7/27/2019 RPF Project-Engineering Scope of Work
http://slidepdf.com/reader/full/rpf-project-engineering-scope-of-work 1/35
*** 2.4 Hazard & P & ID hazop review in the stage of basic, Operability Study detailed design and plant operation (HAZOP)
*** 3.10 Operating Manual
7/27/2019 RPF Project-Engineering Scope of Work
http://slidepdf.com/reader/full/rpf-project-engineering-scope-of-work 2/35
TPI
P.1 OF 29
SCOP
E OF
WOR
K
FOR
BASI
C /
DETAI
LED
DESI
GN, PROCUREMENT, CONSTRUCTION OF
PTA RPF PROJECT
PROJECT PROCEDURE NO.
7/27/2019 RPF Project-Engineering Scope of Work
http://slidepdf.com/reader/full/rpf-project-engineering-scope-of-work 3/35
TPI
P.2 OF 29
CONTENT
PAGE
1.0Project
Administr ation andCoordination ............................................................................................................................................................................ 3
2.0ProjectEngineering ...........................................................................................................
................
................
................
................
................
................
. 4
3.0Process ..................
............................................................................................................................................................................................................
. 6
4.0Environmental..................................................................................................................................................................................................................... 8
5.0Vessels ............................................................................................................................................................................................................................... 8
6.0 Heat
Exchangers ................................................................................................................................................................................................................ 10
7.0 FiredHeater...................................................................................................................................................................................................................... 11
8.0 RotaryEquipment ............................................................................................................................................................................................................... 12
9.0 EquipmentPackage ........................................................................................................................................................................................................... 13
10.0 Other
Equipment ................................................................................................................................................................................................................ 13
11.0 Heating,Ventilating and Air Conditioning(HVAC) .............................................................................................................................................................. 13
12.0Civil ..................................................................................................................................................................................................................................... 14
13.0Structure ............................................................................................................................................................................................................................. 17
14.0 Architecture .......................................................................................................................................................................................
................................. 1815.0Piping .................................................................................................................................................................................................................................. 19
16.0Instrumentation ................................................................................................................................................................................................................... 21
17.0Electrical ............................................................................................................................................................................................................................. 23
7/27/2019 RPF Project-Engineering Scope of Work
http://slidepdf.com/reader/full/rpf-project-engineering-scope-of-work 4/35
18.0PaintingandWrapping................................................................................................
................
................
................
................
................
................
....... 28
19.0Insulation......................................................................................................................................................................................................................... 29
7/27/2019 RPF Project-Engineering Scope of Work
http://slidepdf.com/reader/full/rpf-project-engineering-scope-of-work 5/35
DESCRIPTION
2.0
PROJECTENGINEERING
2.1
E
n
g
i
n
e
e
r
in
g
D
e
f
i
n
e
e
ng
i
n
e
e
r
i
n
g
scope of work Scope of Work
2.2 Mechanical Flow Take lead among process, instrument, Diagrams & piping, equipment, and electrical engineers
to Utility/Offsite Flow complete these diagrams Diagrams
2.3 Plot Plan Prepare overall plot plan & elevation with space dimensions
showing location of equipment and the extent and type of structure required.
2.5 Specification Prepare Construction Specification (requirements)
2.7 Equipment List a) Based on prelimenary equipment list from process
licensor, complete equipment list
2.8 System Specification (a) Specifications Including Package Prepare system specification Units, Waste
Treatment, etc. (b) Data Sheets
Based on process engineering specification sheets, complete equipment and
instrument data sheets
P . 4 OF 29
TECH.
DEPT
TAINANPLANT
DOCUMENT TO BESUBMITTED
X xEngineeringScope of Work
X (i) MechanicalFlow Diagram (ii)Utility FlowDiagram (iii)Offsite SystemFlow DiagramInclude existedMFDmodifications for
tie-in.X (i) Site Plan (ii)
Plot Plan (iii) PlotElevation .
X (i) Hazop Report(If required.)
XConstructionSpecification
X Equipment List
7/27/2019 RPF Project-Engineering Scope of Work
http://slidepdf.com/reader/full/rpf-project-engineering-scope-of-work 6/35
X XX X
7/27/2019 RPF Project-Engineering Scope of Work
http://slidepdf.com/reader/full/rpf-project-engineering-scope-of-work 7/35
TPI
P
. 5 OF 29
NO ITEM
DESCRIPTI
ON TECH.
DEPT
TAINAN
PLANT
DOCUMEN
T TO BE
SUBMITTE
D
2.9
SystemRequisitions
2.10
SystemTechnical BidEvaluation
2
.11
System
Vendor Data &DrawingReview
***2.1
BidDocument
2
etc.
***2.13
MaterialControl
Audit & control materialquantity during thesteps of MTO,requisition, purchasingand field inventory
X X
Tech: bulk materialduring MTO &requisition. Tainan:filed inventorycontrol.
2.14
FireFightingSystem
Prepare fire fightingsystem flow diagram
X Fire FightingSystem FlowDiagram Tie-in toexisting header.
2.15
BasicEngineer ingDesignData( BEDD)
Prepare BasicEngineering DesignData Including site data,weather condition, code& regulation, etc..
X X BEDD
2.
16
ModelReview Model review X
Not required. (or
3D AutoCADmodel)
***2.17
Permit Application
Apply to localgovernment for building,fire prevention ,andpower permits
X
7/27/2019 RPF Project-Engineering Scope of Work
http://slidepdf.com/reader/full/rpf-project-engineering-scope-of-work 8/35
NO ITEM
3.0
PROCESS
3.1 ProcessScheme
*** 3.2ProcessDesign
3.3
Equi
pme
nt
Sizin
g
and/
or
Spec
ificati
ons
3.4 Preliminary Equipment List
3.5 Process Flow Diagrams
TPI
DESCRIPTION
Establish and/or optimize process scheme
(a) Clarify criteria for process design(b) Provide physical and thermodynamic properties(c) Make energy and mass balance including conditions & compositions of streams(d) Establish product yield and flow rates(a) Sizing and/or specification of columns, (towers), drums, tanks, exchangers, fired heaters, etc. including equipmentdimensions, nozzle elevation and size, operating and design conditions, material of construction, internal sketch, etc.(b) Tray calculations(c) Process specifications for commodity equipment
Prepare preliminary equipment list
Prepare process flow diagrams with stream conditions and tabulate mass balancesTECH. DEPT
X
7/27/2019 RPF Project-Engineering Scope of Work
http://slidepdf.com/reader/full/rpf-project-engineering-scope-of-work 9/35
X
XTAINANPLANT
X X X
X
X X
X
X
P . 6 OF 29 DOCUMENT TO BE SUBMITTED
Process Scheme
Tainan provide ; Tech. review
Process Design Data
Process Data/Specification Sheets
Tainan: provide process data. Tech: sizing, prepare vessel sketch..
Tray Data Sheets (not applicable for this project)
Process Engineering Specification Sheets
Preliminary Equipment List (Process information Only)
Process Flow Diagrams
7/27/2019 RPF Project-Engineering Scope of Work
http://slidepdf.com/reader/full/rpf-project-engineering-scope-of-work 10/35
NO ITEM
3.6
P
r
e
li
m
i
n
ar
y
M
e
c
h
a
n
i
c
a
lF
l
o
w
D
i
a
g
r
a
ms
(
P
&
I
D
)
3.7 Preliminary Utility/Offsite System Flow Diagrams
3.8 Line and Flow Summary
3.9 Instrument Process Data
*** 3.11 Analytical Procedure Manual
3.12 Technical Bid Evaluation
TPI
DESCRIPTIONTECH.DEPT
TAINANPLANT
Develop initial layoutshowing processschemes & processrequirements for equipment, pipingandinstrumentation(a)Develop initial layoutshowing utilitysystems schemes &requirements for equipment, pipingandinstrumentation(b)Develop initial layout
showing offsiteprocess schemes &requirements for equipment, pipingandinstrumentationProvide line sizes, flowrates, physicalproperties, operatingconditions, short-
X X XX X XX X X
7/27/2019 RPF Project-Engineering Scope of Work
http://slidepdf.com/reader/full/rpf-project-engineering-scope-of-work 11/35
term variations,insulationrequirements,material of construction, etc.(a)Provide process datafor instrumentation(b) Provide inter-lock/shut downsystem
descriptionPreparegeneral processoperatinginstructionsAnalyticalprocedures for feeds,chemicals andproducts Reviewbidders' data andproposal for conformance withprocessrequirements (Thenumber of bids is
limited to 3.)
P . 7 OF
29
DOCUMEN
T TO BE
SUBMITTE
D
Prelimi
nary
Mecha
nical
Flow
Diagra
ms
TECH:
Review.
Preliminary Utility System Flow Diagrams
TECH: Review.
Preliminary Offsite System Flow Diagrams
Line List & Schedule
TECH: provide blank form or electronic file.
Instrument Process Data Sheets
Operating Manual
Analytical Procedure Manual
Technical Bid Evaluation Sheets
7/27/2019 RPF Project-Engineering Scope of Work
http://slidepdf.com/reader/full/rpf-project-engineering-scope-of-work 12/35
TASCO
P .
PLANT DOCUMENTTO BE
SUBMITTED
1. ENVI
RONMENTAL(mer geintoPROCESSDiscipline,notapplicablefor thisproject.)
2. VESSEL(INCLUDINGTOWER,DRUM,TANK)
5.1
Specifications & (a) Prepare engineering technical X Engineering Specification Standard specifications
(b) Prepare standard drawing X Standard Drawings
5.2 Strength Calculation (a) Based on process sketch(data sheet), X Calculation
Sheets calculate strength of vessel to meet code requirment .
(b) Prepare calculation sheets per code X Calculation sheets
requirement
5.3 Engineering (a) Prepare drawings showing design data, X Engineering Drawing
Drawings material specification, wall thickness, nozzles schedule, orientation &
elevation, supports and anchor,internals.
(b) Prepare drawings showing platform, X Platform & Ladder Engineering ladder,
their supports Drawings
5.4 Shop Drawing (a) Prepare vessel shop drawings X Shop Drawings
(b) Prepare platform & ladder drawings X Platform & Ladder Shop Drawings(c) Prepare lining detail drawing(refractory, X Lining Drawings acid resistance)
*** (d) Prepare welding procedure specification X WPS, Test & Inspection Procedure (WPS), test & inspection procedureTASCO
TPI
P . 9 OF 29
ITEM DESCRIPTIONTECH.DEPT
TAINANPLANT
DOCUMENT TO BESUBMITTED
5.5
M.T.O. Prepare bill of materialand/or materialrequisition
X Bill of Materialand/or Requisitions
5.6
Requisition
(a) Prepare vesselrequisition
X Requisitions
(b) Prepare vesselinternals & liningcomponents requisition
X Requisitions
5.7
Technical BidEvaluation
Compare and assessbidder‘s technical data& drawing to meet therequirements of requisition (Thenumber of bids islimited to 3.)
X X Technical BidEvaluation SheetsSQUAD CHECK
5. Vendor Review vendor‘s data, X X Comment
7/27/2019 RPF Project-Engineering Scope of Work
http://slidepdf.com/reader/full/rpf-project-engineering-scope-of-work 13/35
8 Data &DrawingReview
7/27/2019 RPF Project-Engineering Scope of Work
http://slidepdf.com/reader/full/rpf-project-engineering-scope-of-work 14/35
6.0HEATEXC
HANGERS
6.1
S
p
e
ci
f
i
c
a
t
i
o
n
s
&
(
a
)
P
r
e
pare engineering technical Standard specifications
(b) Prepare standard drawing
6.2 Strength Calculation (a) Based on process sketch(data sheet),calculate strenght of heat exchanger to meet code
requirement.
(b) Prepare calculation sheets per code requirement
6.3 Engineering (a) Prepare drawings showing design data,
Drawings material specification, wall thickness, nozzles schedule, orientation &
elevation, supports and anchor, internals.
(b) Prepare drawings showing platform ,ladder, their supports
6.4 Shop Drawings (a) Prepare heat exchanger shop drawing
(b) Prepare Platform & Ladder drawing(c) Prepare lining detail drawing(refractory, acid resistance)(d) Prepare welding procedure specification(WPS), test & inspection procedure
P . 10 OF 29
TECH.
DEPT
TAINANPLANT
DOCUMENT TO BESUBMITTED
XEngineeringSpecification
XStandardDrawings
X CalculationSheets
XCalculationSheets
X Engineering
Drawings
XPlatform & Ladder EngineeringDrawing
X Shop Drawings
XPlatform & Ladder Shop Drawing
X Lining Drawings
7/27/2019 RPF Project-Engineering Scope of Work
http://slidepdf.com/reader/full/rpf-project-engineering-scope-of-work 15/35
X
TASCO TPI
NO
ITEM DESCRIPTION
6.5 M.T.O. Prepare bill of materialand/or material requisition
6.6 Requisition (a) Prepare heatexchanger requisition (b) Prepare heatexchanger internals & liningcomponents requisition6.7 Technical Bid Evaluation Compareand assess bidder's technical dataand drawings to meet therequirements of requisition (Thenumber of bids is limited to 3.)6.8 Vendor Data & Drawing ReviewReview vendor's data, drawings anddocuments to meet the requirement of requisition
7Fired Heater(Incl.Duct)applicable in RPF project.)
7/27/2019 RPF Project-Engineering Scope of Work
http://slidepdf.com/reader/full/rpf-project-engineering-scope-of-work 16/35
TASCO
P .
PLANT DOCUMENTTO BESUBMITTED
8.0
ROTAR YEQUIPMENT(PUMPS,COMPR
ESSORS,BL
OWERS, FANS, AND THEIR DRIVERS )
8.1 Specifications & (a) Prepare engineering technical X Engineering Specifications Data Sheets specifications
and standard
(b) Complete data sheets X X Data Sheets
(Tech:
prepare,
Tainan:
review)
8.2 Requisition (a) Prepare requisition for purchasing X Requisitions
(b) Prepare equipment & components X Requisitions requisition
8.3 Technical Bid Compare and assess Bidder's technical data X X Technical Bid Evaluation Sheets
Evaluation and drawings to meet the requirements of (SQUAD CHECK)requisition (The
number of bids is limited to 3.)
8.4 Vendor
Data &
Review
vendor's data,drawings, and
X X Comment
(SQUAD
CHECK)
Drawing Review documents to meet the requirements of requisition
7/27/2019 RPF Project-Engineering Scope of Work
http://slidepdf.com/reader/full/rpf-project-engineering-scope-of-work 17/35
TASCO
P .
PLANT DOCUMENTTO BESUBMITTED
9.0
EquipmentPackage(Incl.Refrigeration,Boiler,Pneu
maticConveying
System, etc.)
9.1 Specifications & (a) Prepare engineering technical X Engineering Specification Data Sheets specification and
standard
(b) Complete data sheets X X Data Sheets
(Proces
s data
by
Tainan)
9.2 Requisition Prepare requisition for purchasing X Requisition
9.3 Technical Bid Compare and assess bidder's technical data X X Technical Bid Evaluation Sheets
Evaluation and drawings to meet the requirements of (SQUAD CHECK)requisition (The
number of bids is limited to 3.)
9.4 Vendor
Data &
Review
vendor's data,
drawings and
X X Comment(SQUAD
CHECK)
Drawing Review documents to meet the requirements of requisition
1. Other Equipment (Incl. Stack, Filter ,etc.) (See 9.0 Equipment Package)
2. HEATING, VENTILATING AND AIR CONDITIONING (HVAC): (Not applicable for RPF Project.)
TASCO TPI P . 14 OF 29
NO
ITEM DESCRIPTION TECH.DEPT TAINANPLANT DOCUMENT TO BESUBMITTED
1
CIVIL
12.1
Surveying
(a)
Perform sitesurveying
X Surveying Report
(b
Prepare propertymap
Property Map
7/27/2019 RPF Project-Engineering Scope of Work
http://slidepdf.com/reader/full/rpf-project-engineering-scope-of-work 18/35
12.2
GeotechnicalInvesti
gation
12
.3
Specificati
on/DesignCriteria/StandardDrawings(a) *** (b)
(c)
12.4
SitePrepar ation
12
.5
Soil
Improvement/GeotechnicalDesign
TASCO ITEM
12.612.712.8
12.9
(c) Prepare geotechnical designdrawings Piling/Foundation (a)Decide type of pile (b) Preparepiling diagrams. (including piledesign) (c) Prepare foundationlocation plan (d) Preparecalculation sheets for equipment/machinery/structurefoundations (e) Prepare plan &detail drawings for
equipment/machinery/structurefoundations (f) Prepare piling testprogram (g) Perform pilingtestDike/Retaining Wall/ BlastWall Prepare detail drawing of dike , retaining wall & blast wallPaving/Road/ Drainage System/Pipe Sleeper/Pipe Trench/CableTrench (a) Prepare paving, roadand drainage system drawing (b)Prepare detail drawing of trench,sewer, manhole, catch basin, pit &sump, pipe sleeper, pipe/cable
trench,etc. Fence & GatePrepare detail drawing of fence &gate
X X X XX X X XX X
X
GeotechnicalDesign DrawingsDiscuss withTASCO. PilingLocation Plan/PileDetail FoundationLocation PlanCalculationSheets DetailDrawing for
Foundations Testprogram (If required) Testreport (If required)DetailDrawing of Dike,Retaining Walland Blast wallPaving, Road andDrainage SystemPlan & DetailDetail DrawingsDetail Drawing
7/27/2019 RPF Project-Engineering Scope of Work
http://slidepdf.com/reader/full/rpf-project-engineering-scope-of-work 19/35
TPI
P
. 16 OF
29 NO
ITEM
DESCRIPTI
ON TECH.
DEPT
TAINAN
PLANT
DOCUMEN
T TO BE
SUBMITTE
D
12.10
ConcreteTank/CoolingTower Basin/Separator
1
2.11
Culvert
12.1
M.T.O.
2
***12.13
BidDocument
Prepare bid documentBid Document (not required)
1
2.14
Permit Application(a) *** (b)
Prepare document for permit applicationfrom governmentauthority Applicationfor permit
X X
TECH: prepare
design drawings& calculationsheets whenrequired. AuthorizedPermit
12.15
AsBuiltDrawings
(a)
Prepare marked-updrawing in field by
constructioncontractor
X Marked-upDrawings
***(b)
Prepare as builtdrawings after completion of
erection
As BuiltDrawings (notrequired.)
***12.16
Technical BidEvaluation
Review bidder‘s dataand drawings for conformance withspecifications (Thenumber of bids is limitedto 3.)
X Technical BidEvaluationSheets
12.17
ConstructionContractor‘sData &DrawingsReview
Review constructioncontractor's data anddrawings
X Comment
7/27/2019 RPF Project-Engineering Scope of Work
http://slidepdf.com/reader/full/rpf-project-engineering-scope-of-work 20/35
NO ITEM DESCRIPTION
13.0 STRUCTURE
13.1 Specification/Design (a) Prepare steel and concrete
engineering Criteria/Standard specification/design
criteria Drawings
*** (b) Prepare construction
specification
(c) Prepare standard drawings
13.2 Pipe Rack/Pipe (a) Prepare calculation sheets for
steel pipe Bridge/Conveyor rack/steel pipe
bridge/concrete pipe Support rack/conveyor support
(b) Prepare detail
drawing for steel pipe
rack/steel pipe
bridge/concrete pipe
rack/ conveyor support
13.3 Operating (a) Prepare calculationsheets for Structure/Building
operating/building structures Structure
(b) Prepare detail drawing for
structures
13.4 Access Platform & Prepare detail drawing of
access platform & Walkway walkway
13.9 M.T.O. Prepare bill of
material for purchasing and/or
construction
13.10 Shop Drawings
Prepare shop fabrication
drawings and erection
drawings
*** 13.12 Bid document Prepare bid documentTECH. DEPT TAINAN PLANT
X
X X X
X
X
X X
X
X
P . 17 OF 29 DOCUMENT TO BE SUBMITTED
Steel and Concrete Structural Specification Construction
Specification Standard DrawingsCalculation Sheets
Detail Drawing
Calculation Sheets
7/27/2019 RPF Project-Engineering Scope of Work
http://slidepdf.com/reader/full/rpf-project-engineering-scope-of-work 21/35
Detail Drawing for Structures
Detail Drawing of Access Platform & Walkway Bill of Materials
Shop fabrication Drawings and erection drawings for Steel Structure
(Not required.)
Bid Document
TASCO TPI P . 18N
OITEM DESCRIPTION
TECH.DEPT
TAINANPLANT
DOCUMENT TO BESUBMITTED
13.13
Permit Application
(a)
Prepare documentfor permitapplication fromgovernmentauthority
X XTECH: designdrawings &calculation sheetswhen required.
***(b
)
Application for permit
X Authorized Permit
13.14
AsBuiltDrawings
(a)
Prepare mark-updrawing in field byconstructioncontractor
Marked-upDrawingsrequired.)
***(b)
Prepare as builtdrawings after completion of erection
As Built Drawings(Not required.)
***13.
15
Technical Bid
Evaluation
Review bidder‘s data &drawings for
conformance withspecifications (Thenumber of bids islimited to 3.)
X Technical BidEvaluation Sheets
13.16
ConstructionContractor‘sData &Drawing
Review constructioncontractor's data anddrawings
X Comment
Review
1
ARCHITECTURE (Notapplicable for RPF Project.)
7/27/2019 RPF Project-Engineering Scope of Work
http://slidepdf.com/reader/full/rpf-project-engineering-scope-of-work 22/35
TASCO
NO
ITEM
1
PIPING15.1
PipingSpecific
ation
15.2 Piping Standard
15.3 Line List
15.4 Underground & Fire Fighting Piping
15.5 Piping Plan
15.6 Steam Tracing/Jacketing
15.7 Isometric Drawings
TPI
DESCRIPTION
Establish piping design and material specification
Prepare piping standard
Based on line and flow summary, operating conditions, prepare line
list including design condition, test pressure and insulation
thickness for each line
(a) Piping conceptual design(b) Prepare all necessary arrangement and detail drawings(a) Piping general layout(b) Data of nozzle, platform & ladder orientation of vessel andsupport clip on equipment(c) Utility service station and safety shower location plan
(d) Drawing of piping plans and details
Steam tracing and/or jacketing drawings and details
Prepare isometric drawings for A/G piping two (2) inch and above in
sufficient detail showing dimensions to permit prefabrication
P . 19 OF 29TECH.
DEPT
TAINANPLANT
DOCUMENT TO BESUBMITTED
X XX
(i) Piping DesignSpecification (ii)Piping MaterialSpecification (iii)Instrument PipingMaterialSpecification
X Piping Standard
7/27/2019 RPF Project-Engineering Scope of Work
http://slidepdf.com/reader/full/rpf-project-engineering-scope-of-work 23/35
X X (i) Pipe ScheduleCalculation for Critical Line (ii)Line List
X Conceptual
X (i) UndergroundPiping Drawings(ii) Fire FightingDrawings
X
X
X
Utility ServiceStation and SafetyShower LocationPlan
XPiping Plan &Details
X Steam Tracingand/ or JacketingDrawing
XIsometricDrawings
TASCO
ITEM
TPI
DESCRIPTIONTECH.DEPT
TAINANPLANT
P . 20 OF 29DOCUMENT TO BESUBMITTED
15.815.915.10***15
.11***15.12***15.13
Stress Analysis PipeSuppor tM.T.O.Technical BidEvaluat
ion AsBuiltDrawingPipingModelShopDrawingsVendor
(a) Stress analysis for critical lines (b)Simplified pipingflexibility check (a)Prepare pipe supportstandard (b) Preparepipe support details (c)Prepare pipe supportloading data on pipe
rack, structure andequipment (a) Materialtake-off and prepare billof material sheets for summary (b) Preparepiping summary sheetstabulating all pipingmaterials required for purchase Reviewbidder's data and
X X X XX X X XX X X
X Stress AnalysisSummary PipeSupport Standard(i) Pipe SupportLocation Plans (ii)Special PipeSupport DrawingsBill of MaterialsPiping Summary
Sheets TechnicalBid EvaluationSheetsREQUIRED NOTREQUIREDDrawingsrequired.)Commentcheck) BidDocument
***15.14***15.15***15
.16
Data &DrawingReviewBidDocument
drawings for conformance withspecifications (Thenumber of bids islimited to 3.) Prepareshop drawings of formpiece (a) Review & Approvevendor's data& drawings,interfaceonly for ensuing
detailed design ,
Prepare bid document(incl. constructionspecification)
7/27/2019 RPF Project-Engineering Scope of Work
http://slidepdf.com/reader/full/rpf-project-engineering-scope-of-work 24/35
NO ITEM
16.0 INSTRUMENTATION
16.1 Design Criteria, Specification, and Standard
16.2 Instrument Specification Sheets
16.3 Instrument Pressure Tubing/Piping Hook-up
16.4 Layout of Field Instrument Locations
16.5 Layout of Instrument Main Cable Way
16.6 Layout of Instrument Main Cable
16.7 Electric Power Supply for Instrument
16.8 Control Panel
TPI
DESCRIPTION
Define the design criteria, and prepare instrument, material, and
installation specifications or standards
Prepare instrument specification sheets
Prepare installation drawings showing hookups of tubing/piping
materials
Plot plan showing locations of field instruments, junction boxes, local
panels, etc.
Prepare layout of cable duct, tray, or conduit bank from field to
control room
Prepare layout of instrument main cable from junction boxes and
local panels to control room
Estimate instrument power consumptions and prepare loadschedule for power distribution panels
Prepare control panel layout drawings showing instrument
arrangement, panel configuration and dimensions.TECH. DEPT
X
XTAINAN PLANT
X
X
X X (By Contractor)
X X (By Contractor)
X X (By Contractor)
7/27/2019 RPF Project-Engineering Scope of Work
http://slidepdf.com/reader/full/rpf-project-engineering-scope-of-work 25/35
X X (By Contractor)
X X (By Contractor)
X (By Contractor)
P . 21 OF 29 DOCUMENT TO BE SUBMITTED
Specifications and Standards for Instrumentation
Instrument Specification Sheets
TAINAN:Provide process data.
InstrumentHook-upDrawingsInstrumentSteam
Tracing Hookup Drawings
InstrumentLocation PlanInstrumentWiringConnectionList
Cable Duct or Tray LayoutConduit BankLayoutInstrumentMain CableLayoutInstrumentWiringConnection
List
Load Schedule of Instrument Power Distribution Panel
(i) Outline of Control Panel
7/27/2019 RPF Project-Engineering Scope of Work
http://slidepdf.com/reader/full/rpf-project-engineering-scope-of-work 26/35
TPI
P
. 22 OF 29 NO ITEM DESCRIPTION TECH. DEPT TAINAN PLANT
DOCUMENT TO BE SUBMITTED
1
6.9
Layout
of Control
Prepare drawings
showing locations of
X (
i)
Control
Room Arrangement
Room control roomequipment, cable way,and
X (ii)
ControlRoomCable List
cable routing X (iii
)
CableConnectionList
(ByContractor
)16.10 M.T.O.
Prepare bill of construction materials X
Bill of ConstructionMaterials
(ByContractor
)
16.11
DistributedControl
Define the scope of DCS/ESD, and prepare
XSystemSpecificationand
System(DCS)and
detailed systemspecification and
input/outputSummaryTable
Emergency
input/output summarytable
ShutdownSystem
(ESD)Specificatio
n16.12
Requisition
Prepare requisition for purchasing
X Requisitions
16.13
Technical Bid
Review bidder‘s data,drawing & document
X XTechnical BidEvaluationSheet
Evaluation
to meet therequirements of requisition (The
(SQUADREVIEW)
number of bids islimited to 3.)
16.
14
Vendor‘s Data
&
Review vendor‘s data,drawing, &
x
Comment
DrawingReview
documents (SQUADREVIEW)
***16.15
As BuiltDrawing
(NotRequired.)
16.16 Bid
Document Prepare bid document X Bid Document
TASCO
ITEM
TPI
DESCRIPTIONTECH.DEPT
TAINANPLANT
P . 23 OF 29DOCUMENT TO BESUBMITTED
7/27/2019 RPF Project-Engineering Scope of Work
http://slidepdf.com/reader/full/rpf-project-engineering-scope-of-work 27/35
1 ELECTRICAL 17.1EngineeringSpecification17.2EquipmentSpecification& DataSheets 17.3Installation
Details
Prepare electricalengineeringspecification Prepareelectrical equipmentspecifications anddata sheets Preparetypical electrical
installation drawings
X
X X X
ElectricalEngineeringSpecificationElectr ical EquipmentSpecifications andData SheetsTypical ElectricalInstallation Detail
Drawings
1
PrepareDocuments for Government Approval
(a
Prepare documents anddrawings for approval per local regulation
(not required.),,,,,
17
OneLineDiagram
(a
Establish electrical power distribution system
X
(b
Establish design basis for emergency power system.
Design and preparedetailed drawings for thefollowings:
X (If Required.)
(1) Uninterruptible power system with batterycharger, rectifier, battery,inverter, etc. tp provideemergency power for instruments includingdistributed control system.
X (If Required.)
(2) Supply of emergencypower to critical equipment
X (If Required.)
(3) Supply of emergencypower to emergencylighting
X (If Required. Also,power tocertain pumps.)
(c
Prepare system one linediagram X
One LineDiagrams (If Required.)
7/27/2019 RPF Project-Engineering Scope of Work
http://slidepdf.com/reader/full/rpf-project-engineering-scope-of-work 28/35
NO
TASCO
1
7.6
ITEM
AreaClassifi
cation
17.7
SchematicDiagrams
17.8
Motor
List
17.9
EngineeringStudyandCalculations
17.10 17.11
ProtectiveRelayCoordinationRequisition
17.
Substation andSwitch
12
RoomLayout
DESCRIPTION
(a) Establish classification of hazardous areas for electrical apparatusinstallation(b) Prepare hazardous area classification drawings(a) Develop typical motor control scheme(b) Prepare typical automatic re-acceleration scheme(c) Prepare schematic diagram showing connections and functions for control circuit of motor‘s, etc.
Prepare electrical load list for motors and other electrical
equipment
Prepare engineering study and calculations for electrical design
comprising the followings:
Establish protective relay coordination
(a) Prepare requisition for purchasing of electrical equipment(b) Prepare reqisitions for purchasing of electrical materials(a) Decide location of substation and electrical rooms(b) Prepare equipment layout drawings for substation and electricalrooms
TECH.DEPT
X X
TAINANPLAN
T X XX
X (notrequir ed.)
(notrequir ed.) X X
X
P . 24 OF 29 DOCUMENT TO BE SUBMITTED
Hazardous Area Classification Drawings
(If Required.) (If Required.)
Schematic Diagrams
(If Required.)
Motor List (For Design Use Only) Calculation Sheets (not
required.)
Relay Setting Record and Coordination Drawing
Equipment Requisitions
Material Requisitions
(Not Required.)
7/27/2019 RPF Project-Engineering Scope of Work
http://slidepdf.com/reader/full/rpf-project-engineering-scope-of-work 29/35
Subs
tatio
n
and
Elect
rical
Roo
ms
Layo
ut
Drawings
7/27/2019 RPF Project-Engineering Scope of Work
http://slidepdf.com/reader/full/rpf-project-engineering-scope-of-work 30/35
NOITEM
17.1317.14
ElectricalComputer Monitor ing andControlSystemPower Layout
1
7.15***17.161
7.17
ConnectionDiagramsPower PanelboardScheduleConduitandCable
Schedule
17.18
Electrical HeatTracingSystem
DESCRIPTION TECH. DEPT TAINAN PLANT
(c) Prepare power and control wiring layout X drawings for substationand electrical (By Contractor) rooms
(d) Prepare substation equipment (MCC/SWGR) outline (by vendors)
Prepare power layoutdrawings showing
X
location of electricalequipment,
(ByContractor)
conduits or cables
Prepare cable tray or other type cable X
support layout andinstallation details, if
(ByContractor)
any
Prepare connectiondiagrams for control
X
circuits of motors, etc. (ByContractor)
Prepare power panelboardschedule showingcircuit and load data.
Prepare conduit and/or cable schedule listing Xthe identification number,type, size, length,
(ByContractor)
route and purpose for allconduits and/or cables serving the motorsand other electricalequipment shown onpower layout drawings
Prepare specification for electrical heat
X
tracing system(construction drawings by
(ByContractor)
construction contractor)
P . 25 OF 29 DOCUMENT TO BE SUBMITTED
Substation and Electrical Rooms Wiring Layout Drawings
(Not Required.)(Not Required.)
Power Layout Drawings
Connection Diagrams Power Panelboard Schedule
(Not Required.)
Conduit and/or Cable Schedule
Specification for Electrical Heat Tracing
7/27/2019 RPF Project-Engineering Scope of Work
http://slidepdf.com/reader/full/rpf-project-engineering-scope-of-work 31/35
NOITEM
17.19
17.20
17.21
17.22
17.23
17.24
17.25
17.2
6
Grounding/Lightning Protection Layout
Cathodic Protection Layout
Lighting Layout
lighting Panel Board Schedule
Lighting Fixture Schedule
Communication/Fire Alarm System
Safety/Security system
M.T.O.
TPI
DESCRIPTIONTECH.DEPT
TAINANPLANT
Developgrounding/lightningprotection layoutdrawings showinggrounding looparrangement,location of groundrods andconnections to allequipment to be
grounded includinglightning protectionsystem if requiredDevelop cathodicprotection systemand prepare drawingshowing equipmentand devicearrangement andwiring layout(induding relatedengineeringcalculation of
required) Developlighting system andprepare drawingshowingarrangement of lighting fixtures,lighting panels,conveniencereceptacles andwiring in outdoor areas or in buildingsincluding emergencylighting system
Prepare lightingpanel boardschedule showingload and circuitrequirements of panel Board for lighting systemPrepare lightingfixture schedulesshowing fixtures,
X (ByContract
or) X(By
Contractor) X(By
Contractor) X(By
Contractor) X(By
Contractor) X(By
Contractor) X(By
Contractor) X(By
Contract
or)
7/27/2019 RPF Project-Engineering Scope of Work
http://slidepdf.com/reader/full/rpf-project-engineering-scope-of-work 32/35
type, and wattagePreparecommunication/firealarm layout drawingshowing equipmentand devicearrangement andwiring layout (incl.system diagram)Preparesafety/security layoutdrawings showingequipment anddevice arrangementand wiring layoutPrepare compositebill of electricalmaterials showingtheir requirements
P .
26OF
29
DOC
UME
NT
TO
BE
SUB
MITT
ED
G
r
o
unding/Lightning protection Layout Drawings
Cathodic Protection Layout Drawings
(If Required.)
Lighting Layout Drawings
Lighting Panel Board Schedule
Lighting Fixture Schedule
Communication/Fire Alarm Layout Drawings
Safety/Security layout drawings
(If Required.)
Bill of Materials
7/27/2019 RPF Project-Engineering Scope of Work
http://slidepdf.com/reader/full/rpf-project-engineering-scope-of-work 33/35
TPI
P
. 27 OF 29 NO ITEM DESCRIPTION TECH. DEPT TAINAN
PLANT DOCUMENT TO BE SUBMITTED
17.27
Technical Bid
Review bidder‘s data, drawing& document
X Technical BidEvaluationSheets
Evaluation
to meet the requirements of requisition (Thenumber of bids is limited to 3.)
17.28
Vendor‘s Data&
Review vendor's data, drawing& documents
X Comment
Drawing
Review***17.29
As BuiltDrawings
(Marked-upDrawings
(NOT Required.)
17.30 BidDocument Prepare bid document X Bid Document
7/27/2019 RPF Project-Engineering Scope of Work
http://slidepdf.com/reader/full/rpf-project-engineering-scope-of-work 34/35
7/27/2019 RPF Project-Engineering Scope of Work
http://slidepdf.com/reader/full/rpf-project-engineering-scope-of-work 35/35
TASCO
P .
NO
ITEM DESCRIPTION TECH.DEPT
TAINANPLANT
1 PAINTING AND WRAPPING
18.1
Specifications
(a
)
Prepare paintingspecifications
X
(b)
Prepare wrappingand coatingspecification
X
(c)
Prepare paintingschedule
X
18.2
M.T.O.Prepare bill of materialsfor purchasing
X
***18.3
Technical BidEvaluation
Review bidder's datafor conformance withspecification (Thenumber of bids is
limited to 3.)
X
***18.4
BidDocument
Prepare bid document(incl. constructionspecification)
X