC400-10753437

London Power Networks plc

0800 0280709

CHAPLIN ROAD LONDON s/o 12 Belton road in Chaplin road. f\w.

Network Operations Distribution:Install / Replace / Remove electrical link

box:Replace a very poor condition Link Box in the footway. Part of HSE Initiative to

replace all Identified High Risk Link Bo

STANDARD 26/09/2018 03/10/2018 8 Days PROPOSED WORKS SOME C/W INCURSION EC400-10752676London Power Networks plc

0800 0280709

CHAPTER ROAD LONDON 221 CHAPTER ROAD, LONDON, NW2 5LUMain Clamp 0 to 6' Cway in Carriageway. Our intention is to complete thePermanent

Reinstatement in the same phaseMINOR 20/09/2018 24/09/2018 5 Days PROPOSED WORKS SOME C/W INCURSION MU301-000031153354-001

Thames Water

0800 316 9800

CHAPTER ROAD LONDON outside 60 to 64CLEAR BLOCKED TEE and REPAIR BLOCKAGES IF FOUND FOOTWAY WORKS

ONLYMINOR 22/09/2018 25/09/2018 4 Days PROPOSED WORKS NO C/W INCURSION NK100-/SSERRE/14061025J9

Virgin Media

0870 8883117

CHAPTER ROAD LONDON TK3 - O/S NO.294. f\w.Connections Highway Services:Works on behalf of local authority (Works For Road

Purposes) :Pay and display scheme on behalf of LBB - Valji SenganiSTANDARD 21/09/2018 26/09/2018 6 Days PROPOSED WORKS SOME C/W INCURSION EC400-10753435

London Power Networks plc

0800 0280709

CHATSWORTH AVENUE WEMBLEY OUTSIDE JUNIOR SCHOOL LAY NEW DUCT IN FOOTWAY TO ALLOW CUSTOMER CONNECTION STANDARD 09/10/2018 16/10/2018 8 Days PROPOSED WORKS SOME C/W INCURSION NK100-/SCLJBU/98885/LBAVirgin Media

0870 8883117

CHRISTCHURCH AVENUE LONDON 19 - 19 opp

New customer water supply 6x25mm MDPE mtrd, works in the footway and

inCarriageway. Our intention is to complete the Permanent Reinstatement inthe

same phase

STANDARD 17/09/2018 21/09/2018 5 Days IN PROGRESS PRIORITY WORKING MU307-000807056180100-001Thames Water

0800 316 9800

CHURCH LANE LONDON outside 105 to 109CLEAR BLOCKED TEE and REPAIR BLOCKAGES IF FOUND FOOTWAY WORKS

ONLYMINOR 21/09/2018 24/09/2018 4 Days PROPOSED WORKS NO C/W INCURSION NK100-/SSERRE/14057729J9A

Virgin Media

0870 8883117

CHURCH LANE LONDON O/S 359 , CHURCH LANE Demolish 1 existing jointbox(s) or cabinet base(s) MINOR 24/09/2018 26/09/2018 3 Days PROPOSED WORKS NO C/W INCURSION BC006-TI001LC500262181800BT

03301 233753

CHURCH PATH LONDONFROM JUNCTION WITH REDFERN ROAD TO

OUTSIDE NO 155

WORKING ON BEHALF OF THAMES WATER TO CARRY OUT MAINS

REPLACEMENT SURFACE LOCATION: CW AND FWMAJOR 13/11/2018 10/12/2018 28 Days PROPOSED WORKS SOME C/W INCURSION MU821-H553/MKET13/I002

Thames Water

0800 316 9800

CHURCHILL ROAD LONDON

CHURCHILL ROAD, WHOLE STREET, FROM C/O

NO.1 BALMORAL ROAD TO C/O NO.138CHAPTER

ROAD

IMGA192010 ABANDON 236M X 8' CI MAIN AND INSERT 125MM PE AND RELAY

ORTRANSFER SERVICES.MAJOR 19/11/2018 21/12/2018 33 Days PROPOSED WORKS SOME C/W INCURSION AZ007-1000748012

Cadent Gas Limited

0800 111 999

CLAREMONT ROAD LONDON KILBURN LANE TO NUMBER 19 MAJOR CARRIAGEWAY RESSURFACING WORKS-ROAD CLOSURE 2018-2019 MAJOR 27/07/2018 24/10/2018 90 Days PROPOSED WORKS ROAD CLOSURE AW042-290797LONDON BOROUGH OF BRENT

020 8937 5600

CLARENDON GARDENS WEMBLEY 159Non-excavation permit for closing the road relating to sewer repair works on

Wembley Park DriveIMMEDIATE (EMERGENCY) 18/09/2018 01/10/2018 14 Days IN PROGRESS ROAD CLOSURE MU026-008107LDQG--0002

Thames Water

0800 316 9800

CLARENDON GARDENS WEMBLEYA DOMESTIC GAS ALTERATION AND RELAY FOR 38

CLARENDON GARDENS 2M THE MAIN

A DOMESTIC GAS ALTERATION AND RELAY FOR 38 CLARENDON GARDENS

2M THE MAINSTANDARD 04/10/2018 10/10/2018 7 Days PROPOSED WORKS SOME C/W INCURSION AZ007-1000758284

Cadent Gas Limited

0800 111 999

CLIFTON AVENUE WEMBLEY 51 CLIFTON AVE, WEMBLEY, BRENT Relay Long Service Pipe - working in footway and carriageway MINOR 18/09/2018 20/09/2018 3 Days IN PROGRESS GIVE & TAKE MX044-10013179Affinity Water

01707 679 623

COMPTON ROAD LONDONFROM THE JUNCTION WITH WAKEMAN ROAD TO

THE JUNCTION WITH PEMBER ROAD

MAJOR LARGE DIAMETER MAINS REPLACEMENT WORKS TO TAKE

PLACE.ABANDON154MOF METALLIC MAIN AND REPLACE IT WITH 154M OF

PE MAIN. INSERTION METHOD TO BE USED, NEW MAIN TO BE SLEEVED

INSIDE THE OLDTOREDUCEEX

MAJOR 20/09/2018 27/11/2018 69 Days PROPOSED WORKS ROAD CLOSURE AZ007-1000682228Cadent Gas Limited

0800 111 999

CONDUIT WAY LONDON 89-91 OUTSIDE STOP VALVE REPLACEMENT IN FOOTWAY - LEAK REPAIR MINOR 19/09/2018 21/09/2018 3 Days IN PROGRESS NO C/W INCURSION MU260-CSL-MGJV-200128Thames Water

0800 316 9800

COOPER ROAD LONDON 33B Box Install<33mm Fway in Footway. Our intention is to completethe Permanent

Reinstatement in the same phaseIMMEDIATE (URGENT) 19/09/2018 25/09/2018 7 Days IN PROGRESS SOME C/W INCURSION MU301-000031155167-001

Thames Water

0800 316 9800

COPPERMEAD CLOSE LONDONNEARSIDE FOOTWAY OUTSIDE OF NO. PLOT ONE

COPPER MEAD CLOSELAY NEW DOMESTIC SERVICE 2M FROM MAIN IN NEARSIDE FOOTWAY STANDARD 09/10/2018 15/10/2018 7 Days PROPOSED WORKS NO C/W INCURSION AZ007-1000755829

Cadent Gas Limited

0800 111 999

CORINIUM CLOSE WEMBLEY Outside number 5 . . f\w.

Connections Projects:Installation of a new electricity supply for a customer:Joint Bay

to expose .95ew cable for jointing. 35ew 3 core cable pull from joint bay to customer

service head position

MINOR 28/09/2018 02/10/2018 5 Days PROPOSED WORKS SOME C/W INCURSION EC300-34801698London Power Networks plc

0800 0280709

CORNWALL GARDENS LONDON 24B Box Install<33mm Fway in Footway. Our intention is to completethe Permanent

Reinstatement in the same phaseIMMEDIATE (URGENT) 14/09/2018 20/09/2018 7 Days IN PROGRESS SOME C/W INCURSION MU301-000031155344-001

Thames Water

0800 316 9800

CORONATION ROAD LONDONRoundabout junction on Coronation Road (Roundabout

with Rainsford Road)1x Joint Bay MAJOR 10/09/2018 25/09/2018 16 Days IN PROGRESS SOME C/W INCURSION ZP011-P-0094478/R11 202/01230

Page 4: London Borough of Brent · London Borough of Brent ... Kick off 20:00 03/09/2018 03/09/2018 1 Days Confirmed Event Day Road Closures ... Works in footway and carriageway to carry

London Borough of Brent

highways&[email protected] Roadworks/Events/Festivals

0208 937 5600 Network Management Team

Contact detailsEstimated

End DateEvent DescriptionMonth Duration

For the Week Commencing 24th September 2018

Traffic Management NotesWorks StatusStart Date

CRANLEIGH GARDENS HARROW outside 30 to 34CUSTOMER CONNECTION NEW RESIDENTIAL SUPPLY. CLEAR BLOCKED

TEE and REPAIR BLOCKAGES IF FOUND, FOOTWAY WORKS ONLYMINOR 22/09/2018 25/09/2018 4 Days PROPOSED WORKS NO C/W INCURSION NK100-/SSERRE/13897467J9

Virgin Media

0870 8883117

CRAVEN PARK ROAD LONDON 76Remedial Works Following Defect Inspection- To rectify remedial work in

CarriagewayMINOR 26/09/2018 28/09/2018 3 Days PROPOSED REMEDIAL GIVE & TAKE AZ007-1000608009

Cadent Gas Limited

0800 111 999

CRICKLEWOOD BROADWAY LONDON O/S 147/149 Trial digs around shelter to confirm type of foundations - 0105/0104 MINOR 21/09/2018 23/09/2018 3 Days PROPOSED WORKS SOME C/W INCURSION RK001-00040815 202/00487

CUMBERLAND AVENUE LONDON WHOLE ROAD MAJOR CARRIAGEWAY RESURFACING WORKS -2018-2019-ROAD CLOSURE MAJOR 20/09/2018 22/09/2018 3 Days PROPOSED WORKS ROAD CLOSURE AW042-290740LONDON BOROUGH OF BRENT

020 8937 5600

DAIRY CLOSE LONDON whole road

WORKS METHODOLOGY: WORKING ON BEHALF OF THAMES WATER -

NOTIFICATION OF POTENTIAL WORKS TO CARRY OUT MAINS

REPLACEMENT SCHEME

MAJOR 11/10/2018 25/10/2018 15 Days PROPOSED WORKS SOME C/W INCURSION MU821-H208/MSUL39/Z001Thames Water

0800 316 9800

DARTMOUTH ROAD LONDON outside 2 to 6CUSTOMER CONNECTION NEW RESIDENTIAL SUPPLY. CLEAR BLOCKED

TEE and REPAIR BLOCKAGES IF FOUND, FOOTWAY WORKS ONLYMINOR 21/09/2018 24/09/2018 4 Days PROPOSED WORKS NO C/W INCURSION NK100-/SSERRE/14083519J9

Virgin Media

0870 8883117

DARTMOUTH ROAD LONDON TK5 - Flank Wall of 19 Mapesbury RD. f\w.Connections Highway Services:Works on behalf of local authority (Works For Road

Purposes) :Pay and display scheme on behalf of LBB - Valji SenganiSTANDARD 21/09/2018 26/09/2018 6 Days PROPOSED WORKS SOME C/W INCURSION EC400-10753430

London Power Networks plc

0800 0280709

DARTMOUTH ROAD LONDON TK4 - opposite NO.37. f\w.Connections Highway Services:Works on behalf of local authority (Works For Road

Purposes) :Pay and display scheme on behalf of LBB - Valji SenganiSTANDARD 21/09/2018 26/09/2018 6 Days PROPOSED WORKS SOME C/W INCURSION EC400-10753432

London Power Networks plc

0800 0280709

DARTMOUTH ROAD LONDON s/o 22 Mapesbury Road in Dartmouth Road nw2. f\w.

Network Operations Distribution:Install / Replace / Remove electrical link

box:Replace a very poor condition Link Box in the footway. Part of HSE Initiative to

replace all Identified High Risk Link Bo

STANDARD 09/10/2018 16/10/2018 8 Days PROPOSED WORKS NO C/W INCURSION EC400-10753143London Power Networks plc

0800 0280709

DEERHURST ROAD LONDON TK6 - Adjacent to car park, 68 Chatsworth RD. f\w.

Connections Highway Services:Works on behalf of local authority (Works For Road

Purposes) :Works on behalf of local authority - Disconnection Scheme to pay and

display units. Working in the footway wi

STANDARD 21/09/2018 26/09/2018 6 Days PROPOSED WORKS SOME C/W INCURSION EC400-10753429London Power Networks plc

0800 0280709

DENZIL ROAD LONDON 6 / FIRST FLOOR CUSTOMER SIDE LEAKAGE SUPPLY PIPE REPLACEMENT MINOR 20/09/2018 24/09/2018 5 Days PROPOSED WORKS NO C/W INCURSION MU356-003156SVFN--000001Thames Water

0800 316 9800

DISTRICT ROAD WEMBLEY ALLENDALE ROAD TO MAYBANK OPEN SPACE

FOOTWAY RECONSTRUCTION PROGRAMME- RESERVE SCHEME- 2018/19-

PEDESTRIAN SIGNING AND GUARDING-FOOTWAY CLOSURE, SOME C/W

INCURSION, CHAPTER 8

MAJOR 04/07/2018 01/10/2018 90 Days PROPOSED WORKS SOME C/W INCURSION AW042-292333LONDON BOROUGH OF BRENT

020 8937 5600

DISTRICT ROAD WEMBLEY FROM OPP. NO.37 TO O/S NO.110IMGA192406. ABANDON 386M X 4' CI MAIN AND INSERT 90MM

PEANDRELAYORTRANSFER APPROX 70 SERVICESMAJOR 17/07/2018 31/10/2018 107 Days IN PROGRESS SOME C/W INCURSION AZ007-1000688642

Cadent Gas Limited

0800 111 999

DOLLIS HILL LANE LONDON 201 CUSTOMER SIDE LEAKAGE SUPPLY PIPE REPLACEMENT MINOR 27/09/2018 01/10/2018 5 Days PROPOSED WORKS NO C/W INCURSION MU356-003156STHR--000001Thames Water

0800 316 9800

DOLLIS HILL LANE LONDON 49-51 DOLLIS HILL LANE, NW2 6JHFerrule Exchange in Carriageway. Our intention is to complete thePermanent

Reinstatement in the same phaseMINOR 08/10/2018 10/10/2018 3 Days PROPOSED WORKS SOME C/W INCURSION MU301-000031151993-001

Thames Water

0800 316 9800

DRAYTON ROAD LONDON 102Replace Sewer Cover--WORKS INTENDED TO INCLUDE FIRST TIME

PERMANENT REINSTATEMENT WITHIN SAME PHASEMINOR 01/10/2018 01/10/2018 1 Days PROPOSED WORKS GIVE & TAKE MU026-003156SHVS--000001

Thames Water

0800 316 9800

DUDDEN HILL LANE LONDON O/s 167. f\w. c\w.Connections Projects:Electrical service alteration to customer supply:Disconnection

of existing serviceSTANDARD 03/10/2018 09/10/2018 7 Days PROPOSED WORKS SOME C/W INCURSION EC400-10753153

London Power Networks plc

0800 0280709

DYNE ROAD LONDON 1a/1b opp

new customer water supply 1x90mm BP mtrd F/H, works in the footway andin

Carriageway. Our intention is to complete the Permanent Reinstatementin the same

phase

STANDARD 24/09/2018 27/09/2018 4 Days PROPOSED WORKS PRIORITY WORKING MU307-000806943350270-001Thames Water

0800 316 9800

DYNE ROAD LONDON S/O 1B - O/S AND OPP1x125mm BP NEW WATER METER SUPPLY IN F.WAY AND in Carriageway.

Ourintention is to complete the Permanent Reinstatement in the same phaseSTANDARD 24/09/2018 02/10/2018 9 Days PROPOSED WORKS PRIORITY WORKING MU307-000806987400100-001

Thames Water

0800 316 9800

EALING ROAD WEMBLEY outside 104 to 80 OUT OF HOURS CABLE PULL - FOOTWAY WORKS ONLY - NO EXCAVATION MINOR 20/09/2018 20/09/2018 1 Days PROPOSED WORKS NO C/W INCURSION NK100-/SSERRE/12435883N9Virgin Media

0870 8883117

EALING ROAD WEMBLEY

O/S 6-3 T OPP JCN CARLYON ROAD TO ACROSS

C/W TO AT JCN WITH CARLYON ROAD, EALING

ROAD

Locate and excavate 2 blockages in existing duct MINOR 24/09/2018 25/09/2018 2 Days PROPOSED REMEDIAL NO C/W INCURSION BC006-TI001LC500268396700BT

03301 233753

EALING ROAD WEMBLEY OUTSIDE 188FIT NEW TEE AND LAY DUCT IN FOOTWAY AND CARRIAGEWAY FOR

CUSTOMER CONNECTIONMINOR 27/09/2018 01/10/2018 5 Days PROPOSED WORKS SOME C/W INCURSION NK100-/SCLJBU/98844/LBA

Virgin Media

0870 8883117

EALING ROAD WEMBLEY on the corner with Bowrons AvenueNon excavation works - Pedestrian management 50m barrier around cabinets for

repair/maintenance, Pedestrian diversion , shop entrances left clearMINOR 04/10/2018 05/10/2018 2 Days PROPOSED WORKS NO C/W INCURSION MG014-44936-RTS-CG-CABS 202/00486

EAST HILL WEMBLEY Junction Barn Way Short Section Footway Relay STANDARD 24/09/2018 05/10/2018 12 Days PROPOSED WORKS SOME C/W INCURSION AW999-S000000000386LONDON BOROUGH OF BRENT

020 8937 5600

EDGWARE ROAD LONDON Outside of Hyde House. f\w.Connections Highway Services:NEW SERVICE: (APPROX DEPTH 450mm-

600mm):New metered connection to Virgin Media cabinetSTANDARD 24/09/2018 28/09/2018 5 Days PROPOSED WORKS SOME C/W INCURSION EC300-34800203

London Power Networks plc

0800 0280709

EDGWARE ROAD LONDONIn lane 1 and 2 of the n/b c/w approx 60m s of the junc

with Gladstone Park GardensTfL speed camera works - 2 lane piezos, loops and centre scm MINOR 03/10/2018 05/10/2018 3 Days PROPOSED WORKS TWO-WAY SIGNALS YG504-392638

TFL

0343 222 1234

EDGWARE ROAD LONDONFrom j/o Wakemans Hill Avenue to j/o Windover

Avenue, Edgware Road, Brent, London.. c\w.

Network Operations Distribution:Install / Replace / Remove electrical link

box:Excavation of trench in carriageway to enable the installation of a duct that will

accommodate a new high voltage cable.

MAJOR 24/09/2018 16/11/2018 54 Days PROPOSED WORKS MULTI-WAY SIGNALS EC300-34795204London Power Networks plc

0800 0280709

ELSPETH ROAD WEMBLEY whole Rd Trunk Main Reinforcement. Kier working on behalf of Affinity Water. MAJOR 24/09/2018 04/11/2018 42 Days POTENTIAL WORKS PRIORITY WORKING MX049-TMRFELSPETHRDAffinity Water

01707 679 623

ELTHORNE WAY LONDON WHOLE ROAD

FOOTWAY RECONSTRUCTION PROGRAMME- RESERVE SCHEME- 2018/19-

PEDESTRIAN SIGNING AND GUARDING-FOOTWAY CLOSURE, SOME C/W

INCURSION, CHAPTER 8

MAJOR 04/07/2018 01/10/2018 90 Days PROPOSED WORKS SOME C/W INCURSION AW042-292339LONDON BOROUGH OF BRENT

020 8937 5600

EMPIRE WAY WEMBLEYO/S 1-49 MAPLE HOUSE TO OPP 64-72 RAGLAN

COURT , EMPIRE WAYLocate and excavate 2 blockage in existing duct MINOR 19/09/2018 21/09/2018 3 Days IN PROGRESS NO C/W INCURSION BC006-TI001LC500268968200

BT

03301 233753

ENGINEERS WAY WEMBLEY Junction of Olympic Way Excavate large HV joint bay in FW for UKPN disconnection. STANDARD 17/09/2018 21/09/2018 5 Days IN PROGRESS SOME C/W INCURSION VQ004-UKP7405 202/01887

ENGINEERS WAY WEMBLEY Stadium Boxing - Joshua v Povetkin HIGHWAYS ACT PERMITS 22/09/2018 22/09/2018 1 Days PROPOSED WORKS ROAD CLOSURE AW888-L-MAIN-00000914LONDON BOROUGH OF BRENT

020 8937 5600

ENGINEERS WAY WEMBLEY

ETHERNET CIRCUIT NUMBER BTSA210412, S58

WAIVER INC, OPP RUTHERFORD WAY JUNC,

ENGINEERS WAY

Build 1 concrete chamber 915mm x 445mm x 965mm deep in Footway,Install 2m of

1 way poly duct in FootwayMINOR 24/09/2018 26/09/2018 3 Days PROPOSED WORKS NO C/W INCURSION BC006-TI001LC500267688200

BT

03301 233753

Page 5: London Borough of Brent · London Borough of Brent ... Kick off 20:00 03/09/2018 03/09/2018 1 Days Confirmed Event Day Road Closures ... Works in footway and carriageway to carry

London Borough of Brent

highways&[email protected] Roadworks/Events/Festivals

0208 937 5600 Network Management Team

Contact detailsEstimated

End DateEvent DescriptionMonth Duration

For the Week Commencing 24th September 2018

Traffic Management NotesWorks StatusStart Date

ENGINEERS WAY WEMBLEY Stadium Tottenham v Barcelona HIGHWAYS ACT PERMITS 03/10/2018 03/10/2018 1 Days PROPOSED WORKS ROAD CLOSURE AW888-L-MAIN-00000933LONDON BOROUGH OF BRENT

020 8937 5600

ENGINEERS WAY WEMBLEY Stadium Tottenham v Cardiff HIGHWAYS ACT PERMITS 06/10/2018 06/10/2018 1 Days PROPOSED WORKS ROAD CLOSURE AW888-L-MAIN-00000920LONDON BOROUGH OF BRENT

020 8937 5600

ENGINEERS WAY WEMBLEY Stadium NFL - Seattle Seahawks @ Oakland Raiders HIGHWAYS ACT PERMITS 14/10/2018 14/10/2018 1 Days PROPOSED WORKS ROAD CLOSURE AW888-L-MAIN-00000921LONDON BOROUGH OF BRENT

020 8937 5600

ENGINEERS WAY WEMBLEY Stadium NFL - Titans @ Chargers HIGHWAYS ACT PERMITS 21/10/2018 21/10/2018 1 Days PROPOSED WORKS ROAD CLOSURE AW888-L-MAIN-00000865LONDON BOROUGH OF BRENT

020 8937 5600

ENGINEERS WAY WEMBLEY Stadium NFL - Eagles @ Jaguars HIGHWAYS ACT PERMITS 28/10/2018 28/10/2018 1 Days PROPOSED WORKS ROAD CLOSURE AW888-L-MAIN-00000866LONDON BOROUGH OF BRENT

020 8937 5600

ENGINEERS WAY WEMBLEY Stadium Tottenham v Man City HIGHWAYS ACT PERMITS 29/10/2018 29/10/2018 1 Days PROPOSED WORKS ROAD CLOSURE AW888-L-MAIN-00000934LONDON BOROUGH OF BRENT

020 8937 5600

ENGINEERS WAY WEMBLEY Stadium Tottenham v PSV HIGHWAYS ACT PERMITS 06/11/2018 06/11/2018 1 Days PROPOSED WORKS ROAD CLOSURE AW888-L-MAIN-00000935LONDON BOROUGH OF BRENT

020 8937 5600

ENGINEERS WAY WEMBLEY Stadium England v USA HIGHWAYS ACT PERMITS 15/11/2018 15/11/2018 1 Days PROPOSED WORKS ROAD CLOSURE AW888-L-MAIN-00000893LONDON BOROUGH OF BRENT

020 8937 5600

ENGINEERS WAY WEMBLEY Stadium England v Croatia HIGHWAYS ACT PERMITS 18/11/2018 18/11/2018 1 Days PROPOSED WORKS ROAD CLOSURE AW888-L-MAIN-00000867LONDON BOROUGH OF BRENT

020 8937 5600

ENGINEERS WAY WEMBLEY Stadium EE Wembley Cup HIGHWAYS ACT PERMITS 25/11/2018 25/11/2018 1 Days PROPOSED WORKS ROAD CLOSURE AW888-L-MAIN-00000937LONDON BOROUGH OF BRENT

020 8937 5600

ENGINEERS WAY WEMBLEY Stadium Tottenham v Inter Milan HIGHWAYS ACT PERMITS 28/11/2018 28/11/2018 1 Days PROPOSED WORKS ROAD CLOSURE AW888-L-MAIN-00000936LONDON BOROUGH OF BRENT

020 8937 5600

ETON GROVE LONDON 63 eton grove Brent Repair Water Main in the footway IMMEDIATE (URGENT) 17/09/2018 21/09/2018 5 Days IN PROGRESS SOME C/W INCURSION MX044-10025625Affinity Water

01707 679 623

EVELYN AVENUE LONDON whole roadFOOTWAY RECONSTRUCTION PROGRAMME 2018/19-PEDESTRIAN SIGNING

AND GUARDING-FOOTWAY CLOSURE, SOME C/W INCURSIONMAJOR 25/06/2018 28/09/2018 96 Days IN PROGRESS SOME C/W INCURSION AW042-292009

LONDON BOROUGH OF BRENT

020 8937 5600

FAIRFIELDS CRESCENT LONDON WHOLE ROAD MAJOR C/W RESURFACING(RESERVE SCHEME)-2018-2019-ROAD CLOSURE MAJOR 28/06/2018 25/09/2018 90 Days IN PROGRESS ROAD CLOSURE AW042-291118LONDON BOROUGH OF BRENT

020 8937 5600

FELIXSTOWE ROAD LONDON O/S NO 17/19 TO O/S NO 5, FELIXSTOWE ROAD Locate and excavate 1 blockage in existing duct MINOR 21/09/2018 25/09/2018 5 Days PROPOSED WORKS NO C/W INCURSION BC006-TI001LC500269051200BT

03301 233753

FELIXSTOWE ROAD LONDON O/S NO 17/19 TO O/S NO 45/47, FELIXSTOWE ROAD Locate and excavate 1 blockage in existing duct MINOR 21/09/2018 25/09/2018 5 Days PROPOSED WORKS NO C/W INCURSION BC006-TI001LC500269051600BT

03301 233753

FELIXSTOWE ROAD LONDONO/S NO 47 TO CNR JCTN WITH PURVES RD ON,

FELIXSTOWE ROADLocate and excavate 1 blockage in existing duct MINOR 21/09/2018 25/09/2018 5 Days PROPOSED WORKS NO C/W INCURSION BC006-TI001LC500269053500

BT

03301 233753

FERNWOOD AVENUE WEMBLEYFERNWOOD AVENUE, FROM C/O NO.203 CHAPLIN

ROADTOC/ONO.35/36FERNWOODAVENUE

IMGA192407 ABANDON APPROXIMATELY 62M X 4' CI

MAINANDINSERT75MMPEANDRELAYOR TRANSFER SERVICES.STANDARD 21/09/2018 04/10/2018 14 Days PROPOSED WORKS NO C/W INCURSION AZ007-1000748116

Cadent Gas Limited

0800 111 999

FIRST AVENUE WEMBLEY 3 FIRST AVENUE, PINNER, HA5 Relay Long Service Pipe - working in footway and carriageway MINOR 18/09/2018 20/09/2018 3 Days IN PROGRESS SOME C/W INCURSION MX044-10013012Affinity Water

01707 679 623

FIRST AVENUE WEMBLEY outside 10 to 14 INTERIM TO PERMANENT REINSTATEMENT INT HE FOOTWAY MINOR 29/09/2018 01/10/2018 3 Days PROPOSED PERMANENT NO C/W INCURSION NK100-/SSERRE/14027925J9AVirgin Media

0870 8883117

FIRST WAY WEMBLEY ENTRANCE TO CANNON INDUSTRIAL ESTATEIMGD180192. DIVERSION - CUT OFF EXISTING 125MM MAIN TO ALLOW

SITEREDEVELOPMENTSTANDARD 17/09/2018 24/09/2018 8 Days IN PROGRESS NO C/W INCURSION AZ007-1000744752

Cadent Gas Limited

0800 111 999

FIRST WAY WEMBLEY Footway - Gate 5 to opp Dhamecha

Proposed Temporary Traffic Order for a footway closure and temporary pedestrian

crossings o/s Plot E05 in First Way to carry out construction works. Our ref:

TTRO/17/032

HIGHWAYS ACT PERMITS 04/12/2017 03/06/2019 547 Days PROPOSED WORKS NO C/W INCURSION AW888-L-MAIN-00000831LONDON BOROUGH OF BRENT

020 8937 5600

FOXHOLT GARDENS LONDON 0pp 10Fire Hydrant Repack Gland No Excav in Footway. Our intention is tocomplete the

Permanent Reinstatement in the same phaseMINOR 19/09/2018 21/09/2018 3 Days IN PROGRESS SOME C/W INCURSION MU301-000031155965-001

Thames Water

0800 316 9800

FOXHOLT GARDENS LONDON 9 FOXHOLT GARDENS, LONDON, NW10 0TAValve Repack 0 to 6' Cway in Carriageway. Our intention is to completethe

Permanent Reinstatement in the same phaseIMMEDIATE (URGENT) 18/09/2018 24/09/2018 7 Days IN PROGRESS SOME C/W INCURSION MU301-000031152064-001

Thames Water

0800 316 9800

FRYENT WAY LONDON o/s moot court fryent way Repair Water Main (Urgent) - WORKING IN THE VERGE IMMEDIATE (URGENT) 18/09/2018 20/09/2018 3 Days IN PROGRESS NO C/W INCURSION MX044-10026098Affinity Water

01707 679 623

FULTON ROAD WEMBLEY

130M NORTHEAST AND ACROSS C/W TO 152M

EAST FROM JCTN WITH HARBUTT RD ON, FULTON

ROAD

Build 1 concrete chamber 915mm x 445mm x 965mm deep in Footway,Build 1

concrete chamber 725mm x 255mm x 665mm deep in Footway,Install 12m of 1 way

poly duct in Carriageway,Install 12m of 1 way poly d

STANDARD 24/09/2018 27/09/2018 4 Days PROPOSED WORKS TWO-WAY SIGNALS BC006-TI001LC500267670900BT

03301 233753

FULTON ROAD WEMBLEY from J/w Olympic Way to 50m west - f/way closureProposed Temporary Traffic Order for a footway closure o/s Box Park - Fulton Road

j/w Olympic Way to allow for construction works. Our ref: TTRO/18/004HIGHWAYS ACT PERMITS 31/07/2018 30/11/2018 123 Days PROPOSED WORKS NO C/W INCURSION AW888-L-MAIN-00000909

LONDON BOROUGH OF BRENT

020 8937 5600

GLENGALL ROAD LONDON O/s 135. f\w.

Network Operations Faults:Essential and immediate replacement or repair of multi-

way link box to ensure safe and reliable power supplies:urgent repairs to faulted link

box

IMMEDIATE (URGENT) 17/09/2018 24/09/2018 8 Days IN PROGRESS SOME C/W INCURSION EC400-10753547London Power Networks plc

0800 0280709

GOWAN ROAD LONDONFROM JUNCTION WITH HIGH ROAD TO OUTSIDE NO

58

WORKS METHODOLOGY: WORKING ON BEHALF OF THAMES WATER TO

CARRY OUT MAINS REPLACEMENT SURFACE LOCATION: CW AND FWMAJOR 24/09/2018 22/10/2018 29 Days PROPOSED WORKS SOME C/W INCURSION MU821-H553/MSUL25/I004

Thames Water

0800 316 9800

GREAT CENTRAL WAY WEMBLEYon footway Great Central Way, approx 30 yds from

Hannah CLose

SRC Defects - taking photos/ Testing/ Labelling -All works within existing cabinet.

Some C/W incursion. Works to be on the footpath and verge. Personal barriers to be

used Fault Invesigation & Rectif

MINOR 21/09/2018 21/09/2018 1 Days PROPOSED WORKS NO C/W INCURSION NX260-VF86164WHP/NJE05Vodafone

01724 848246

Page 6: London Borough of Brent · London Borough of Brent ... Kick off 20:00 03/09/2018 03/09/2018 1 Days Confirmed Event Day Road Closures ... Works in footway and carriageway to carry

London Borough of Brent

highways&[email protected] Roadworks/Events/Festivals

0208 937 5600 Network Management Team

Contact detailsEstimated

End DateEvent DescriptionMonth Duration

For the Week Commencing 24th September 2018

Traffic Management NotesWorks StatusStart Date

GRENDON GARDENS WEMBLEY whole roadFOOTWAY RECONSTRUCTION PROGRAMME 2018/19-PEDESTRIAN SIGNING

AND GUARDING-FOOTWAY CLOSURE, SOME C/W INCURSIONMAJOR 04/07/2018 31/01/2019 212 Days IN PROGRESS SOME C/W INCURSION AW042-292012

LONDON BOROUGH OF BRENT

020 8937 5600

GROSVENOR CRESCENT LONDON OUTSIDE 19 INTERIM TO PERMANENT REINSTATEMENT IN THE FOOTWAY MINOR 27/09/2018 28/09/2018 2 Days PROPOSED PERMANENT NO C/W INCURSION NK100-/SSERRE/13941117J8Virgin Media

0870 8883117

GROVE CRESCENT LONDON jct Evelyn Avenue STORES COMPOUND- onsite 24 hours a day MAJOR 27/06/2018 04/12/2018 161 Days IN PROGRESS NO C/W INCURSION AW042-311245LONDON BOROUGH OF BRENT

020 8937 5600

GROVE PARK LONDON OUTSIDE 89 ON, GROVE PARKPerform 1 reinstatement activity,Performing an 1excavation to expose existing

power cable in FootwayMINOR 31/10/2018 02/11/2018 3 Days PROPOSED WORKS TWO-WAY SIGNALS BC006-TI001LC500262936001

BT

03301 233753

GROVE PARK LONDONGROVE PARK - WHOLE STREET FROM THE J/O

EDGWARE ROAD TO J/O STAGG LANE.

IMGA192293. ABANDON - 503M X 8' SI AND 66M X 8' SI AND 167M X 4' SI

AND4M X 4' SI AND INSERT 503M X 180MM PE AND 66M X 180MM PE AND

167M X 90MM PE AND 4M X 90MM PE AND RELAY OR TRANSFER SERVICES.

MAJOR 07/01/2019 25/03/2019 78 Days PROPOSED WORKS SOME C/W INCURSION AZ007-1000758311Cadent Gas Limited

0800 111 999

HANOVER ROAD LONDON 122Boundary Box Exchange Fway in Footway. Our intention is to complete

thePermanent Reinstatement in the same phaseIMMEDIATE (URGENT) 18/09/2018 24/09/2018 7 Days IN PROGRESS SOME C/W INCURSION MU301-000031157230-001

Thames Water

0800 316 9800

HARLESDEN ROAD LONDON OUTSIDE NO.131 CLEAR FOOTWAY BLOCKAGE MINOR 01/10/2018 03/10/2018 3 Days PROPOSED WORKS SOME C/W INCURSION NK100-/SCLJBU/106250/LBCVirgin Media

0870 8883117

HARLESDEN ROAD LONDONFROM SIDE OF HEALTH CENTRE TO OPPOSITE 197-

221INSTALL NEW CHAMBER AND DUCTING IN CARRIAGEWAY/VERGE/FOOTWAY STANDARD 15/10/2018 21/10/2018 7 Days PROPOSED WORKS SOME C/W INCURSION NK100-/SCLJBU/96765/LBA

Virgin Media

0870 8883117

HARROW ROAD WEMBLEY HARROW ROAD AT J/O LINTHORPE AVENUEIMGA192407 MAINS CONNECTIONS FOR ASSOCIATED WORKS IN LINTHORP

AVENUESTANDARD 10/09/2018 21/09/2018 12 Days IN PROGRESS SOME C/W INCURSION AZ007-1000755502

Cadent Gas Limited

0800 111 999

HARROW ROAD WEMBLEYONE HOLE IN RD BY ROKESBY PLACE, OPPOSITE

POLICE STATIONTrace, then excavate to repair gas escape and reinstate where possible IMMEDIATE (EMERGENCY) 13/09/2018 21/09/2018 9 Days IN PROGRESS SOME C/W INCURSION AZ007-1000756488

Cadent Gas Limited

0800 111 999

HARROW ROAD WEMBLEY OPP 815 TO OPP CHURCH , HARROW ROAD Locate and excavate 1 blockage in existing duct MINOR 24/09/2018 25/09/2018 2 Days PROPOSED WORKS NO C/W INCURSION BC006-TI001LC500268186202BT

03301 233753

HARROW ROAD WEMBLEYTregenna Court,Rear to 622, HARROW ROAD, ,

WEMBLEY, BRENT

COMMUNICATION PIPE - INSTALL ; 63 MDPE; 4' CI; 1 OF 1 - CROSSOVER/CW

WORKS - FW CLOSURE REQUIRED - PEDS TO USE WALKWAY IN CWMINOR 25/09/2018 27/09/2018 3 Days PROPOSED WORKS SOME C/W INCURSION MX044-284225800

Affinity Water

01707 679 623

HARROW ROAD WEMBLEY outside 547-549 clear carriageway blockage MINOR 26/09/2018 28/09/2018 3 Days PROPOSED WORKS MULTI-WAY SIGNALS NK100-/SCLJBU/103850/LSMVirgin Media

0870 8883117

HARROW ROAD LONDON Advertising board on Harrow road, Kensal Green. f\w.

Connections Small Service:Installation of a new electricity supply for a

customer:installation of a new 100amp single phase supply Bus stop 2825 to be

suspended and a footpath closure is required

MINOR 29/09/2018 30/09/2018 2 Days PROPOSED WORKS SOME C/W INCURSION EC400-10753250London Power Networks plc

0800 0280709

HARROW ROAD WEMBLEY DIG IN NEARSIDE FOOTWAY OUTSIDE NO 178 LAY NEW DOMESTIC 32MM PE SERVICE 3M FROM MAIN IN FOOTWAY STANDARD 01/10/2018 05/10/2018 5 Days PROPOSED WORKS LANE CLOSURE AZ007-1000749053Cadent Gas Limited

0800 111 999

HARROW ROAD WEMBLEY O/S 567W.R.P. - Relocation of 3 Bay Non Ad Bus Shelter, Centre of Path, for and on behalf

of Transport For London 0105/1013 2784703MINOR 05/10/2018 06/10/2018 2 Days PROPOSED WORKS SOME C/W INCURSION RK001-00040807 202/02039

HARROW ROAD WEMBLEY OUTSIDE NO 537 LAY DUCT IN FOOTWAY AND CARRIAGEWAY MINOR 04/10/2018 08/10/2018 5 Days PROPOSED WORKS CONTRA-FLOW NK100-/SCLJBU/104733/LSMVirgin Media

0870 8883117

HARROW ROAD WEMBLEY o/s 778 HARROW ROAD, WEMBLEYaccessing BT chamber to cable duct, no excavation and to complete termination of

cable inside cabinets + pod install.MINOR 09/10/2018 09/10/2018 1 Days PROPOSED WORKS LANE CLOSURE BC005-HU789W00CMG-NMANZY2

BT

03301 233753

HARROW ROAD WEMBLEY HARROW ROAD, O/S NO.651 IMGA192407. MUCK AND SPOIL AREA ONLY STANDARD 01/10/2018 12/10/2018 12 Days PROPOSED WORKS SOME C/W INCURSION AZ007-1000757529Cadent Gas Limited

0800 111 999

HARROW ROAD WEMBLEY HARROW ROAD, OPPOSITE NO.641 AND NO.643 IMGA192407. STORAGE / COMPOUND AND WELFARE UNIT STANDARD 01/10/2018 12/10/2018 12 Days PROPOSED WORKS SOME C/W INCURSION AZ007-1000757528Cadent Gas Limited

0800 111 999

HARROW ROAD WEMBLEYTHE MAIN IS IN THE NEARSIDE CARRIAGEWAY

OUTSIDE OF 319A HARROW ROAD

LAY 2 X NEW GAS SERVICES TO FLAT 1& 2 319A HARROW ROAD 8M FROM

THE MAINSTANDARD 09/10/2018 15/10/2018 7 Days PROPOSED WORKS LANE CLOSURE AZ007-1000757336

Cadent Gas Limited

0800 111 999

HARROW ROAD LONDON In the footway outside No. 811-815 Harrow RoadTo excavate and connect onto the existing gas main, to lay a new gas service into

811-815 Harrow RoadSTANDARD 05/11/2018 14/11/2018 10 Days PROPOSED WORKS MULTI-WAY SIGNALS ZY040-180804-1 202/01241

HARROW ROAD WEMBLEY J/O Tring Avenue Upgrade of Thames Water Infrastructure in footway& carriageway MAJOR 12/12/2018 12/01/2019 32 Days PROPOSED WORKS MULTI-WAY SIGNALS MU302-KCD-MAJOR-H456-3Thames Water

0800 316 9800

HARROW ROAD LONDON 750-756

Proposed Temporary Traffic Order for a single yellow line and 'No waiting'

restriction, 09:30 - 14:30 Mon-Fri, 08.00 - 13.00 Sat, o/s 750-756 Harrow Road to

allow them to carry out construction works.

HIGHWAYS ACT PERMITS 01/04/2018 30/09/2019 548 Days PROPOSED WORKS NO C/W INCURSION AW888-L-MAIN-00000879LONDON BOROUGH OF BRENT

020 8937 5600

HARROWDENE ROAD WEMBLEY Jnc Hardwood Close in the C/W Trace, then excavate to repair a gas escape and reinstate wherepossible. IMMEDIATE (EMERGENCY) 12/09/2018 20/09/2018 9 Days IN PROGRESS SOME C/W INCURSION AZ007-1000756057Cadent Gas Limited

0800 111 999

HARTLAND ROAD LONDON outside 7 desilt pit in footway MINOR 18/09/2018 20/09/2018 3 Days IN PROGRESS SOME C/W INCURSION NK100-/SCLJFI/102642/LSMVirgin Media

0870 8883117

HARVIST ROAD LONDON 189Valve Repack in Carriageway. Our intention is to complete the

PermanentReinstatement in the same phaseMINOR 24/09/2018 26/09/2018 3 Days PROPOSED WORKS PRIORITY WORKING MU301-000031142885-002

Thames Water

0800 316 9800

HARVIST ROAD LONDON O/S KENSAL RISE PRIMARY SCHOOL

28/027 - 110981 - EXCAVATION FOR THE INSTALLATION OF IBUS CABLE INTO

TRAFFIC SIGNAL CONTROLLER AND IBUS CABLE INTO TRAFFIC SIGNAL

POLE 7, 08:00 - 17:00, FOOTWAY WORKS ONLY

MINOR 01/10/2018 01/10/2018 1 Days PROPOSED WORKS NO C/W INCURSION YG515-S000000002203TFL

0343 222 1234

HAWKINS ROAD LONDON Bridge (Rail Over Road) No: 08 Detailed examination of rail over road bridge working from 0930 - 1530 MAJOR 22/10/2018 22/10/2018 1 Days PROPOSED WORKS ROAD CLOSURE KL701-CAW-07-31-161018 202/04110

HAWKINS ROAD LONDON Bridge (Rail Over Road) No: 08Replace all existing Chevrons plates and painted chevrons with a high visability

seabridge sign type chevron plates to bridgeMAJOR 23/10/2018 23/10/2018 1 Days PROPOSED WORKS ROAD CLOSURE KL721-CAW-07-31-231018 202/04110

HAWKINS ROAD LONDON J/W Bridge Road

Proposed Temporary Traffic Order for a road closure at Hawkins Road j/w Bridge

Road to carry out a detailed bridge examination. From: 22/10/2018 (1 day), Times:

09:30 - 15:30hrs Our ref: TTRO/18/016

HIGHWAYS ACT PERMITS 22/10/2018 23/10/2018 2 Days PROPOSED WORKS ROAD CLOSURE AW888-L-MAIN-00000928LONDON BOROUGH OF BRENT

020 8937 5600

HAYCROFT GARDENS LONDON whole road

sWORKS METHODOLOGY: WORKING ON BEHALF OF THAMES WATER -

NOTIFICATION OF POTENTIAL WORKS TO CARRY OUT MAINS

REPLACEMENT SCHEME

MAJOR 18/10/2018 08/11/2018 22 Days PROPOSED WORKS SOME C/W INCURSION MU821-H208/MBIW07/Z024Thames Water

0800 316 9800

HAYLAND CLOSE LONDON OUTSIDE NO.20REMOVE CARRIAGEWAY AND FOOTWAY BLOCKAGE TO ALLOW CUSTOMER

CONNECTIONMINOR 21/09/2018 25/09/2018 5 Days PROPOSED WORKS SOME C/W INCURSION NK100-/SCLJFI/107197/LSM

Virgin Media

0870 8883117

HAZELDEAN ROAD LONDONFROM JUNCTION WITH BRUCE ROAD TO JUNCTION

WITH SELWYN ROAD

WORKS METHODOLOGY: WORKING ON BEHALF OF THAMES WATER TO

CARRY OUT MAINS REPLACEMENT SURFACE LOCATION: CW AND FWMAJOR 19/10/2018 05/02/2019 110 Days PROPOSED WORKS SOME C/W INCURSION MU821-H553/MSUL03/I001

Thames Water

0800 316 9800

HEATHER PARK DRIVE WEMBLEY 39 PERM REINSTATEMENT IN THE CARRIAGEWAY MINOR 21/09/2018 21/09/2018 1 Days PROPOSED PERMANENT GIVE & TAKE MU026-003156SPKT--000001Thames Water

0800 316 9800

Page 7: London Borough of Brent · London Borough of Brent ... Kick off 20:00 03/09/2018 03/09/2018 1 Days Confirmed Event Day Road Closures ... Works in footway and carriageway to carry

London Borough of Brent

highways&[email protected] Roadworks/Events/Festivals

0208 937 5600 Network Management Team

Contact detailsEstimated

End DateEvent DescriptionMonth Duration

For the Week Commencing 24th September 2018

Traffic Management NotesWorks StatusStart Date

HEATHER PARK DRIVE WEMBLEY outside 128 to 114CLEAR BLOCKED DUCT and REPAIR BLOCKAGES IF FOUND FOOTWAY

WORKS ONLYMINOR 23/09/2018 23/09/2018 1 Days PROPOSED WORKS NO C/W INCURSION NK100-/SSERRE/13966337J9

Virgin Media

0870 8883117

HEATHFIELD PARK LONDON OUTSIDE NO.17-19LAY NEW DUCT FROM EXISTING VM CHAMBER IN FOOTWAY, BUILD NEW

CHAMBER IN FOOTWAY.STANDARD 20/09/2018 27/09/2018 8 Days PROPOSED WORKS SOME C/W INCURSION NK100-/SSEJF/101656/LBA

Virgin Media

0870 8883117

HEBER ROAD LONDON JUNCTION WITH OLIVE ROADWORKING ON BEHALF OF THAMES WATER TO CARRY OUT MAINS

REPLACMENTMAJOR 22/10/2018 12/12/2018 52 Days PROPOSED WORKS MULTI-WAY SIGNALS MU821-H553/MBIW04/I009

Thames Water

0800 316 9800

HIGH ROAD WEMBLEY Outside and opposite 365 - 367

28/091 - 110746 - Access TfL traffic signal poles to install call cancel detectors and

replace pole 2 and pole 4: 2 x 2m poles with 2 x 4 m poles. 09:00-16:00. Footway

works only

MINOR 20/09/2018 21/09/2018 2 Days PROPOSED WORKS NO C/W INCURSION YG515-S000000002196TFL

0343 222 1234

HIGH ROAD LONDONOPP JCN WITH CHURCH ROAD TO AT JCN WITH

NEASDEN LANE , HIGH ROADWorks are to permanently reinstate the site MINOR 20/09/2018 21/09/2018 2 Days PROPOSED PERMANENT SOME C/W INCURSION BC006-TI001LC500264635500

BT

03301 233753

HIGH ROAD LONDON OUTSIDE NO.130 CLEAR BLOCKAGE IN FOOTWAY MINOR 21/09/2018 25/09/2018 5 Days PROPOSED WORKS SOME C/W INCURSION NK100-/SCLJBU/106488/LBAVirgin Media

0870 8883117

HIGH ROAD WEMBLEY kerb line o/s chesterfield house and 444 high road Permanent Reinstatement. KIER WORKING ON BEHALF OF AFFINITY WATER. MINOR 29/09/2018 30/09/2018 2 Days PROPOSED PERMANENT SOME C/W INCURSION MX049-THWM460021Affinity Water

01707 679 623

HIGH ROAD LONDON*CUSTOMER DRIVEN WORKS* FOOTWAY OUTSIDE

OF NUMBER 101LAY NEW SERVICE 3M FROM MAIN IN FOOTWAY STANDARD 15/10/2018 19/10/2018 5 Days PROPOSED WORKS MULTI-WAY SIGNALS AZ007-1000758154

Cadent Gas Limited

0800 111 999

HIGH ROAD WEMBLEYFROM J/O CRAWFORDAVENUE TO WEMBLEY HILL

ROAD.TRUNK MAINS SCHEME BY KIER ON BEHALF OF AFFINITY WATER MAJOR 02/04/2018 31/12/2018 274 Days POTENTIAL WORKS SOME C/W INCURSION MX049-HIGHROAD

Affinity Water

01707 679 623

HIGH ROAD LONDON FROM J/W STRODE ROAD TO COLIN ROADFOOTWAY RECONSTRUCTION PROGRAMME 2018/19-PEDESTRIAN SIGNING

AND GUARDING-FOOTWAY CLOSURE, SOME C/W INCURSION, CHAPTER 8MAJOR 18/06/2018 31/12/2018 197 Days IN PROGRESS SOME C/W INCURSION AW042-292123

LONDON BOROUGH OF BRENT

020 8937 5600

HIGH ROAD WEMBLEY Steps from High Road to Station Grove

Proposed temporary traffic order for a footpath/steps closure from High Road

leading down to Station Grove to allow construction of a new development on

Montrose Crescent car park plot. Our ref: TTRO

HIGHWAYS ACT PERMITS 05/07/2017 05/01/2019 550 Days PROPOSED WORKS NO C/W INCURSION AW888-L-MAIN-00000726LONDON BOROUGH OF BRENT

020 8937 5600

HIGH STREET LONDON jubilee clock to tavistock roadFOOTWAY RECONSTRUCTION PROGRAMME 2018/19-PEDESTRIAN SIGNING

AND GUARDING-FOOTWAY CLOSURE, SOME C/W INCURSION, CHAPTER 8MAJOR 04/07/2018 01/10/2018 90 Days PROPOSED WORKS SOME C/W INCURSION AW042-292196

LONDON BOROUGH OF BRENT

020 8937 5600

HIGH STREET LONDON JW Park ParadeExcavate in the CW to locate Thames Water valve, make sure valve is operable,

backfill and reinstateMINOR 11/10/2018 11/10/2018 1 Days PROPOSED WORKS MULTI-WAY SIGNALS MU277-000HCV6987350/01

Thames Water

0800 316 9800

HILL VIEW GARDENS LONDON 9 HILLVIEW GARDENS NW9 0TE Relay Short Service Pipe - WORKING IN FOOTWAY AND CARRIAGEWAY MINOR 21/09/2018 25/09/2018 5 Days PROPOSED WORKS GIVE & TAKE MX044-10025452Affinity Water

01707 679 623

HILLSIDE GARDENS HARROW O/S 11 in the F/WSupply new gas service to property due to poor condition of Cadent Gasplant to

prevent loss of supply.IMMEDIATE (URGENT) 14/09/2018 20/09/2018 7 Days IN PROGRESS NO C/W INCURSION AZ007-1000756767

Cadent Gas Limited

0800 111 999

HOLLAND ROAD LONDON o/s 161 . f\w.

Network Operations Distribution:Install / Replace / Remove electrical link box:-

Replace a very poor condition Link Box in the footway. Part of HSE Initiative to

replace all Identified High Risk Link

STANDARD 24/09/2018 01/10/2018 8 Days PROPOSED WORKS SOME C/W INCURSION EC400-10752497London Power Networks plc

0800 0280709

HOMEFIELD ROAD WEMBLEY HOMEFIELD ROAD Relay Short Service Pipe - workingin footway and carriageway MINOR 20/09/2018 24/09/2018 5 Days IN PROGRESS GIVE & TAKE MX044-10012970Affinity Water

01707 679 623

HONEYWOOD ROAD LONDONHONEYWOOD ROAD - WHOLE STREET FROM J/O

STATIONROADTOO/SNO.14HONEYWOODROAD.

IMGA202021 - ABANDON 113M X 100MM DI AND INSERT 113M

X75MMPEANDRELAYORTRANSFER SERVICES.MAJOR 28/08/2018 02/10/2018 36 Days IN PROGRESS SOME C/W INCURSION AZ007-1000726748

Cadent Gas Limited

0800 111 999

HOWARD ROAD LONDONNEARSIDE FOOTWAY OUTSIDE 46A HOWARD

ROADLAY NEW DOMESTIC SERVICE 2.8M FROM MAIN IN NEARSIDE FOOTWAY STANDARD 22/10/2018 26/10/2018 5 Days PROPOSED WORKS SOME C/W INCURSION AZ007-1000757080

Cadent Gas Limited

0800 111 999

HUDDLESTONE ROAD LONDONFROM JUNCTION WITH HIGH ROAD TO JUNCTION

WITH BALMORAL ROAD

WORKING ON BEHALF OF THAMES WATER TO CARRY OUT MAINS

REPLACEMENT CW AND FWMAJOR 06/12/2018 21/01/2019 47 Days PROPOSED WORKS SOME C/W INCURSION MU821-H553/MSUL02//I002

Thames Water

0800 316 9800

IRWIN GARDENS LONDON 23Fire Hydrant Repack Gland Fway in Footway. Our intention is to completethe

Permanent Reinstatement in the same phaseMINOR 25/09/2018 27/09/2018 3 Days PROPOSED WORKS SOME C/W INCURSION MU301-000031159032-001

Thames Water

0800 316 9800

IVY ROAD LONDONFROM JUNCTION WITH CEDAR ROAD TO JUNCTION

WITH LARCH ROAD

WORKS METHODOLOGY: WORKING ON BEHALF OF THAMES WATER TO

CARRY OUT MAINS REPLACEMENT SURFACE LOCATION: CW AND FWSTANDARD 24/09/2018 03/10/2018 10 Days PROPOSED WORKS SOME C/W INCURSION MU821-H553/MBIW04/I006

Thames Water

0800 316 9800

IVY ROAD LONDON Whole of Road

WORKS METHODOLOGY: FORWARD PLANNING NOTICE FOR THE

NOTIFICATION OF A POTENTIAL MAINS REHABILITATION SCHEME WORKING

ON BEHALF OF THAMES WATER

MAJOR 07/11/2018 16/11/2018 10 Days PROPOSED WORKS SOME C/W INCURSION MU821-H553/MBIW04/Z002Thames Water

0800 316 9800

JEYMER AVENUE LONDONJEYMER AVENUE, C/O NO.44 PARK AVENUE

NORTHIMGA192010 ABANDON APPROXIMATELY 5M X 4' CI MAIN STANDARD 02/01/2019 15/01/2019 14 Days PROPOSED WORKS NO C/W INCURSION AZ008-1000748015

Cadent Gas Limited

0800 111 999

JEYMER AVENUE LONDONFROM JUNCTION WITH PARK AVENUE TO

JUNCTION WITH RIFFEL ROAD

WORKING ON BEHALF OF THAMES WATER TO CARRY OUT MAINS

REPLACEMENT CW AND FWMAJOR 19/11/2018 04/02/2019 78 Days PROPOSED WORKS SOME C/W INCURSION MU821-H553/MSUL19/I001

Thames Water

0800 316 9800

KENDAL ROAD LONDON whole road major carriageway resurfacing works(preventative)2018-2019-road closure MAJOR 27/07/2018 24/10/2018 90 Days PROPOSED WORKS ROAD CLOSURE AW042-290768LONDON BOROUGH OF BRENT

020 8937 5600

KENTON ROAD HARROW OUTSIDE NO.3 KENTON PARK MANSIONS LAY DUCT IN FOOTWAY TO ALLOW CUSTOMER CONNECTION MINOR 21/09/2018 25/09/2018 5 Days PROPOSED WORKS NO C/W INCURSION NK100-/SCLJBU/106591/LSMVirgin Media

0870 8883117

KILBURN HIGH ROAD LONDON outside 218CUSTOMER CONNECTION RESIDENTIAL SUPPLY and CLEAR BLOCKAGES IF

FOUND. FOOTWAY WORKS ONLYMINOR 23/09/2018 23/09/2018 1 Days PROPOSED WORKS NO C/W INCURSION NK100-/SSERRE/10587550J9

Virgin Media

0870 8883117

KILBURN HIGH ROAD LONDON in the area of the bridgeStructures Examination of bridge with Small Hoist in use 22:30hrs Monday 1st until

05:30hrs Tuesday 2nd October 2018 No disturbance to roadwayMINOR 01/10/2018 02/10/2018 2 Days PROPOSED WORKS MULTI-WAY SIGNALS KL333-CEFA-MCJ1-BRG-21 202/02523

KILBURN HIGH ROAD LONDON WILLESDEN LANE TO CHRISTCHURCH AVENUE major carriageway resurfacing works 2018-2019-road closure MAJOR 27/07/2018 24/10/2018 90 Days PROPOSED WORKS ROAD CLOSURE AW042-290924LONDON BOROUGH OF BRENT

020 8937 5600

KILBURN LANE LONDON outside 121 in carriage way Trace, then excavate to repair gas escape and reinstate where possible IMMEDIATE (EMERGENCY) 10/09/2018 21/09/2018 12 Days IN PROGRESS SOME C/W INCURSION AZ007-1000755207Cadent Gas Limited

0800 111 999

KILBURN LANE LONDON outside 287 to 291CUSTOMER CONNECTION RESIDENTIAL SUPPLY and CLEAR BLOCKAGES IF

FOUND. FOOTWAY WORKS ONLYMINOR 22/09/2018 25/09/2018 4 Days PROPOSED WORKS NO C/W INCURSION NK100-/SSERRE/11878354KCA

Virgin Media

0870 8883117

KILBURN PARK ROAD LONDON 81-83S81 EMERGENCY COVER REPLACEMEN--WORKS INTENDED TO INCLUDE

FIRST TIME PERMANENT REINSTATEMENT WITHIN SAME PHASEMINOR 27/09/2018 27/09/2018 1 Days PROPOSED WORKS MULTI-WAY SIGNALS MU026-003156RXJM--000002

Thames Water

0800 316 9800

KINGSBURY ROAD LONDONon footway Kingsbury Road, approx 55 yds from

Barmingham Way

Pedestrian diversion into carriageway. Excavation by hand on the footway, give and

take to be used. Day 1& 2 Installation of tsc, meter cabinet and TT earth. Day 3

Rigging, DICI, rewire site from new

STANDARD 08/10/2018 13/10/2018 6 Days PROPOSED WORKS GIVE & TAKE NX260-VF77670WHP/NJE01Vodafone

01724 848246

Page 8: London Borough of Brent · London Borough of Brent ... Kick off 20:00 03/09/2018 03/09/2018 1 Days Confirmed Event Day Road Closures ... Works in footway and carriageway to carry

London Borough of Brent

highways&[email protected] Roadworks/Events/Festivals

0208 937 5600 Network Management Team

Contact detailsEstimated

End DateEvent DescriptionMonth Duration

For the Week Commencing 24th September 2018

Traffic Management NotesWorks StatusStart Date

KINGSBURY ROAD LONDON FROM J/W VALLEY DRIVE TO FRYENT WAY

KINGSBURY TOWN CENTRE -FOOTWAY WORKS BOTH SIDES-ALL SIGNING

LIGHTING AND GUARDING CONTAINED TO THE FOOTWAY NO C/WAY

INCURSION.

MAJOR 25/03/2018 31/08/2019 525 Days IN PROGRESS NO C/W INCURSION AW042-260642LONDON BOROUGH OF BRENT

020 8937 5600

LAKESIDE DRIVE LONDON Verge behind Lakeside Drive 1 x Joint Bay MAJOR 10/09/2018 25/09/2018 16 Days IN PROGRESS SOME C/W INCURSION ZP011-P-0094478/R12 202/04131

LAKESIDE DRIVE LONDON100m from j/w RAINSFORD ROAD and 148m from j/w

RAINSFORD ROAD

This permit is for Thames Water to carry out interim to permament reinstatement

workMINOR 27/09/2018 28/09/2018 2 Days PROPOSED PERMANENT SOME C/W INCURSION MU307-000805768370325-001

Thames Water

0800 316 9800

LARCH ROAD LONDON Outside 5 Larch Road . f\w.Connections Small Service:Installation of a new electricity supply for a

customer:Installing a 100amp three phase supplySTANDARD 27/09/2018 03/10/2018 7 Days PROPOSED WORKS SOME C/W INCURSION EC400-10753379

London Power Networks plc

0800 0280709

LAWRENCE AVENUE LONDON 78 - 78 opp

New customer water supply 1x63mm BP mtrd, works in the footway and

inCarriageway. Our intention is to complete the Permanent Reinstatement inthe

same phase

MAJOR 26/11/2018 30/11/2018 5 Days PROPOSED WORKS ROAD CLOSURE MU307-000806963660360-001Thames Water

0800 316 9800

LENNOX GARDENS LONDONFROM JUNCTION WITH DUDDEN HILL LANE TO

JUNCTION WITH PARK VIEW ROAD

WORKING ON BEHALF OF THAMES WATER MAINS REPLACEMENT CW AND

FWMAJOR 17/09/2018 12/10/2018 26 Days IN PROGRESS SOME C/W INCURSION MU821-H553/MSUL46/I002

Thames Water

0800 316 9800

LIDDELL GARDENS LONDON whole road

WORKS METHODOLOGY: WORKING ON BEHALF OF THAMES WATER -

NOTIFICATION OF POTENTIAL WORKS TO CARRY OUT MAINS

REPLACEMENT SCHEME

MAJOR 09/11/2018 13/12/2018 35 Days PROPOSED WORKS SOME C/W INCURSION MU821-H208/MSUL20/Z009Thames Water

0800 316 9800

LINCOLN ROAD WEMBLEY 18 LINCOLN ROAD, WEMBLEY Relay Short Service Pipe - WORKINGIN FOOTWAY AND CARRIAGEWAY MINOR 21/09/2018 25/09/2018 5 Days PROPOSED WORKS SOME C/W INCURSION MX044-10020910Affinity Water

01707 679 623

LINDEN AVENUE WEMBLEY 4 Linden Avenue S/O Cott

Proposed Temporary Traffic Order for the full footpath closure o/s 4 Linden Avenue

HA9 8BD (Cottrell House) and suspension of loading bay on Wembley Hill Road to

allow construction of a new developmen

HIGHWAYS ACT PERMITS 03/04/2018 02/10/2019 548 Days PROPOSED WORKS NO C/W INCURSION AW888-L-MAIN-00000871LONDON BOROUGH OF BRENT

020 8937 5600

LINDSAY DRIVE HARROW from junction with Chapman Crescent to roundabout major c/w resurfacing works(reserve scheme)2018-2019-road closure MAJOR 28/06/2018 25/09/2018 90 Days IN PROGRESS ROAD CLOSURE AW042-291179LONDON BOROUGH OF BRENT

020 8937 5600

LINTHORPE AVENUE WEMBLEYFROM S/O NO.130 CHAPLIN ROAD TO TO O/S

NO.651 HARROW ROAD

IMGA192407. IMGA192407 ABANDON 306M X 4'

CIMAINANDINSERT90MMPEANDRELAYOR TRANSFER APPROX 40 SERVICESMAJOR 08/06/2018 21/09/2018 106 Days IN PROGRESS SOME C/W INCURSION AZ007-1000688588

Cadent Gas Limited

0800 111 999

LITTLETON ROAD HARROWLITTLETON ROAD, FROM S/O NO 47. SUDBURY

COURT DRIVE TO J/O PEBWORTH ROAD

IMGA192372. ABANDON 352M X 6' ST MAIN AND INSERT 125MM PE AND

RELAY ORTRANSFER SERVICES.MAJOR 24/09/2018 09/11/2018 47 Days PROPOSED WORKS SOME C/W INCURSION AZ007-1000730256

Cadent Gas Limited

0800 111 999

LOGAN ROAD WEMBLEY O/S NO 46/48, LOGAN ROADInstall 2m of 1 way poly duct in Footway,Provide 1 core drill(s) into jointbox or

buildingIMMEDIATE (URGENT) 19/09/2018 21/09/2018 3 Days IN PROGRESS NO C/W INCURSION BC006-TI001LC500269063000

BT

03301 233753

LYON PARK AVENUE WEMBLEY 183 lyon park avenue Relay Short Service Pipe - working in footway and carriageway MINOR 19/09/2018 21/09/2018 3 Days PROPOSED WORKS SOME C/W INCURSION MX044-10022580Affinity Water

01707 679 623

MAGNOLIA COURT HARROW outside 15 to 25CLEAR BLOCKED TEE and REPAIR BLOCKAGES IF FOUND FOOTWAY WORKS

ONLYMINOR 25/09/2018 26/09/2018 2 Days PROPOSED WORKS NO C/W INCURSION NK100-/SSERRE/14048467J9

Virgin Media

0870 8883117

MALLARD WAY LONDON IN FOOTWAY O/S 13 Trace, then excavate to repair gas escape and reinstate where possible IMMEDIATE (EMERGENCY) 17/09/2018 25/09/2018 9 Days IN PROGRESS NO C/W INCURSION AZ007-1000757462Cadent Gas Limited

0800 111 999

MALVERN MEWS LONDON 28 Excavate in carriageway to install new chamber approx 3-4m deep MAJOR 24/09/2018 05/10/2018 12 Days PROPOSED WORKS ROAD CLOSURE MU026-003156RFLS--0001Thames Water

0800 316 9800

MANOR FARM ROAD WEMBLEY OUTSIDE NO.78 AND OUTSIDE NO. 88REMOVE TWO CARRIAGEWAY BLOCKAGES TO ALLOW CUSTOMER

CONNECTIONSMINOR 02/10/2018 04/10/2018 3 Days PROPOSED WORKS MULTI-WAY SIGNALS NK100-/SCLJFI/106574/LSM

Virgin Media

0870 8883117

MAPESBURY ROAD LONDON56M SOUTH FROM JCTN WITH MOWBRAY RD ON,

MAPESBURY ROAD

Install 3m of 1 way poly duct in Footway,Provide 1 core drill(s) into jointbox or

buildingIMMEDIATE (URGENT) 19/09/2018 21/09/2018 3 Days IN PROGRESS NO C/W INCURSION BC006-TI001LC500269124000

BT

03301 233753

MAPESBURY ROAD LONDON o/s 22. f\w.

Network Operations Distribution:Install / Replace / Remove electrical link

box:Replace a very poor condition Link Box in the footway. Part of HSE Initiative to

replace all Identified High Risk Link Bo

STANDARD 09/10/2018 16/10/2018 8 Days PROPOSED WORKS NO C/W INCURSION EC400-10753144London Power Networks plc

0800 0280709

MAYBANK AVENUE WEMBLEY J/W GREENBANK AVENUE

FOOTWAY RECONSTRUCTION PROGRAMME- RESERVE SCHEME- 2018/19-

PEDESTRIAN SIGNING AND GUARDING-FOOTWAY CLOSURE, SOME C/W

INCURSION, CHAPTER 8

MAJOR 05/07/2018 02/10/2018 90 Days PROPOSED WORKS SOME C/W INCURSION AW042-292466LONDON BOROUGH OF BRENT

020 8937 5600

MAYO ROAD LONDON o/s 23-25. f\w.Network Operations Faults:Essential repair of electricity cables powering street

lighting / furniture:street light faultIMMEDIATE (URGENT) 19/09/2018 25/09/2018 7 Days IN PROGRESS NO C/W INCURSION EC400-10753690

London Power Networks plc

0800 0280709

MCNICOL DRIVE LONDON adj to no. 23 lay new gas service approx 1.5m in f/way STANDARD 05/10/2018 10/10/2018 6 Days PROPOSED WORKS SOME C/W INCURSION WY002-NSA00020689 202/02790

MELROSE AVENUE LONDON 155 CUSTOMER SIDE LEAKAGE SUPPLY PIPE REPLACEMENT MINOR 27/09/2018 01/10/2018 5 Days PROPOSED WORKS NO C/W INCURSION MU356-003156SMNZ--000001Thames Water

0800 316 9800

MEYRICK ROAD LONDON O/S AND OPP 16x25MM NEW WATER SUPPLY CONNECTION, FOOTWAY AND in Carriageway.

Ourintention is to complete the Permanent Reinstatement in the same phaseSTANDARD 01/10/2018 05/10/2018 5 Days PROPOSED WORKS SOME C/W INCURSION MU307-000806973770045-001

Thames Water

0800 316 9800

MILMAN ROAD LONDON 20m before jct Harvist Road to jct Harvist Road STORES COMPOUND- Onsite 24 hours a day MAJOR 27/06/2018 04/12/2018 161 Days IN PROGRESS NO C/W INCURSION AW042-311239LONDON BOROUGH OF BRENT

020 8937 5600

MONKS PARK WEMBLEY 110 MONKS PARK, WEMBLEY Relay Short Service Pipe - WORKING IN FOOTWAY AND CARRIAGEWAY MINOR 20/09/2018 24/09/2018 5 Days PROPOSED WORKS SOME C/W INCURSION MX044-10018027Affinity Water

01707 679 623

MOUNT PLEASANT WEMBLEY outside 75 to 87CLEAR BLOCKED TEE and REPAIR BLOCKAGES IF FOUND FOOTWAY WORKS

ONLYMINOR 21/09/2018 24/09/2018 4 Days PROPOSED WORKS NO C/W INCURSION NK100-/SSERRE/13999070J9A

Virgin Media

0870 8883117

MOUNT PLEASANT WEMBLEY 152

Proposed Temporary Traffic Order for a double yellow line restriction o/s 152 Mount

Pleasant, Abbey Wharf to allow them to carry out construction works. Start date

from: 23/04/2018 to 22/10/2019 for

HIGHWAYS ACT PERMITS 23/04/2018 27/10/2019 553 Days PROPOSED WORKS NO C/W INCURSION AW888-L-MAIN-00000877LONDON BOROUGH OF BRENT

020 8937 5600

NAPIER ROAD LONDON WHOLE OF THE ROADWORKING ON BEHALF OF THAMES WATER TO CARRY OUT MAINS

REPLACEMENT CW AND FWMAJOR 12/10/2018 07/11/2018 27 Days PROPOSED WORKS SOME C/W INCURSION MU821-H553/MSUL20/I002

Thames Water

0800 316 9800

NASH WAY HARROW In FW O/S SainsburysTHESE WORKS ARE FOR THE EXCAVATION OF A TRIAL HOLE TO ASSESS

THE SUITABILITY OF NEW TELECOMS EQUIPMENTMINOR 03/10/2018 03/10/2018 1 Days PROPOSED WORKS NO C/W INCURSION YN112-W96423-WK40 202/02805

NEASDEN LANE LONDON 270 supersave food& wineB Box Exchange<33mm Fway in Footway. Our intention is to completethe

Permanent Reinstatement in the same phaseMINOR 18/09/2018 20/09/2018 3 Days IN PROGRESS NO C/W INCURSION MU301-000031150385-001

Thames Water

0800 316 9800

NEASDEN LANE LONDON JUNC WITH ROUNDABOUT Permanent reinstatement of tarmac in carriageway MINOR 26/09/2018 26/09/2018 1 Days PROPOSED PERMANENT LANE CLOSURE MU026-003156SHTS-001001Thames Water

0800 316 9800

NEASDEN LANE LONDON Outside 60 New Foul Water Connection STANDARD 24/09/2018 05/10/2018 12 Days PROPOSED WORKS TWO-WAY SIGNALS AW999-S000000000345LONDON BOROUGH OF BRENT

020 8937 5600

NEASDEN LANE NORTH LONDON Junction with Braemar AvenueExcavation - install of new telecommunication cabinets on behalf of TEF. x2 Days on

site.MINOR 20/09/2018 21/09/2018 2 Days PROPOSED WORKS LANE CLOSURE MG074-82014-PGN/MW 202/02443

Page 9: London Borough of Brent · London Borough of Brent ... Kick off 20:00 03/09/2018 03/09/2018 1 Days Confirmed Event Day Road Closures ... Works in footway and carriageway to carry

London Borough of Brent

highways&[email protected] Roadworks/Events/Festivals

0208 937 5600 Network Management Team

Contact detailsEstimated

End DateEvent DescriptionMonth Duration

For the Week Commencing 24th September 2018

Traffic Management NotesWorks StatusStart Date

NEWLANDS CLOSE WEMBLEY WHOLE STREET FROM J/O LINTHORPE AVENUEIMGA1921407 ABANDON 255M X 4' CI MAIN AND INSERT 75MM PE AND

RELAYORTRANSFER APPROX 28 SERVICESMAJOR 04/09/2018 28/09/2018 25 Days IN PROGRESS SOME C/W INCURSION AZ007-1000688640

Cadent Gas Limited

0800 111 999

NICOLL ROAD LONDON O/s 62. f\w.

Connections Projects:Electrical service alteration to customer supply:100A new

service and disconnection in footpath. Temporary walkway provided in suspended

parking bays.

STANDARD 27/09/2018 03/10/2018 7 Days PROPOSED WORKS SOME C/W INCURSION EC400-10753237London Power Networks plc

0800 0280709

NORTH CIRCULAR ROAD LONDONVerge In gated compound in the verge at the side of the

access laneLift off existing kiosk and install new together with associated civils MAJOR 26/09/2018 26/09/2018 1 Days PROPOSED WORKS ROAD CLOSURE AZ014-NL0213

Cadent Gas Limited

0800 111 999

NORTH CIRCULAR ROAD LONDONBrent / Ealing boundary to Drury Way, East and

Westbound carriageways

NRW - Cyclic Cleansing for Brent Council NIL EXCAVATION. Back to back lane 3

and 2 closures on both carriageways for central reservation works. Eastbound

carriageway lane 3 and 2 swapping to westbound

MINOR 01/10/2018 02/10/2018 2 Days PROPOSED WORKS LANE CLOSURE AW001-CLEANSING75LONDON BOROUGH OF BRENT

020 8937 5600

NORTH CIRCULAR ROAD LONDON(westbound) WATERLOO ROAD TO CHARTLEY

AVENUE

BLOCK CLOSURE WB# TESTING LIGHTS& BOLLARDS, BULK CLEAN &

CHANGE, SWEEPING, GULLY & BEANY BLOCK CLEANING, BARRIER WORKS,

GRASS CUTTING, SIGN CLEANING, DEBRIS PATROLS

MAJOR 05/10/2018 05/10/2018 1 Days PROPOSED WORKS LANE CLOSURE YG431-316828TFL

0343 222 1234

NORTH CIRCULAR ROAD LONDON(eastbound) CHARTLEY AVENUE TO WATERLOO

ROAD

BLOCK CLOSURE EB# TESTING LIGHTS& BOLLARDS, BULK CLEAN &

CHANGE, SWEEPING, GULLY & BEANY BLOCK CLEANING, BARRIER WORKS,

GRASS CUTTING, SIGN CLEANING, DEBRIS PATROLS

MAJOR 05/10/2018 05/10/2018 1 Days PROPOSED WORKS LANE CLOSURE YG431-316990TFL

0343 222 1234

NORTH CIRCULAR ROAD LONDON(eastbound) JW DRURY WAY TO CHARTLEY

AVENUE

BLOCK CLOSURE EB# TESTING LIGHTS& BOLLARDS, BULK CLEAN &

CHANGE, SWEEPING, GULLY & BEANY BLOCK CLEANING, BARRIER WORKS,

GRASS CUTTING, SIGN CLEANING, DEBRIS PATROLS

MAJOR 05/10/2018 05/10/2018 1 Days PROPOSED WORKS LANE CLOSURE YG431-316823TFL

0343 222 1234

NORTH CIRCULAR ROAD LONDON(westbound) CHARTLEY AVENUE TO JW DRURY

WAY

BLOCK CLOSURE WB# TESTING LIGHTS& BOLLARDS, BULK CLEAN &

CHANGE, SWEEPING, GULLY & BEANY BLOCK CLEANING, BARRIER WORKS,

GRASS CUTTING, SIGN CLEANING, DEBRIS PATROLS

MAJOR 05/10/2018 05/10/2018 1 Days PROPOSED WORKS LANE CLOSURE YG431-316827TFL

0343 222 1234

NORTH CIRCULAR ROAD LONDON(eastbound) CHARTLEY AVENUE TO WATERLOO

ROAD

BLOCK CLOSURE EB# TESTING LIGHTS& BOLLARDS, BULK CLEAN &

CHANGE, SWEEPING, GULLY & BEANY BLOCK CLEANING, BARRIER WORKS,

GRASS CUTTING, SIGN CLEANING, DEBRIS PATROLS

MAJOR 05/10/2018 06/10/2018 2 Days PROPOSED WORKS LANE CLOSURE YG431-316608TFL

0343 222 1234

NORTH CIRCULAR ROAD LONDON(westbound) WATERLOO ROAD TO CHARTLEY

AVENUE

BLOCK CLOSURE WB# TESTING LIGHTS& BOLLARDS, BULK CLEAN &

CHANGE, SWEEPING, GULLY & BEANY BLOCK CLEANING, BARRIER WORKS,

GRASS CUTTING, SIGN CLEANING, DEBRIS PATROLS

MAJOR 05/10/2018 06/10/2018 2 Days PROPOSED WORKS LANE CLOSURE YG431-316617TFL

0343 222 1234

NORTH CIRCULAR ROAD LONDON(eastbound) CHARTLEY AVENUE TO WATERLOO

ROAD

BLOCK CLOSURE EB# TESTING LIGHTS& BOLLARDS, BULK CLEAN &

CHANGE, SWEEPING, GULLY & BEANY BLOCK CLEANING, BARRIER WORKS,

GRASS CUTTING, SIGN CLEANING, DEBRIS PATROLS

MAJOR 05/10/2018 06/10/2018 2 Days PROPOSED WORKS LANE CLOSURE YG431-316820TFL

0343 222 1234

NORTH CIRCULAR ROAD LONDON(eastbound) JW DRURY WAY TO CHARTLEY

AVENUE

BLOCK CLOSURE EB# TESTING LIGHTS& BOLLARDS, BULK CLEAN &

CHANGE, SWEEPING, GULLY & BEANY BLOCK CLEANING, BARRIER WORKS,

GRASS CUTTING, SIGN CLEANING, DEBRIS PATROLS

MAJOR 05/10/2018 06/10/2018 2 Days PROPOSED WORKS LANE CLOSURE YG431-316610TFL

0343 222 1234

NORTH CIRCULAR ROAD LONDON(westbound) CHARTLEY AVENUE TO JW DRURY

WAY WAY

BLOCK CLOSURE WB# TESTING LIGHTS& BOLLARDS, BULK CLEAN &

CHANGE, SWEEPING, GULLY & BEANY BLOCK CLEANING, BARRIER WORKS,

GRASS CUTTING, SIGN CLEANING, DEBRIS PATROLS

MAJOR 05/10/2018 06/10/2018 2 Days PROPOSED WORKS LANE CLOSURE YG431-316629TFL

0343 222 1234

NORTH CIRCULAR ROAD LONDON (eastbound) ABBEY ROAD TO GREAT CENTRAL WAY

BLOCK CLOSURE EB# TESTING LIGHTS& BOLLARDS, BULK CLEAN &

CHANGE, SWEEPING, GULLY & BEANY BLOCK CLEANING, BARRIER WORKS,

GRASS CUTTING, SIGN CLEANING, DEBRIS PATROLS

MAJOR 08/10/2018 09/10/2018 2 Days PROPOSED WORKS LANE CLOSURE YG431-316634TFL

0343 222 1234

NORTH CIRCULAR ROAD LONDON(westbound) JW GREAT CENTRAL WAY TO ABBEY

ROAD

BLOCK CLOSURE WB# TESTING LIGHTS& BOLLARDS, BULK CLEAN &

CHANGE, SWEEPING, GULLY & BEANY BLOCK CLEANING, BARRIER WORKS,

GRASS CUTTING, SIGN CLEANING, DEBRIS PATROLS

MAJOR 08/10/2018 09/10/2018 2 Days PROPOSED WORKS LANE CLOSURE YG431-316636TFL

0343 222 1234

NORTH CIRCULAR ROAD LONDON(eastbound) ABBEY ROAD TO JW GREAT CENTRAL

WAY

BLOCK CLOSURE EB# TESTING LIGHTS& BOLLARDS, BULK CLEAN &

CHANGE, SWEEPING, GULLY & BEANY BLOCK CLEANING, BARRIER WORKS,

GRASS CUTTING, SIGN CLEANING, DEBRIS PATROLS

MAJOR 09/10/2018 10/10/2018 2 Days PROPOSED WORKS LANE CLOSURE YG431-316638TFL

0343 222 1234

NORTH CIRCULAR ROAD LONDON(westbound) JW GREAT CENTRAL WAY TO ABBEY

ROAD

BLOCK CLOSURE WB# TESTING LIGHTS& BOLLARDS, BULK CLEAN &

CHANGE, SWEEPING, GULLY & BEANY BLOCK CLEANING, BARRIER WORKS,

GRASS CUTTING, SIGN CLEANING, DEBRIS PATROLS

MAJOR 09/10/2018 10/10/2018 2 Days PROPOSED WORKS LANE CLOSURE YG431-316640TFL

0343 222 1234

NORTH CIRCULAR ROAD LONDON (eastbound) AQUADUCT FLYOVER TO ABBEY ROAD

BLOCK CLOSURE EB# TESTING LIGHTS& BOLLARDS, BULK CLEAN &

CHANGE, SWEEPING, GULLY & BEANY BLOCK CLEANING, BARRIER WORKS,

GRASS CUTTING, SIGN CLEANING, DEBRIS PATROLS

MAJOR 10/10/2018 11/10/2018 2 Days PROPOSED WORKS LANE CLOSURE YG431-316652TFL

0343 222 1234

NORTH CIRCULAR ROAD LONDON(westbound) ABBEY ROAD TO THE AQUADUCT

FLYOVER

BLOCK CLOSURE WB# - TESTING LIGHTS& BOLLARDS, BULK CLEAN &

CHANGE, SWEEPING, GULLY & BEANY BLOCK CLEANING, BARRIER WORKS,

GRASS CUTTING, SIGN CLEANING, DEBRIS PATROLS

MAJOR 10/10/2018 11/10/2018 2 Days PROPOSED WORKS LANE CLOSURE YG431-316657TFL

0343 222 1234

NORTH CIRCULAR ROAD LONDON (eastbound) AQUADUCT FLYOVER TO ABBEY ROAD

BLOCK CLOSURE EB# TESTING LIGHTS& BOLLARDS, BULK CLEAN &

CHANGE, SWEEPING, GULLY & BEANY BLOCK CLEANING, BARRIER WORKS,

GRASS CUTTING, SIGN CLEANING, DEBRIS PATROLS

MAJOR 11/10/2018 12/10/2018 2 Days PROPOSED WORKS LANE CLOSURE YG431-316666TFL

0343 222 1234

NORTH CIRCULAR ROAD LONDON(westbound) ABBEY ROAD TO THE AQUADUCT

FLYOVER

BLOCK CLOSURE WB# TESTING LIGHTS& BOLLARDS, BULK CLEAN &

CHANGE, SWEEPING, GULLY & BEANY BLOCK CLEANING, BARRIER WORKS,

GRASS CUTTING, SIGN CLEANING, DEBRIS PATROLS

MAJOR 11/10/2018 12/10/2018 2 Days PROPOSED WORKS LANE CLOSURE YG431-316667TFL

0343 222 1234

NORTH CIRCULAR ROAD LONDONNeasden slips - 1st westbound slip and then 2nd

westbound slip, only one closed at a timeNRW - Cyclic Cleansing for Brent Council NIL EXCAVATION MINOR 15/10/2018 16/10/2018 2 Days PROPOSED WORKS LANE CLOSURE AW001-CLEANSING77

LONDON BOROUGH OF BRENT

020 8937 5600

NORTH CIRCULAR ROAD LONDON Neasden Slips - Eastbound off slips NRW - Cyclic Cleansing for Brent Council NIL EXCAVATION MINOR 16/10/2018 17/10/2018 2 Days PROPOSED WORKS LANE CLOSURE AW001-CLEANSING78LONDON BOROUGH OF BRENT

020 8937 5600

NORTH CIRCULAR ROAD LONDONDrury Way to Staples Corner - East and Westbound

carriageways

NRW - Cyclic Cleansing for Brent Council NIL EXCAVATION. Back to back lane 3

and 2 closure on both carriageways for central reservation works. Eastbound

carriageway lane 3 and 2, swapping to westbound

MINOR 01/11/2018 02/11/2018 2 Days PROPOSED WORKS LANE CLOSURE AW001-CLEANSING76LONDON BOROUGH OF BRENT

020 8937 5600

NORTH CIRCULAR ROAD LONDONEDGWARE ROAD FLYOVER TO COLES GREEN

ROAD'CYCLICAL ROUTINE MAINTENANCE FULL CLOSURE & DIVERSIONS' MAJOR 06/11/2018 08/11/2018 3 Days PROPOSED WORKS ROAD CLOSURE YG431-270171

TFL

0343 222 1234

NORTH CIRCULAR ROAD LONDON os 4B, Staples Corner Business ParkHoarding- TM: no impact on c/w - working hours: 0800-1800 - 24h contact: Ian

Greaves 07713784172STANDARD 03/02/2018 10/11/2018 281 Days PROPOSED WORKS NO C/W INCURSION YG450-378876

TFL

0343 222 1234

NORTH CIRCULAR ROAD LONDON

THESE WORKS ARE IN THE FOOTWAY APPROX

200MTRS EAST OF THE FLYOVER WITH HARROW

ROAD

THESE WORKS ARE FOR THE EXCAVATION AND INSTALLATION OF A NEW

TELECOMS CABINET AND MAST.MAJOR 24/12/2018 10/01/2019 18 Days PROPOSED WORKS ROAD CLOSURE YN112-W50855-WK39A 202/01638

OAKLANDS ROAD LONDONFrom outside no 97 to junction with Cricklewood

Broadway

WORKS METHODOLOGY: WORKING ON BEHALF OF THAMES WATER TO

CARRY OUT MAINS REPLACEMENT SURFACE LOCATION: C/W AND F/WMAJOR 18/07/2018 21/09/2018 66 Days IN PROGRESS SOME C/W INCURSION MU821-H553/MBIW04/I001

Thames Water

0800 316 9800

Page 10: London Borough of Brent · London Borough of Brent ... Kick off 20:00 03/09/2018 03/09/2018 1 Days Confirmed Event Day Road Closures ... Works in footway and carriageway to carry

London Borough of Brent

highways&[email protected] Roadworks/Events/Festivals

0208 937 5600 Network Management Team

Contact detailsEstimated

End DateEvent DescriptionMonth Duration

For the Week Commencing 24th September 2018

Traffic Management NotesWorks StatusStart Date

OAKLANDS ROAD LONDON Cricklewood Broadway (A5) - Howard Road National Car Free Day - Road closure - 11:00 - 17:00 HIGHWAYS ACT PERMITS 22/09/2018 22/09/2018 1 Days PROPOSED WORKS ROAD CLOSURE AW888-L-MAIN-00000939LONDON BOROUGH OF BRENT

020 8937 5600

OAKLANDS ROAD LONDON JUNCTION WITH CRICKLEWOOD BROADWAYWORKING ON BEHALF OF THAMES WATER TO CARRY OUT MAINS

REPLACEMENTMAJOR 08/10/2018 19/10/2018 12 Days PROPOSED WORKS ROAD CLOSURE MU821-H553/MBIW04/I007

Thames Water

0800 316 9800

OAKLANDS ROAD LONDON j/w Cricklewood Broadway

Proposed Temporary Traffic Order for a road closure at Oaklands Road j/w

Cricklewood Broadway to carrying out mains replacement works Our ref:

TTRO/18/020

HIGHWAYS ACT PERMITS 08/10/2018 19/10/2018 12 Days PROPOSED WORKS ROAD CLOSURE AW888-L-MAIN-00000929LONDON BOROUGH OF BRENT

020 8937 5600

OKEHAMPTON ROAD LONDON whole road

WORKS METHODOLOGY: WORKING ON BEHALF OF THAMES WATER -

NOTIFICATION OF POTENTIAL WORKS TO CARRY OUT MAINS

REPLACEMENT SCHEME

MAJOR 27/09/2018 04/10/2018 8 Days PROPOSED WORKS SOME C/W INCURSION MU821-H208/MBIW07/Z018Thames Water

0800 316 9800

OLD CHURCH LANE LONDON o/s 48 in f/p Trace, then excavate to repair gas escape and reinstate where possible IMMEDIATE (EMERGENCY) 12/09/2018 20/09/2018 9 Days IN PROGRESS SOME C/W INCURSION AZ007-1000755989Cadent Gas Limited

0800 111 999

OLD CHURCH LANE LONDON 1 Sewer repair in Carriageway IMMEDIATE (EMERGENCY) 28/08/2018 24/09/2018 28 Days IN PROGRESS LANE CLOSURE MU026-008107SFNP--001001Thames Water

0800 316 9800

OLD CHURCH LANE LONDON 03-MayNon excavation permit for compound relating to excavation permit MU026-

008107SFNP--001001 - Emergency works due to collapsed sewerIMMEDIATE (EMERGENCY) 28/08/2018 24/09/2018 28 Days IN PROGRESS SOME C/W INCURSION MU026-008107SFNP--001002

Thames Water

0800 316 9800

OLDBOROUGH ROAD WEMBLEY 7Remedial Works Following Defect Inspection- To rectify remedial work in

CarriagewayMINOR 22/09/2018 24/09/2018 3 Days PROPOSED REMEDIAL SOME C/W INCURSION AZ007-1000566826

Cadent Gas Limited

0800 111 999

OLIVE ROAD LONDON The Cross Junction with Heber Road and Ashford RoadWORKING ON BEHALF OF THAMES WATER TO CARRY OUT MAINS

REPLACEMENTMAJOR 22/10/2018 09/11/2018 19 Days PROPOSED WORKS ROAD CLOSURE MU821-H553/MBIW04/I008

Thames Water

0800 316 9800

OLIVE ROAD LONDON j/w Heber RoadProposed Temporary Traffic Order for a road closure at Olive Road j/w Heber Road

to carry out mains replacement works.HIGHWAYS ACT PERMITS 22/10/2018 09/11/2018 19 Days PROPOSED WORKS ROAD CLOSURE AW888-L-MAIN-00000930

LONDON BOROUGH OF BRENT

020 8937 5600

OXFORD ROAD LONDON O/s 14 - 22. f\w. c\w.

Connections Projects:Electrical service alteration to customer supply:Dig 4 x LV

Joint Holes& 2 x HV Joint Holes as shown on plans. Pull 4 x 80m 300mm WV & 2 x

80m 300mm Al Triplex

STANDARD 24/09/2018 05/10/2018 12 Days PROPOSED WORKS SOME C/W INCURSION EC400-10753109London Power Networks plc

0800 0280709

PARK LANE WEMBLEYO/S CHESTERFIELD HOUSE PARK LANE,

WEMBLEY, BRENT

DS0015062 - 2 X MAINS INSTALLATION TO NEW DEVELOPMENT ON BEHALF

OF AFFINITY WATER ND -FW/CW - STANDARD SLG - ONE WAY ROAD

CLOSURE - 2 PARKING BAY SUSPENSIONS

MAJOR 19/11/2018 30/11/2018 12 Days PROPOSED WORKS ROAD CLOSURE MX043-215ND587/01Affinity Water

01707 679 623

PARK VIEW ROAD LONDONFROM JUNCTION WITH LENNOX GARDENS TO

JUNCTION WITH DOLLIS HILL LANE

WORKING ON BEHALF OF THAMES WATER MAINS REPALCEMENT CW AND

FWMAJOR 23/07/2018 30/11/2018 131 Days IN PROGRESS SOME C/W INCURSION MU821-H553/MSUL46/I003

Thames Water

0800 316 9800

PARKFIELD ROAD LONDON O/S 1 OUTSIDE STOP VALVE REPLACEMENT IN FOOTWAY - LEAK REPAIR MINOR 25/09/2018 27/09/2018 3 Days PROPOSED WORKS NO C/W INCURSION MU260-CSL-MGJV-200643Thames Water

0800 316 9800

PEBWORTH ROAD HARROW 26 pebworth road, harrow, ha13ud Relay Long Service Pipe - Working in footway and carriageway MINOR 19/09/2018 24/09/2018 6 Days IN PROGRESS SOME C/W INCURSION MX044-10020401Affinity Water

01707 679 623

PETER AVENUE LONDON whole road

WORKS METHODOLOGY: WORKING ON BEHALF OF THAMES WATER -

NOTIFICATION OF POTENTIAL WORKS TO CARRY OUT MAINS

REPLACEMENT SCHEME

MAJOR 25/10/2018 01/11/2018 8 Days PROPOSED WORKS SOME C/W INCURSION MU821-H208/MBIW07/Z019Thames Water

0800 316 9800

PRESTON ROAD WEMBLEYPreston Road outside 'The Martins ' to o/s 27- 60 m

North and 60 m South

Laying the Anti skid to the zebra crossing-to put up four way lights at the junction

with Forty Avenue, Wembley Hill Road East Lane and Preston RoadMINOR 19/09/2018 21/09/2018 3 Days IN PROGRESS MULTI-WAY SIGNALS AW041-325456

LONDON BOROUGH OF BRENT

020 8937 5600

PRINCES AVENUE LONDON OUTSIDE NO.176 TO NO.169 REMOVE FOOTWAY/DRIVE BLOCKAGE TO ALLOW CUSTOMER CONNECTION MINOR 21/09/2018 25/09/2018 5 Days PROPOSED WORKS SOME C/W INCURSION NK100-/SCLJFI/106665/LSMVirgin Media

0870 8883117

PRINCES AVENUE LONDON 232 SEWER CLEANING - PLANNED MINOR 24/09/2018 26/09/2018 3 Days PROPOSED WORKS MULTI-WAY SIGNALS MU026-008107XVVB--000003Thames Water

0800 316 9800

PRINCES AVENUE LONDON 9 Princes Avenue Interim to perm works in the footway MINOR 25/09/2018 27/09/2018 3 Days PROPOSED PERMANENT SOME C/W INCURSION MX044-10020208Affinity Water

01707 679 623

PRINCES CLOSE LONDON 7 - Princes Avenue

Proposed Temporary Traffic Order for a single yellow line and 'No waiting'

restriction, 08:00 - 18:00 Mon - Fri, 09.00 - 13.00 Sat, in the cu-de-sac at the land

near 7 Princes Close, NW9 9QT j/w Princ

HIGHWAYS ACT PERMITS 25/05/2018 24/03/2019 304 Days PROPOSED WORKS NO C/W INCURSION AW888-L-MAIN-00000891LONDON BOROUGH OF BRENT

020 8937 5600

PRIORY CRESCENT WEMBLEY footway 12 priory crecent Relay Short Service Pipe - WORKING IN FOOTWAY MINOR 20/09/2018 24/09/2018 5 Days PROPOSED WORKS SOME C/W INCURSION MX044-10021194Affinity Water

01707 679 623

RANELAGH ROAD LONDONRANELAGH ROAD - WHOLE STREET FROM J/O

HONEYWOOD ROAD TO J/O STATIONROAD.

IMGA202021. ABANDON 91M X 100MM DI AND 156M X 100MM

DIANDINSERT91MX75MMPE AND 156M X 75MM PE AND RELAY OR

TRANSFER SERVICES.

MAJOR 28/08/2018 09/10/2018 43 Days IN PROGRESS SOME C/W INCURSION AZ007-1000726761Cadent Gas Limited

0800 111 999

REDFERN ROAD LONDONFROM JUNCTION WITH GLYNFIELD ROAD TO

OUTSIDE NO 68 AND 69

WORKS METHODOLOGY: WORKING ON BEHALF OF THAMES WATER TO

CARRY OUT MAINS REPLACEMENT SURFACE LOCATION: CW AND FWMAJOR 07/01/2019 07/02/2019 32 Days PROPOSED WORKS SOME C/W INCURSION MU821-H553/MKET13/I001

Thames Water

0800 316 9800

ROSSLYN CRESCENT WEMBLEY 43 ROSSLYN CRESCENT, WEMBLEY BRENT Relay Short Service Pipe - WORKING IN FOOTWAY AND CARRIAGEWAY MINOR 24/09/2018 26/09/2018 3 Days PROPOSED WORKS SOME C/W INCURSION MX044-10025160Affinity Water

01707 679 623

RUCKLIDGE AVENUE LONDON WHOLE ROAD MAJOR C/W RESURFACING WORKS - 2018-2019-ROAD CLOSURE MAJOR 28/06/2018 25/09/2018 90 Days IN PROGRESS ROAD CLOSURE AW042-291105LONDON BOROUGH OF BRENT

020 8937 5600

RUGBY AVENUE WEMBLEY 154 RUGBY AVENUE, WEMBLEYRelay Long Service Pipe - WORKING IN FOOTWAY AND CARRIAGEWAY - SAME

DAY REINSTATEMENT REQUIREDIMMEDIATE (URGENT) 20/09/2018 24/09/2018 5 Days IN PROGRESS ROAD CLOSURE MX044-10017190

Affinity Water

01707 679 623

SALUSBURY ROAD LONDON outside 65 to Junction of Victoria Road

OUT OF HOURS CABLE PULL - FOOTWAY WORKS ONLY - NO EXCAVATION,

Only one footway/permit to be worked on at any given time. Raised in conjunction

with NK100/SSERRE/14019921N9A

MINOR 20/09/2018 20/09/2018 1 Days PROPOSED WORKS NO C/W INCURSION NK100-/SSERRE/14019921N9Virgin Media

0870 8883117

SALUSBURY ROAD LONDON*CUSTOMER DRIVEN WORKS* FOOTWAY OUTSIDE

OF NUMBER 102LAY NEW SERVICE 2M FROM MAIN IN FOOTWAY STANDARD 17/09/2018 21/09/2018 5 Days IN PROGRESS TWO-WAY SIGNALS AZ007-1000749229

Cadent Gas Limited

0800 111 999

SALUSBURY ROAD LONDON OUTSIDE 53-55 REPAIR AND REPLACE DUCTING IN FOOTWAY MINOR 24/09/2018 26/09/2018 3 Days PROPOSED WORKS NO C/W INCURSION NK100-/SCLJDA/97362/LDAVirgin Media

0870 8883117

SELWYN ROAD LONDONFROM JUNCTION WITH ALRIC AVENUE TO

JUNCTION WITH HAZELDEAN ROAD

WORKS METHODOLOGY: WORKING ON BEHALF OF THAMES WATER TO

CARRY OUT MAINS REPLACEMENT SURFACE LOCATION: C/W AND F/WMAJOR 13/11/2018 12/12/2018 30 Days PROPOSED WORKS SOME C/W INCURSION MU821-H553/MSUL03/I003

Thames Water

0800 316 9800

SHAKESPEARE DRIVE HARROW outside 42 lay duct and fit service point in footway MINOR 23/10/2018 25/10/2018 3 Days PROPOSED WORKS SOME C/W INCURSION NK100-/SSEJPL/104621/PLSVirgin Media

0870 8883117

SHOOT UP HILL LONDON 38Main Clamp 0 to 6' Fway in Footway. Our intention is to complete thePermanent

Reinstatement in the same phaseIMMEDIATE (URGENT) 19/09/2018 25/09/2018 7 Days IN PROGRESS SOME C/W INCURSION MU301-000031143502-002

Thames Water

0800 316 9800

SONIA GARDENS LONDON OUTSIDE NO 34 TO SIDE OF NO 22 COMPOUND/ WELFARE UNIT FOR WORKS ON PARK VIEW MAJOR 02/08/2018 28/09/2018 58 Days IN PROGRESS SOME C/W INCURSION MU821-H553/MSUL46/I004Thames Water

0800 316 9800

Page 11: London Borough of Brent · London Borough of Brent ... Kick off 20:00 03/09/2018 03/09/2018 1 Days Confirmed Event Day Road Closures ... Works in footway and carriageway to carry

London Borough of Brent

highways&[email protected] Roadworks/Events/Festivals

0208 937 5600 Network Management Team

Contact detailsEstimated

End DateEvent DescriptionMonth Duration

For the Week Commencing 24th September 2018

Traffic Management NotesWorks StatusStart Date

SONIA GARDENS LONDON WHOLE ROAD

FOOTWAY RECONSTRUCTION PROGRAMME- RESERVE SCHEME- 2018/19-

PEDESTRIAN SIGNING AND GUARDING-FOOTWAY CLOSURE, SOME C/W

INCURSION, CHAPTER 8

MAJOR 04/07/2018 01/10/2018 90 Days PROPOSED WORKS SOME C/W INCURSION AW042-292338LONDON BOROUGH OF BRENT

020 8937 5600

SONIA GARDENS LONDON S/o 167 Dudden Hill Lane. f\w. c\w. Connections Projects:Electrical service alteration to customer supply:New service STANDARD 03/10/2018 09/10/2018 7 Days PROPOSED WORKS SOME C/W INCURSION EC400-10753149London Power Networks plc

0800 0280709

SONIA GARDENS LONDON FOOTWAY OUTSIDE OF NO 2 SONIA GARDENS LAY 3 X NEW DOMSTIC GAS SERVICES 1M FROM MAIN IN THE FOOTWAY MINOR 08/10/2018 10/10/2018 3 Days PROPOSED WORKS GIVE & TAKE AZ007-1000748890Cadent Gas Limited

0800 111 999

SOUTH WAY WEMBLEY*CUSTOMER DRIVEN WORKS* FOOTWAY OUTSIDE

OF V.D.CDISCONNECT 8' MAIN IN FOOTWAY STANDARD 01/10/2018 09/10/2018 9 Days PROPOSED WORKS LANE CLOSURE AZ007-1000748455

Cadent Gas Limited

0800 111 999

SOUTH WAY WEMBLEY J/W Wembley Hill RoadProposed Temporary Traffic Order for a road closure in South Way j/w Wembley Hill

Road for a new sewer connection. Our ref: TTRO/18/012HIGHWAYS ACT PERMITS 06/08/2018 11/11/2018 98 Days PROPOSED WORKS ROAD CLOSURE AW888-L-MAIN-00000908

LONDON BOROUGH OF BRENT

020 8937 5600

SOUTH WAY WEMBLEY J/W Wembley Hill RoadTM and excavation works to upgrade existing Thames infra structure in footway and

carriagewayMAJOR 29/08/2018 31/01/2019 156 Days IN PROGRESS ROAD CLOSURE MU302-KCD-MAJOR-H456-1

Thames Water

0800 316 9800

ST ALBANS ROAD LONDON o/s 10. f\w.Network Operations Faults:Essential repair of electricity cables powering street

lighting / furniture:repairs to lamp column walk way in the carriageIMMEDIATE (URGENT) 18/09/2018 24/09/2018 7 Days IN PROGRESS NO C/W INCURSION EC400-10753629

London Power Networks plc

0800 0280709

ST JOHNS ROAD WEMBLEY 109 ST JOHNS ROAD WEMBLEY Remedial works in the footway MINOR 17/09/2018 21/09/2018 5 Days IN PROGRESS SOME C/W INCURSION MX044-10015657Affinity Water

01707 679 623

ST JOHNS ROAD WEMBLEY Elm Road to High Road National Car Free day - Road Closure - 10:00 - 16:00 HIGHWAYS ACT PERMITS 22/09/2018 22/09/2018 1 Days PROPOSED WORKS ROAD CLOSURE AW888-L-MAIN-00000938LONDON BOROUGH OF BRENT

020 8937 5600

ST JOHNS ROAD WEMBLEY At the railway bridge (rail over road)Structures examination of the railway bridge using a truck mounted hoist. 09:30 -

15:00.MINOR 15/10/2018 15/10/2018 1 Days PROPOSED WORKS TWO-WAY SIGNALS KL333-NAJ1-BRG-14-2018 202/00697

ST MARYS ROAD LONDON O/S 19 OUTSIDE STOP VALVE REPLACEMENT IN FOOTWAY - LEAK REPAIR MINOR 25/09/2018 27/09/2018 3 Days PROPOSED WORKS NO C/W INCURSION MU260-CSL-MGJV-200644Thames Water

0800 316 9800

STAPLEFORD ROAD WEMBLEY 9Replace Sewer Cover--WORKS INTENDED TO INCLUDE FIRST TIME

PERMANENT REINSTATEMENT WITHIN SAME PHASEMINOR 22/09/2018 24/09/2018 3 Days PROPOSED WORKS GIVE & TAKE MU026-008107VCQG--000005

Thames Water

0800 316 9800

STAPLEFORD ROAD WEMBLEY O/S NO 23, STAPLEFORD ROAD Install 3m of 1 way poly duct in Footway MINOR 20/09/2018 24/09/2018 5 Days PROPOSED WORKS NO C/W INCURSION BC006-TI001LC500269104000BT

03301 233753

TALBOT ROAD WEMBLEYOpposite number 2 TALBOT ROAD in footway&

carriageway

Excavate& connect to CGL Gas Main providing gas supply to new housing

development. Approx dimensions: 3m x 0.5m footway, 4m x 0.5m carriageway.

Depth: 0.8m. FIRST TIME PERM

MINOR 08/10/2018 10/10/2018 3 Days PROPOSED WORKS GIVE & TAKE ZP007-69601/EPLR 202/02290

TALBOT WALK LONDON 37Main Clamp in Footway. Our intention is to complete the PermanentReinstatement

in the same phaseMINOR 02/10/2018 04/10/2018 3 Days PROPOSED WORKS SOME C/W INCURSION MU301-000031131229-002

Thames Water

0800 316 9800

TANFIELD AVENUE LONDON 112 SELF DEFECT- Rectify remedial work in Footway MINOR 18/09/2018 20/09/2018 3 Days IN PROGRESS NO C/W INCURSION AZ007-1000733732Cadent Gas Limited

0800 111 999

TENNYSON ROAD LONDON s/o 135 Glengall road in Tennyson road. f\w.Network Operations Faults:Essential and immediate replacement or repair of multi-

way link box to ensure safe and reliable power supplies:repairs to faulted link boxIMMEDIATE (URGENT) 17/09/2018 24/09/2018 8 Days IN PROGRESS SOME C/W INCURSION EC400-10753548

London Power Networks plc

0800 0280709

THE AVENUE LONDONEXCAVATION IN FOOTPATH OUTSIDE 5-7 THE

AVENUE.. f\w.

Connections Small Service:Disconnection / reconnection of existing electricity

supply for a customer:EXCAVATION IN FOOTPATH OUTSIDE 5-7 THE AVENUE

TO PERMANENTLY DISCONNECT 2 ELECTRICITY SERVICES. F/P

STANDARD 14/09/2018 20/09/2018 7 Days IN PROGRESS NO C/W INCURSION EC400-10748214London Power Networks plc

0800 0280709

THE AVENUE LONDON outside 60 to 64CUSTOMER CONNECTION NEW RESIDENTIAL SUPPLY. CLEAR BLOCKED

TEE and REPAIR BLOCKAGES IF FOUND, FOOTWAY WORKS ONLYMINOR 22/09/2018 25/09/2018 4 Days PROPOSED WORKS NO C/W INCURSION NK100-/SSERRE/14030462J9

Virgin Media

0870 8883117

THE CIRCLE LONDONjnc of The circle and North Cicular Road. Between

house no. 336 and 334Trace, then excavate to repair gas escape and reinstate where possible IMMEDIATE (EMERGENCY) 19/09/2018 25/09/2018 7 Days IN PROGRESS ROAD CLOSURE AZ007-1000758382

Cadent Gas Limited

0800 111 999

THE FAIRWAY WEMBLEY 42 the fairway wembley Relay Short Service Pipe - WORKING IN FOOTWAY AND CARRIAGEWAY MINOR 19/09/2018 21/09/2018 3 Days PROPOSED WORKS SOME C/W INCURSION MX044-10015865Affinity Water

01707 679 623

THE GROVE LONDON THE GROVE, O/S NO.41IMGA192408. URGENT: TO RESTORE GAS SUPPLY TO NO.41 THE GROVE,

LONDON,NW9 0TNIMMEDIATE (URGENT) 19/09/2018 25/09/2018 7 Days IN PROGRESS NO C/W INCURSION AZ007-1000758182

Cadent Gas Limited

0800 111 999

THE MALL HARROW whole road major carriageway resurfacing works -joint repairs 2018-2019-road closure MAJOR 27/07/2018 24/10/2018 90 Days PROPOSED WORKS ROAD CLOSURE AW042-290858LONDON BOROUGH OF BRENT

020 8937 5600

THE RIDGEWAY HARROW 8 the ridgeway kenton ha30ll Relay Long Service Pipe - WORKING IN FOOTWAY MINOR 21/09/2018 25/09/2018 5 Days PROPOSED WORKS SOME C/W INCURSION MX044-10018002Affinity Water

01707 679 623

TORBAY ROAD LONDON WHOLE ROADPREVENTATIVE CARRIAGEWAY RESURFACING WORKS-2018 TO 2019-ROAD

CLOSUREMAJOR 18/09/2018 20/09/2018 3 Days IN PROGRESS ROAD CLOSURE AW042-290745

LONDON BOROUGH OF BRENT

020 8937 5600

TUDOR GARDENS LONDON OUTSIDE 27 Make works perm in footway MINOR 02/10/2018 04/10/2018 3 Days PROPOSED PERMANENT NO C/W INCURSION AZ007-1000742458Cadent Gas Limited

0800 111 999

UFFINGTON ROAD LONDONFrom Opposite Esher House to Opposite Shalford

CottagePERMIT IS FOR OFFICE AND SITE COMPOUND. MAJOR 04/07/2018 28/09/2018 87 Days IN PROGRESS SOME C/W INCURSION MU821-H208/MBIW07/I011

Thames Water

0800 316 9800

UPHILL DRIVE LONDON WHOLE ROADMAJOR CARRIAGEWAY RESURFACING WORKS(RESERVE SCHEME)2018-

2019-ROAD CLOSUREMAJOR 28/06/2018 25/09/2018 90 Days IN PROGRESS ROAD CLOSURE AW042-291242

LONDON BOROUGH OF BRENT

020 8937 5600

UXENDON CRESCENT WEMBLEY WHOLE ROADMAJOR CARRIAGEWAY RESURFACING(RESERVE) 2018-2019-ROAD

CLOSUREMAJOR 28/06/2018 25/09/2018 90 Days IN PROGRESS ROAD CLOSURE AW042-291135

LONDON BOROUGH OF BRENT

020 8937 5600

VALLEY DRIVE LONDON FRYENT WAY TO WALTHAM AVENUEFOOTWAY RECONSTRUCTION PROGRAMME 2018/19-PEDESTRIAN SIGNING

AND GUARDING-FOOTWAY CLOSURE, SOME C/W INCURSION, CHAPTER 8MAJOR 24/09/2018 28/02/2019 158 Days PROPOSED WORKS SOME C/W INCURSION AW042-325241

LONDON BOROUGH OF BRENT

020 8937 5600

VICTOR ROAD LONDON FOOTWAY OUTSIDE OF NO 4 VICTOR ROAD LAY NEW DOMESTIC GAS SERVICE 2M FROM MAIN IN THE FOOTWAY STANDARD 14/09/2018 20/09/2018 7 Days IN PROGRESS SOME C/W INCURSION AZ007-1000749530Cadent Gas Limited

0800 111 999

VICTOR ROAD LONDONFROM JUNCTION WITH HARROW ROAD TO END OF

THE ROAD

WORKING ON BEHALF OF THAMES WATER TO CARRY OUT MAINS

REPLACEMENTMAJOR 03/09/2018 23/10/2018 51 Days IN PROGRESS SOME C/W INCURSION MU821-H553/MSUL20/I001

Thames Water

0800 316 9800

VICTORIA ROAD LONDONoutside Junction of Salusbury Road on Victoria Road to

106 Victoria Road

OUT OF HOURS CABLE PULL - FOOTWAY WORKS ONLY - NO EXCAVATION,

Only one footway/permit to be worked on at any given time. Raised in conjunction

with NK100/SSERRE/14019921N9

MINOR 20/09/2018 20/09/2018 1 Days PROPOSED WORKS NO C/W INCURSION NK100-/SSERRE/14019921N9AVirgin Media

0870 8883117

Page 12: London Borough of Brent · London Borough of Brent ... Kick off 20:00 03/09/2018 03/09/2018 1 Days Confirmed Event Day Road Closures ... Works in footway and carriageway to carry

London Borough of Brent

highways&[email protected] Roadworks/Events/Festivals

0208 937 5600 Network Management Team

Contact detailsEstimated

End DateEvent DescriptionMonth Duration

For the Week Commencing 24th September 2018

Traffic Management NotesWorks StatusStart Date

VILLAGE WAY LONDON 67 OUTSIDE STOP VALVE INSTALLATION IN FOOTWAY MINOR 19/09/2018 21/09/2018 3 Days PROPOSED WORKS NO C/W INCURSION MU275-OSV-199750Thames Water

0800 316 9800

VILLIERS ROAD LONDON 184 VILLIERS ROAD, LONDON, NW2 5PUMain Clamp in Carriageway. Our intention is to complete the

PermanentReinstatement in the same phaseMINOR 26/09/2018 28/09/2018 3 Days PROPOSED WORKS MULTI-WAY SIGNALS MU301-000031154810-001

Thames Water

0800 316 9800

WAKEMAN ROAD LONDON 86 OUTSIDE STOP VALVE REPLACEMENT IN FOOTWAY - LEAK REPAIR MINOR 25/09/2018 27/09/2018 3 Days PROPOSED WORKS NO C/W INCURSION MU260-CSL-MGJV-200653Thames Water

0800 316 9800

WAKEMAN ROAD LONDONFROM JUNCTION WITH Chamberlayne Road TO

JUNCTION WITH COMPTON ROAD

MAJOR LARGE DIAMETER MAINS REPLACEMENT WORKS TO TAKE PLACE.

ABANDON 62MOF METALLIC MAIN AND REPLACE IT WITH 62M OF PE MAIN.

INSERTION METHOD TO BE USED, NEW MAIN TO BE SLEEVED INSIDE THE

OLD TO REDUCE

MAJOR 14/09/2018 21/11/2018 69 Days IN PROGRESS NO C/W INCURSION AZ007-1000668688Cadent Gas Limited

0800 111 999

WAKEMANS HILL AVENUE LONDONFrom electricity sub-station at the s/o 2 to j/o Edgware

Road, Wakemans Hill Avenue. . f\w. c\w.

Network Operations Distribution:Installation of new 11kv High Voltage electricity

cables to ensure safe and reliable power supplies:Excavation of trench in footway&

carriageway to enable the installat

MAJOR 05/10/2018 16/11/2018 43 Days PROPOSED WORKS SOME C/W INCURSION EC300-34795203London Power Networks plc

0800 0280709

WALM LANE LONDON outside 129a on Walm Lane to 131CLEAR BLOCKED DUCT and REPAIR BLOCKAGES IF FOUND FOOTWAY

WORKS ONLYMINOR 21/09/2018 24/09/2018 4 Days PROPOSED WORKS NO C/W INCURSION NK100-/SSERRE/14009182J9A

Virgin Media

0870 8883117

WALM LANE LONDON Outside 179 Clear blockage and desilt chamber in footway. MINOR 03/10/2018 04/10/2018 2 Days PROPOSED WORKS SOME C/W INCURSION NK100-/SCLJBU/6417024/ERSVirgin Media

0870 8883117

WALM LANE LONDON 17

new customer water supply 1x32mm MDPE mtrd, works in the footway and

inCarriageway. Our intention is to complete the Permanent Reinstatement inthe

same phase

STANDARD 05/10/2018 10/10/2018 6 Days PROPOSED WORKS SOME C/W INCURSION MU307-000807582360045-001Thames Water

0800 316 9800

WARFIELD ROAD LONDONFROM THE JUNCTION WITH PEMBER ROAD TO THE

JUNCTION WITH HARROW ROAD

MAJOR LARGE DIAMETER MAINS REPLACEMENT WORKS TO TAKE

PLACE.ABANDON90MOFMETALLIC MAIN AND REPLACE IT WITH 90M OF PE

MAIN. INSERTIONMETHOD TO BE USED, NEW MAIN TO BE SLEEVED INSIDE

THEOLDTOREDUCEEXCAVAT

MAJOR 17/09/2018 22/11/2018 67 Days IN PROGRESS ROAD CLOSURE AZ007-1000682229Cadent Gas Limited

0800 111 999

WATFORD ROAD HARROWOn footway, west side of road, 30 metres north of John

Lyon roundabout.

Working on existing telecommunications cabinet on footway. No excavation, no

carriageway incursion. All signing lighting and guarding confined to footway, 1.2

metres will be maintained for peds.

MINOR 24/09/2018 26/09/2018 3 Days PROPOSED WORKS NO C/W INCURSION MG056-37660 202/01453

WATFORD ROAD WEMBLEY outside 123 to 127CLEAR BLOCKED TEE and REPAIR BLOCKAGES IF FOUND FOOTWAY WORKS

ONLYMINOR 25/09/2018 26/09/2018 2 Days PROPOSED WORKS NO C/W INCURSION NK100-/SSERRE/14098642J9

Virgin Media

0870 8883117

WELLS DRIVE LONDON outside 9 to 13CLEAR BLOCKED DUCT and REPAIR BLOCKAGES IF FOUND FOOTWAY

WORKS ONLYMINOR 22/09/2018 25/09/2018 4 Days PROPOSED WORKS NO C/W INCURSION NK100-/SSERRE/14055726J9A

Virgin Media

0870 8883117

WEMBLEY HILL ROAD WEMBLEY 90 WEMBLEY HILL ROAD, WEMBLEY Fit Stop Tap / Boundary Box - WORKING IN FOOTWAY MINOR 21/09/2018 25/09/2018 5 Days PROPOSED WORKS SOME C/W INCURSION MX044-10020754Affinity Water

01707 679 623

WEMBLEY HILL ROAD WEMBLEY J/W South WayTM and excavation works to upgrade existing Thames infra structure works in

footway& carriagewayMAJOR 29/08/2018 31/01/2019 156 Days IN PROGRESS MULTI-WAY SIGNALS MU302-KCD-MAJOR-H456-2

Thames Water

0800 316 9800

WEMBLEY PARK DRIVE WEMBLEY 3 Emergency sewer repair works in carriageway due to external flooding IMMEDIATE (EMERGENCY) 18/09/2018 01/10/2018 14 Days IN PROGRESS MULTI-WAY SIGNALS MU026-008107LDQG--0001Thames Water

0800 316 9800

WEST COURT WEMBLEY NEARSIDE FOOTWAY OUTSIDE 26 WEST COURTALTER AND RELAY DOMESTIC SERVICE 1.5M FROM MAIN IN NEARSIDE

FOOTWAYSTANDARD 28/09/2018 04/10/2018 7 Days PROPOSED WORKS NO C/W INCURSION AZ007-1000756975

Cadent Gas Limited

0800 111 999

WESTMORELAND ROAD LONDON Adj 6 Bowmans Trading Estate

Proposed Temporary Traffic Order for a footway and part carriageway closure adj. 6

Bowmans Trading Estate j/w Westmoreland Road to allow for construction works.

Our ref: TTRO/18/026

HIGHWAYS ACT PERMITS 21/09/2018 20/03/2020 547 Days PROPOSED WORKS SOME C/W INCURSION AW888-L-MAIN-00000925LONDON BOROUGH OF BRENT

020 8937 5600

WHITMORE GARDENS LONDON whole roadWORKING ON BEHALF OF THAMES WATER TO CARRY OUT MAINS

REPLACEMENTMAJOR 13/08/2018 19/10/2018 68 Days IN PROGRESS SOME C/W INCURSION MU821-H208/MSUL20/Z001

Thames Water

0800 316 9800

WOODGRANGE CLOSE HARROW 37 Non excavation permit raised for compound - Related to pollution investigation IMMEDIATE (EMERGENCY) 29/08/2018 19/10/2018 52 Days IN PROGRESS SOME C/W INCURSION MU026-008107TBKJ--001001Thames Water

0800 316 9800

WOODSIDE PLACE WEMBLEYADJ TO 57 WOODSIDE AVENUE, WOODSIDE

PLACE, WEMBLEY, BRENT

COMMUNICATION PIPE - INSTALL; 25 MDPE; 4' CI; 1 OF 1 - FW WORKS - FW

CLOSURE REQUIRED - PEDS TO USE OPP FWMINOR 26/09/2018 28/09/2018 3 Days PROPOSED WORKS SOME C/W INCURSION MX044-285413600

Affinity Water

01707 679 623

WOODSIDE PLACE WEMBLEYjoint hole in fw adj to 55 with road crossing to site adj to

57 woodside ave . f\w. c\w.

Connections Small Service:Installation of a new electricity supply for a customer:new

supply with road crossing on woodside placeMAJOR 28/11/2018 04/12/2018 7 Days PROPOSED WORKS ROAD CLOSURE EC300-34801922

London Power Networks plc

0800 0280709

WOODSTOCK ROAD WEMBLEY O/S 10, WOODSTOCK ROAD Install 15m of 1 way poly duct in Verge,Install 3m of 1 way poly duct in Footway MINOR 19/09/2018 20/09/2018 2 Days PROPOSED WORKS NO C/W INCURSION BC006-TI001LC500267069003BT

03301 233753

WYCOMBE ROAD WEMBLEY Junction Beresford Ave to Outside Sub Station Trial Holes MAJOR 08/05/2018 31/05/2019 389 Days IN PROGRESS ROAD CLOSURE AW999-S000000000343LONDON BOROUGH OF BRENT

020 8937 5600

WYLD WAY WEMBLEYWHOLE STREET FROM S/O NO.130 VIVIAN AVENUE

TO J/O HARROW ROAD

IMGA192405. ABANDON 325M X 6/8' CI MAIN AND INSERT 125/180MM PE

ANDRELAY OR TRANSFER APPROX 40 SERVICESMAJOR 29/10/2018 30/11/2018 33 Days PROPOSED WORKS SOME C/W INCURSION AZ007-1000741692

Cadent Gas Limited

0800 111 999

YEATS CLOSE LONDONFROM ENTRANCE TO SELCO BUILDERS TO SMALL

ROUNDABOUT

footway + carriageway works-ped signing and guarding, 2 way lights, footway

closure, some c/w incursion-chapter 8.STANDARD 24/09/2018 07/10/2018 14 Days PROPOSED WORKS TWO-WAY SIGNALS AW041-326848

LONDON BOROUGH OF BRENT

020 8937 5600

YEWFIELD ROAD LONDON WHOLE ROADMAJOR CARRIAGEWAY RESURFACING WORKS(reserve scheme)2018-2019-

road closureMAJOR 28/06/2018 25/09/2018 90 Days IN PROGRESS ROAD CLOSURE AW042-291250