A P R O J E C T R E P O R T
O N
ERP Modules for Construction Industry
Under Consideration of
Image Software Consultancy
A
DISSERTATION SUBMITTED IN PARTIAL
FULFILLMENT OF THE ACADEMIC CURRICULUM OF
BACHELORS OF COMPUTER APPLICATION (2013-14)
6TH SEMESTER
SUBMITTED BY:
Student Name: Patel Sanket Haribhai (Roll No.: 55)
Student Name: Nakrani Mayur Nanjibhai (Roll No.:26)
UNDER THE GUIDANCE OF
Internal Guide External Guide
Prof. Kinjal Acharya Mr. Nimesh Dhulla
SUBMITTED TO:
FACULTY OF MANAGEMENT AND INFORMATION SCIENCE
8/12/2019 Project Report on ERP Modules for Construction Industry
2/289
P REFACE
As a part of BCA curriculum the sixth semester is dedicated to full time project
development. The purpose of the full time industry project is to allow students to enter in realmarket and develop their skills to get acquainted with and learn to implement the conceptthey have been taught during the theory exposure of the various application.
An IT Professionals role is to engineer solutions. The subjec t might be of that of anyfiled, but the purpose is still the same that is to bring out the best solution is the result ofintegration of theory as well as Practice. Hence, this report too, is a mix of theory and
practical work done. This report would enable the understanding of methodologies adopted
for the implementation of the application system.
8/12/2019 Project Report on ERP Modules for Construction Industry
3/289
ACKNOWLEDGEMENT
This project could never have been designated if; we do not convey heart felt gratitude to
those people, from whom we have got considerable support and encouragement for
developing this generous project.
First, I would like to thank Dharmsinh Desai University for providing me opportunity to
collaborate with Image Software Consultancy, Vadodara.
Also, I would like to thank Mr. Nimesh Dhulla (Project Guide), under whose interest,
guidance and constant supervision, we received the greatest help in bringing out this work in
the present shape. I would also like to be very thankful to all the staff members for providing
me excellent support during this project duration.
Very special thanks to Prof. Kinjal Acharya who helped us, throughout the project. Their
motivation to do better and always aim for improvement inspired us to aim for perfection.
Additionally, both faculties played a heroic role throughout this learning process. Thanks
are not the sentence that fills their level of involvement.
Finally, I would like to thank HOD of BCA Department, Prof. C. P. Patel and everyone whodirectly or indirectly helped me in the project.
Student Name: Patel Sanket Haribhai
Student Name: Nakrani Mayur Nanjibhai
8/12/2019 Project Report on ERP Modules for Construction Industry
4/289
T ABLE O F C ONTENETS
1. About System
1.1 Purpose
1.2 Scope
2. Organization Overview & Organization Chart
2.1 Organization Overview
2.2 Organization Location
2.3 Organization Chart
3. Hardware Software Configuration
4. Features of tools used
5. Detail Description of System
5.1 Existing System
5.2 Proposed System
6. System Documentation
6.1 Feasibility Study
6.2 System Flow Diagram
6.3 E/R Diagram with Relationship
6.4 Context Diagram
6.5 Dataflow Diagram
6.6 Data Dictionary
6.7 Screen Layout with Description
6.8 Report Generated from System
8/12/2019 Project Report on ERP Modules for Construction Industry
5/289
7. Testing -Test Data, Excepted Result, Actual Result
8. Scope and Limitation
9. Future Expansion
10. Reference & Bibliography
8/12/2019 Project Report on ERP Modules for Construction Industry
6/289
8/12/2019 Project Report on ERP Modules for Construction Industry
7/289
8/12/2019 Project Report on ERP Modules for Construction Industry
8/289
8/12/2019 Project Report on ERP Modules for Construction Industry
9/289
The company and its reputation will contin ue to be built on the foundation of
professional and dependable service.
They follow a rigorous project life cycle for every customer to ensure that no
aspect of their business process is left unanalyzed.
By offering a seamless integration of marketing, communication, visual design
and technology, Image Software Consultancy provides practical, viable strategies to
reach customers and improve business. With a dedicated team of experts working with
market-leading technologies, Image Software Consultancy provides accelerated time to
return and greatly reduced project costs. And they're not focused on "giving advice" but
on creating solutions that sell.
At Image Software Consultancy they offer a wide range of services including:
Website Development
E-mail Marketing (E-Marketing)
Website Maintenance (AMC)
Customized Software Development
Ready Products for Manufacturer and Traders
Corporate Multi Media Presentation on CD
Flash Introduction & Custom Animation
3D Modeling & Architecture
2.2 Organization Location
Image Software Consultancy,
104, Chanakya Complex,
Karelibaug,
Vadodra, Gujarat-India
8/12/2019 Project Report on ERP Modules for Construction Industry
10/289
2.3 Organization Chart
Vadodara H.O Nimesh Dhulla(Proprietor)
Canada BranchAbhinav Patel(Mktg
Manager)
Canada BranchKrunal
Patel(Programmer)
Vadodara BranchPranali Gurjar(Team
Leader)
Vadodara BranchRaxit Patel(Programmer)
8/12/2019 Project Report on ERP Modules for Construction Industry
11/289
3. H ARDWARE & SOFTWARE C ONFIGURATION
Hardware / Software Configuration& Tools Used in Development
SERVER SIDE CONFIGURATION
HARDWARE Processor Pentium-IV 1.7GHZ or Faster
1 GB Ram
Hard disk 80 GB or More
SOFTWARE Windows 98/2000/2003/XP
Ms Sql Server
CLIENT SIDE CONFIGURATION
HARDWARE Processor Pentium-IV 1.7 GHz or Faster
512 MB Memory or More
Minimum Requirement of 80 GB Hard disk
SOFTWARE Windows 98/2000/2003/XP/7/8
Internet Explorer / Mozilla / Chrome/Opera
TOOLS USED FOR DEVELOPMENT:
Front End : Visual Studio 2010, ASP .Net, C#
Back end : SQL Server 2008
Other Tools : MS Office, MS Visio, Adobe Photoshop
8/12/2019 Project Report on ERP Modules for Construction Industry
12/289
4. F EATURES O F T OOLS USED
Microsoft SQL Server - 2008 [Back-End]:
Microsoft SQL Server is a relational database management system developed byMicrosoft. As a database, it is a software product whose primary function is to storeand retrieve data as requested by other software applications, be it those on the samecomputer or those running on another computer across a network (including theInternet).
There are at least a dozen different editions of Microsoft SQL Server aimed atdifferent audiences and for different workloads (ranging from small applications thatstore and retrieve data on the same computer, to millions of users and computers that
access huge amounts of data from the Internet at the same time). SQL Server support for structured and semi-structured data, including digital media
formats for pictures, audio, video and other multimedia data. It can be a data storage backend for different varieties of data: email, time/calendar, file, document, spatial,etc. as well as perform search, query, analysis, sharing, and synchronization across alldata types.
Microsoft Visual Studio 2010 (Asp.Net, C# Language) [Front-End]:
Visual Studio is a comprehensive collection of tools and services for developingapplications that target the desktop, the web, devices, and the cloud. For teamsworking across multiple platforms, Visual Studio provides a flexible collaborationenvironment for that welcomes connection with other development tools, such asEclipse and Xcode.
Microsoft Visual Studio 2010 is an integrated development environment (IDE) fromMicrosoft that simplifies the basic tasks of creating, debugging and deployingapplications. Visual Studio 2010 Professional unleashes your imagination and easilydelivers your ideas.
Microsoft Visual C#, Microsofts implementation of the C# language, targets the.NET Framework, along with the language services that lets the Visual Studio IDEsupport C# projects. While the language services are a part of Visual Studio, thecompiler is available separately as a part of the .NET Framework.
MS-Visio:
Visio began as a standalone product produced by Shape-Ware Corporation; version1.0 shipped in 1992. A pre-release, Version 0.92, was distributed free on a floppy disk
along with a Microsoft Windows systems readiness evaluation utility. In 1995, Shape-Ware Corporation changed their name to Visio Corporation to take advantage of
8/12/2019 Project Report on ERP Modules for Construction Industry
13/289
market recognition and related product equity. Microsoft acquired Visio in 2000, re-
branding it as a Microsoft Office application, like Microsoft Project; however, it has
never been included in any of the Office suites. Microsoft included a Visio for
Enterprise Architects edition with some editions of Visual Studio .NET
2003 and Visual Studio 2005.
Along with Microsoft Visio 2002 Professional, Microsoft introduced Visio Enterprise Network Tools and Visio Network Centre. Visio Enterprise Network Tools was an
add-on product that enabled automated network and directory services diagramming.
Visio Network Centre was a subscription-based website where users could locate the
latest network documentation content and exact-replica network equipment shapes
from 500 leading manufacturers.
MS-Office:
Microsoft Office 2007 (officially called 2007 Microsoft Office System), alsocalled MS Office 2007, is a Windows version of the Microsoft Office
System, Microsoft's productivity suite. Known as Office 12 in the early stages of its
beta development, it was released to volume license customers on November 30,
2006 and made available to retail customers on January 30, 2007. These are,
respectively, the same dates Windows Vista was released to volume licensing and
retail customers. Office 2007 contains a number of new features, the most notable of
which is the entirely new graphical user interface called the Fluent User Interface
initially referred to as the Ribbon User Interface, replacing the menus and toolbars
which have been the cornerstone of Office since its inception with a tabbed toolbar,
known as the Ribbon. Office 2007 requires Windows XP with Service Pack 2 or
higher, Windows Server 2003 with Service Pack 1 or higher, Windows Vista or
Windows 7.Office 2007 is the last version of Microsoft Office which is officially
supported on Windows XP Professional x64 Edition and the first version to officially
work on Windows 8.
8/12/2019 Project Report on ERP Modules for Construction Industry
14/289
5. DETAILED DESCRIPTION O F SYSTEM
5.1 Existing System:There doesnt exist any computerized system. Accounts and other books are kept
manually. Records are manually entered in each and every book therefore large amount of
time is spent maintaining the books.
Every project is managed by physically visiting the sites and contacting the
respective project managers. Inventories at every project are maintained by bookkeepers
manually. Units sold and status of units can be determined by contacting the projectmanager. For any information regarding the project or units of project, project manager is
contacted. Booking of unit is made from the respective project office only
As every task in existing system is done manually, large amount of time is
consumed to complete simple tasks. Therefore to overcome this drawback of existing
system, proposed system is equipped with such features that reduces time consumed for
simple tasks and helps in completing the projects as fast as possible.
5.2 Proposed System:
5.2.1Modules
Administration:
Add New Projects Register New Managers
Define Role of Managers Add new project sites Defining Budget of Projects Adding Employees / Business Associates
Sales:
Site Booking Facility Payments Received Payments Due
Maintain Enquiry &perform continuous Follow up Payment Reminders
8/12/2019 Project Report on ERP Modules for Construction Industry
15/289
Maintain details of owners of different units
Production& Purchase:
Raw Material Purchased &Raw Materials Issued
Complete purchase history and delivery schedules Construction Status of units Material Purchase Reminders Keeping track of Inventories available on all sites Maintaining Purchase book on the basis of Goods Received Note
Project:
Payment and Expense management of Project Scan and add the scanned papers& documents of Projects
Add details of the Project such as : Project Name, Location, No. of Plots,Area of Individual plots
Define installment structure of Project Define rates of a unit at different levels Define Cancellation and transfer fees Maintaining books at Project level
Accounts:
Manage overall books and accounts of the firm
Integrate and audit books of all projects Maintain Payroll book Generate different reports and ledgers
5.2.2Actors in the System:
Admin (Administration Module) Sales Manager (Sales and Marketing Module) Production Manager (Production & Purchase Module) Project Manager (Project Module)
Accountant (Accounts)
5.2.3 Advantages of the System:
Tracking Use of Materials of all sites Payment reminders reminding payment that are due on particular date Purchase reminder to avoid shortage of resources Optimum Utilization of resources by tracking use of resources at particular site Getting booking status of any site System can be used from Office, Site Location, or Company Headquarters Maintaining Authority and Control by providing priorities to Actors Site View and Company View Accounting Integrated in Single System
8/12/2019 Project Report on ERP Modules for Construction Industry
16/289
Viewing Site Plan Site Status and Progress Tracking Dynamic E-Mail and SMS service to inform customers about Payment and status of
their site Tracking Human Resources Facility to add and update the details of the clients Facility to add the payment schedule (dates) of the client. Facility to Book / Sale Plots , Flats, Offices, Shop from any connected office Setting up of installment structure for a project Maintains history of customer enquiries with complete details and its subsequent
follow-ups Get complete purchase history, item and delivery schedules Add the details of the Construction Project : Project Name, Location, No. of Flats,
No. of Shops / Offices, Area of Individual Flats, Shops, Offices, to add the ratesFloor Wise, Shop wise / Office wise, to add Amenities
Inter-Project Material Transfer Facility Define Transfer fee and also, cancellation charges between dates Report Generation including invoice Account Books like day cash, bank transactions etc. Facility to Export reports in different formats (xlsx, pdf, docx etc.)
8/12/2019 Project Report on ERP Modules for Construction Industry
17/289
6. S YSTEM DOCUMENTATION
6.1 Feasibility Study
A feasibility study is undertaken to determine the possibility or probability
of either improving the existing system or developing a completely new system. Once
the entire research has been done with scope of project being defined one should ask
him Can we build the software to meet the scope? Is the project feasible? There is a
famous quote from Putnam and Myers Not everything imaginable is feasible, not
even in software, evanescent as it may appear to outsiders. Before developing ant
system, whether be a mechanical or electrical or Computer system, its facility must be
study properly.
The objective of feasibility Study is to test technical, economic and social
feasibility of a system to be developed. This is done by investigating the existing
system in the area under investigation and generating ideas about new system. The
purpose system must be evaluated from a technical viewpoint first and if compatible,
social and technical system be devised, then they must be tested for economic
feasibility.
It helps to obtain overview of the problem and to get rough assessment of
whether feasible solution exists. This is essential to avoid committing large resources
to a project and then repent on it later.
There are three aspects in Feasibility Study portion of the preliminary investigation.
Technical Feasibility
Economic Feasibility
Operational Feasibility
8/12/2019 Project Report on ERP Modules for Construction Industry
18/289
Technical Feasibility
Project is required to be implemented using PHP and MS-SQL Server 2005.
Image Software Consultancy is equipped with technologies required. Also the proposed
system does not need any sophisticated technologies. The platform used area readily
available. The new system proposed uses least of the system resources. The proposed
system can be expanded in future, by adding new modules.
i.e.
The minimum required technology exists or can be acquired to do what
is suggested.
The proposed System has a technical capacity to hold data required till
use in the new system.
There are technical guarantees of accuracy, reliability, ease of access
and data security.
Operational Feasibility
Website would be easy to operate for the members and admin of the organization
who are going to use this website, so that they can make the best use of the website.
End users of the system are Administrators, extra care is taken but the developers to
provide very good and easy to understand user interfaces and a proper user manual, So
that least operational problems would be encountered. Performance of Sales and
Purchase Dept. of RPPL will shoot up sharply after implementation of this system.
Hence; this in turn makes this software product operationally feasible.
i.e.
There is a sufficient support for the project from the management andusers.
Accessibility of information will not be lost.
Individual performance will be better after implementation than before.
Economic Feasibility
This feasibility is important in development of the software for any organization.
Since, all Software support and hardware platform required in this project are alreadyavailable at Image Software Consultancy, no extra cost have to be involved for
8/12/2019 Project Report on ERP Modules for Construction Industry
19/289
developing and implementing this software product. Thus, this software is financially
feasible.
The cost to conduct the full system investigation.
The cost of hardware and software for the class of application being
considered.
The benefits in the form of reduce cost or fewer costly errors.
The cost of nothing changes(i.e. the proposed system is not developed)
6.2 System Flow Diagram
8/12/2019 Project Report on ERP Modules for Construction Industry
20/289
6.3 E/R Diagram with Relationship
8/12/2019 Project Report on ERP Modules for Construction Industry
21/289
8/12/2019 Project Report on ERP Modules for Construction Industry
22/289
6.5 Dataflow Diagram
8/12/2019 Project Report on ERP Modules for Construction Industry
23/289
6.6 Data Dictionary
Table 1: Account_Books
FIELD NAME DATA TYPE CONSTRAINT DESCRIPTIONBook_ID int Primary KeyBook_Name varchar(50) Not Null, Unique
Table 2: Account_Types
FIELD NAME DATA TYPE CONSTRAINT DESCRIPTIONAccount_Type_ID int Primary KeyType_Name varchar(50) Not Null, UniqueBook_ID int Foreign Key For Relating With
Account_Books
Table 3: Accounts
FIELD NAME DATA TYPE CONSTRAINT DESCRIPTIONAccount_ID int Primary KeyAccount_Name varchar(50) Not Null, Unique
Account_Type int Foreign Key For Relating WithAccount_Types
Table 4: Banks
FIELD NAME DATA TYPE CONSTRAINT DESCRIPTIONBank_ID int Primary KeyBank_Name varchar(50) Not Null, Unique
Table 5: Booking
FIELD NAME DATA TYPE CONSTRAINT DESCRIPTIONBooking_ID int Primary KeyCustomer_ID int Foreign Key For Relating
CustomerUnit_ID int Foreign Key For Relating Unit
booked
Amount moneyBooking_Date date Not Null To Specify Date of
8/12/2019 Project Report on ERP Modules for Construction Industry
24/289
BookingStructure_ID int Foreign Key For Relating With
Installment_Structure
Table 6: Cities
FIELD NAME DATA TYPE CONSTRAINT DESCRIPTIONCity_ID int Primary KeyCity_Name varchar(50) Not Null, UniqueState_ID int Foreign Key For Relating with
States Table
Table 7: CountriesFIELD NAME DATA TYPE CONSTRAINT DESCRIPTIONCountry_ID int Primary KeyCountry_Name varchar(50) Not Null, Unique
Table 8 : Customers
FIELD NAME DATA TYPE CONSTRAINT DESCRIPTIONCustomer_ID int Primary KeyFirst_Name varchar(50) Not NullLast_Name varchar(50)Gender char(1)Mobile_No varchar(55) Not NullStreet varchar(500)City int Foreign KeyState int Foreign KeyCountry int Foreign Key
Post_Code varchar(50)Fax_ID varchar(50)EMail_ID varchar(50) Not NullDOB date
Table 9: Departments
FIELD NAME DATA TYPE CONSTRAINT DESCRIPTIONDepartment_Id int Primary KeyDepartment_Name varchar(50) Not Null, Unique
8/12/2019 Project Report on ERP Modules for Construction Industry
25/289
Table 10: Designation
FIELD NAME DATA TYPE CONSTRAINT DESCRIPTIONDesignation_ID int Primary KeyDesignation_Name varchar(50) Unique, Not NullIs_User varchar(3) Not Null y or n
Table 11: Employees
FIELD NAME DATA TYPE CONSTRAINT DESCRIPTIONEmployee_ID int Primary KeyFirst_Name varchar(50) Not NullLast_Name varchar(50)DOB dateGender char(1)Department_ID int Foreign KeyProject_ID int Foreign KeyMobile_No varchar(55)Street varchar(500)City int Foreign KeyState int Foreign KeyCountry int Foreign KeyPost_Code varchar(50)Designation_ID int Foreign KeyEMail_ID varchar(50)
Table 12: Enquiries
FIELD NAME DATA TYPE CONSTRAINT DESCRIPTION
Enquiries_ID int Primary KeyFirst_Name varchar(50) Not NullLast_Name varchar(50)E_Mail varchar(50) Not NullMobile_No varchar(50) Not NullUnit_ID int Foreign KeyCity_ID int Foreign KeyStreet varchar(500)Post_Code varchar(50)
8/12/2019 Project Report on ERP Modules for Construction Industry
26/289
Table 13: Installment_Structure
FIELD NAME DATA TYPE CONSTRAINT DESCRIPTIONInstallment_Structure_ID int Primary Key
Instalments int Not NullInstallment_Gaps varchar(50)
Table 14: Issue
FIELD NAME DATA TYPE CONSTRAINT DESCRIPTIONIssue_ID int Primary KeyProject_ID int Foreign Key For Relating with
Projects TableIssue_Date date Not NullIssue_Note_No varchar(50) Unique, Not Null
Table 15: Issue_Details
FIELD NAME DATA TYPE CONSTRAINT DESCRIPTIONDetail_ID int Primary KeyIssue_ID int Foreign Key For Relating with
Issue TableItem_ID int Foreign Key For Relating withItems Table
Quantity real Not Null
Table 16: Items
FIELD NAME DATA TYPE CONSTRAINT DESCRIPTIONItem_Code int Primary KeyItem_Name varchar(50) Not Null, UniqueUnit varchar(50) Not NullImage varchar(50)
Table 17: Journal
FIELD NAME DATA TYPE CONSTRAINT DESCRIPTIONTransaction_ID int Primary Key
Transaction_Date date Not NullDr_Account int Foreign Key For Relating with
8/12/2019 Project Report on ERP Modules for Construction Industry
27/289
Accounts Tablefor DR Account
Cr_Account int Foreign Key For Relating withAccounts TableFor CR Account
Amount money Not NullNarration varchar(500)Project_ID int Foreign Key For Relating with
Projects Table
Table 18: Min_Stock
FIELD NAME DATA TYPE CONSTRAINT DESCRIPTION
Min_Stock_ID int Primary KeyProject_ID int Foreign Key For Relating with
Projects TableItem_ID int Foreign Key For Relating with
Items TableQuantity int Not Null
Table 19: Payment_Modes
FIELD NAME DATA TYPE CONSTRAINT DESCRIPTIONPayment_Mode_ID int Primary KeyMode_Name varchar(50) Unique ,Not Null
Table 20: Project_Documents
FIELD NAME DATA TYPE CONSTRAINT DESCRIPTIONDocument_ID int Primary Key
Document_Path varchar(500) Not NullDocument_Name varchar(50) Not NullProject_ID int Foreign Key For Relating with
Projects Table
Table 21: Project_Images
FIELD NAME DATA TYPE CONSTRAINT DESCRIPTIONProject_Image_ID int Primary KeyImage_Path varchar(500) Not Null
8/12/2019 Project Report on ERP Modules for Construction Industry
28/289
Project_ID int Foreign Key For Relating withProjects Table
Table 22: Project_TypesFIELD NAME DATA TYPE CONSTRAINT DESCRIPTIONType_ID int Primary KeyType_Name varchar(50) Unique,Not Null
Table 23: Projects
FIELD NAME DATA TYPE CONSTRAINT DESCRIPTIONProject_ID int Primary KeyProject_Name varchar(150) Not NullType_ID int Foreign Key For Relating with
Projects_TypesTable
Project_Street_Address varchar(500)City_ID int Foreign Key For Relating with
Cities TableState_ID int Foreign Key For Relating with
States Table
Country_ID int Foreign Key For Relating withCountries Table
Project_Post_Code varchar(50)Contact_No varchar(55)Email_ID varchar(50)Logo varchar(500)Bank_ID int Foreign Key For Relating with
Banks Table
Table 24: Purchase
FIELD NAME DATA TYPE CONSTRAINT DESCRIPTIONPurchase_ID int Primary KeyProject_ID int Foreign Key For Relating with
Projects TableSupplier_ID int Foreign Key For Relating with
Suppliers TablePurchase_Date date Not Null
Invoice_No varchar(50) UniquePayment varchar(10) Not Null Cash / Credit
8/12/2019 Project Report on ERP Modules for Construction Industry
29/289
Table 25: Purchase_Details
FIELD NAME DATA TYPE CONSTRAINT DESCRIPTIONDetail_ID int Primary Key
Purchase_ID int Foreign KeyItem_ID int Foreign KeyQuantity real Not NullRate real Not Null
Table 26: Stages
FIELD NAME DATA TYPE CONSTRAINT DESCRIPTIONStage_ID int Primary KeyStage_Name varchar(50) Not Null ,UniqueStage_Discription varchar(500)Min_Completion_Days intImage varchar(50)
Table 27: States
FIELD NAME DATA TYPE CONSTRAINT DESCRIPTION
State_ID int Primary KeyState_Name varchar(50) Not Null ,UniqueCountry_ID int Foreign Key
Table 28: Suppliers
FIELD NAME DATA TYPE CONSTRAINT DESCRIPTIONSupplier_ID int Primary KeyFirst_Name varchar(50) Not NullLast_Name varchar(50)Gender char(1)Mobile_No varchar(55) Not NullStreet varchar(500)City intState intCountry intPost_Code varchar(50)Fax_ID varchar(50)EMail_ID varchar(50)Company_Name varchar(50) Not Null
8/12/2019 Project Report on ERP Modules for Construction Industry
30/289
Tin_No varchar(50) Not Null
Table 29: Unit_Images
FIELD NAME DATA TYPE CONSTRAINT DESCRIPTIONImage_ID int Primary KeyImage_Path varchar(500) Not NullUnit_ID int Foreign Key For Relating with
Unitss Table
Table 30: Unit_Stages
FIELD NAME DATA TYPE CONSTRAINT DESCRIPTIONUnit_Stage_ID int Primary KeyStage_ID int Foreign Key For Relating with
Stages TableUnit_ID int Foreign Key For Relating with
Units TableCompletion_Days intComplete_Date dateOrder_No intStart_Date date
Table 31: Units
FIELD NAME DATA TYPE CONSTRAINT DESCRIPTIONUnit_ID int Primary KeyUnit_Name varchar(50) Not NullProject_ID int Foreign Key For Relating with
Projects Table
Min_Amt moneyMax_Amt moneyDetails varchar(500)Image varchar(500)
Table 32: Users
FIELD NAME DATA TYPE CONSTRAINT DESCRIPTIONUser_ID int Primary KeyUser_Name varchar(50) Unique,Not Null
8/12/2019 Project Report on ERP Modules for Construction Industry
31/289
Password varchar(50) Not NullEmployee_ID int Foreign Key For Relating with
Employees TableImage_URL varchar(500)
8/12/2019 Project Report on ERP Modules for Construction Industry
32/289
6.7 Screen Layout with Description
Login(Default):
8/12/2019 Project Report on ERP Modules for Construction Industry
33/289
8/12/2019 Project Report on ERP Modules for Construction Industry
34/289
Admin_Dashboard:
Admin Homepage or Dashboard provides information about number of systemusers and number of projects along with over all cash in hand of company.
Cash flow graph helps in graphically show flow of cash in the company.
8/12/2019 Project Report on ERP Modules for Construction Industry
35/289
Sales_Manager_Dashboard:
8/12/2019 Project Report on ERP Modules for Construction Industry
36/289
Project_Manager_Dashboard:
8/12/2019 Project Report on ERP Modules for Construction Industry
37/289
Accounts_Manager_Dashboard:
8/12/2019 Project Report on ERP Modules for Construction Industry
38/289
Production_Manager_Dashboard:
8/12/2019 Project Report on ERP Modules for Construction Industry
39/289
Add_Account:
8/12/2019 Project Report on ERP Modules for Construction Industry
40/289
Accounts Form that Shows tabs to add Account and Account Type.
8/12/2019 Project Report on ERP Modules for Construction Industry
41/289
Accounts Form showing Tab to add Accounting Book
8/12/2019 Project Report on ERP Modules for Construction Industry
42/289
Account Form Showing Validation Messages shown on Null Values for the
Fields where data is mandatory
8/12/2019 Project Report on ERP Modules for Construction Industry
43/289
8/12/2019 Project Report on ERP Modules for Construction Industry
44/289
8/12/2019 Project Report on ERP Modules for Construction Industry
45/289
8/12/2019 Project Report on ERP Modules for Construction Industry
46/289
8/12/2019 Project Report on ERP Modules for Construction Industry
47/289
Banks:
8/12/2019 Project Report on ERP Modules for Construction Industry
48/289
8/12/2019 Project Report on ERP Modules for Construction Industry
49/289
8/12/2019 Project Report on ERP Modules for Construction Industry
50/289
8/12/2019 Project Report on ERP Modules for Construction Industry
51/289
8/12/2019 Project Report on ERP Modules for Construction Industry
52/289
8/12/2019 Project Report on ERP Modules for Construction Industry
53/289
8/12/2019 Project Report on ERP Modules for Construction Industry
54/289
8/12/2019 Project Report on ERP Modules for Construction Industry
55/289
8/12/2019 Project Report on ERP Modules for Construction Industry
56/289
8/12/2019 Project Report on ERP Modules for Construction Industry
57/289
Booking Form:
8/12/2019 Project Report on ERP Modules for Construction Industry
58/289
8/12/2019 Project Report on ERP Modules for Construction Industry
59/289
8/12/2019 Project Report on ERP Modules for Construction Industry
60/289
Construction_Stages_Registeration :
8/12/2019 Project Report on ERP Modules for Construction Industry
61/289
8/12/2019 Project Report on ERP Modules for Construction Industry
62/289
8/12/2019 Project Report on ERP Modules for Construction Industry
63/289
8/12/2019 Project Report on ERP Modules for Construction Industry
64/289
8/12/2019 Project Report on ERP Modules for Construction Industry
65/289
8/12/2019 Project Report on ERP Modules for Construction Industry
66/289
8/12/2019 Project Report on ERP Modules for Construction Industry
67/289
Customer_Registeration:
8/12/2019 Project Report on ERP Modules for Construction Industry
68/289
8/12/2019 Project Report on ERP Modules for Construction Industry
69/289
8/12/2019 Project Report on ERP Modules for Construction Industry
70/289
8/12/2019 Project Report on ERP Modules for Construction Industry
71/289
8/12/2019 Project Report on ERP Modules for Construction Industry
72/289
8/12/2019 Project Report on ERP Modules for Construction Industry
73/289
Enquiry_Registeration:
8/12/2019 Project Report on ERP Modules for Construction Industry
74/289
8/12/2019 Project Report on ERP Modules for Construction Industry
75/289
8/12/2019 Project Report on ERP Modules for Construction Industry
76/289
Installment_Structure:
8/12/2019 Project Report on ERP Modules for Construction Industry
77/289
8/12/2019 Project Report on ERP Modules for Construction Industry
78/289
8/12/2019 Project Report on ERP Modules for Construction Industry
79/289
8/12/2019 Project Report on ERP Modules for Construction Industry
80/289
8/12/2019 Project Report on ERP Modules for Construction Industry
81/289
Material_Issue:
8/12/2019 Project Report on ERP Modules for Construction Industry
82/289
8/12/2019 Project Report on ERP Modules for Construction Industry
83/289
8/12/2019 Project Report on ERP Modules for Construction Industry
84/289
8/12/2019 Project Report on ERP Modules for Construction Industry
85/289
8/12/2019 Project Report on ERP Modules for Construction Industry
86/289
Items:
8/12/2019 Project Report on ERP Modules for Construction Industry
87/289
8/12/2019 Project Report on ERP Modules for Construction Industry
88/289
8/12/2019 Project Report on ERP Modules for Construction Industry
89/289
8/12/2019 Project Report on ERP Modules for Construction Industry
90/289
8/12/2019 Project Report on ERP Modules for Construction Industry
91/289
8/12/2019 Project Report on ERP Modules for Construction Industry
92/289
8/12/2019 Project Report on ERP Modules for Construction Industry
93/289
8/12/2019 Project Report on ERP Modules for Construction Industry
94/289
8/12/2019 Project Report on ERP Modules for Construction Industry
95/289
8/12/2019 Project Report on ERP Modules for Construction Industry
96/289
Minimum_Stock:
8/12/2019 Project Report on ERP Modules for Construction Industry
97/289
8/12/2019 Project Report on ERP Modules for Construction Industry
98/289
8/12/2019 Project Report on ERP Modules for Construction Industry
99/289
Miscellenous Forms:
8/12/2019 Project Report on ERP Modules for Construction Industry
100/289
8/12/2019 Project Report on ERP Modules for Construction Industry
101/289
8/12/2019 Project Report on ERP Modules for Construction Industry
102/289
8/12/2019 Project Report on ERP Modules for Construction Industry
103/289
8/12/2019 Project Report on ERP Modules for Construction Industry
104/289
8/12/2019 Project Report on ERP Modules for Construction Industry
105/289
8/12/2019 Project Report on ERP Modules for Construction Industry
106/289
8/12/2019 Project Report on ERP Modules for Construction Industry
107/289
8/12/2019 Project Report on ERP Modules for Construction Industry
108/289
8/12/2019 Project Report on ERP Modules for Construction Industry
109/289
8/12/2019 Project Report on ERP Modules for Construction Industry
110/289
8/12/2019 Project Report on ERP Modules for Construction Industry
111/289
8/12/2019 Project Report on ERP Modules for Construction Industry
112/289
8/12/2019 Project Report on ERP Modules for Construction Industry
113/289
8/12/2019 Project Report on ERP Modules for Construction Industry
114/289
8/12/2019 Project Report on ERP Modules for Construction Industry
115/289
8/12/2019 Project Report on ERP Modules for Construction Industry
116/289
8/12/2019 Project Report on ERP Modules for Construction Industry
117/289
Project_Registeration:
8/12/2019 Project Report on ERP Modules for Construction Industry
118/289
8/12/2019 Project Report on ERP Modules for Construction Industry
119/289
8/12/2019 Project Report on ERP Modules for Construction Industry
120/289
Purchase:
8/12/2019 Project Report on ERP Modules for Construction Industry
121/289
8/12/2019 Project Report on ERP Modules for Construction Industry
122/289
8/12/2019 Project Report on ERP Modules for Construction Industry
123/289
8/12/2019 Project Report on ERP Modules for Construction Industry
124/289
Supplier_Registeration:
8/12/2019 Project Report on ERP Modules for Construction Industry
125/289
8/12/2019 Project Report on ERP Modules for Construction Industry
126/289
8/12/2019 Project Report on ERP Modules for Construction Industry
127/289
Units_Registeration:
8/12/2019 Project Report on ERP Modules for Construction Industry
128/289
8/12/2019 Project Report on ERP Modules for Construction Industry
129/289
8/12/2019 Project Report on ERP Modules for Construction Industry
130/289
Booking_Edit:
8/12/2019 Project Report on ERP Modules for Construction Industry
131/289
8/12/2019 Project Report on ERP Modules for Construction Industry
132/289
8/12/2019 Project Report on ERP Modules for Construction Industry
133/289
8/12/2019 Project Report on ERP Modules for Construction Industry
134/289
8/12/2019 Project Report on ERP Modules for Construction Industry
135/289
8/12/2019 Project Report on ERP Modules for Construction Industry
136/289
8/12/2019 Project Report on ERP Modules for Construction Industry
137/289
Cusatomers_Edit:
8/12/2019 Project Report on ERP Modules for Construction Industry
138/289
8/12/2019 Project Report on ERP Modules for Construction Industry
139/289
8/12/2019 Project Report on ERP Modules for Construction Industry
140/289
8/12/2019 Project Report on ERP Modules for Construction Industry
141/289
8/12/2019 Project Report on ERP Modules for Construction Industry
142/289
8/12/2019 Project Report on ERP Modules for Construction Industry
143/289
Employee_Edit:
8/12/2019 Project Report on ERP Modules for Construction Industry
144/289
8/12/2019 Project Report on ERP Modules for Construction Industry
145/289
8/12/2019 Project Report on ERP Modules for Construction Industry
146/289
8/12/2019 Project Report on ERP Modules for Construction Industry
147/289
8/12/2019 Project Report on ERP Modules for Construction Industry
148/289
8/12/2019 Project Report on ERP Modules for Construction Industry
149/289
Enquiries_Edit:
8/12/2019 Project Report on ERP Modules for Construction Industry
150/289
8/12/2019 Project Report on ERP Modules for Construction Industry
151/289
8/12/2019 Project Report on ERP Modules for Construction Industry
152/289
8/12/2019 Project Report on ERP Modules for Construction Industry
153/289
8/12/2019 Project Report on ERP Modules for Construction Industry
154/289
8/12/2019 Project Report on ERP Modules for Construction Industry
155/289
8/12/2019 Project Report on ERP Modules for Construction Industry
156/289
Issue_Edit:
8/12/2019 Project Report on ERP Modules for Construction Industry
157/289
8/12/2019 Project Report on ERP Modules for Construction Industry
158/289
8/12/2019 Project Report on ERP Modules for Construction Industry
159/289
8/12/2019 Project Report on ERP Modules for Construction Industry
160/289
8/12/2019 Project Report on ERP Modules for Construction Industry
161/289
8/12/2019 Project Report on ERP Modules for Construction Industry
162/289
8/12/2019 Project Report on ERP Modules for Construction Industry
163/289
Project_Edit:
8/12/2019 Project Report on ERP Modules for Construction Industry
164/289
8/12/2019 Project Report on ERP Modules for Construction Industry
165/289
8/12/2019 Project Report on ERP Modules for Construction Industry
166/289
8/12/2019 Project Report on ERP Modules for Construction Industry
167/289
8/12/2019 Project Report on ERP Modules for Construction Industry
168/289
Purchase_Edit:
8/12/2019 Project Report on ERP Modules for Construction Industry
169/289
8/12/2019 Project Report on ERP Modules for Construction Industry
170/289
8/12/2019 Project Report on ERP Modules for Construction Industry
171/289
8/12/2019 Project Report on ERP Modules for Construction Industry
172/289
8/12/2019 Project Report on ERP Modules for Construction Industry
173/289
Suppliers_Edit:
8/12/2019 Project Report on ERP Modules for Construction Industry
174/289
8/12/2019 Project Report on ERP Modules for Construction Industry
175/289
8/12/2019 Project Report on ERP Modules for Construction Industry
176/289
8/12/2019 Project Report on ERP Modules for Construction Industry
177/289
8/12/2019 Project Report on ERP Modules for Construction Industry
178/289
8/12/2019 Project Report on ERP Modules for Construction Industry
179/289
User_Generation:
8/12/2019 Project Report on ERP Modules for Construction Industry
180/289
8/12/2019 Project Report on ERP Modules for Construction Industry
181/289
8/12/2019 Project Report on ERP Modules for Construction Industry
182/289
8/12/2019 Project Report on ERP Modules for Construction Industry
183/289
8/12/2019 Project Report on ERP Modules for Construction Industry
184/289
8/12/2019 Project Report on ERP Modules for Construction Industry
185/289
Balance_Sheet:
8/12/2019 Project Report on ERP Modules for Construction Industry
186/289
8/12/2019 Project Report on ERP Modules for Construction Industry
187/289
Trading Account:
8/12/2019 Project Report on ERP Modules for Construction Industry
188/289
Trial Balance Sheet:
8/12/2019 Project Report on ERP Modules for Construction Industry
189/289
8/12/2019 Project Report on ERP Modules for Construction Industry
190/289
Ledger:
8/12/2019 Project Report on ERP Modules for Construction Industry
191/289
8/12/2019 Project Report on ERP Modules for Construction Industry
192/289
8/12/2019 Project Report on ERP Modules for Construction Industry
193/289
8/12/2019 Project Report on ERP Modules for Construction Industry
194/289
8/12/2019 Project Report on ERP Modules for Construction Industry
195/289
8/12/2019 Project Report on ERP Modules for Construction Industry
196/289
Projects:
8/12/2019 Project Report on ERP Modules for Construction Industry
197/289
Project_Profile:
8/12/2019 Project Report on ERP Modules for Construction Industry
198/289
8/12/2019 Project Report on ERP Modules for Construction Industry
199/289
Project_Gallery:
8/12/2019 Project Report on ERP Modules for Construction Industry
200/289
8/12/2019 Project Report on ERP Modules for Construction Industry
201/289
8/12/2019 Project Report on ERP Modules for Construction Industry
202/289
8/12/2019 Project Report on ERP Modules for Construction Industry
203/289
8/12/2019 Project Report on ERP Modules for Construction Industry
204/289
Project_Documents:
8/12/2019 Project Report on ERP Modules for Construction Industry
205/289
8/12/2019 Project Report on ERP Modules for Construction Industry
206/289
8/12/2019 Project Report on ERP Modules for Construction Industry
207/289
8/12/2019 Project Report on ERP Modules for Construction Industry
208/289
Project_Material_Stock:
8/12/2019 Project Report on ERP Modules for Construction Industry
209/289
Project_Material_Flow:
8/12/2019 Project Report on ERP Modules for Construction Industry
210/289
Project_Units:
8/12/2019 Project Report on ERP Modules for Construction Industry
211/289
Unit Profile:
8/12/2019 Project Report on ERP Modules for Construction Industry
212/289
8/12/2019 Project Report on ERP Modules for Construction Industry
213/289
8/12/2019 Project Report on ERP Modules for Construction Industry
214/289
8/12/2019 Project Report on ERP Modules for Construction Industry
215/289
8/12/2019 Project Report on ERP Modules for Construction Industry
216/289
8/12/2019 Project Report on ERP Modules for Construction Industry
217/289
Unit_Status:
8/12/2019 Project Report on ERP Modules for Construction Industry
218/289
8/12/2019 Project Report on ERP Modules for Construction Industry
219/289
8/12/2019 Project Report on ERP Modules for Construction Industry
220/289
Unit_Status_Update:
8/12/2019 Project Report on ERP Modules for Construction Industry
221/289
8/12/2019 Project Report on ERP Modules for Construction Industry
222/289
8/12/2019 Project Report on ERP Modules for Construction Industry
223/289
8/12/2019 Project Report on ERP Modules for Construction Industry
224/289
8/12/2019 Project Report on ERP Modules for Construction Industry
225/289
User_Profile:
8/12/2019 Project Report on ERP Modules for Construction Industry
226/289
8/12/2019 Project Report on ERP Modules for Construction Industry
227/289
8/12/2019 Project Report on ERP Modules for Construction Industry
228/289
8/12/2019 Project Report on ERP Modules for Construction Industry
229/289
Units Search:
8/12/2019 Project Report on ERP Modules for Construction Industry
230/289
Google_Map:
8/12/2019 Project Report on ERP Modules for Construction Industry
231/289
8/12/2019 Project Report on ERP Modules for Construction Industry
232/289
Forgot_Password:
8/12/2019 Project Report on ERP Modules for Construction Industry
233/289
8/12/2019 Project Report on ERP Modules for Construction Industry
234/289
8/12/2019 Project Report on ERP Modules for Construction Industry
235/289
6.8 Report Generated From System
Accounts Balance:
8/12/2019 Project Report on ERP Modules for Construction Industry
236/289
Accounts List:
8/12/2019 Project Report on ERP Modules for Construction Industry
237/289
Accounts Journal:
8/12/2019 Project Report on ERP Modules for Construction Industry
238/289
Accounts Ledger:
8/12/2019 Project Report on ERP Modules for Construction Industry
239/289
Assets:
8/12/2019 Project Report on ERP Modules for Construction Industry
240/289
8/12/2019 Project Report on ERP Modules for Construction Industry
241/289
8/12/2019 Project Report on ERP Modules for Construction Industry
242/289
Customers:
8/12/2019 Project Report on ERP Modules for Construction Industry
243/289
Current Stages:
8/12/2019 Project Report on ERP Modules for Construction Industry
244/289
Employees:
8/12/2019 Project Report on ERP Modules for Construction Industry
245/289
Enquiries:
8/12/2019 Project Report on ERP Modules for Construction Industry
246/289
Material Issue:
8/12/2019 Project Report on ERP Modules for Construction Industry
247/289
8/12/2019 Project Report on ERP Modules for Construction Industry
248/289
8/12/2019 Project Report on ERP Modules for Construction Industry
249/289
Material Purchase List:
8/12/2019 Project Report on ERP Modules for Construction Industry
250/289
Material Required:
8/12/2019 Project Report on ERP Modules for Construction Industry
251/289
8/12/2019 Project Report on ERP Modules for Construction Industry
252/289
Minimum Stock:
8/12/2019 Project Report on ERP Modules for Construction Industry
253/289
Payments:
8/12/2019 Project Report on ERP Modules for Construction Industry
254/289
Stock:
8/12/2019 Project Report on ERP Modules for Construction Industry
255/289
8/12/2019 Project Report on ERP Modules for Construction Industry
256/289
Unit Booking:
8/12/2019 Project Report on ERP Modules for Construction Industry
257/289
8/12/2019 Project Report on ERP Modules for Construction Industry
258/289
Upcoming Payments:
8/12/2019 Project Report on ERP Modules for Construction Industry
259/289
7. T ESTING TEST DATA, EXPECTED R ESULT, ACTUAL R ESULT
Account_Add:
Column Name Or
Control Name Type Value Expected Output Original Output Result
Account Button Action Click Display List Of Account Displayed List OfAccount
Pass
Account Type Button Action Click Open Panel To Add
Account Type
Opened Panel To Add
Account Type
Pass
Account Book Button Action Click Open Panel To AddAccount Book
Opened Panel To AddAccount Book
Pass
Account Name Input Null Cause Validation Caused Validation Pass
Account Name Input Machinery Accept Data Accepted Data Pass
Add Account Button Action Click With Null
Values
Cause Validation Caused Validation Pass
Add Account Button Action Click With FullData
Add Account Added Account Pass
Reset Button Action Click Clear Data Cleared Data Pass
Type Name Input Null Cause Validation Caused Validation Pass
Type Name Input Current Asset Accept Data Accepted Data Pass
Add Account TypeButton
Action Click With FullData
Add Account Type Added Account Type Pass
Add Account TypeButton
Action Click With NullValues
Cause Validation Caused Validation Pass
Book Name Input Null Cause Validation Caused Validation Pass
Book Name Input Trading Account Accept Data Accepted Data Pass
Add Accounting Book Action Click With Full Add Accounting Book Added Accounting Book Pass
8/12/2019 Project Report on ERP Modules for Construction Industry
260/289
Column Name Or
Control Name Type Value Expected Output Original Output Result
Button Data
Add Accounting BookButton
Action Click With NullValues
Cause Validation Caused Validation Pass
Banks:
Column Name OrControl Name
Type Value Expected Output Original Output Result
View Bank Button Action Click Display Bank NameList
Displayed Bank NameList
Pass
Add Bank Button Action Click Open Panel To AddBank
Opened Panel To AddBank
Pass
Edit Bank Button Action Click Open Panel To EditBank
Opened Panel To EditBank
Pass
Bank Name Input Null Cause Validation Caused Validation Pass Bank Name Input HDFC Bank Accept Data Accepted Data Pass Add Bank Button Action Click With Full
Data Add Bank Added Bank Pass
Add Bank Button Action Click With NullValues
Cause Validation Caused Validation Pass
Update Bank Button Action Click With FullData
Update Bank Updated Bank Pass
Update Bank Button Action Click With NullValues
Cause Validation Caused Validation Pass
Delete Bank Button Action Click With FullData
Delete Bank Deleted Bank Pass
Delete Bank Button Action Click With NullValues
Cause Validation Caused Validation Pass
Cancel Button Action Click Display Bank NameList
Displayed Bank NameList
Pass
8/12/2019 Project Report on ERP Modules for Construction Industry
261/289
Booking:
Column Name Or ControlName
Type Value ExpectedOutput
Original Output Result
Amount Input abc CauseValidation
CausedValidation
Pass
Amount Input 121365jk CauseValidation
CausedValidation
Pass
Amount Input Null CauseValidation
CausedValidation
Pass
Amount Input 123@8* CauseValidation
CausedValidation
Pass
Amount Input 9900000 Accept Data Accepted Data Pass Book Unit Button Action Click With Full Data Book Unit Booked Unit Pass
Book Unit Button Action Click With NullValues
CauseValidation
CausedValidation
Pass
Reset Button Action Click Clear Data Cleared Data Pass
Construction_Stages:
Column Name OrControl Name
Type Value Expected Output Original Output Result
View ConstructionStages Button
Action Click Display ConstructionStages List
Displayed ConstructionStages List
Pass
Add ConstructionStages Button
Action Click Open Panel To AddConstruction Stage
Opened Panel To AddConstruction Stage
Pass
Edit ConstructionStages Button
Action Click Open Panel To EditConstruction Stage
Opened Panel To EditConstruction Stage
Pass
Stage Name Input Painting Accept Data Accepted Data Pass Stage Name Input Null Cause Validation Caused Validation Pass Compition Days Input Null Cause Validation Caused Validation Pass Compition Days Input @we*123 Cause Validation Caused Validation Pass Compition Days Input hggfhg Cause Validation Caused Validation Pass Compition Days Input 5 Accept Data Accepted Data Pass Select Image Input abc.jpg Accept Data Accepted Data Pass Select Image Input abc.mkv Cause Validation Caused Validation Pass Select Image Input Null Cause Validation Caused Validation Fail Add Item Button Action Click With Full
Data Add Construction Stage Added Construction
Stage Pass
Add Item Button Action Click With NullValues
Cause Validation Caused Validation Pass
Update Item Button Action Click With FullData
Update ConstructionStage
Updated ConstructionStage
Pass
8/12/2019 Project Report on ERP Modules for Construction Industry
262/289
Column Name OrControl Name
Type Value Expected Output Original Output Result
Update Item Button Action Click With NullValues
Cause Validation Caused Validation Pass
Delete Item Button Action Click With FullData
Delete ConstructionStage
Deleted ConstructionStage
Pass
delete Item Button Action Click With NullValues
Cause Validation Caused Validation Pass
Customer_Registeration:
ColumnName OrControlName
Type Value Expected Output Original Output Result
ViewRecords(Link)
Action Click Navigate to PageCustomer_Edit.aspx
Navigated to PageCustomer_Edit.aspx
Pass
First Name Input Null Cause Validation Caused Validation Pass Last Name Input Null Cause Validation Caused Validation Pass DOB Input Null Cause Validation Allowed Fail E Mail ID Input Null Allow Allowed Pass
ContactNumber Input Null Cause Validation Allowed Pass
Fax ID Input Null Allow Allowed Pass Street Input Null Allow Allowed Pass Postal Code Input Null Allow Allowed Pass E Mail ID Input abcde@[email protected] Cause Validation Caused Validation Pass E Mail ID Input Bc Cause Validation Caused Validation Pass E Mail ID Input [email protected] Accept Data Accepted Data Pass ContactNumber
Input 987456321 Cause Validation Caused Validation Pass
ContactNumber
Input 986532abc Cause Validation Caused Validation Pass
ContactNumber
Input 98-654-32-3241 Cause Validation Caused Validation Pass
ContactNumber
Input 98 96 65 63 21 Cause Validation Caused Validation Pass
ContactNumber
Input abcde Cause Validation Caused Validation Pass
ContactNumber
Input 98/98989210 Cause Validation Caused Validation Pass
Contact Input 9876543210 Accept Data Caused Validation Pass
8/12/2019 Project Report on ERP Modules for Construction Industry
263/289
ColumnName OrControlName
Type Value Expected Output Original Output Result
Number Fax ID Input 9876543210123456 Accept Data Accepted Data Pass Fax ID Input 986532abc Cause Validation Caused Validation Pass Fax ID Input abcdef Cause Validation Caused Validation Pass Fax ID Input 98765 pd Cause Validation Caused Validation Pass Fax ID Input 9827 6524 3221 0123 Cause Validation Caused Validation Pass Post Code Input 98653 Cause Validation Caused Validation Pass Post Code Input 387002 Accept Data Accepted Data Pass Post Code Input 9870100 Cause Validation Caused Validation Pass Post Code Input abcdef Cause Validation Caused Validation Pass RegisterButton
Action With No Data Cause Validation Caused Validation Pass
Reset Button Action Click Clear Data Cleared Data Pass RegisterButton
Action With Full Data Register Customer Registered Customer Pass
Enquiry:
Column NameOr Control
Name Type Value Expected Output Original Output Result
First Name Input Null Cause Validation Caused Validation Pass Last Name Input Null Cause Validation Caused Validation Pass E Mail ID Input Null Cause Validation Caused Validation Pass ContactNumber
Input Null Cause Validation Caused Validation Pass
Street Input Null Allow Allowed Pass
Post Code Input Null Allow Allowed Pass E Mail ID Input [email protected] Allow Allowed Pass E Mail ID Input abc123 Cause Validation Caused Validation Pass E Mail ID Input abcde Cause Validation Caused Validation Pass E Mail ID Input [email protected] Cause Validation Caused Validation Pass E Mail ID Input abcde@[email protected] Cause Validation Caused Validation Pass E Mail ID Input [email protected] Allow Allowed Pass ContactNumber
Input 98 96 65 63 21 Cause Validation Caused Validation Pass
ContactNumber
Input 98*98* Cause Validation Caused Validation Pass
8/12/2019 Project Report on ERP Modules for Construction Industry
264/289
Column NameOr Control
Name Type Value Expected Output Original Output Result
ContactNumber
Input +919865432 Cause Validation Caused Validation Pass
ContactNumber
Input 985 985 655 1 Cause Validation Caused Validation Pass
ContactNumber
Input 9856321456 Allow Allowed Pass
ContactNumber
Input 98-654-32-3241 Cause Validation Caused Validation Pass
ContactNumber
Input 986532abc Cause Validation Caused Validation Pass
ContactNumber
Input 98765-43210 Cause Validation Caused Validation Pass
Post Code Input 378001 Allow Allowed Pass Post Code Input 378-001 Cause Validation Caused Validation Pass Post Code Input 37856412 Cause Validation Caused Validation Pass Post Code Input 3875 Cause Validation Caused Validation Pass Post Code Input abcdef Cause Validation Caused Validation Pass RegisterButton
Action Null Values Check Validations Checked Validation Pass
Reset Button Action Click Clear Data Cleared Data Pass Register
Button
Action Click With Full Data Register Enquiry Registered Enquiry Pass
View Records(Link)
Action Click Navigate to PageEnquiry_Edit.aspx
Navigated to PageEnquiry_Edit.aspx
Pass
Employee_Registeration:
ColumnName Or
ControlName
Type Value Expected Output Original Output Result
ViewRecords(Link)
Action Click Navigate to PageEmployee_Edit.aspx
Navigate to PageEmployee_Edit.aspx
Pass
First Name Input Null Cause Validation Caused Validation Pass Last Name Input Null Cause Validation Caused Validation Pass DOB Input Null Cause Validation Allowed Fail E Mail ID Input Null Cause Validation Caused Validation Pass Street Input Null Allow Allowed Pass Contact Input Null Allow Allowed Pass
8/12/2019 Project Report on ERP Modules for Construction Industry
265/289
ColumnName OrControlName
Type Value Expected Output Original Output Result
Number RegisterButton
Action Click With Null Values Check Validations Checked Validation Pass
Reset Button Action Click Should Not Check forValidation
Validation Bypass Pass
RegisterButton
Action Click With Full Data Add Employee Employee Added Pass
Reset Button Action Click Clear Data Cleared Data Pass E Mail ID Input abcde Generate Validation of
Invalid Address Validation Generated Pass
E Mail ID
Input
abcde@[email protected] Generate Validation ofInvalid Address
Validation Generated
Pass
Post Code Input 12345 Genearate Validation Validation Generated Pass E Mail ID Input [email protected] Accept Data Accepted Data Pass Post Code Input 1234567 Genearate Validation Validation Generated Pass Post Code Input 123456 Accept Data Accepted Data Pass Post Code Input abc123 Genearate Validation Validation Generated Pass ContactNumber
Input 987456321 Genearate Validation Allowed Pass
Contact
Number
Input 98765-43210 Genearate Validation Allowed Pass
ContactNumber
Input 986532abc Genearate Validation Allowed Pass
ContactNumber
Input abcdef Genearate Validation Allowed Pass
ContactNumber
Input 98 98 98 98 98 Genearate Validation Allowed Pass
ContactNumber
Input 98*98* Genearate Validation Allowed Pass
Contact
Number Input 9876543210 Allow Data Allowed Pass
Installment_Structure:
Column Name OrControl Name
Type Value Expected Output Original Output Result
No Of Installments Input asd Cause Validation Caused Validation Pass No Of Installments Input *gh65 Cause Validation Caused Validation Pass No Of Installments Input Null Cause Validation Caused Validation Pass
8/12/2019 Project Report on ERP Modules for Construction Industry
266/289
8/12/2019 Project Report on ERP Modules for Construction Industry
267/289
Column Name Or Control Name Type Value Expected Output Original Output Result Issue Note No Input Null Cause Validation Caused Validation Pass Quantity Input 1 Allow Caused Validation Fail Quantity Input 120 Allow Caused Validation Fail
Quantity Input 120.25 Allow Caused Validation Fail Quantity Input abc Cause Validation Caused Validation Pass Quantity Input @ Cause Validation Caused Validation Pass Quantity Input -120 Cause Validation Caused Validation Pass Quantity Input 20.25.25 Cause Validation Caused Validation Pass
Minimum_Stock:
Column Name OrControl Name
Type Value Expected Output Original Output Result
Quantity Input abc Cause Validation Caused Validation Pass Quantity Input 125 Accept Data Accepted Data Pass Quantity Input 98 96 65
63 21 Cause Validation Caused Validation Pass
Item Name Input Null Cause Validation Caused Validation Pass Quantity Input Null Cause Validation Caused Validation Pass Item Name Input Bricks Accept Data Accepted Data Pass
Add Item Limit Button Action Click Add Item MinimumStock Limit
Added Item MinimumStock Limit
Pass
Material_Purchase:
Column Name Or Control Name Type Value Expected Output Original Output Result Invoice No Input Null Cause Validation Caused Validation Pass Quantity Input Null Cause Validation Caused Validation Pass Rate Input Null Cause Validation Caused Validation Pass Quantity Input a Cause Validation Caused Validation Pass Rate Input a Cause Validation Caused Validation Pass Quantity Input 220 Allow Allowed Pass Rate Input 230 Allow Allowed Pass Quantity Input 220.5 Allow Allowed Fail Rate Input 230.5 Allow Allowed Fail
Payment:
8/12/2019 Project Report on ERP Modules for Construction Industry
268/289
Column Name Or ControlName
Type Value ExpectedOutput
Original Output Result
Date Input Null CauseValidation
CausedValidation
Fail
Date Input 13/10/1993 Accept Data Accepted Data Pass Installment No Input nj Cause
Validation CausedValidation
Pass
Installment No Input 23 236 CauseValidation
CausedValidation
Pass
Installment No Input 5 Accept Data Accepted Data Pass Make Payment Button Action Click With Full Data Make Payment Maked Payment Pass Make Payment Button Action Click With Null
Values CauseValidation
CausedValidation
Pass
Register Button Action Click Clear Data Cleared Data Pass
Amount Input 1250000 Accept Data Accepted Data Pass Amount Input 98 96 65 63 21 Cause
Validation CausedValidation
Pass
Amount Input ***bn90 CauseValidation
CausedValidation
Pass
Project_Registeration:
Column Name OrControl Name
Type Value Expected Output Original Output Result
Project Name Input Null Cause Validation Caused Validation Pass Project Name Input Prathna
Shopping Mall Accept Data Accepted Data Pass
Postal Code Input 123@8* Cause Validation Caused Validation Pass PostalCode Input 1250000 Cause Validation Caused Validation Pass PostalCode Input 90 89 0 Cause Validation Caused Validation Pass PostalCode Input 387002 Accept Data Accepted Data Pass View Records (Link)
Action
Click
Navigate to PageProject_Edit.aspx
Navigated to PageProject_Edit.aspx
Pass
Register Button Action Click With FullData
Register Project Registered Project Pass
Register Button Action Click With NullValues
Cause Validation Caused Validation Pass
Reset Button Action Click Clear Data Cleared Data Pass
Supplier_Registeration:
8/12/2019 Project Report on ERP Modules for Construction Industry
269/289
Column NameOr Control
Name Type Value Expected Output Original Output Result
CompanyName
Input Null Cause Validation Caused Validation Pass
Tin No Input Null Cause Validation Caused Validation Pass First Name Input Null Cause Validation Caused Validation Pass Last Name Input Null Cause Validation Caused Validation Pass ContactNumber
Input Null Cause Validation Caused Validation Pass
E Mail ID Input Null Allow Allowed Pass Fax ID Input Null Allow Allowed Pass Street Input Null Allow Allowed Pass Post Code Input Null Allow Allowed Pass
ContactNumber
Input 98 98 98 98 98 Cause Validation Caused Validation Pass
ContactNumber
Input 986532abc Cause Validation Caused Validation Pass
ContactNumber
Input 9856321456 Accept Data Accepted Data Pass
ContactNumber
Input 985 985 655 1 Cause Validation Caused Validation Pass
ContactNumber
Input 98*98* Cause Validation Caused Validation Pass
ContactNumber
Input 98765-43210 Cause Validation Caused Validation Pass
E Mail ID Input abc123 Cause Validation Caused Validation Pass E Mail ID Input abcde@[email protected] Cause Validation Caused Validation Pass E Mail ID Input [email protected] Accept Data Accepted Data Pass E Mail ID Input abcdef Cause Validation Caused Validation Pass Fax ID Input 12345 Cause Validation Caused Validation Pass Fax ID Input 98 98 98 98 98 Cause Validation Caused Validation Pass Fax ID Input 9876543210123456 Allow Allowed Pass
Fax ID Input 987463 987456 9874 Cause Validation Caused Validation Pass Fax ID Input abc123 Cause Validation Caused Validation Pass Post Code Input 3874563 Cause Validation Caused Validation Pass Post Code Input 987002 Accept Data Accepted Data Pass Post Code Input 38745 Cause Validation Caused Validation Pass Post Code Input 387a4 Cause Validation Caused Validation Pass Register Button Action With Null Values Check Validations Checked Validation Pass Reset Button Action Click Clear Data Cleared Data Pass Register Button Action With Full Data Register Supplier Registered Supplier Pass
View Records(Link)
Action Click Navigate toSupplier_Edit.aspx Navigate to PageSupplier_Edit.aspx
Pass
8/12/2019 Project Report on ERP Modules for Construction Industry
270/289
Add_Units:
Column Name Or ControlName
Type Value ExpectedOutput
Original Output Result
Unit Name Input Null CauseValidation
CausedValidation
Pass
Unit Name Input Shop 9 Accept Data Accepted Data Pass Add Button Action Click With Full Data Add Unit Added Unit Pass Add Button Action Click With Null
Values CauseValidation
CausedValidation
Pass
Reset Button Action Click Clear Data Cleared Data Pass
Miscellenous:
Column Name Or ControlName
Type Value ExpectedOutput
Original Output Result
Department Name Input Null CauseValidation
Caused Validation Pass
Department Name Input Marketing Accept Data Accepted Data Pass
Add Department Button Action Click With Full Data AddDepartment AddedDepartment Pass
Reset Button Action Click Clear Data Cleared Data Pass Project Type Input Null Cause
Validation Caused Validation Pass
Project Type Input Shopping Mall Accept Data Accepted Data Pass Add Project Type Button Action Click With Full Data Add Project
Type Added ProjectType
Pass
Add Project Type Button Action Click With NullValues
CauseValidation
Caused Validation Pass
Add Department Button Action Click With NullValues
CauseValidation
Caused Validation Pass
State Name Input Null CauseValidation
Caused Validation Pass
State Name Input Aasam Accept Data Accepted Data Pass Add State Button Action Click With Full Data Add State Added State Pass Add State Button Action Click With Null
Values CauseValidation
Caused Validation Pass
Country Name Input Null CauseValidation
Caused Validation Pass
Country Name Input Pakistan Accept Data Accepted Data Pass
8/12/2019 Project Report on ERP Modules for Construction Industry
271/289
Column Name Or ControlName
Type Value ExpectedOutput
Original Output Result
Add Country Button Action Click With Full Data Add Country Added Country Pass Add Country Button Action Click With Null
Values CauseValidation
Caused Validation Pass
City Name Input Null CauseValidation
Caused Validation Pass
City Name Input Surat Accept Data Accepted Data Pass Add City Button Action Click With Full Data Add City added City Pass Add City Button Action Click With Null
Values CauseValidation
Caused Validation Pass
Designation Name Input Null CauseValidation
Caused Validation Pass
Designation Name Input Accountant Accept Data Accepted Data Pass
Add Designation Button Action Click With Full Data Add Designation addedDesignation
Pass
Add Designation Button Action Click With NullValues
CauseValidation
Caused Validation Pass
Booking_Edit:
Column Name OrControl Name Type Value Expected Output Original Output Result
Filter (Link) Action Click Open Filter RecordPopup Menu
Opened Filter RecordPopup Menu
Pass
Filter Button Action Click With FullData
Display Filtered Data Displayed FilteredData
Pass
Filter Button Action Click With NullValues
Display All Data Displayed All Data Pass
UnFilter Button Action Click Display All Data Displayed All Data Pass Close Button Action Click Close Filter Record
Popup Menu
Closed Filter RecordPopup Menu
Pass
Value Input Sanjay With FirstName Field
Accept Data Accepted Data Pass
Value Input Null With FirstName Field
Display All Data Displayed All Data Pass
Amount Input abc Cause Validation Caused Validation Pass Amount Input 123gh Cause Validation Caused Validation Pass Amount Input Null Cause Validation Caused Validation Pass Amount Input 123@8* Cause Validation Caused Validation Pass Amount Input 1250000 Accept Data Accepted Data Pass Upadte BookingButton
Action Click With FullData
Update Booking Updated Booking Pass
8/12/2019 Project Report on ERP Modules for Construction Industry
272/289
Column Name OrControl Name
Type Value Expected Output Original Output Result
Upadte BookingButton
Action Click With NullValues
Cause Validation Caused Validation Pass
Delete BookingButton
Action Click With FullData
Delete Booking Deleted Booking Pass
Delete BookingButton
Action Click With NullValues
Cause Validation Caused Validation Pass
Cancel Button Action Click Display Booking List Displayed Booking List Pass
Customer_Edit:
Column Name OrControl Name Type Value Expected Output Original Output Result
First Name Input Null Cause Validation Caused Validation Pass Last Name Input Null Cause Validation Caused Validation Pass DOB Input Null Cause Validation Allowed Fail E Mail ID Input Null Allow Allowed Pass Contact Number Input Null Cause Validation Allowed Pass Fax ID Input Null Allow Allowed Pass Street Input Null Allow Allowed Pass Postal Code Input Null Allow Allowed Pass E Mail ID Input abcde@[email protected] Cause Validation Caused Validation Pass E Mail ID Input Bc Cause Validation Caused Validation Pass E Mail ID Input [email protected] Accept Data Accepted Data Pass Contact Number Input 987456321 Cause Validation Caused Validation Pass Contact Number Input 986532abc Cause Validation Caused Validation Pass Contact Number Input 98-654-32-3241 Cause Validation Caused Validation Pass Contact Number Input 98 96 65 63 21 Cause Validation Caused Validation Pass Contact Number Input Abcde Cause Validation Caused Validation Pass Delete CustomerButton
Action Click Delete Customer Deleted Customer Pass
Contact Number Input 9876543210 Accept Data Caused Validation Pass Fax ID Input 9876543210123456 Accept Data Accepted Data Pass Fax ID Input 986532abc Cause Validation Caused Validation Pass Fax ID Input Abcdef Cause Validation Caused Validation Pass Fax ID Input 98765 pd Cause Validation Caused Validation Pass Fax ID Input 9827 6524 3221 0123 Cause Validation Caused Validation Pass Post Code Input 98653 Cause Validation Caused Validation Pass Post Code Input 387002 Accept Data Accepted Data Pass
Post Code Input 9870100 Cause Validation Caused Validation Pass
mailto:abcde@[email protected]:[email protected]:[email protected]:abcde@[email protected]8/12/2019 Project Report on ERP Modules for Construction Industry
273/289
Column Name OrControl Name
Type Value Expected Output Original Output Result
Post Code Input Abcdef Cause Validation Caused Validation Pass Save ChangesButton
Action Click With Full Data Save Changes InCustomer Records
Saved Changes InCustomer Records
Pass
Cancel Button Action Click Display CustomerList
Displayed CustomerList
Pass
Save ChangesButton
Action Click With Null Values Cause Validation Caused Validation Pass
Filter (Link) Action Click Open Filter RecordPopup Menu
Opened FilterRecord PopupMenu
Pass
Filter Button Action Click With Full Data Display FilteredData
DisplayedFiltered Data
Pass
Filter Button
Action Click With Null Values
Display All Data
Displayed All Data
Pass
UnFilter Button Action Click Display All Data Displayed All Data Pass Close Button Action Click Close Filter Record
Popup Menu Closed Filter RecordPopup Menu
Pass
Value Input Sanjay With First NameField
Accept Data Accepted Data Pass
Value Input Null With First NameField
Display All Data Displayed All Data Pass
Employee_Edit:
Column Name OrControl Name
Type Value Expected Output Original Output Result
First Name Input Null Cause Validation Caused Validation Pass Last Name Input Null Cause Validation Caused Validation Pass DOB Input Null Cause Validation Allowed Fail E Mail ID Input Null Cause Validation Caused Validation Pass Street Input Null Allow Allowed Pass Contact Number Input Null Allow Allowed Pass Save ChangesButton
Action Click With Null Values Cause Validation Caused Validation Pass
Cancel Button Action Click Display AllEmployee List
Displayed AllEmployee List
Pass
Save Changes
Button
Action Click With Full Data Save Changes In
Employee Records
Saved Changes In
Employee Records
Pass
Reset Button Action Click Clear Data Cleared Data Pass
8/12/2019 Project Report on ERP Modules for Construction Industry
274/289
8/12/2019 Project Report on ERP Modules for Construction Industry
275/289
ColumnName Or
Control Name Type Value Expected Output Original Output Result
First Name Input Null Cause Validation Caused Validation Pass Last Name Input Null Cause Validation Caused Validation Pass E Mail ID Input Null Cause Validation Caused Validation Pass ContactNumber
Input Null Cause Validation Caused Validation Pass
Street Input Null Allow Allowed Pass Post Code Input Null Allow Allowed Pass E Mail ID Input [email protected] Allow Allowed Pass E Mail ID Input abc123 Cause Validation Caused Validation Pass E Mail ID Input abcde Cause Validation Caused Validation Pass E Mail ID Input [email protected] Cause Validation Caused Validation Pass E Mail ID Input abcde@[email protected] Cause Validation Caused Validation Pass E Mail ID Input [email protected] Allow Allowed Pass ContactNumber
Input 98 96 65 63 21 Cause Validation Caused Validation Pass
ContactNumber
Input 98*98* Cause Validation Caused Validation Pass
ContactNumber
Input +919865432 Cause Validation Caused Validation Pass
ContactNumber
Input 985 985 655 1 Cause Validation Caused Validation Pass
ContactNumber
Input 9856321456 Allow Allowed Pass
ContactNumber
Input 98-654-32-3241 Cause Validation Caused Validation Pass
DeleteEnquiryButton
Action Click Delete Enquiry Deleted Enquiry Pass
ContactNumber
Input 98765-43210 Cause Validation Caused Validation Pass
Post Code Input 378001 Allow Allowed Pass Post Code Input 378-001 Cause Validation Caused Validation Pass Post Code Input 37856412 Cause Validation Caused Validation Pass Post Code Input 3875 Cause Validation Caused Validation Pass Post Code Input abcdef Cause Validation Caused Validation Pass Save ChangesButton
Action Click With Null Values Cause Validation Caused Validation Pass
Cancel Button Action Click Display List Of AllEnquiry
Displayed List Of AllEnquiry
Pass
Save Changes
Button
Action Click With Full Data Save Changes In
Enquiry Records
Saved Changes In
Enquiry Records
Pass
View Records Action Click Navigate to Page Navigated to Page Pass
8/12/2019 Project Report on ERP Modules for Construction Industry
276/289
ColumnName Or
Control Name Type Value Expected Output Original Output Result
(Link) Enquiry_Edit.aspx Enquiry_Edit.aspx Filter (Link) Action Click Open Filter Record
Popup Menu Opened Filter RecordPopup Menu
Pass
Filter Button Action Click With Full Data Display Filtered Data Displayed FilteredData
Pass
Filter Button Action Click With Null Values Display All Data Displayed All Data Pass UnFilterButton
Action Click Display All Data Displayed All Data Pass
Close Button Action Click Close Filter RecordPopup Menu
Closed Filter RecordPopup Menu
Pass
Value Input Sanjay With First NameField
Accept Data Accepted Data Pass
Value Input Null With First NameField
Display All Data Displayed All Data Pass
Issue_Edit:
Column Name OrControl Name
Type Value Expected Output Original Output Result
Delete Issue Button Action Click Delete Selected Issue Deleted Selected Issue Pass Issue Note No Input Null Cause Validation Caused Validation Pass Issue Note No Input A00023 Accept Data Accepted Data Pass Date Input Null Cause Validation Caused Validation Fail Date Input 23/05/14 Accept Data Accepted Data Pass Quantity Input Null Cause Validation Caused Validation Pass Quantity Input 25/3/12 Cause Validation Caused Validation Pass Quantity Input abd Cause Validation Caused Validation Pass Quantity Input 13 Accept Data Accepted Data Pass Upadte IssueRecord Button
Action Click With Full Data
Update Issue Record
Update Issue Record
Pass
Upadte IssueRecord Button
Action Click With NullValues
Cause Validation Caused Validation Pass
Delete SelectedItem Button
Action Click Delete Selected ItemFrom Issue List
Deleted Selected ItemFrom Issue List
Pass
Back To Issue ListButton
Action Click Display Issue List Displayed Issue List Pass
Filter (Link) Action Click Open Filter RecordPopup Menu
Opened Filter RecordPopup Menu
Pass
Filter Button Action Click With Full Data Display Filtered Data Displayed FilteredData Pass
8/12/2019 Project Report on ERP Modules for Construction Industry
277/289
Column Name OrControl Name
Type Value Expected Output Original Output Result
Filter Button Action Click With NullValues
Display All Data Displayed All Data Pass
UnFilter Button Action Click Display All Data Displayed All Data Pass Close Button Action Click Close Filter Record
Popup Menu Closed Filter RecordPopup Menu
Pass
Value Input A00035 With IssueNote No Field
Accept Data Accepted Data Pass
Value Input Null With IssueNote No Field
Display All Data Displayed All Data Pass
Project_Edit:
Column Name OrControl Name
Type Value Expected Output Original Output Result
Project Name Input Null Cause Validation Caused Validation Pass Project Name Input Access Shopping
Mall Accept Data Accepted Data Pass
Postal Code Input 123@8* Cause Validation Caused Validation Pass PostalCode Input 1250000 Cause Validation Caused Validation Pass PostalCode Input 90 89 0 Cause Validation Caused Validation Pass
Reset Button Action Click Clear Data Cleared Data Pass Save ChangesButton
Action Click With Full Data Register Project Registered Project Pass
Save ChangesButton
Action Click With NullValues
Cause Validation Caused Validation Pass
Delete ProjectButton
Action Click Delete Project Deleted Project Pass