REKAPITULASI RENCANA ANGGARAN BIAYA PERPIPAAN + BANGUNAN PELENGKAP
Kegiatan : Program P2TPD Dinas Kesehatan Kab. Bulukumba Lokasi : Kel. Mariorennu Pekerjaan : Pembangunan Jaringan Perpipaan + Bangunan Pelengkap Tahun Anggaran : 2010Volume : 5,500 m Kabupaten : Bulukumba
NO URAIAN PEKERJAAN VOLUMEJUMLAH
JUMLAH (Rp)HARGA SATUAN (Rp)
1 2 3 4 5
I PEK. PENDAHULUAN 12,324,167.40 12,324,167.40 II PEKERJAAN UTAMA
Pengadaan Pipa 277,796,740.00 277,796,740.00 Pengadaan Accessories 15,768,700.00 15,768,700.00 Pemasangan Pipa 72,565,305.48 72,565,305.48 Pemasangan Accessories 6,552,316.49 6,552,316.49
III PEKERJAAN BANGUNAN PELENGKAPPek. Hidrant Umum 25 7,370,984.14 184,274,603.40 Pek. Rangka Struktur Turbine 127,105,012.80 127,105,012.80 Pek. Pengadaan dan Pemasangan Turbin Angin 2,917,800,000.00 2,917,800,000.00 Pengadaan Dan Instalasi Listrik 10,739,421.69 10,739,421.69
IV Pekerjaan Pengeboran 2 141,992,126.09 283,984,252.18
Jumlah (A) 3,908,910,519.44 DIBULATKAN (B) 3,908,910,000.00
PPn 10% (tidak dipungut)(10% x B = C) 390,891,000.00 Jumlah (B + C) 4,299,801,000.00
DIBULATKAN 4,299,801,000.00
Terbilang : Tiga Milyar Sembilan Ratus Delapan Juta Sembilan Ratus Sepuluh Ribu Rupiah
Bulukumba, Februari 2010Pimpinan Kegiatan Mengetahui / Menyetujui
Program P2TPD Dinas Kesehatan Kepala Dinas Kesehatan Kab. BulukumbaKab. Bulukumba
Hasanuddin, SKM. M.Kes Dr. Hj. Rusni Sufran. M.KesNip: 196212110 198303 1 021 Pangkat : Pembina Tk.I
Nip ; 19530103 198011 2 001
RENCANA ANGGARAN BIAYAKegiatan : Program P2TPD Dinas Kesehatan Kab. Bulukumba LokasiPekerjaan : Pembangunan Jaringan Perpipaan + Bangunan Pelengkap Tahun AnggaranVolume : 5,500 m Kabupaten
NO URAIAN PEKERJAANVOL. / HARGASAT. SATUAN
1 2 3 4
A. PEK. PENDAHULUAN1. 1 Pengukuran Jalur Pipa dan Pematokan 5,500.00 926.95
2 Papan Nama Proyek 1.00 ls 350,000.00 3 Administrasi dan Dokumentasi 1.00 ls 1,000,000.00 4 Back Up Data dan As Built Drawing 1.00 ls 750,000.00 5 Direksikeet 3 x 3 meter 9.00 m2 458,435.55 6 Mobilisasi Peralatan dan Tenaga Kerja 1.00 ls 1,000,000.00
J U M L A H AB. PEKERJAAN UTAMA
1. Pengadaan Pipa
Termasuk Pengangkutan Ke Lokasi Pekerjaan1 Pipa PVC Paralon std S - 12,5 RRJ 3" 4,580.00 54,571.00
2 Pipa PVC Paralon std S - 12,5 RRJ 2" 920.00 27,588.00 3 Pipa GIP 4" (pelintas) 30.00 m1 79,300.00 4 Pipa GIP 1" (pelintas) 8.00 m 12,700.00
J U M L A H2. Pengadaan Accessories
1 Long Bend Ø 3" (raubber ring) 6.00 bh 133,300.00
4.00 bh 116,700.00 2 Bell Reducer Ø 3" x Ø 2" (raubber ring) 2.00 bh 74,600.00 3 TS TEE Ø 3" (raubber ring) 3.00 bh 50,000.00 4 TS TEE Ø 3" - 2"(raubber ring) 2.00 bh 65,000.00 5 Ventil Udara Ø 13 mm 2.00 bh 425,000.00 6 Clamp Sadlle Ø 2" x 0,5" 25.00 bh 24,400.00 7 DOP 3.00 bh 36,800.00 8 Stop Kran Ø 3" (Flange) 6.00 bh 500,000.00 9 WaterMeter 3/4 25.00 bh 350,000.00
10 Stop Kran Ø 3/4 " 25.00 bh 30,100.00 J U M L A H
3. Pemasangan Pipa1 Pipa PVC Paralon std S - 12,5 RRJ 3" 4,580.00 13,452.57
2 Pipa PVC Paralon std S - 12,5 RRJ 2" 920.00 11,139.44 3 Pipa GIP 4" (pelintas) 30.00 m1 18,533.33 4 Pipa GIP 1" (pelintas) 8.00 m 18,533.33
J U M L A H4. Pemasangan Accessories
1 Bell Bend Ø 3" 6.00 bh 72,072.04
4.00 bh 66,811.88 2 Bell Reducer Ø 3" x Ø 2" (raubber ring) 2.00 bh 79,878.06 3 TS TEE Ø 3" (raubber ring) 3.00 bh 76,660.08 4 TS TEE Ø 3" - 2"(raubber ring) 2.00 bh 76,660.08 5 Ventil Udara Ø 13 mm 2.00 bh 61,200.00 6 Clamp Sadlle Ø 2" x 0,5" 25.00 bh 61,200.00 7 DOP 3.00 bh 76,660.08 8 Stop Kran Ø 3" (Flange) 6.00 bh 61,200.00 9 WaterMeter 3/4 25.00 bh 61,200.00
10 Stop Kran Ø 3/4 " 25.00 bh 61,200.00
m1
Pipa PVC, Tekanan Nominal 10 kg/cm2
m1
m1
- Ø 3" 90o
- Ø 3" 45o
m1
m1
- Ø 3" 90o
- Ø 3" 45o
NO URAIAN PEKERJAANVOL. / HARGASAT. SATUAN
1 2 3 4
J U M L A HJ U M L A H B
NO URAIAN PEKERJAANVOL. / HARGASAT. SATUAN
1 2 3 4
C. PEKERJAAN BANGUNAN PELENGKAP1 Pek. Hidrant Umum
1 Galian Tanah 1.22 13,900.00
2 Urugan Tanah 0.61 161,687.50
3 Urugan Sirtu Bawah Lantai 2.10 209,275.00
4 Pasangan Batu Kosong 1.43 313,942.50
5 Pasangan Pondasi Batu Kali 1 : 4 2.78 528,470.90
6 0.70 624,977.00
7 0.70 624,977.00
8 Pekerjaan Plesteran Camp. 1 : 4 6.16 26,724.90
9 Pekerjaan Acian dengan Semen 6.16 5,557.50
10 1.00 unit 3,219,300.00
11 Pas.Pipa PVC 3/4" aw 12.00 m' 5,458.75 12 Kran Air 1/2" inc. install 6.00 Bh 73,000.00 13 Plampung Ø 3/4" inc. install 1.00 unit 101,200.00
J U M L A H C2 Pek. Rangka Struktur Turbin
A Pondasi Rangka Struktur Turbin1 Galian Tanah 36.36 13,900.00
2 Urugan Tanah kembali 25.14 6,662.50
3 Lantai kerja (rabat Beton 1:3;5) 3.30 624,977.00
4 Beton Bertulang (1:2:3) 11.22 2,623,207.50 B Fabrikasi Rangka Struktur1 Pipa GIP Medium A Ø 3" 209.00 m 145,200.00 2 Pipa GIP Medium A Ø 1,5" 666.00 m 60,550.00 3 Plat Sepatu uk 30x30cm tebal 8mm 22.00 unit 64,616.26 4 Angkur 15mm 88.00 Bh 75,000.00 6 Pengecatan Rangka 135.58 m2 11,760.75 5 Biaya Fabrikasi dan instal rangka 875.00 m 16,740.68
J U M L A H 3 Pengadaan dan Instalsi Turbin Angin
1 Wind Turbine dia 1m (200 watt) 140.00 unit 18,200,000.00 2 Charge Controller 140.00 Bh 1,350,000.00 3 Inverter 5KW 6.00 Bh 19,800,000.00 4 Battery 100aH 20.00 Bh 1,850,000.00 5 Frame ukuran 3625x5790 (alum, t 2") 10.00 unit 2,500,000.00
J U M L A H D4 Pengadaan Dan Instalasi Listrik
1 Pas. Kabel NFA2X 2x10mm 1,500.00 m 3,755.00 2
30.00 btg 170,230.72
J U M L A H D
m3
m3
m3
m3
m3
Pekerjaan Rabat Beton 1 : 3 : 5 Lantai Dudukan
m3
Pekerjaan Rabat Beton 1 : 3 : 5 Tempat Cuci
m3
m2
m2
Pekerjaan Pasangan Bak Penampungan 2 m3
m3
m3
m3
m3
Tiang penyangga Gip Ø 1,5" 6 m inc dudukan beton 20x20x60cm
RENCANA ANGGARAN BIAYA: Kel. Mariorennu : 2010: Bulukumba
JUMLAHHARGA
5
5,098,247.45 350,000.00 1,000,000.00 750,000.00 4,125,919.95 1,000,000.00 12,324,167.40
249,935,180.00
25,380,960.00 2,379,000.00 101,600.00 277,796,740.00
799,800.00
466,800.00 149,200.00 150,000.00 130,000.00 850,000.00 610,000.00 110,400.00 3,000,000.00 8,750,000.00 752,500.00 15,768,700.00
61,612,750.56
10,248,288.25 556,000.00 148,266.67 72,565,305.48
432,432.21
267,247.51 159,756.12 229,980.24 153,320.16 122,400.00 1,530,000.00 229,980.24 367,200.00 1,530,000.00 1,530,000.00
JUMLAHHARGA
5
6,552,316.49 372,683,061.97
JUMLAHHARGA
5
16,958.00
98,629.38
439,477.50
448,937.77
1,469,149.10
437,483.90
437,483.90
164,625.38
34,234.20
3,219,300.00
65,505.00 438,000.00 101,200.00
7,370,984.14
505,404.00
167,495.25
2,062,424.10
29,432,388.15 - 30,346,800.00 40,326,300.00 1,421,557.78 6,600,000.00 1,594,550.71 14,648,092.81 127,105,012.80
2,548,000,000.00 189,000,000.00 118,800,000.00 37,000,000.00 25,000,000.00
2,917,800,000.00
5,632,500.00
5,106,921.69
10,739,421.69
ANALISA HARGA LUMSUMITEM PEKERJAAN PENGADAAN TURBIN ANGIN DAN INSTALASI
No Uraian Volume Satuan Harga Satuan Total Harga Harga Barang ( C ) 1.00 ea $ 1000 Harga Barang ( C ) $ 1000 ea Rp 11,000.00 Rp 11,000,000.00 Insurance ( I ) (2%) 2.00% Rp 11,000,000.00 Rp 220,000.00 Ongkos kirim ( F ) 20% 20.00% Rp 11,000,000.00 Rp 2,200,000.00
Total CIF (A) Rp 13,420,000.00
10.00% Rp 13,420,000.00 Rp 1,342,000.00
PPN = (CIF + bea masuk) * 10% 10.00% Rp 14,762,000.00 Rp 1,476,200.00 PPh = (CIF + bea masuk) * 7.5% 7.50% Rp 14,762,000.00 Rp 1,107,150.00
Jumlah Tagihan Pajak (B) Rp 3,925,350.00
Biaya kirim dari Jakarta ke Bulukumba / kg 10.00 kg 15,465.00 Rp 154,650.00
1.00 LS 350,000.00 Rp 350,000.00
Biaya Komisioning (pengetesan 48 Jam 1.00 LS 350,000.00 Rp 350,000.00
Jumlah Pekerjaan Lokal (C) Rp 854,650.00
Jumlah Material On Site dan Instalasi = A + B + C Rp 18,200,000.00
Note : $1 = Rp 11,000,-
Bea Masuk MFN (Most Favourable Nations) CIT * (10%)
Biaya Instalasi (turbin ke rumah panel , diambil jarak rata rata
DAFTAR ANALISA HARGA SATUAN PERPIPAAN
A. PEKERJAAN PATOK Patok dibuat dari kayu 5/7 pjg : 50 cm dgn ujung diruncingkan :
1. 1 m2 Pengecatan : Dinding / kayu / Besi 0.2600 kg Cat Kayu / Besi @ Rp. 36,700.00 = Rp. 9,542.00 0.0025 oh Mandor @ Rp. 47,500.00 = Rp. 118.75 0.0700 oh Pekerja @ Rp. 30,000.00 = Rp. 2,100.00
Rp. 11,760.75
2. Biaya Pembuatan 100 Patok :
0.0250 Kayu Kaso Kls. II @ Rp. 3,145,000.00 = Rp. 78,625.00
0.6500 Pengecatan @ Rp. 11,760.75 = Rp. 7,644.49 0.1000 oh Mandor @ Rp. 47,500.00 = Rp. 4,750.00 1.0000 oh Tukang Kayu @ Rp. 45,000.00 = Rp. 45,000.00 1.0000 oh Pekerja @ Rp. 30,000.00 = Rp. 30,000.00 1.0000 ls Biaya Pemasangan @ Rp. 100,000.00 = Rp. 100,000.00 1.0000 ls Biaya Pengukuran @ Rp. 100,000.00 = Rp. 100,000.00
Rp. 366,019.49 Biaya Pembuatan 1 Patok : Rp. 1,452.46
3. Biaya Pengukuran 500 m Uiset Jalur Pipa : 1.0000 oh Mandor @ Rp. 47,500.00 = Rp. 47,500.00 5.0000 oh Pekerja @ Rp. 30,000.00 = Rp. 150,000.00 11.0000 bh Patok @ Rp. 1,452.46 = Rp. 15,977.04 1.0000 ls Alat Bantu @ Rp. 250,000.00 = Rp. 250,000.00
463,477.04
Rp. 926.95
B. PEKERJAAN PEMASANGAN PIPA 1. Pemasangan Per Batang Pipa PVC Dia. 3":
1.2600 Galian Tanah Biasa @ Rp. 13,900.00 = Rp. 17,514.00
0.3150 Urugan Pasir @ Rp. 145,915.00 = Rp. 45,963.23
1.0395 Urugan Tanah dan Pemadatan @ Rp. 6,662.50 = Rp. 6,925.67 1.0000 Btg Penurunan dan Penyetelan Pipa @ Rp. 10,312.50 = Rp. 10,312.50
80,715.39 Biaya Pemas. Per meter Pipa PVC Dia. 3" : Rp. 13,452.57
2. Pemasangan Per Batang Pipa PVC Dia. 2" :
0.9000 Galian Tanah Biasa @ Rp. 13,900.00 = Rp. 12,510.00
0.2700 Urugan Pasir @ Rp. 145,915.00 = Rp. 39,397.05
0.6930 Urugan Tanah dan Pemadatan @ Rp. 6,662.50 = Rp. 4,617.11 1.0000 Btg Penurunan dan Penyetelan Pipa @ Rp. 10,312.50 = Rp. 10,312.50
66,836.66 Biaya Pemas. Per meter Pipa PVC Dia. 2" : Rp. 11,139.44
C. PEMASANGAN TEE / DOP 1. Pemasangan Tee / Dop pada Pipa Dia. 100 mm dan < 100 mm :
1.0000 bh Penyetelan @ Rp. 61,200.00 = Rp. 61,200.00
0.0048 Blok Beton @ Rp. 618,842.00 = Rp. 2,970.44
0.0400 Bekisting Biasa @ Rp. 312,241.00 = Rp. 12,489.64 76,660.08
D. PEMASANGAN REDUCER 1. Pemasangan Reducer pada Pipa Dia. 100 mm dan < 100 mm :
1.0000 bh Penyetelan @ Rp. 61,200.00 = Rp. 61,200.00
0.0100 Blok Beton @ Rp. 618,842.00 = Rp. 6,188.42
0.0400 Bekisting Biasa @ Rp. 312,241.00 = Rp. 12,489.64 79,878.06
m3
m2
Biaya Pengukuran dan Pematokan Per Meter ( m1 ) :
m3
m3
m3
m3
m3
m3
m3
m2
m3
m2
DAFTAR ANALISA HARGA SATUAN PERPIPAAN
F.
1. 1.0000 bh Penyetelan @ Rp. 61,200.00 = Rp. 61,200.00
0.0100 Blok Beton @ Rp. 618,842.00 = Rp. 6,188.42
0.0150 Bekisting @ Rp. 312,241.00 = Rp. 4,683.62 72,072.04
G.1. Pemasangan Bend pada Pipa Dia. 100 mm dan < 100 mm :
1.0000 bh Penyetelan @ Rp. 61,200.00 = Rp. 61,200.00
0.0015 Blok Beton @ Rp. 618,842.00 = Rp. 928.26
0.0150 Bekisting @ Rp. 312,241.00 = Rp. 4,683.62 66,811.88
H PEKERJAAN PEMASANGAN, PENURUNAN DAN PENYETELAN PIPA 1. 1 BATANG ( 6 METER ) PIPA PVC
Pipa Dia. 100 mm dan < Dia. 100 mm 0.0150 oh Mandor @ Rp. 47,500.00 = Rp. 712.50 0.0800 oh Tukang Pipa @ Rp. 45,000.00 = Rp. 3,600.00 0.1500 oh Pekerja @ Rp. 30,000.00 = Rp. 4,500.00 1.0000 oh Peralatan @ Rp. 1,500.00 = Rp. 1,500.00
= Rp. 10,312.50 Sehingga pekerjaan penyetelan Pipa PVC uk < dia 100 mm untuk 1 Meter = 1,718.75
Biaya Pemasangan Pipa PVC dia 3/4" 1.1000 m' Pipa 3/4 @ Rp. 3,400.00 = Rp. 3,740.00 1.0000 Biaya penyetelan @ Rp. 1,718.75 = Rp. 1,718.75
5,458.75
PEKERJAAN PENURUNAN DAN PENYETELAN PIPA 2. 1 BATANG ( 6 METER ) PIPA GIP
Pipa Dia. 4''mm dan < Dia. 4" 0.0200 oh Mandor @ Rp. 47,500.00 = Rp. 950.00 0.7500 oh Tukang Pipa @ Rp. 45,000.00 = Rp. 33,750.00 2.5000 oh Pekerja @ Rp. 30,000.00 = Rp. 75,000.00 1.0000 oh Peralatan @ Rp. 1,500.00 = Rp. 1,500.00
= Rp. 111,200.00 Sehingga pekerjaanPenyetelan Pipa GIP uk < dia 100 mm untuk 1 Meter = 18,533.33
I PEK. PENURUNAN / PENYAMBUNGAN FITTING (BEND/TEE/REDUCER/FLANGE SOCKET/FLANGET SPIGOT/ GIL BOULT JOINT) DAN SEJENISNYA :
1. Pipa Dia. 100 mm dan < Dia. 100 mm 0.1200 oh Mandor @ Rp. 47,500.00 = Rp. 5,700.00 0.4000 oh Tukang Pipa @ Rp. 45,000.00 = Rp. 18,000.00 1.2000 oh Pekerja @ Rp. 30,000.00 = Rp. 36,000.00 1.0000 oh Peralatan @ Rp. 1,500.00 = Rp. 1,500.00
= Rp. 61,200.00
J
1. Pipa Dia. 100 mm dan < Dia. 100 mm 0.1200 oh Mandor @ Rp. 47,500.00 = Rp. 5,700.00 0.4000 oh Tukang Pipa @ Rp. 45,000.00 = Rp. 18,000.00 1.2000 oh Pekerja @ Rp. 30,000.00 = Rp. 36,000.00 1.0000 ls Peralatan @ Rp. 1,500.00 = Rp. 1,500.00
= Rp. 61,200.00
PEMASANGAN BEND 90o
Pemasangan Bend 90o pada Pipa Dia. 100 mm dan < 100 mm :
m3
m2
PEMASANGAN BEND 45o ,22,5o , & 11./14o
m3
m2
PEK. PENURUNAN / PENYAMBUNGAN FITTING (GATE VALVE /CHECK VALVE/WATER METER/BUTTERFLY VALVE) DAN SEJENISNYA
JENIS PEKERJAAN Fabrikasi Rangka strukturITEM PEKERJAAN
Kode Analisa Uraian Koofisien Harga Satuan Jumlah Harga
Analisa (Rp.) (Rp.)
- Bahan -. Elektroda Baja 0.0350 kg 110,000.00 3,850.00 -. Plat Besi T 8 mm 120 x 240 cm 0.0381 cm 1,378,500.00 52,520.85 -. Welding Set 0.1500 hr 30,312.75 4,546.91
Jumlah (A) 60,917.76
Tenaga -. Pekerja Terampil 0.0250 Oh 35,000.00 875.00 -. Tukang Las 0.0600 Oh 45,000.00 2,700.00 -. Mandor 0.0026 Oh 47,500.00 123.50
Jumlah (B) 3,698.50
Jumlah (A + B) 64,616.26
JENIS PEKERJAAN
ITEM PEKERJAAN
Kode Analisa Uraian Koofisien Harga Satuan Jumlah Harga
Analisa (Rp.) (Rp.)
ap Bahan -. Kabel NFA2X 2x10mm 1.0000 M 3,410.00 3,410.00
Jumlah (A) 3,410.00
ap. Sup Tenaga -. Pekerja 0.0100 Oh 30,000.00 300.00 -. Tukang Listrik 0.0010 Oh 45,000.00 45.00
Jumlah (B) 345.00
Jumlah (A + B) 3,755.00
: Plat Sepatu uk 30x30cm tebal 8mm
: Pemasangan Kabel Listrik
: 1 m1
DAFTAR HARGA BAHAN TAHUN 2010
NO. JENIS BAHAN SAT.HARGA
KETERANGANSTANDARD(Rp)
1 2 3 4 5
BAHAN DASAR1 Batu Kali :
- Batu Kali Utuh (Besar) M³ 185,300.00 - Batu Kali (Kecil Disaring) M³ 192,400.00 - Batu Split 3 - 5 cm M³ 221,500.00 - Batu Split 2 - 3 cm M³ 263,900.00
2 Batu Gunung (Royalty) - Batu Gunung (Royalti) M³ 124,500.00
3 Tanah - Timbunan / Urug M³ 121,900.00 - Urugan Pilihan M³ 127,500.00
4 Pasir : - Timbunan / Urug M³ 113,700.00 - Pasangan M³ 156,100.00 - Beton M³ 209,500.00
5 Kerikil - Kerikil Sungai Tersaring M³ 252,500.00 - Sirtu M³ 166,500.00 - Sirtu Tersaring M³ 216,500.00
8 Semen (PC) - Tonasa 50 Kg Zak 59,250.00 - Tonasa 40 Kg Zak 47,400.00
9 Batu Merah Bh 700.00 10 Bambu Bh 11,000.00 11 Ijuk Ikat12 Flux Oil / Modifier Ltr 4,300.00 13 Kerosine / Minyak Tanah Ltr 9,500.00 14 Alat - alat Kerja (3 alat) Set 103,000.00 15 Minyak Diesel / Solar Ltr 6,000.00 16 Premium / Bensin Ltr 6,000.00 17 Minyak Pelumas / Oli Ltr 27,000.00 18 P r e m I x Ltr 7,500.00 19 Minyak Bekisting ltr 11,300.00
1 2 3 4 5BAHAN KAYU
1 Kayu Kls. II - Balok M³ 3,145,000.00 - Papan M³ 3,531,400.00
BAHAN BESI1 Besi Beton Kg 14,500.00 P. Besi (1 mtr)
2 P a k u - Paku Biasa Kg 15,200.00
3 K a w a t - Beton Kg 13,400.00
4 Besi Plat
- 10 mm = 120 x 240 mm Lbr 1,378,500.00
5 Besi Strep - 30,3 mm Btg Cek Teknik Sipil - 35,4 mm Btg Untuk Besi Strep - 46,4 mm Btg Per kg - 40,6 mm Btg - 50,6 mm Btg
6 Besi Siku - 30.30.3 m' - 40.40.3 m' - 40.40.4 m' - 50.50.4 m' - 50.50.5 m' - 60.60.6 m' - 70.70.7 m'
7 Besi CNP - 100 x 6 mtr m' - 125 x 6 mtr m' - 150 x 6 mtr m'
8 Besi UNP - 50 x 6 mtr m' - 65 x 6 mtr m' - 80 x 6 mtr m' - 120 x 6 mtr m' - 150 x 6 mtr m'
8 Besi IWF Kg9 Rangka Aluminium Btg
10 Stainles Stell m'11 Plat Mur, Plong, Baut / Begel U Set12 Baja
- Gulungan Uk. Ringan / Tralis Kg - Anyaman Bronjong Kg - Anyaman Bronjong Galpanis Kg - Baut - baut Kg - Baja Galvanisasi Kg - Baja Struktur Kg - paku - paku Jembatan Kg
BAHAN PIPA1 Pipa Besi GIP
- ø 1" - 6 m m' 12,700.00 - ø 1,5" - 6 m m' 18,100.00 - ø 3" - 6 m m' 51,800.00 - ø 4" - 6 m m' 79,300.00
uk 30X30 +siku 15x15 = Rp 64.617,19
2 Pipa Besi GIP Medium A - ø 1,5" - 6 m m' 60,550.00 - ø 2" - 6 m m' 74,300.00 - ø 3" - 6 m m' 145,200.00
3 Jenis Pipa Standar SNI (P = 6.00 meter)Pipa PVC Pralon Std. S - 12,5 RRJ ø 2" m' 27,588.00 Pipa PVC Pralon Std. S - 12,5 RRJ ø 3" m' 54,571.00 Pipa PVC Pralon Std. S - 12,5 RRJ ø 4" m' 66,000.00 Pipa PVC Diameter 6 " m' 139,200.00 Pipa PVC Diameter 8" m' 213,900.00 Pipa PVC Diameter 10 " m' 333,100.00
4 Lem Pipa Klg 33,200.00 5 Isolasi Pipa Bh 1,700.00 6 Sealed Pipe set 3,600.00 7 Sealed Pipe / Gasket (Washtafel) set 153,100.00 8 Sambungan Pipa PVC bh 3,600.00 9 Sambungan Pipa Galvanis bh 39,100.00
10 Long Bend Ø 3" (raubber ring)
a bh 133,300.00
b bh 116,700.00 11 Bell Reducer Ø 3" x Ø 2" (raubber ring) bh 74,600.00 12 TS TEE Ø 3" (raubber ring) bh 50,000.00 13 TS TEE Ø 3" - 2"(raubber ring) bh 65,000.00 14 TS TEE Ø 3" - 3/4" (raubber ring) bh 228,100.00 15 TS TEE Ø 2" - 3/4" (raubber ring) bh 47,400.00 16 Ventil Udara Ø 13 mm bh 425,000.00 17 DOP bh 36,800.00 18 Stop Kran Ø 3" (Flange) bh 500,000.00 19 WaterMeter 3/4 bh 350,000.00 20 Stop Kran Ø 3/4 " bh 30,100.00 21 Kran Air 1/2" bh 73,000.00 22 Clamp sadle bh 24,400.00 23 Plampung Ø 3/4" bh 101,200.00 24 Bak Fiber 2M2 bh 3,219,300.00
MATERIAL SUMUR BOR1 Bentonite Zak 500,000.00 2 STTIP Kg 300,000.00 3 Pipa GIP A dia. 4 " Meter 79,300.00 4 Pipa Paralon PVC dia. 6 " Meter 139,200.00 5 Low Carbon Screen dia. 6" Meter 139,200.00 6 Pipa GIP A dia. 1.5 " Meter 60,550.00 7 Botton Plug dia. 6" Buah 500,000.00 8 Pengadaan & pemas. Patok tanda Buah 50,000.00 9 Pengadaan & pemas. Tutup sumur Buah 350,000.00
10 Alat Bantu( ayakan, botol, ember) Set /m 50,000.00 11 Pompa Submersible 1 Phase Buah 25,000,000.00 12 Pipa PVC dia.10 " Meter 333,100.00 13 Tali Selling Mtr 36,000.00 14 Acceasories pompa dan box control Set 1,500,000.00 15 Panel, kabel, acceasories, Tiang Set 3,500,000.00 16 Elektroda Baja kg 110,000.00
1 Dolken Kayu Galam Ø 8 - 10 / 4 m Lbr 18,000.00 2 Multipleks 9 mm Lbr 223,100.00 3 Cat Kayu Kg 36,700.00
- Ø 3" 90o
- Ø 3" 45o
BAHAN INSTALASI LISTRIK1 Type NYFGBY
- 2 x 10 mm m' 3,410.00
DAFTAR UPAH KERJA TAHUN 2010
NO. UPAH KERJA SAT.HRG. STANDARD
KET.(Rp.)
1 2 3 4 5
1 Pekerja Tak Terlatih Org / Hr 30,000.00 Pekerja Kurang Terlatih Org / Hr 32,500.00 Pekerja Terlatih Org / Hr 35,000.00
2 Tukang Kayu Org / Hr 45,000.00 Tukang Batu Org / Hr 45,000.00 Tukang Cat Org / Hr 45,000.00 Tukang Listrik Org / Hr 45,000.00 Tukang Pipa Org / Hr 45,000.00 Tukang Besi Org / Hr 45,000.00
3 Kepala Tukang Kayu Org / Hr 50,000.00 Kepala Tukang Batu Org / Hr 50,000.00 Kepala Tukang Cat Org / Hr 50,000.00 Kepala Tukang Listrik Org / Hr 50,000.00 Kepala Tukang Pipa Org / Hr 50,000.00 Kepala Tukang Besi Org / Hr 50,000.00
4 Mandor Org / Hr 47,500.00 5 Mekanik Org / Hr 55,000.00 6 Pembantu Mekanik Org / Hr 45,000.00 7 Operator - Terampil Org / Hr 55,000.00 8 Operator - Semi Terampil Org / Hr 45,000.00 9 Pembantu Operator Org / Hr 40,000.00
10 Sopir Truk Org / Hr 50,000.00 11 Sopir Personil Org / Hr 50,000.00 12 Pembantu Sopir Org / Hr 45,000.00
Geologist Org / Hr 100,000.00 Hidrogeologist Org / Hr 75,000.00 Asisten Geologist/ hidrogiologist Org / Hr 75,000.00 Ahli Pumping Org / Hr 50,000.00 Driller Org / Hr 50,000.00 Welder Org / Hr 45,000.00 Asisten Driller Org / Hr 45,000.00
INDEKS DAFTAR HARGA BAHAN PIPA TAHUN 2010(Sumber : Hasil Survey Harga pipa standard SNI dari Mks ke Blk)
No. JENIS BAHAN KODE SAT. HARGA ONGKOS TAMBANG SUB OVER
PPH JUMLAH PEMBULATAN DASAR ANGKUT GALIAN C JUMLAH HEAD
(Rp.) (Rp.) (20%) (Rp.) (15% - 20%) 1,5% (8 + 9) (Rp.) (Rp.) 1 2 3 4 5 6 7 8 9 10 11 12
1 Pipa PVC Pralon Std. S - 10 SCJ ø 1/2" - btg 16,800.00 5,000.00 - 21,800.00 3,270.00 501.40 25,571.40 25,500.00
Pipa PVC Pralon Std. S - 10 SCJ ø 3/4" - btg 25,200.00 5,000.00 - 30,200.00 4,530.00 694.60 35,424.60 35,000.00
Pipa PVC Pralon Std. S - 10 SCJ ø 1" - btg 41,400.00 5,000.00 - 46,400.00 6,960.00 1,067.20 54,427.20 54,000.00
Pipa PVC Pralon Std. S - 10 SCJ ø 1 1/4" - btg 60,300.00 5,000.00 - 65,300.00 9,795.00 1,501.90 76,596.90 76,500.00
Pipa PVC Pralon Std. S - 10 SCJ ø 1 1/2" - btg 95,400.00 5,000.00 - 100,400.00 15,060.00 2,309.20 117,769.20 117,700.00
2 Pipa PVC Pralon Std. S - 12,5 SCJ ø 2" - btg 121,200.00 5,000.00 - 126,200.00 18,930.00 2,902.60 148,032.60 148,000.00
Pipa PVC Pralon Std. S - 12,5 SCJ ø 2 1/2" - btg 171,600.00 5,000.00 - 176,600.00 26,490.00 4,061.80 207,151.80 207,000.00
Pipa PVC Pralon Std. S - 12,5 SCJ ø 3" - btg 248,100.00 5,000.00 - 253,100.00 37,965.00 5,821.30 296,886.30 296,800.00
Pipa PVC Pralon Std. S - 12,5 SCJ ø 4" - btg 364,500.00 5,000.00 - 369,500.00 55,425.00 8,498.50 433,423.50 433,000.00
3 Pipa PVC Pralon Std. S - 12,5 RRJ ø 2" - btg 125,700.00 5,000.00 - 130,700.00 19,605.00 3,006.10 153,311.10 153,000.00
Pipa PVC Pralon Std. S - 12,5 RRJ ø 2 1/2" - btg 178,200.00 5,000.00 - 183,200.00 27,480.00 4,213.60 214,893.60 214,800.00
Pipa PVC Pralon Std. S - 12,5 RRJ ø 3" - btg 257,700.00 5,000.00 - 262,700.00 39,405.00 6,042.10 308,147.10 308,000.00
Pipa PVC Pralon Std. S - 12,5 RRJ ø 4" - btg 378,300.00 5,000.00 - 383,300.00 57,495.00 8,815.90 449,610.90 449,600.00
4 Pipa GI Std. SIO Merk Bakrie ø 1/2" - btg 74,200.00 5,000.00 - 79,200.00 11,880.00 1,821.60 92,901.60 92,900.00
Pipa GI Std. SIO Merk Bakrie ø 1/2" - btg 224,900.00 5,000.00 - 229,900.00 34,485.00 5,287.70 269,672.70 269,600.00
Pipa GI Std. SIO Merk Bakrie ø 1/2" - btg 475,700.00 5,000.00 - 480,700.00 72,105.00 11,056.10 563,861.10 563,800.00
Bulukumba, Februari 2005
Pemimpin Kegiatan Team Perencana,Kasi Bangunan, Kasubdin Cipta karya
H. H A M J A. S, ST DRS. BAMBANG HERU. P, M. SiNip. : 580 017 567 Pangkat : Pembina
Nip. : 580 016 635
Mengetahui :KEPALA DINAS KEPALA DINAS
……………………………………… PEKERJAAN UMUM KAB. BULUKUMBA
…………………………….. IR. BAHARUDDIN, MMPangkat : Pembina Tk. I Pangkat : Pembina Tk. I
Nip. : ………………… Nip. : 010 202 342
Mengetahui / Menyetujui :BUPATI BULUKUMBA,
H. ANDI PATABAI PABOKORI
DAFTAR HARGA BAHAN TAHUN 2010NO. JENIS BAHAN SAT. HARGA STANDARD (Rp)
1 2 3 41 Batu Kali :
- Batu Kali Utuh (Besar) M³ 185,300.00 - Batu Kali (Kecil Disaring) M³ 192,400.00 - Batu Split 3 - 5 cm M³ 221,500.00 - Batu Split 2 - 3 cm M³ 263,900.00 - Batu Gunung (Royalti) M³ 124,500.00
3 Tanah - Timbunan / Urug M³ 121,900.00 - Urugan Pilihan M³ 127,500.00
4 Pasir : - Timbunan / Urug M³ 113,700.00 - Pasangan M³ 156,100.00 - Beton M³ 209,500.00
5 Kerikil - Kerikil Sungai Tersaring M³ 252,500.00 - Sirtu M³ 166,500.00 - Sirtu Tersaring M³ 216,500.00
8 Semen Pc 50 Kg Zak 59,250.00 9 Batu Merah Bh 700.00
10 Keramik 20 x 20 bh 2,000.00 11 Bambu Bh 11,000.00 12 Flux Oil / Modifier Ltr 4,300.00 13 Kerosine / Minyak Tanah Ltr 9,500.00 14 Alat - alat Kerja (3 alat) Set 103,000.00 15 Minyak Diesel / Solar Ltr 6,000.00 16 Premium / Bensin Ltr 6,000.00 17 Minyak Pelumas / Oli Ltr 27,000.00 18 P r e m I x Ltr 7,500.00 19 Minyak Bekisting ltr 11,300.00 20 Kayu Kls. II
- Balok M³ 3,145,000.00 - Papan M³ 3,531,400.00
21 Besi Beton Kg 14,500.00 22 Paku Biasa Kg 15,200.00 23 Besi
- Beton Kg 13,400.00 - Plat 8 mm = 120 x 240 mm Lbr 1,378,500.00 - Angkur 15 mm bh 75000
24 Pipa Besi GIP - ø 1" - 6 m m' 12,700.00 - ø 1,5" - 6 m m' 18,100.00 - ø 3" - 6 m m' 51,800.00 - ø 4" - 6 m m' 79,300.00
25 Pipa Besi GIP Medium A - ø 1,5" - 6 m m' 60,550.00 - ø 2" - 6 m m' 74,300.00 - ø 3" - 6 m m' 145,200.00
26 Jenis Pipa Standar SNI (P = 6.00 meter)Pipa PVC Pralon Std. S - 12,5 RRJ ø 2" m' 27,588.00 Pipa PVC Pralon Std. S - 12,5 RRJ ø 3" m' 54,571.00 Pipa PVC Pralon Std. S - 12,5 RRJ ø 4" m' 66,000.00 Pipa PVC Diameter 3/4 " m' 3,400.00 Pipa PVC Diameter 6 " m' 139,200.00 Pipa PVC Diameter 8" m' 213,900.00 Pipa PVC Diameter 10 " m' 333,100.00
27 Lem Pipa Klg 33,200.00 28 Isolasi Pipa Bh 1,700.00 29 Sealed Pipe set 3,600.00 30 Sealed Pipe / Gasket (Washtafel) set 153,100.00 31 Sambungan Pipa PVC bh 3,600.00 32 Sambungan Pipa Galvanis bh 39,100.00 33 Long Bend Ø 3" (raubber ring)a bh 133,300.00 b bh 116,700.00 c bh 116,700.00
34 Bell Reducer Ø 3" x Ø 2" (raubber ring) bh 74,600.00 35 TS TEE Ø 3" (raubber ring) bh 50,000.00
TS TEE Ø 3" - 2"(raubber ring) bh 65,000.00 TS TEE Ø 3" - 3/4" (raubber ring) bh 228,100.00 TS TEE Ø 2" - 3/4" (raubber ring) bh 47,400.00
36 Ventil Udara Ø 13 mm bh 425,000.00 37 DOP bh 36,800.00 38 a. Stop Kran Ø 3" (Flange) bh 500,000.00
b. Stop Kran Ø 2" (Flange) bh 450,000.00 39 WaterMeter 3/4 bh 350,000.00 40 Stop Kran Ø 3/4 " bh 30,100.00 41 Kran Air 1/2" inc. install bh 73,000.00 42 Clamp sadle bh 24,400.00 43 Plampung Ø 3/4" inc. install bh 101,200.00 44 Bak Fiber 2M2 bh 3,219,300.00 45 Wind Turbine dia 1m (200 watt) inc install bh 18,200,000.00 46 Charge Controller inc install bh 1,350,000.00 47 Inverter 5KW inc install bh 19,800,000.00
- Ø 3" 90o
- Ø 3" 45o
- Ø 2" 90o
48 Battery 100aH inc install bh 1,850,000.00 49 Seng Gelombang BWG 33" BJLS 0.22 mm Feet 8,000.00 50 Pintu PVC inc. Install SET 300,000.00 1 2 3 452 Frame ukuran 3625x5790 (alum, t 2") ea 2,500,000.00 53 Bentonite Zak 500,000.00 54 STTIP Kg 300,000.00 55 Pipa GIP A dia. 4 " Meter 79,300.00 56 Pipa Paralon PVC dia. 6 " Meter 139,200.00 57 Low Carbon Screen dia. 6" Meter 139,200.00 58 Pipa GIP A dia. 1.5 " Meter 60,550.00 59 Botton Plug dia. 6" Buah 500,000.00 60 Pengadaan & pemas. Patok tanda Buah 50,000.00 61 Pengadaan & pemas. Tutup sumur Buah 350,000.00 62 Alat Bantu( ayakan, botol, ember) Set /m 50,000.00 63 Pompa Submersible 1 Phase Buah 25,000,000.00 64 Pompa Submersible 3 Phase Buah 27,000,000.00 65 Pipa PVC dia.10 " Meter 333,100.00 66 Tali Selling Mtr 36,000.00 67 Acceasories pompa Box Control inc install Set 1,500,000.00 68 Kabel dan tiang Tiang inc install Set 1,000,000.00 69 Elektroda Baja kg 110,000.00 70 Dolken Kayu Galam Ø 8 - 10 / 4 m Lbr 18,000.00 71 Multipleks 9 mm Lbr 223,100.00 72 Cat Kayu Kg 36,700.00 73 Kabel NFA2X
- 2 x 10 mm m' 3,410.00
DAFTAR UPAH KERJA TAHUN 2010
NO. UPAH KERJA SAT.HRG. STANDARD
(Rp.)1 2 3 4
1 Pekerja Tak Terlatih Org / Hr 30,000.00 Pekerja Kurang Terlatih Org / Hr 32,500.00 Pekerja Terlatih Org / Hr 35,000.00
2 Tukang Kayu Org / Hr 45,000.00 Tukang Batu Org / Hr 45,000.00 Tukang Cat Org / Hr 45,000.00 Tukang Listrik Org / Hr 45,000.00 Tukang Pipa Org / Hr 45,000.00 Tukang Besi Org / Hr 45,000.00
3 Kepala Tukang Kayu Org / Hr 50,000.00 Kepala Tukang Batu Org / Hr 50,000.00 Kepala Tukang Cat Org / Hr 50,000.00 Kepala Tukang Listrik Org / Hr 50,000.00 Kepala Tukang Pipa Org / Hr 50,000.00 Kepala Tukang Besi Org / Hr 50,000.00
4 Mandor Org / Hr 47,500.00 5 Mekanik Org / Hr 55,000.00 6 Pembantu Mekanik Org / Hr 45,000.00 7 Operator - Terampil Org / Hr 55,000.00 8 Operator - Semi Terampil Org / Hr 45,000.00 9 Pembantu Operator Org / Hr 40,000.00
10 Sopir Truk Org / Hr 50,000.00 11 Sopir Personil Org / Hr 50,000.00 12 Pembantu Sopir Org / Hr 45,000.00 13 Geologist Org / Hr 100,000.00 14 Hidrogeologist Org / Hr 75,000.00 15 Asisten Geologist/ hidrogiologist Org / Hr 75,000.00 16 Ahli Pumping Org / Hr 50,000.00 17 Driller Org / Hr 50,000.00 18 Welder Org / Hr 45,000.00 19 Asisten Driller Org / Hr 45,000.00
Bupati Kabupaten Bulukumba
A.M Sukri Sappewali
REKAPITULASI RENCANA ANGGARAN BIAYA PERPIPAAN + BANGUNAN PELENGKAP
Kegiatan : Program P2TPD Dinas Kesehatan Kab. Bulukumba Lokasi : Desa CarammingPekerjaan : Pembangunan Jaringan Perpipaan + Bangunan Pelengkap Tahun Anggaran : 2010Volume : 7150 M Kabupaten : Bulukumba
NO URAIAN PEKERJAAN VOLUMEJUMLAH
JUMLAH (Rp)HARGA SATUAN (Rp)
1 2 3 4 5
I PEK. PENDAHULUAN 13,853,641.64 13,853,641.64 II PEKERJAAN UTAMA
Pengadaan Pipa 259,405,850.00 259,405,850.00 Pengadaan Accessories 14,501,600.00 14,501,600.00 Pemasangan Pipa 86,291,151.41 86,291,151.41 Pemasangan Accessories 6,879,272.63 6,879,272.63
III PEKERJAAN BANGUNAN PELENGKAPPek. Hidrant Umum 33 6,544,681.81 215,974,499.89
IV Pekerjaan Pengeboran 2 200,105,838.63 400,211,677.26 Pekerjaan Reservoir (Tower) 1 43,882,321.04 43,882,321.04
Jumlah 1,041,000,013.87 DIBULATKAN (B) 1,041,000,000.00
PPn 10% (tidak dipungut)(10% x B = C) 104,100,000.00 Jumlah (B + C) 1,145,100,000.00
DIBULATKAN 1,145,100,000.00
Terbilang : Satu Milyar Empat Puluh Satu Juta Rupiah
Bulukumba, Februari 2010Pimpinan Kegiatan Kepala Dinas Kesehatan Kab. Bulukumba
Program P2TPD Dinas KesehatanKab. Bulukumba
Hasanuddin, SKM. M.Kes Dr. Hj. Rusni Sufran. M.KesNip: 196212110 198303 1 021 Pangkat : Pembina Tk.I
Nip : 19530103 198011 2 001
RENCANA ANGGARAN BIAYAKegiatan : Program P2TPD Dinas Kesehatan Kab. Bulukumba LokasiPekerjaan : Pembangunan Jaringan Perpipaan + Bangunan Pelengkap Tahun AnggaranVolume : 7150 m Kabupaten
NO URAIAN PEKERJAANVOL. / HARGASAT. SATUAN
1 2 3 4
A. PEK. PENDAHULUAN1. 1 Pengukuran Jalur Pipa dan Pematokan 7,150.00 926.95
2 Papan Nama Proyek 1.00 ls 350,000.00 3 Administrasi dan Dokumentasi 1.00 ls 1,000,000.00 4 Back Up Data dan As Built Drawing 1.00 ls 750,000.00 5 Direksikeet 3 x 3 meter 9.00 m2 458,435.55 6 Mobilisasi Peralatan dan Tenaga Kerja 1.00 ls 1,000,000.00
J U M L A H AB. PEKERJAAN UTAMA
1. Pengadaan Pipa
Termasuk Pengangkutan Ke Lokasi Pekerjaan1 Pipa PVC Paralon std S - 12,5 RRJ 3" 2,150.00 54,571.00
2 Pipa PVC Paralon std S - 12,5 RRJ 2" 5,150.00 27,588.00 J U M L A H
2. Pengadaan Accessories1 Long Bend Ø 3" (raubber ring)
1.00 bh 133,300.00
2.00 bh 116,700.00 2 Bell Reducer Ø 3" x Ø 2" (raubber ring) 2.00 bh 74,600.00 3 TS TEE Ø 3" - 2"(raubber ring) 1.00 bh 65,000.00 4 Ventil Udara Ø 13 mm 1.00 bh 425,000.00 5 Clamp Sadlle Ø 2" x 0,5" 33.00 bh 24,400.00 6 DOP 4.00 bh 36,800.00 7 WaterMeter 3/4 33.00 bh 350,000.00 8 Stop Kran Ø 3/4 " 33.00 bh 30,100.00
J U M L A H3. Pemasangan Pipa
1 Pipa PVC Paralon std S - 12,5 RRJ 3" 2,150.00 13,452.57
2 Pipa PVC Paralon std S - 12,5 RRJ 2" 5,150.00 11,139.44 J U M L A H
4. Pemasangan Accessories1 Bell Bend Ø "
1.00 bh 72,072.04
2.00 bh 72,072.04 2 Bell Reducer Ø 3" x Ø 2" (raubber ring) 2.00 bh 79,878.06 3 TS TEE Ø 3" - 2"(raubber ring) 1.00 bh 76,660.08 4 Ventil Udara Ø 13 mm 1.00 bh 61,200.00 5 Clamp Sadlle Ø 2" x 0,5" 33.00 bh 61,200.00 6 DOP 4.00 bh 76,660.08 7 WaterMeter 3/4 33.00 bh 61,200.00 8 Stop Kran Ø 3/4 " 33.00 bh 61,200.00
J U M L A HJ U M L A H B
m1
Pipa PVC, Tekanan Nominal 10 kg/cm2
m1
m1
- Ø 3" 90o
- Ø 2" 90o
m1
m1
- Ø 3" 90o
- Ø 2" 90o
NO URAIAN PEKERJAANVOL. / HARGASAT. SATUAN
1 2 3 4
C. PEKERJAAN BANGUNAN PELENGKAP1 Pek. Hidrant Umum
1 Galian Tanah 1.03 13,900.00
2 Urugan Tanah 0.52 161,687.50
3 Urugan Sirtu Bawah Lantai 1.95 209,275.00
4 Pasangan Batu Kosong 0.99 313,942.50
5 Pasangan Pondasi Batu Kali 1 : 4 1.90 528,470.90
6 0.60 624,977.00
7 0.56 624,977.00
8 Pekerjaan Plesteran Camp. 1 : 4 5.40 26,724.90
9 Pekerjaan Acian dengan Semen 5.40 5,557.50
10 1.00 unit 3,219,300.00
11 Pas.Pipa PVC 3/4" aw 12.00 m' 5,458.75 12 Kran Air 1/2" inc. install 6.00 Bh 73,000.00 13 Plampung Ø 3/4" inc. install 1.00 unit 101,200.00
J U M L A H CD PEKERJAAN RESERVOIR (TOWER)
I Pekerjaan Tanah 1 Galian Tanah Pondasi 13.20 m3 13,900.00 2 Urugan Tanah kembali 0.54 m3 6,662.50 3 Urugan Sirtu Bawah Lantai 3.40 m3 209,275.00 4 Urugan Pasir Bawah Lantai dan Pondasi 0.54 m3 145,915.00
JUMLAH III Pekerjaan Batu dan Beton
1 Pasangan Batu Kosong 2.82 m3 313,942.50 2 Pasangan Batu Kali 1:4 6.79 m3 528,470.90 3 Pek. Dinding Batu Bata 1:4 15.78 m2 84,652.30 4 Pekerjaan Beton 12.12 m3 2,623,207.50 5 Rabat Beton Lantai R. Panel 0.5 m3 624,977.00 7 Plasteran 1:4 27.24 m2 26,724.90 8 Acian Semen 27.24 m2 5,557.50 9 Pek. Lantai Keramik 20X20 14.00 m2 107,827.20
10 Pek Dinding Keramik 20x20 5.00 m2 110,101.70 JUMLAH II
III Pek. Pintu, dan tangga1 Tangga Besi
a. Pipa GIP Medium A Ø 1,5" 18.50 m 60,550.00 b. Biaya Fabrikasi dan Install 18.50 m 16,740.68
7 Pintu PVC inc. Install 1.00 set 300,000.00 JUMLAH III
IV Pekerjaan Pengecatan 1 Pengecatan Dinding 27.24 m2 11,760.75
JUMLAH IVJUMLAH D
m3
m3
m3
m3
m3
Pekerjaan Rabat Beton 1 : 3 : 5 Lantai Dudukan
m3
Pekerjaan Rabat Beton 1 : 3 : 5 Tempat Cuci
m3
m2
m2
Pekerjaan Pasangan Bak Penampungan 2 m3
RENCANA ANGGARAN BIAYA: Desa Caramming: 2010: Bulukumba
JUMLAHHARGA
5
6,627,721.69 350,000.00 1,000,000.00 750,000.00 4,125,919.95 1,000,000.00 13,853,641.64
117,327,650.00
142,078,200.00 259,405,850.00
133,300.00
233,400.00 149,200.00 65,000.00 425,000.00 805,200.00 147,200.00 11,550,000.00 993,300.00 14,501,600.00
28,923,016.09
57,368,135.31 86,291,151.41
72,072.04
144,144.07 159,756.12 76,660.08 61,200.00 2,019,600.00 306,640.33 2,019,600.00 2,019,600.00 6,879,272.63 367,077,874.04
JUMLAHHARGA
5
14,317.00
84,077.50
408,086.25
310,803.08
1,004,094.71
374,986.20
349,987.12
144,314.46
30,010.50
3,219,300.00
65,505.00 438,000.00 101,200.00 6,544,681.81
183,480.00 3,597.75 711,535.00 78,794.10 977,406.85
885,317.85 3,588,317.41 1,335,813.29 31,793,274.90 312,488.50 727,986.28 151,386.30 1,509,580.80 550,508.50 40,854,673.83
- 1,120,175.00 309,702.53 300,000.00 1,729,877.53
320,362.83 320,362.83 43,882,321.04
ANALISA HARGA SATUAN BIAYA PEKERJAANANALISA BIAYA KONSTRUKSI BANGUNAN GEDUNG DAN PERUMAHAN
BERDASARKAN SNI - 2001 (EDISI REVISI)12 JENIS PEKERJAAN
ITEM PEKERJAANINSTANSI : DINAS PEKERJAAN UMUMKABUPATEN : BULUKUMBATAHUN ANGGARAN #REF!
Kode Analisa Uraian Koofisien Harga Satuan
Analisa (Rp.)
6.4.1 Bahan -. Semen Portland (PC 50 K 0.1040 Zak 59,250.00 -. Pasir Pasang 0.0200 M³ 156,100.00
Jumlah (A)
6.4.2 Tenaga -. Pekerja 0.2000 Oh 30,000.00 -. Tukang Batu 0.1500 Oh 45,000.00 -. Kepala Tukang 0.0150 Oh 50,000.00 -. Mandor 0.0100 Oh 47,500.00
Jumlah (B)
Jumlah (A + B)
ANALISA HARGA SATUAN BIAYA PEKERJAANANALISA BIAYA KONSTRUKSI BANGUNAN GEDUNG DAN PERUMAHAN
BERDASARKAN SNI - 2001 (EDISI REVISI)13 JENIS PEKERJAAN
ITEM PEKERJAANINSTANSI : DINAS PEKERJAAN UMUMKABUPATEN : BULUKUMBATAHUN ANGGARAN #REF!
Kode Analisa Uraian Koofisien Harga Satuan
Analisa (Rp.)
6.47.1 Bahan -. Ubin Keramik 30 x 30 cm 11.1111 Bh - -. Semen Portlan (PC 50 Kg) 0.2276 Zak 59,250.00 -. Pasir Pasang 0.0420 M³ 156,100.00 -. Semen Warna (PC 40 Kg) 0.0375 Zak 47,400.00
Jumlah (A)
6.47.2 Tenaga -. Pekerja 0.2500 Oh 30,000.00 -. Tukang Batu 0.1200 Oh 45,000.00 -. Kepala Tukang 0.0120 Oh 50,000.00 -. Mandor 0.0125 Oh 47,500.00
Jumlah (B)
Jumlah (A + B)
ANALISA HARGA SATUAN BIAYA PEKERJAAN
: PEKERJAAN PLESTERAN: 1 m² Plesteran Batu Bata 1 : 4 (Tebal 15 mm)
: PEKERJAAN LANTAI: 1 m² Pasangan Lantai Keramik Ukuran 30 x 30 cm
ANALISA BIAYA KONSTRUKSI BANGUNAN GEDUNG DAN PERUMAHANBERDASARKAN SNI - 2001 (EDISI REVISI)
14 JENIS PEKERJAANITEM PEKERJAANINSTANSI : DINAS PEKERJAAN UMUMKABUPATEN : BULUKUMBATAHUN ANGGARAN #REF!
Kode Analisa Uraian Koofisien Harga Satuan
Analisa (Rp.)
6.44.1 Bahan -. Ubin Keramik 20 x 20 cm 25.0000 Bh - -. Semen Portlan (PC 50 Kg) 0.2276 Zak 59,250.00 -. Pasir Pasang 0.0420 M³ 156,100.00 -. Semen Warna (PC 40 Kg) 0.0375 Zak 47,400.00
Jumlah (A)
6.44.2 Tenaga -. Pekerja 0.6200 Oh 30,000.00 -. Tukang Batu 0.3500 Oh 45,000.00 -. Kepala Tukang 0.0350 Oh 50,000.00 -. Mandor 0.0300 Oh 47,500.00
Jumlah (B)
Jumlah (A + B)
ANALISA HARGA SATUAN BIAYA PEKERJAANANALISA BIAYA KONSTRUKSI BANGUNAN GEDUNG DAN PERUMAHAN
BERDASARKAN SNI - 2001 (EDISI REVISI)15 JENIS PEKERJAAN
ITEM PEKERJAANINSTANSI : DINAS PEKERJAAN UMUMKABUPATEN : BULUKUMBATAHUN ANGGARAN #REF!
Kode Analisa Uraian Koofisien Harga Satuan
Analisa (Rp.)
6.44.1 Bahan -. Keramik 20 x 25 cm (War 20.0000 Bh Err:509-. Semen Portlan (PC 50 Kg) 0.1860 Zak 59,250.00 -. Pasir Pasang 0.0180 M³ 156,100.00 -. Semen Warna (PC 40 Kg) 0.0375 Zak 47,400.00
Jumlah (A)
6.44.2 Tenaga -. Pekerja 0.6200 Oh 30,000.00 -. Tukang Batu 0.3500 Oh 45,000.00 -. Kepala Tukang 0.0350 Oh 50,000.00 -. Mandor 0.0300 Oh 47,500.00
Jumlah (B)
Jumlah (A + B)
ANALISA HARGA SATUAN BIAYA PEKERJAANANALISA BIAYA KONSTRUKSI BANGUNAN GEDUNG DAN PERUMAHAN
BERDASARKAN SNI - 2001 (EDISI REVISI)16 JENIS PEKERJAAN
: PEKERJAAN LANTAI: 1 m² Pasangan Lantai Keramik Ukuran 20 x 20 cm
: PEKERJAAN LANTAI: 1 m² Pasangan Dinding Keramik Ukuran 20 x 25 cm
: PEKERJAAN KAYU
ITEM PEKERJAANINSTANSI : DINAS PEKERJAAN UMUMKABUPATEN : BULUKUMBATAHUN ANGGARAN #REF!
Kode Analisa Uraian Koofisien Harga Satuan
Analisa (Rp.)
6.1.1 Bahan -. Balok Kls. I (Jati / Bayam) 1.1000 M³ -
Jumlah (A)
6.1.2 Tenaga -. Pekerja 6.0000 Oh 30,000.00 -. Tukang Kayu 20.0000 Oh 45,000.00 -. Kepala Tukang 2.0000 Oh 50,000.00 -. Mandor 0.3000 Oh 47,500.00
Jumlah (B)
Jumlah (A + B)
ANALISA HARGA SATUAN BIAYA PEKERJAANANALISA BIAYA KONSTRUKSI BANGUNAN GEDUNG DAN PERUMAHAN
BERDASARKAN SNI - 2001 (EDISI REVISI)17 JENIS PEKERJAAN
ITEM PEKERJAANINSTANSI : DINAS PEKERJAAN UMUMKABUPATEN : BULUKUMBATAHUN ANGGARAN #REF!
Kode Analisa Uraian Koofisien Harga Satuan
Analisa (Rp.)
6.7.1 Bahan -. Papan Kls. I (Jati / Bayam 0.0400 M³ -
Jumlah (A)
6.7.2 Tenaga -. Pekerja 1.0000 Oh 30,000.00 -. Tukang Kayu 2.5000 Oh 45,000.00 -. Kepala Tukang 0.2500 Oh 50,000.00 -. Mandor 0.0500 Oh 47,500.00
Jumlah (B)
Jumlah (A + B)
ANALISA HARGA SATUAN BIAYA PEKERJAANANALISA BIAYA KONSTRUKSI BANGUNAN GEDUNG DAN PERUMAHAN
BERDASARKAN SNI - 2001 (EDISI REVISI)18 JENIS PEKERJAAN
ITEM PEKERJAANINSTANSI : DINAS PEKERJAAN UMUMKABUPATEN : BULUKUMBATAHUN ANGGARAN #REF!
: 1 m³ Pas. Kusen Pintu dan Jendela Kls. I (Jati / Bayam)
: PEKERJAAN KAYU: 1 m² Pas. Pintu Panil Kls. I (Jati / Bayam)
: PEKERJAAN KAYU + KACA: 1 m² Pas. Pintu dan Jendela Kaca Kls. II (Kamper / Meranti)
Kode Analisa Uraian Koofisien Harga Satuan
Analisa (Rp.)BINGKAI KACA (I)
6.10.1 Bahan -. Papan Kls. II (Kamper / M 0.0350 M³ 3,531,400.00
Jumlah (A)
6.10.2 Tenaga -. Pekerja 0.8000 Oh 30,000.00 -. Tukang Kayu 2.0000 Oh 45,000.00 -. Kepala Tukang 0.2000 Oh 50,000.00 -. Mandor 0.0400 Oh 47,500.00
Jumlah (B)KACA BENING 5 MM (II)
6.17.1 Bahan -. Kaca Bening 5 mm 1.1000 M² -
Jumlah (A)
6.17.2 Tenaga -. Pekerja 0.0150 Oh 30,000.00 -. Tukang Kayu 0.1500 Oh 45,000.00 -. Kepala Tukang 0.0150 Oh 50,000.00 -. Mandor 0.0008 Oh 47,500.00
Jumlah (B)
Jumlah (I + II)
ANALISA HARGA SATUAN BIAYA PEKERJAANANALISA BIAYA KONSTRUKSI BANGUNAN GEDUNG DAN PERUMAHAN
BERDASARKAN SNI - 2001 (EDISI REVISI)19 JENIS PEKERJAAN
ITEM PEKERJAANINSTANSI : DINAS PEKERJAAN UMUMKABUPATEN : BULUKUMBATAHUN ANGGARAN #REF!
Kode Analisa Uraian Koofisien Harga Satuan
Analisa (Rp.)
6.12.1 Bahan -. Papan Kls. I (Jati / Bayam 0.0640 M³ -
Jumlah (A)
6.12.2 Tenaga -. Pekerja 1.0000 Oh 30,000.00 -. Tukang Kayu 3.0000 Oh 45,000.00 -. Kepala Tukang 0.3000 Oh 50,000.00 -. Mandor 0.3000 Oh 47,500.00
Jumlah (B)
Jumlah (A + B)
: PEKERJAAN KAYU: 1 m² Pas. Pintu dan Jendela Jalusi Kls. I (Jati / Bayam)
ANALISA HARGA SATUAN BIAYA PEKERJAANANALISA BIAYA KONSTRUKSI BANGUNAN GEDUNG DAN PERUMAHAN
BERDASARKAN SNI - 2001 (EDISI REVISI)20 JENIS PEKERJAAN
ITEM PEKERJAANINSTANSI : DINAS PEKERJAAN UMUMKABUPATEN : BULUKUMBATAHUN ANGGARAN #REF!
Kode Analisa Uraian Koofisien Harga Satuan
Analisa (Rp.)
6.27.1 Bahan -. Balok Kls. I (Jati / Bayam) 1.1000 M³ - -. Besi Strip 15.0000 Kg - -. Paku Biasa 2" - 5" 0.8000 Kg 15,200.00
Jumlah (A)
6.27.2 Tenaga -. Pekerja 4.0000 Oh 30,000.00 -. Tukang Kayu 12.0000 Oh 45,000.00 -. Kepala Tukang 1.2000 Oh 50,000.00 -. Mandor 0.2000 Oh 47,500.00
Jumlah (B)
Jumlah (A + B)
ANALISA HARGA SATUAN BIAYA PEKERJAANANALISA BIAYA KONSTRUKSI BANGUNAN GEDUNG DAN PERUMAHAN
BERDASARKAN SNI - 2001 (EDISI REVISI)21 JENIS PEKERJAAN
ITEM PEKERJAANINSTANSI : DINAS PEKERJAAN UMUMKABUPATEN : BULUKUMBATAHUN ANGGARAN #REF!
Kode Analisa Uraian Koofisien Harga Satuan
Analisa (Rp.)
6.28.1 Bahan -. Balok Kls. II (Kamper / M 1.1000 M³ 3,145,000.00 -. Besi Strip 15.0000 Kg - -. Paku Biasa 2" - 5" 0.8000 Kg 15,200.00
Jumlah (A)
6.28.2 Tenaga -. Pekerja 4.0000 Oh 30,000.00 -. Tukang Kayu 12.0000 Oh 45,000.00 -. Kepala Tukang 1.2000 Oh 50,000.00 -. Mandor 0.2000 Oh 47,500.00
Jumlah (B)
Jumlah (A + B)
ANALISA HARGA SATUAN BIAYA PEKERJAANANALISA BIAYA KONSTRUKSI BANGUNAN GEDUNG DAN PERUMAHAN
: PEKERJAAN KAYU: 1 m³ Pas. Konstruksi Kuda - Kuda Kls. I (Jati / Bayam)
: PEKERJAAN KAYU: 1 m³ Pas. Konstruksi Kuda - Kuda / Gording Kls. II (Kamper / Meranti)
BERDASARKAN SNI - 2001 (EDISI REVISI)22 JENIS PEKERJAAN
ITEM PEKERJAANINSTANSI : DINAS PEKERJAAN UMUMKABUPATEN : BULUKUMBATAHUN ANGGARAN #REF!
Kode Analisa Uraian Koofisien Harga Satuan
Analisa (Rp.)
6.39.1 Bahan -. Balok Kls. II (Kamper / M 0.0120 M³ 3,145,000.00 -. Paku Biasa 2" - 5" 0.1000 Kg 15,200.00
Jumlah (A)
6.39.2 Tenaga -. Pekerja 0.1500 Oh 30,000.00 -. Tukang Kayu 0.2500 Oh 45,000.00 -. Kepala Tukang 0.0250 Oh 50,000.00 -. Mandor 0.0750 Oh 47,500.00
Jumlah (B)
Jumlah (A + B)
ANALISA HARGA SATUAN BIAYA PEKERJAANANALISA BIAYA KONSTRUKSI BANGUNAN GEDUNG DAN PERUMAHAN
BERDASARKAN SNI - 2001 (EDISI REVISI)23 JENIS PEKERJAAN
ITEM PEKERJAANINSTANSI : DINAS PEKERJAAN UMUMKABUPATEN : BULUKUMBATAHUN ANGGARAN #REF!
Kode Analisa Uraian Koofisien Harga Satuan
Analisa (Rp.)
6.1.1 Bahan -. Eternit 100 x 100 cm 1.1000 Lbr - -. Paku 0.0100 Kg 15,200.00
Jumlah (A)
6.1.2 Tenaga -. Pekerja 0.0300 Oh 30,000.00 -. Tukang Kayu 0.0700 Oh 45,000.00 -. Kepala Tukang 0.0070 Oh 50,000.00 -. Mandor 0.0015 Oh 47,500.00
Jumlah (B)
Jumlah (A + B)
ANALISA HARGA SATUAN BIAYA PEKERJAANANALISA BIAYA KONSTRUKSI BANGUNAN GEDUNG DAN PERUMAHAN
BERDASARKAN SNI - 2001 (EDISI REVISI)24 JENIS PEKERJAAN
ITEM PEKERJAAN
: PEKERJAAN KAYU: 1 m² Pas. Rangka Langit - Langit 100 x 100 cm Kls. II (Kamper / Meranti)
: PEKERJAAN LANGIT - LANGIT: 1 m² Langit - Langit Eternit 100 x 100 cm (Tebal = 6 mm)
: PEKERJAAN KAYU: 1 m' Pas. Listplank Uk. 2/30 cm Kls. I (Jati / Bayam)
INSTANSI : DINAS PEKERJAAN UMUMKABUPATEN : BULUKUMBATAHUN ANGGARAN #REF!
Kode Analisa Uraian Koofisien Harga Satuan
Analisa (Rp.)
6.39.1 Bahan -. Papan Kls. I (Jati / Bayam 0.0060 M³ - -. Paku Biasa 2" - 5" 0.0500 Kg 15,200.00
Jumlah (A)
6.39.2 Tenaga -. Pekerja 0.1000 Oh 30,000.00 -. Tukang Kayu 0.2000 Oh 45,000.00 -. Kepala Tukang 0.0250 Oh 50,000.00 -. Mandor 0.0050 Oh 47,500.00
Jumlah (B)
Jumlah (A + B)
ANALISA HARGA SATUAN BIAYA PEKERJAANANALISA BIAYA KONSTRUKSI BANGUNAN GEDUNG DAN PERUMAHAN
BERDASARKAN SNI - 2001 (EDISI REVISI)25 JENIS PEKERJAAN
ITEM PEKERJAANINSTANSI : DINAS PEKERJAAN UMUMKABUPATEN : BULUKUMBATAHUN ANGGARAN #REF!
Kode Analisa Uraian Koofisien Harga Satuan
Analisa (Rp.)
6.60.1 Bahan -. Kayu Profil 1.0500 M' Err:509
Jumlah (A)
6.60.2 Tenaga -. Pekerja 0.0210 Oh 30,000.00 -. Tukang Kayu 0.0210 Oh 45,000.00 -. Kepala Tukang 0.0020 Oh 50,000.00 -. Mandor 0.0010 Oh 47,500.00
Jumlah (B)
Jumlah (A + B)
ANALISA HARGA SATUAN BIAYA PEKERJAANANALISA BIAYA KONSTRUKSI BANGUNAN GEDUNG DAN PERUMAHAN
BERDASARKAN SNI - 2001 (EDISI REVISI)26 JENIS PEKERJAAN
ITEM PEKERJAANINSTANSI : DINAS PEKERJAAN UMUMKABUPATEN : BULUKUMBA
: PEKERJAAN KAYU: 1 m' Pas. List Plafound Kayu Profil
: PEKERJAAN ATAP: 1 m² Pas. Atap Seng Gelombang
TAHUN ANGGARAN #REF!
Kode Analisa Uraian Koofisien Harga Satuan
Analisa (Rp.)
6.38.1 Bahan -. Seng Gelombang BWG 33" 6.0000 Ft - -. Paku Seng (Payung) RRT 0.0200 Kg Err:509
Jumlah (A)
6.38.2 Tenaga -. Pekerja 0.0210 Oh 30,000.00 -. Tukang Kayu 0.0210 Oh 45,000.00 -. Kepala Tukang 0.0020 Oh 50,000.00 -. Mandor 0.0010 Oh 47,500.00
Jumlah (B)
Jumlah (A + B)
ANALISA HARGA SATUAN BIAYA PEKERJAANANALISA BIAYA KONSTRUKSI BANGUNAN GEDUNG DAN PERUMAHAN
BERDASARKAN SNI - 2001 (EDISI REVISI)27 JENIS PEKERJAAN
ITEM PEKERJAANINSTANSI : DINAS PEKERJAAN UMUMKABUPATEN : BULUKUMBATAHUN ANGGARAN #REF!
Kode Analisa Uraian Koofisien Harga Satuan
Analisa (Rp.)
6.39.1 Bahan -. Seng Plat BJLS 0.28 mm 0.3000 Lbr - -. Paku Seng (Payung) RRT 0.0200 Kg Err:509
Jumlah (A)
6.39.2 Tenaga -. Pekerja 0.0210 Oh 30,000.00 -. Tukang Kayu 0.0210 Oh 45,000.00 -. Kepala Tukang 0.0020 Oh 50,000.00 -. Mandor 0.0010 Oh 47,500.00
Jumlah (B)
Jumlah (A + B)
ANALISA HARGA SATUAN BIAYA PEKERJAANANALISA BIAYA KONSTRUKSI BANGUNAN GEDUNG DAN PERUMAHAN
BERDASARKAN SNI - 2001 (EDISI REVISI)28 JENIS PEKERJAAN
: PEKERJAAN ATAP: 1 m² Pas. Atap Nok Seng
: PEKERJAAN PENGECETAN
ANALISA HARGA SATUAN BIAYA PEKERJAANANALISA BIAYA KONSTRUKSI BANGUNAN GEDUNG DAN PERUMAHAN
BERDASARKAN SNI - 2001 (EDISI REVISI)
Jumlah Harga(Rp.)
6,162.00 3,122.00
9,284.00
6,000.00 6,750.00 750.00 475.00 13,975.00
23,259.00
ANALISA HARGA SATUAN BIAYA PEKERJAANANALISA BIAYA KONSTRUKSI BANGUNAN GEDUNG DAN PERUMAHAN
BERDASARKAN SNI - 2001 (EDISI REVISI)
Jumlah Harga(Rp.)
- 13,485.30 6,556.20 1,777.50
21,819.00
7,500.00 5,400.00 600.00 593.75 14,093.75
35,912.75
ANALISA HARGA SATUAN BIAYA PEKERJAAN
ANALISA BIAYA KONSTRUKSI BANGUNAN GEDUNG DAN PERUMAHANBERDASARKAN SNI - 2001 (EDISI REVISI)
Jumlah Harga(Rp.)
- 13,485.30 6,556.20 1,777.50
21,819.00
18,600.00 15,750.00 1,750.00 1,425.00 37,525.00
59,344.00
ANALISA HARGA SATUAN BIAYA PEKERJAANANALISA BIAYA KONSTRUKSI BANGUNAN GEDUNG DAN PERUMAHAN
BERDASARKAN SNI - 2001 (EDISI REVISI)
Jumlah Harga(Rp.)
Err:509 11,020.50 2,809.80 1,777.50
Err:509
18,600.00 15,750.00 1,750.00 1,425.00 37,525.00
Err:509
ANALISA HARGA SATUAN BIAYA PEKERJAANANALISA BIAYA KONSTRUKSI BANGUNAN GEDUNG DAN PERUMAHAN
BERDASARKAN SNI - 2001 (EDISI REVISI)
Jumlah Harga(Rp.)
-
-
180,000.00 900,000.00 100,000.00 14,250.00 1,194,250.00
1,194,250.00
ANALISA HARGA SATUAN BIAYA PEKERJAANANALISA BIAYA KONSTRUKSI BANGUNAN GEDUNG DAN PERUMAHAN
BERDASARKAN SNI - 2001 (EDISI REVISI)
Jumlah Harga(Rp.)
-
-
30,000.00 112,500.00 12,500.00 2,375.00 157,375.00
157,375.00
ANALISA HARGA SATUAN BIAYA PEKERJAANANALISA BIAYA KONSTRUKSI BANGUNAN GEDUNG DAN PERUMAHAN
BERDASARKAN SNI - 2001 (EDISI REVISI)
Jumlah Harga(Rp.)
249,499.00
123,599.00
123,599.00
24,000.00 90,000.00 10,000.00 1,900.00 125,900.00 7,985.63
-
-
450.00 6,750.00 750.00 35.63 7,985.63
257,484.63
ANALISA HARGA SATUAN BIAYA PEKERJAANANALISA BIAYA KONSTRUKSI BANGUNAN GEDUNG DAN PERUMAHAN
BERDASARKAN SNI - 2001 (EDISI REVISI)
Jumlah Harga(Rp.)
-
-
30,000.00 135,000.00 15,000.00 14,250.00 194,250.00
194,250.00
ANALISA HARGA SATUAN BIAYA PEKERJAANANALISA BIAYA KONSTRUKSI BANGUNAN GEDUNG DAN PERUMAHAN
BERDASARKAN SNI - 2001 (EDISI REVISI)
Jumlah Harga(Rp.)
- - 12,160.00
12,160.00
120,000.00 540,000.00 60,000.00 9,500.00 729,500.00
741,660.00
ANALISA HARGA SATUAN BIAYA PEKERJAANANALISA BIAYA KONSTRUKSI BANGUNAN GEDUNG DAN PERUMAHAN
BERDASARKAN SNI - 2001 (EDISI REVISI)
Jumlah Harga(Rp.)
3,459,500.00 - 12,160.00
3,471,660.00
120,000.00 540,000.00 60,000.00 9,500.00 729,500.00
4,201,160.00
ANALISA HARGA SATUAN BIAYA PEKERJAANANALISA BIAYA KONSTRUKSI BANGUNAN GEDUNG DAN PERUMAHAN
1 m³ Pas. Konstruksi Kuda - Kuda / Gording Kls. II (Kamper / Meranti)
BERDASARKAN SNI - 2001 (EDISI REVISI)
Jumlah Harga(Rp.)
37,740.00 1,520.00
39,260.00
4,500.00 11,250.00 1,250.00 3,562.50 20,562.50
59,822.50
ANALISA HARGA SATUAN BIAYA PEKERJAANANALISA BIAYA KONSTRUKSI BANGUNAN GEDUNG DAN PERUMAHAN
BERDASARKAN SNI - 2001 (EDISI REVISI)
Jumlah Harga(Rp.)
- 152.00
152.00
900.00 3,150.00 350.00 71.25 4,471.25
4,623.25
ANALISA HARGA SATUAN BIAYA PEKERJAANANALISA BIAYA KONSTRUKSI BANGUNAN GEDUNG DAN PERUMAHAN
BERDASARKAN SNI - 2001 (EDISI REVISI)
1 m² Pas. Rangka Langit - Langit 100 x 100 cm Kls. II (Kamper / Meranti)
Jumlah Harga(Rp.)
- 760.00
760.00
3,000.00 9,000.00 1,250.00 237.50 13,487.50
14,247.50
ANALISA HARGA SATUAN BIAYA PEKERJAANANALISA BIAYA KONSTRUKSI BANGUNAN GEDUNG DAN PERUMAHAN
BERDASARKAN SNI - 2001 (EDISI REVISI)
Jumlah Harga(Rp.)
Err:509
Err:509
630.00 945.00 100.00 47.50 1,722.50
Err:509
ANALISA HARGA SATUAN BIAYA PEKERJAANANALISA BIAYA KONSTRUKSI BANGUNAN GEDUNG DAN PERUMAHAN
BERDASARKAN SNI - 2001 (EDISI REVISI)
Jumlah Harga(Rp.)
- Err:509
Err:509
630.00 945.00 100.00 47.50 1,722.50
Err:509
ANALISA HARGA SATUAN BIAYA PEKERJAANANALISA BIAYA KONSTRUKSI BANGUNAN GEDUNG DAN PERUMAHAN
BERDASARKAN SNI - 2001 (EDISI REVISI)
Jumlah Harga(Rp.)
- Err:509
Err:509
630.00 945.00 100.00 47.50 1,722.50
Err:509
ANALISA HARGA SATUAN BIAYA PEKERJAANANALISA BIAYA KONSTRUKSI BANGUNAN GEDUNG DAN PERUMAHAN
BERDASARKAN SNI - 2001 (EDISI REVISI)