    A P R O J E C T R E P O R T

    O N

    ERP Modules for Construction Industry

    Under Consideration of

    Image Software Consultancy

    A

    DISSERTATION SUBMITTED IN PARTIAL

    FULFILLMENT OF THE ACADEMIC CURRICULUM OF

    BACHELORS OF COMPUTER APPLICATION (2013-14)

    6TH SEMESTER

    SUBMITTED BY:

    Student Name: Patel Sanket Haribhai (Roll No.: 55)

    Student Name: Nakrani Mayur Nanjibhai (Roll No.:26)

    UNDER THE GUIDANCE OF

    Internal Guide External Guide

    Prof. Kinjal Acharya Mr. Nimesh Dhulla

    SUBMITTED TO:

    FACULTY OF MANAGEMENT AND INFORMATION SCIENCE

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    2/289

    P REFACE

    As a part of BCA curriculum the sixth semester is dedicated to full time project

    development. The purpose of the full time industry project is to allow students to enter in realmarket and develop their skills to get acquainted with and learn to implement the conceptthey have been taught during the theory exposure of the various application.

    An IT Professionals role is to engineer solutions. The subjec t might be of that of anyfiled, but the purpose is still the same that is to bring out the best solution is the result ofintegration of theory as well as Practice. Hence, this report too, is a mix of theory and

    practical work done. This report would enable the understanding of methodologies adopted

    for the implementation of the application system.

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    3/289

    ACKNOWLEDGEMENT

    This project could never have been designated if; we do not convey heart felt gratitude to

    those people, from whom we have got considerable support and encouragement for

    developing this generous project.

    First, I would like to thank Dharmsinh Desai University for providing me opportunity to

    collaborate with Image Software Consultancy, Vadodara.

    Also, I would like to thank Mr. Nimesh Dhulla (Project Guide), under whose interest,

    guidance and constant supervision, we received the greatest help in bringing out this work in

    the present shape. I would also like to be very thankful to all the staff members for providing

    me excellent support during this project duration.

    Very special thanks to Prof. Kinjal Acharya who helped us, throughout the project. Their

    motivation to do better and always aim for improvement inspired us to aim for perfection.

    Additionally, both faculties played a heroic role throughout this learning process. Thanks

    are not the sentence that fills their level of involvement.

    Finally, I would like to thank HOD of BCA Department, Prof. C. P. Patel and everyone whodirectly or indirectly helped me in the project.

    Student Name: Patel Sanket Haribhai

    Student Name: Nakrani Mayur Nanjibhai

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    4/289

    T ABLE O F C ONTENETS

    1. About System

    1.1 Purpose

    1.2 Scope

    2. Organization Overview & Organization Chart

    2.1 Organization Overview

    2.2 Organization Location

    2.3 Organization Chart

    3. Hardware Software Configuration

    4. Features of tools used

    5. Detail Description of System

    5.1 Existing System

    5.2 Proposed System

    6. System Documentation

    6.1 Feasibility Study

    6.2 System Flow Diagram

    6.3 E/R Diagram with Relationship

    6.4 Context Diagram

    6.5 Dataflow Diagram

    6.6 Data Dictionary

    6.7 Screen Layout with Description

    6.8 Report Generated from System

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    5/289

    7. Testing -Test Data, Excepted Result, Actual Result

    8. Scope and Limitation

    9. Future Expansion

    10. Reference & Bibliography

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    6/289

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    7/289

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    8/289

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    9/289

    The company and its reputation will contin ue to be built on the foundation of

    professional and dependable service.

    They follow a rigorous project life cycle for every customer to ensure that no

    aspect of their business process is left unanalyzed.

    By offering a seamless integration of marketing, communication, visual design

    and technology, Image Software Consultancy provides practical, viable strategies to

    reach customers and improve business. With a dedicated team of experts working with

    market-leading technologies, Image Software Consultancy provides accelerated time to

    return and greatly reduced project costs. And they're not focused on "giving advice" but

    on creating solutions that sell.

    At Image Software Consultancy they offer a wide range of services including:

    Website Development

    E-mail Marketing (E-Marketing)

    Website Maintenance (AMC)

    Customized Software Development

    Ready Products for Manufacturer and Traders

    Corporate Multi Media Presentation on CD

    Flash Introduction & Custom Animation

    3D Modeling & Architecture

    2.2 Organization Location

    Image Software Consultancy,

    104, Chanakya Complex,

    Karelibaug,

    Vadodra, Gujarat-India

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    10/289

    2.3 Organization Chart

    Vadodara H.O Nimesh Dhulla(Proprietor)

    Canada BranchAbhinav Patel(Mktg

    Manager)

    Canada BranchKrunal

    Patel(Programmer)

    Vadodara BranchPranali Gurjar(Team

    Leader)

    Vadodara BranchRaxit Patel(Programmer)

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    11/289

    3. H ARDWARE & SOFTWARE C ONFIGURATION

    Hardware / Software Configuration& Tools Used in Development

    SERVER SIDE CONFIGURATION

    HARDWARE Processor Pentium-IV 1.7GHZ or Faster

    1 GB Ram

    Hard disk 80 GB or More

    SOFTWARE Windows 98/2000/2003/XP

    Ms Sql Server

    CLIENT SIDE CONFIGURATION

    HARDWARE Processor Pentium-IV 1.7 GHz or Faster

    512 MB Memory or More

    Minimum Requirement of 80 GB Hard disk

    SOFTWARE Windows 98/2000/2003/XP/7/8

    Internet Explorer / Mozilla / Chrome/Opera

    TOOLS USED FOR DEVELOPMENT:

    Front End : Visual Studio 2010, ASP .Net, C#

    Back end : SQL Server 2008

    Other Tools : MS Office, MS Visio, Adobe Photoshop

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    12/289

    4. F EATURES O F T OOLS USED

    Microsoft SQL Server - 2008 [Back-End]:

    Microsoft SQL Server is a relational database management system developed byMicrosoft. As a database, it is a software product whose primary function is to storeand retrieve data as requested by other software applications, be it those on the samecomputer or those running on another computer across a network (including theInternet).

    There are at least a dozen different editions of Microsoft SQL Server aimed atdifferent audiences and for different workloads (ranging from small applications thatstore and retrieve data on the same computer, to millions of users and computers that

    access huge amounts of data from the Internet at the same time). SQL Server support for structured and semi-structured data, including digital media

    formats for pictures, audio, video and other multimedia data. It can be a data storage backend for different varieties of data: email, time/calendar, file, document, spatial,etc. as well as perform search, query, analysis, sharing, and synchronization across alldata types.

    Microsoft Visual Studio 2010 (Asp.Net, C# Language) [Front-End]:

    Visual Studio is a comprehensive collection of tools and services for developingapplications that target the desktop, the web, devices, and the cloud. For teamsworking across multiple platforms, Visual Studio provides a flexible collaborationenvironment for that welcomes connection with other development tools, such asEclipse and Xcode.

    Microsoft Visual Studio 2010 is an integrated development environment (IDE) fromMicrosoft that simplifies the basic tasks of creating, debugging and deployingapplications. Visual Studio 2010 Professional unleashes your imagination and easilydelivers your ideas.

    Microsoft Visual C#, Microsofts implementation of the C# language, targets the.NET Framework, along with the language services that lets the Visual Studio IDEsupport C# projects. While the language services are a part of Visual Studio, thecompiler is available separately as a part of the .NET Framework.

    MS-Visio:

    Visio began as a standalone product produced by Shape-Ware Corporation; version1.0 shipped in 1992. A pre-release, Version 0.92, was distributed free on a floppy disk

    along with a Microsoft Windows systems readiness evaluation utility. In 1995, Shape-Ware Corporation changed their name to Visio Corporation to take advantage of

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    13/289

    market recognition and related product equity. Microsoft acquired Visio in 2000, re-

    branding it as a Microsoft Office application, like Microsoft Project; however, it has

    never been included in any of the Office suites. Microsoft included a Visio for

    Enterprise Architects edition with some editions of Visual Studio .NET

    2003 and Visual Studio 2005.

    Along with Microsoft Visio 2002 Professional, Microsoft introduced Visio Enterprise Network Tools and Visio Network Centre. Visio Enterprise Network Tools was an

    add-on product that enabled automated network and directory services diagramming.

    Visio Network Centre was a subscription-based website where users could locate the

    latest network documentation content and exact-replica network equipment shapes

    from 500 leading manufacturers.

    MS-Office:

    Microsoft Office 2007 (officially called 2007 Microsoft Office System), alsocalled MS Office 2007, is a Windows version of the Microsoft Office

    System, Microsoft's productivity suite. Known as Office 12 in the early stages of its

    beta development, it was released to volume license customers on November 30,

    2006 and made available to retail customers on January 30, 2007. These are,

    respectively, the same dates Windows Vista was released to volume licensing and

    retail customers. Office 2007 contains a number of new features, the most notable of

    which is the entirely new graphical user interface called the Fluent User Interface

    initially referred to as the Ribbon User Interface, replacing the menus and toolbars

    which have been the cornerstone of Office since its inception with a tabbed toolbar,

    known as the Ribbon. Office 2007 requires Windows XP with Service Pack 2 or

    higher, Windows Server 2003 with Service Pack 1 or higher, Windows Vista or

    Windows 7.Office 2007 is the last version of Microsoft Office which is officially

    supported on Windows XP Professional x64 Edition and the first version to officially

    work on Windows 8.

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    14/289

    5. DETAILED DESCRIPTION O F SYSTEM

    5.1 Existing System:There doesnt exist any computerized system. Accounts and other books are kept

    manually. Records are manually entered in each and every book therefore large amount of

    time is spent maintaining the books.

    Every project is managed by physically visiting the sites and contacting the

    respective project managers. Inventories at every project are maintained by bookkeepers

    manually. Units sold and status of units can be determined by contacting the projectmanager. For any information regarding the project or units of project, project manager is

    contacted. Booking of unit is made from the respective project office only

    As every task in existing system is done manually, large amount of time is

    consumed to complete simple tasks. Therefore to overcome this drawback of existing

    system, proposed system is equipped with such features that reduces time consumed for

    simple tasks and helps in completing the projects as fast as possible.

    5.2 Proposed System:

    5.2.1Modules

    Administration:

    Add New Projects Register New Managers

    Define Role of Managers Add new project sites Defining Budget of Projects Adding Employees / Business Associates

    Sales:

    Site Booking Facility Payments Received Payments Due

    Maintain Enquiry &perform continuous Follow up Payment Reminders

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    15/289

    Maintain details of owners of different units

    Production& Purchase:

    Raw Material Purchased &Raw Materials Issued

    Complete purchase history and delivery schedules Construction Status of units Material Purchase Reminders Keeping track of Inventories available on all sites Maintaining Purchase book on the basis of Goods Received Note

    Project:

    Payment and Expense management of Project Scan and add the scanned papers& documents of Projects

    Add details of the Project such as : Project Name, Location, No. of Plots,Area of Individual plots

    Define installment structure of Project Define rates of a unit at different levels Define Cancellation and transfer fees Maintaining books at Project level

    Accounts:

    Manage overall books and accounts of the firm

    Integrate and audit books of all projects Maintain Payroll book Generate different reports and ledgers

    5.2.2Actors in the System:

    Admin (Administration Module) Sales Manager (Sales and Marketing Module) Production Manager (Production & Purchase Module) Project Manager (Project Module)

    Accountant (Accounts)

    5.2.3 Advantages of the System:

    Tracking Use of Materials of all sites Payment reminders reminding payment that are due on particular date Purchase reminder to avoid shortage of resources Optimum Utilization of resources by tracking use of resources at particular site Getting booking status of any site System can be used from Office, Site Location, or Company Headquarters Maintaining Authority and Control by providing priorities to Actors Site View and Company View Accounting Integrated in Single System

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    16/289

    Viewing Site Plan Site Status and Progress Tracking Dynamic E-Mail and SMS service to inform customers about Payment and status of

    their site Tracking Human Resources Facility to add and update the details of the clients Facility to add the payment schedule (dates) of the client. Facility to Book / Sale Plots , Flats, Offices, Shop from any connected office Setting up of installment structure for a project Maintains history of customer enquiries with complete details and its subsequent

    follow-ups Get complete purchase history, item and delivery schedules Add the details of the Construction Project : Project Name, Location, No. of Flats,

    No. of Shops / Offices, Area of Individual Flats, Shops, Offices, to add the ratesFloor Wise, Shop wise / Office wise, to add Amenities

    Inter-Project Material Transfer Facility Define Transfer fee and also, cancellation charges between dates Report Generation including invoice Account Books like day cash, bank transactions etc. Facility to Export reports in different formats (xlsx, pdf, docx etc.)

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    17/289

    6. S YSTEM DOCUMENTATION

    6.1 Feasibility Study

    A feasibility study is undertaken to determine the possibility or probability

    of either improving the existing system or developing a completely new system. Once

    the entire research has been done with scope of project being defined one should ask

    him Can we build the software to meet the scope? Is the project feasible? There is a

    famous quote from Putnam and Myers Not everything imaginable is feasible, not

    even in software, evanescent as it may appear to outsiders. Before developing ant

    system, whether be a mechanical or electrical or Computer system, its facility must be

    study properly.

    The objective of feasibility Study is to test technical, economic and social

    feasibility of a system to be developed. This is done by investigating the existing

    system in the area under investigation and generating ideas about new system. The

    purpose system must be evaluated from a technical viewpoint first and if compatible,

    social and technical system be devised, then they must be tested for economic

    feasibility.

    It helps to obtain overview of the problem and to get rough assessment of

    whether feasible solution exists. This is essential to avoid committing large resources

    to a project and then repent on it later.

    There are three aspects in Feasibility Study portion of the preliminary investigation.

    Technical Feasibility

    Economic Feasibility

    Operational Feasibility

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    18/289

    Technical Feasibility

    Project is required to be implemented using PHP and MS-SQL Server 2005.

    Image Software Consultancy is equipped with technologies required. Also the proposed

    system does not need any sophisticated technologies. The platform used area readily

    available. The new system proposed uses least of the system resources. The proposed

    system can be expanded in future, by adding new modules.

    i.e.

    The minimum required technology exists or can be acquired to do what

    is suggested.

    The proposed System has a technical capacity to hold data required till

    use in the new system.

    There are technical guarantees of accuracy, reliability, ease of access

    and data security.

    Operational Feasibility

    Website would be easy to operate for the members and admin of the organization

    who are going to use this website, so that they can make the best use of the website.

    End users of the system are Administrators, extra care is taken but the developers to

    provide very good and easy to understand user interfaces and a proper user manual, So

    that least operational problems would be encountered. Performance of Sales and

    Purchase Dept. of RPPL will shoot up sharply after implementation of this system.

    Hence; this in turn makes this software product operationally feasible.

    i.e.

    There is a sufficient support for the project from the management andusers.

    Accessibility of information will not be lost.

    Individual performance will be better after implementation than before.

    Economic Feasibility

    This feasibility is important in development of the software for any organization.

    Since, all Software support and hardware platform required in this project are alreadyavailable at Image Software Consultancy, no extra cost have to be involved for

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    19/289

    developing and implementing this software product. Thus, this software is financially

    feasible.

    The cost to conduct the full system investigation.

    The cost of hardware and software for the class of application being

    considered.

    The benefits in the form of reduce cost or fewer costly errors.

    The cost of nothing changes(i.e. the proposed system is not developed)

    6.2 System Flow Diagram

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    20/289

    6.3 E/R Diagram with Relationship

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    21/289

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    22/289

    6.5 Dataflow Diagram

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    23/289

    6.6 Data Dictionary

    Table 1: Account_Books

    FIELD NAME DATA TYPE CONSTRAINT DESCRIPTIONBook_ID int Primary KeyBook_Name varchar(50) Not Null, Unique

    Table 2: Account_Types

    FIELD NAME DATA TYPE CONSTRAINT DESCRIPTIONAccount_Type_ID int Primary KeyType_Name varchar(50) Not Null, UniqueBook_ID int Foreign Key For Relating With

    Account_Books

    Table 3: Accounts

    FIELD NAME DATA TYPE CONSTRAINT DESCRIPTIONAccount_ID int Primary KeyAccount_Name varchar(50) Not Null, Unique

    Account_Type int Foreign Key For Relating WithAccount_Types

    Table 4: Banks

    FIELD NAME DATA TYPE CONSTRAINT DESCRIPTIONBank_ID int Primary KeyBank_Name varchar(50) Not Null, Unique

    Table 5: Booking

    FIELD NAME DATA TYPE CONSTRAINT DESCRIPTIONBooking_ID int Primary KeyCustomer_ID int Foreign Key For Relating

    CustomerUnit_ID int Foreign Key For Relating Unit

    booked

    Amount moneyBooking_Date date Not Null To Specify Date of

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    24/289

    BookingStructure_ID int Foreign Key For Relating With

    Installment_Structure

    Table 6: Cities

    FIELD NAME DATA TYPE CONSTRAINT DESCRIPTIONCity_ID int Primary KeyCity_Name varchar(50) Not Null, UniqueState_ID int Foreign Key For Relating with

    States Table

    Table 7: CountriesFIELD NAME DATA TYPE CONSTRAINT DESCRIPTIONCountry_ID int Primary KeyCountry_Name varchar(50) Not Null, Unique

    Table 8 : Customers

    FIELD NAME DATA TYPE CONSTRAINT DESCRIPTIONCustomer_ID int Primary KeyFirst_Name varchar(50) Not NullLast_Name varchar(50)Gender char(1)Mobile_No varchar(55) Not NullStreet varchar(500)City int Foreign KeyState int Foreign KeyCountry int Foreign Key

    Post_Code varchar(50)Fax_ID varchar(50)EMail_ID varchar(50) Not NullDOB date

    Table 9: Departments

    FIELD NAME DATA TYPE CONSTRAINT DESCRIPTIONDepartment_Id int Primary KeyDepartment_Name varchar(50) Not Null, Unique

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    25/289

    Table 10: Designation

    FIELD NAME DATA TYPE CONSTRAINT DESCRIPTIONDesignation_ID int Primary KeyDesignation_Name varchar(50) Unique, Not NullIs_User varchar(3) Not Null y or n

    Table 11: Employees

    FIELD NAME DATA TYPE CONSTRAINT DESCRIPTIONEmployee_ID int Primary KeyFirst_Name varchar(50) Not NullLast_Name varchar(50)DOB dateGender char(1)Department_ID int Foreign KeyProject_ID int Foreign KeyMobile_No varchar(55)Street varchar(500)City int Foreign KeyState int Foreign KeyCountry int Foreign KeyPost_Code varchar(50)Designation_ID int Foreign KeyEMail_ID varchar(50)

    Table 12: Enquiries

    FIELD NAME DATA TYPE CONSTRAINT DESCRIPTION

    Enquiries_ID int Primary KeyFirst_Name varchar(50) Not NullLast_Name varchar(50)E_Mail varchar(50) Not NullMobile_No varchar(50) Not NullUnit_ID int Foreign KeyCity_ID int Foreign KeyStreet varchar(500)Post_Code varchar(50)

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    26/289

    Table 13: Installment_Structure

    FIELD NAME DATA TYPE CONSTRAINT DESCRIPTIONInstallment_Structure_ID int Primary Key

    Instalments int Not NullInstallment_Gaps varchar(50)

    Table 14: Issue

    FIELD NAME DATA TYPE CONSTRAINT DESCRIPTIONIssue_ID int Primary KeyProject_ID int Foreign Key For Relating with

    Projects TableIssue_Date date Not NullIssue_Note_No varchar(50) Unique, Not Null

    Table 15: Issue_Details

    FIELD NAME DATA TYPE CONSTRAINT DESCRIPTIONDetail_ID int Primary KeyIssue_ID int Foreign Key For Relating with

    Issue TableItem_ID int Foreign Key For Relating withItems Table

    Quantity real Not Null

    Table 16: Items

    FIELD NAME DATA TYPE CONSTRAINT DESCRIPTIONItem_Code int Primary KeyItem_Name varchar(50) Not Null, UniqueUnit varchar(50) Not NullImage varchar(50)

    Table 17: Journal

    FIELD NAME DATA TYPE CONSTRAINT DESCRIPTIONTransaction_ID int Primary Key

    Transaction_Date date Not NullDr_Account int Foreign Key For Relating with

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    27/289

    Accounts Tablefor DR Account

    Cr_Account int Foreign Key For Relating withAccounts TableFor CR Account

    Amount money Not NullNarration varchar(500)Project_ID int Foreign Key For Relating with

    Projects Table

    Table 18: Min_Stock

    FIELD NAME DATA TYPE CONSTRAINT DESCRIPTION

    Min_Stock_ID int Primary KeyProject_ID int Foreign Key For Relating with

    Projects TableItem_ID int Foreign Key For Relating with

    Items TableQuantity int Not Null

    Table 19: Payment_Modes

    FIELD NAME DATA TYPE CONSTRAINT DESCRIPTIONPayment_Mode_ID int Primary KeyMode_Name varchar(50) Unique ,Not Null

    Table 20: Project_Documents

    FIELD NAME DATA TYPE CONSTRAINT DESCRIPTIONDocument_ID int Primary Key

    Document_Path varchar(500) Not NullDocument_Name varchar(50) Not NullProject_ID int Foreign Key For Relating with

    Projects Table

    Table 21: Project_Images

    FIELD NAME DATA TYPE CONSTRAINT DESCRIPTIONProject_Image_ID int Primary KeyImage_Path varchar(500) Not Null

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    28/289

    Project_ID int Foreign Key For Relating withProjects Table

    Table 22: Project_TypesFIELD NAME DATA TYPE CONSTRAINT DESCRIPTIONType_ID int Primary KeyType_Name varchar(50) Unique,Not Null

    Table 23: Projects

    FIELD NAME DATA TYPE CONSTRAINT DESCRIPTIONProject_ID int Primary KeyProject_Name varchar(150) Not NullType_ID int Foreign Key For Relating with

    Projects_TypesTable

    Project_Street_Address varchar(500)City_ID int Foreign Key For Relating with

    Cities TableState_ID int Foreign Key For Relating with

    States Table

    Country_ID int Foreign Key For Relating withCountries Table

    Project_Post_Code varchar(50)Contact_No varchar(55)Email_ID varchar(50)Logo varchar(500)Bank_ID int Foreign Key For Relating with

    Banks Table

    Table 24: Purchase

    FIELD NAME DATA TYPE CONSTRAINT DESCRIPTIONPurchase_ID int Primary KeyProject_ID int Foreign Key For Relating with

    Projects TableSupplier_ID int Foreign Key For Relating with

    Suppliers TablePurchase_Date date Not Null

    Invoice_No varchar(50) UniquePayment varchar(10) Not Null Cash / Credit

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    29/289

    Table 25: Purchase_Details

    FIELD NAME DATA TYPE CONSTRAINT DESCRIPTIONDetail_ID int Primary Key

    Purchase_ID int Foreign KeyItem_ID int Foreign KeyQuantity real Not NullRate real Not Null

    Table 26: Stages

    FIELD NAME DATA TYPE CONSTRAINT DESCRIPTIONStage_ID int Primary KeyStage_Name varchar(50) Not Null ,UniqueStage_Discription varchar(500)Min_Completion_Days intImage varchar(50)

    Table 27: States

    FIELD NAME DATA TYPE CONSTRAINT DESCRIPTION

    State_ID int Primary KeyState_Name varchar(50) Not Null ,UniqueCountry_ID int Foreign Key

    Table 28: Suppliers

    FIELD NAME DATA TYPE CONSTRAINT DESCRIPTIONSupplier_ID int Primary KeyFirst_Name varchar(50) Not NullLast_Name varchar(50)Gender char(1)Mobile_No varchar(55) Not NullStreet varchar(500)City intState intCountry intPost_Code varchar(50)Fax_ID varchar(50)EMail_ID varchar(50)Company_Name varchar(50) Not Null

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    30/289

    Tin_No varchar(50) Not Null

    Table 29: Unit_Images

    FIELD NAME DATA TYPE CONSTRAINT DESCRIPTIONImage_ID int Primary KeyImage_Path varchar(500) Not NullUnit_ID int Foreign Key For Relating with

    Unitss Table

    Table 30: Unit_Stages

    FIELD NAME DATA TYPE CONSTRAINT DESCRIPTIONUnit_Stage_ID int Primary KeyStage_ID int Foreign Key For Relating with

    Stages TableUnit_ID int Foreign Key For Relating with

    Units TableCompletion_Days intComplete_Date dateOrder_No intStart_Date date

    Table 31: Units

    FIELD NAME DATA TYPE CONSTRAINT DESCRIPTIONUnit_ID int Primary KeyUnit_Name varchar(50) Not NullProject_ID int Foreign Key For Relating with

    Projects Table

    Min_Amt moneyMax_Amt moneyDetails varchar(500)Image varchar(500)

    Table 32: Users

    FIELD NAME DATA TYPE CONSTRAINT DESCRIPTIONUser_ID int Primary KeyUser_Name varchar(50) Unique,Not Null

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    31/289

    Password varchar(50) Not NullEmployee_ID int Foreign Key For Relating with

    Employees TableImage_URL varchar(500)

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    32/289

    6.7 Screen Layout with Description

    Login(Default):

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    33/289

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    34/289

    Admin_Dashboard:

    Admin Homepage or Dashboard provides information about number of systemusers and number of projects along with over all cash in hand of company.

    Cash flow graph helps in graphically show flow of cash in the company.

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    35/289

    Sales_Manager_Dashboard:

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    36/289

    Project_Manager_Dashboard:

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    37/289

    Accounts_Manager_Dashboard:

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    38/289

    Production_Manager_Dashboard:

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    39/289

    Add_Account:

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    40/289

    Accounts Form that Shows tabs to add Account and Account Type.

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    41/289

    Accounts Form showing Tab to add Accounting Book

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    42/289

    Account Form Showing Validation Messages shown on Null Values for the

    Fields where data is mandatory

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    43/289

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    44/289

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    45/289

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    46/289

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    47/289

    Banks:

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    48/289

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    49/289

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    50/289

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    51/289

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    52/289

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    53/289

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    54/289

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    55/289

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    56/289

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    57/289

    Booking Form:

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    58/289

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    59/289

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    60/289

    Construction_Stages_Registeration :

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    61/289

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    62/289

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    63/289

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    64/289

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    65/289

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    66/289

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    67/289

    Customer_Registeration:

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    68/289

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    69/289

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    70/289

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    71/289

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    72/289

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    73/289

    Enquiry_Registeration:

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    74/289

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    75/289

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    76/289

    Installment_Structure:

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    77/289

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    78/289

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    79/289

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    80/289

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    81/289

    Material_Issue:

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    82/289

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    83/289

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    84/289

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    85/289

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    86/289

    Items:

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    87/289

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    88/289

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    89/289

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    90/289

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    91/289

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    92/289

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    93/289

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    94/289

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    95/289

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    96/289

    Minimum_Stock:

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    97/289

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    98/289

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    99/289

    Miscellenous Forms:

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    100/289

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    101/289

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    102/289

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    103/289

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    104/289

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    105/289

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    106/289

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    107/289

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    108/289

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    109/289

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    110/289

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    111/289

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    112/289

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    113/289

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    114/289

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    115/289

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    116/289

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    117/289

    Project_Registeration:

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    118/289

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    119/289

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    120/289

    Purchase:

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    121/289

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    122/289

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    123/289

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    124/289

    Supplier_Registeration:

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    125/289

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    126/289

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    127/289

    Units_Registeration:

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    128/289

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    129/289

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    130/289

    Booking_Edit:

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    131/289

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    132/289

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    133/289

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    134/289

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    135/289

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    136/289

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    137/289

    Cusatomers_Edit:

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    138/289

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    139/289

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    140/289

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    141/289

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    142/289

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    143/289

    Employee_Edit:

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    144/289

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    145/289

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    146/289

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    147/289

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    148/289

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    149/289

    Enquiries_Edit:

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    150/289

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    151/289

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    152/289

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    153/289

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    154/289

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    155/289

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    156/289

    Issue_Edit:

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    157/289

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    158/289

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    159/289

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    160/289

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    161/289

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    162/289

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    163/289

    Project_Edit:

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    164/289

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    165/289

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    166/289

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    167/289

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    168/289

    Purchase_Edit:

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    169/289

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    170/289

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    171/289

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    172/289

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    173/289

    Suppliers_Edit:

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    174/289

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    175/289

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    176/289

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    177/289

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    178/289

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    179/289

    User_Generation:

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    180/289

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    181/289

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    182/289

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    183/289

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    184/289

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    185/289

    Balance_Sheet:

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    186/289

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    187/289

    Trading Account:

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    188/289

    Trial Balance Sheet:

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    189/289

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    190/289

    Ledger:

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    191/289

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    192/289

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    193/289

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    194/289

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    195/289

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    196/289

    Projects:

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    197/289

    Project_Profile:

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    198/289

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    199/289

    Project_Gallery:

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    200/289

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    201/289

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    202/289

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    203/289

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    204/289

    Project_Documents:

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    205/289

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    206/289

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    207/289

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    208/289

    Project_Material_Stock:

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    209/289

    Project_Material_Flow:

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    210/289

    Project_Units:

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    211/289

    Unit Profile:

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    212/289

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    213/289

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    214/289

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    215/289

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    216/289

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    217/289

    Unit_Status:

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    218/289

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    219/289

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    220/289

    Unit_Status_Update:

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    221/289

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    222/289

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    223/289

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    224/289

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    225/289

    User_Profile:

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    226/289

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    227/289

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    228/289

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    229/289

    Units Search:

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    230/289

    Google_Map:

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    231/289

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    232/289

    Forgot_Password:

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    233/289

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    234/289

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    235/289

    6.8 Report Generated From System

    Accounts Balance:

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    236/289

    Accounts List:

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    237/289

    Accounts Journal:

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    238/289

    Accounts Ledger:

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    239/289

    Assets:

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    240/289

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    241/289

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    242/289

    Customers:

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    243/289

    Current Stages:

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    244/289

    Employees:

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    245/289

    Enquiries:

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    246/289

    Material Issue:

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    247/289

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    248/289

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    249/289

    Material Purchase List:

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    250/289

    Material Required:

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    251/289

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    252/289

    Minimum Stock:

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    253/289

    Payments:

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    254/289

    Stock:

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    255/289

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    256/289

    Unit Booking:

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    257/289

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    258/289

    Upcoming Payments:

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    259/289

    7. T ESTING TEST DATA, EXPECTED R ESULT, ACTUAL R ESULT

    Account_Add:

    Column Name Or

    Control Name Type Value Expected Output Original Output Result

    Account Button Action Click Display List Of Account Displayed List OfAccount

    Pass

    Account Type Button Action Click Open Panel To Add

    Account Type

    Opened Panel To Add

    Account Type

    Pass

    Account Book Button Action Click Open Panel To AddAccount Book

    Opened Panel To AddAccount Book

    Pass

    Account Name Input Null Cause Validation Caused Validation Pass

    Account Name Input Machinery Accept Data Accepted Data Pass

    Add Account Button Action Click With Null

    Values

    Cause Validation Caused Validation Pass

    Add Account Button Action Click With FullData

    Add Account Added Account Pass

    Reset Button Action Click Clear Data Cleared Data Pass

    Type Name Input Null Cause Validation Caused Validation Pass

    Type Name Input Current Asset Accept Data Accepted Data Pass

    Add Account TypeButton

    Action Click With FullData

    Add Account Type Added Account Type Pass

    Add Account TypeButton

    Action Click With NullValues

    Cause Validation Caused Validation Pass

    Book Name Input Null Cause Validation Caused Validation Pass

    Book Name Input Trading Account Accept Data Accepted Data Pass

    Add Accounting Book Action Click With Full Add Accounting Book Added Accounting Book Pass

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    260/289

    Column Name Or

    Control Name Type Value Expected Output Original Output Result

    Button Data

    Add Accounting BookButton

    Action Click With NullValues

    Cause Validation Caused Validation Pass

    Banks:

    Column Name OrControl Name

    Type Value Expected Output Original Output Result

    View Bank Button Action Click Display Bank NameList

    Displayed Bank NameList

    Pass

    Add Bank Button Action Click Open Panel To AddBank

    Opened Panel To AddBank

    Pass

    Edit Bank Button Action Click Open Panel To EditBank

    Opened Panel To EditBank

    Pass

    Bank Name Input Null Cause Validation Caused Validation Pass Bank Name Input HDFC Bank Accept Data Accepted Data Pass Add Bank Button Action Click With Full

    Data Add Bank Added Bank Pass

    Add Bank Button Action Click With NullValues

    Cause Validation Caused Validation Pass

    Update Bank Button Action Click With FullData

    Update Bank Updated Bank Pass

    Update Bank Button Action Click With NullValues

    Cause Validation Caused Validation Pass

    Delete Bank Button Action Click With FullData

    Delete Bank Deleted Bank Pass

    Delete Bank Button Action Click With NullValues

    Cause Validation Caused Validation Pass

    Cancel Button Action Click Display Bank NameList

    Displayed Bank NameList

    Pass

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    261/289

    Booking:

    Column Name Or ControlName

    Type Value ExpectedOutput

    Original Output Result

    Amount Input abc CauseValidation

    CausedValidation

    Pass

    Amount Input 121365jk CauseValidation

    CausedValidation

    Pass

    Amount Input Null CauseValidation

    CausedValidation

    Pass

    Amount Input 123@8* CauseValidation

    CausedValidation

    Pass

    Amount Input 9900000 Accept Data Accepted Data Pass Book Unit Button Action Click With Full Data Book Unit Booked Unit Pass

    Book Unit Button Action Click With NullValues

    CauseValidation

    CausedValidation

    Pass

    Reset Button Action Click Clear Data Cleared Data Pass

    Construction_Stages:

    Column Name OrControl Name

    Type Value Expected Output Original Output Result

    View ConstructionStages Button

    Action Click Display ConstructionStages List

    Displayed ConstructionStages List

    Pass

    Add ConstructionStages Button

    Action Click Open Panel To AddConstruction Stage

    Opened Panel To AddConstruction Stage

    Pass

    Edit ConstructionStages Button

    Action Click Open Panel To EditConstruction Stage

    Opened Panel To EditConstruction Stage

    Pass

    Stage Name Input Painting Accept Data Accepted Data Pass Stage Name Input Null Cause Validation Caused Validation Pass Compition Days Input Null Cause Validation Caused Validation Pass Compition Days Input @we*123 Cause Validation Caused Validation Pass Compition Days Input hggfhg Cause Validation Caused Validation Pass Compition Days Input 5 Accept Data Accepted Data Pass Select Image Input abc.jpg Accept Data Accepted Data Pass Select Image Input abc.mkv Cause Validation Caused Validation Pass Select Image Input Null Cause Validation Caused Validation Fail Add Item Button Action Click With Full

    Data Add Construction Stage Added Construction

    Stage Pass

    Add Item Button Action Click With NullValues

    Cause Validation Caused Validation Pass

    Update Item Button Action Click With FullData

    Update ConstructionStage

    Updated ConstructionStage

    Pass

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    262/289

    Column Name OrControl Name

    Type Value Expected Output Original Output Result

    Update Item Button Action Click With NullValues

    Cause Validation Caused Validation Pass

    Delete Item Button Action Click With FullData

    Delete ConstructionStage

    Deleted ConstructionStage

    Pass

    delete Item Button Action Click With NullValues

    Cause Validation Caused Validation Pass

    Customer_Registeration:

    ColumnName OrControlName

    Type Value Expected Output Original Output Result

    ViewRecords(Link)

    Action Click Navigate to PageCustomer_Edit.aspx

    Navigated to PageCustomer_Edit.aspx

    Pass

    First Name Input Null Cause Validation Caused Validation Pass Last Name Input Null Cause Validation Caused Validation Pass DOB Input Null Cause Validation Allowed Fail E Mail ID Input Null Allow Allowed Pass

    ContactNumber Input Null Cause Validation Allowed Pass

    Fax ID Input Null Allow Allowed Pass Street Input Null Allow Allowed Pass Postal Code Input Null Allow Allowed Pass E Mail ID Input abcde@[email protected] Cause Validation Caused Validation Pass E Mail ID Input Bc Cause Validation Caused Validation Pass E Mail ID Input [email protected] Accept Data Accepted Data Pass ContactNumber

    Input 987456321 Cause Validation Caused Validation Pass

    ContactNumber

    Input 986532abc Cause Validation Caused Validation Pass

    ContactNumber

    Input 98-654-32-3241 Cause Validation Caused Validation Pass

    ContactNumber

    Input 98 96 65 63 21 Cause Validation Caused Validation Pass

    ContactNumber

    Input abcde Cause Validation Caused Validation Pass

    ContactNumber

    Input 98/98989210 Cause Validation Caused Validation Pass

    Contact Input 9876543210 Accept Data Caused Validation Pass

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    263/289

    ColumnName OrControlName

    Type Value Expected Output Original Output Result

    Number Fax ID Input 9876543210123456 Accept Data Accepted Data Pass Fax ID Input 986532abc Cause Validation Caused Validation Pass Fax ID Input abcdef Cause Validation Caused Validation Pass Fax ID Input 98765 pd Cause Validation Caused Validation Pass Fax ID Input 9827 6524 3221 0123 Cause Validation Caused Validation Pass Post Code Input 98653 Cause Validation Caused Validation Pass Post Code Input 387002 Accept Data Accepted Data Pass Post Code Input 9870100 Cause Validation Caused Validation Pass Post Code Input abcdef Cause Validation Caused Validation Pass RegisterButton

    Action With No Data Cause Validation Caused Validation Pass

    Reset Button Action Click Clear Data Cleared Data Pass RegisterButton

    Action With Full Data Register Customer Registered Customer Pass

    Enquiry:

    Column NameOr Control

    Name Type Value Expected Output Original Output Result

    First Name Input Null Cause Validation Caused Validation Pass Last Name Input Null Cause Validation Caused Validation Pass E Mail ID Input Null Cause Validation Caused Validation Pass ContactNumber

    Input Null Cause Validation Caused Validation Pass

    Street Input Null Allow Allowed Pass

    Post Code Input Null Allow Allowed Pass E Mail ID Input [email protected] Allow Allowed Pass E Mail ID Input abc123 Cause Validation Caused Validation Pass E Mail ID Input abcde Cause Validation Caused Validation Pass E Mail ID Input [email protected] Cause Validation Caused Validation Pass E Mail ID Input abcde@[email protected] Cause Validation Caused Validation Pass E Mail ID Input [email protected] Allow Allowed Pass ContactNumber

    Input 98 96 65 63 21 Cause Validation Caused Validation Pass

    ContactNumber

    Input 98*98* Cause Validation Caused Validation Pass

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    264/289

    Column NameOr Control

    Name Type Value Expected Output Original Output Result

    ContactNumber

    Input +919865432 Cause Validation Caused Validation Pass

    ContactNumber

    Input 985 985 655 1 Cause Validation Caused Validation Pass

    ContactNumber

    Input 9856321456 Allow Allowed Pass

    ContactNumber

    Input 98-654-32-3241 Cause Validation Caused Validation Pass

    ContactNumber

    Input 986532abc Cause Validation Caused Validation Pass

    ContactNumber

    Input 98765-43210 Cause Validation Caused Validation Pass

    Post Code Input 378001 Allow Allowed Pass Post Code Input 378-001 Cause Validation Caused Validation Pass Post Code Input 37856412 Cause Validation Caused Validation Pass Post Code Input 3875 Cause Validation Caused Validation Pass Post Code Input abcdef Cause Validation Caused Validation Pass RegisterButton

    Action Null Values Check Validations Checked Validation Pass

    Reset Button Action Click Clear Data Cleared Data Pass Register

    Button

    Action Click With Full Data Register Enquiry Registered Enquiry Pass

    View Records(Link)

    Action Click Navigate to PageEnquiry_Edit.aspx

    Navigated to PageEnquiry_Edit.aspx

    Pass

    Employee_Registeration:

    ColumnName Or

    ControlName

    Type Value Expected Output Original Output Result

    ViewRecords(Link)

    Action Click Navigate to PageEmployee_Edit.aspx

    Navigate to PageEmployee_Edit.aspx

    Pass

    First Name Input Null Cause Validation Caused Validation Pass Last Name Input Null Cause Validation Caused Validation Pass DOB Input Null Cause Validation Allowed Fail E Mail ID Input Null Cause Validation Caused Validation Pass Street Input Null Allow Allowed Pass Contact Input Null Allow Allowed Pass

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    265/289

    ColumnName OrControlName

    Type Value Expected Output Original Output Result

    Number RegisterButton

    Action Click With Null Values Check Validations Checked Validation Pass

    Reset Button Action Click Should Not Check forValidation

    Validation Bypass Pass

    RegisterButton

    Action Click With Full Data Add Employee Employee Added Pass

    Reset Button Action Click Clear Data Cleared Data Pass E Mail ID Input abcde Generate Validation of

    Invalid Address Validation Generated Pass

    E Mail ID

    Input

    abcde@[email protected] Generate Validation ofInvalid Address

    Validation Generated

    Pass

    Post Code Input 12345 Genearate Validation Validation Generated Pass E Mail ID Input [email protected] Accept Data Accepted Data Pass Post Code Input 1234567 Genearate Validation Validation Generated Pass Post Code Input 123456 Accept Data Accepted Data Pass Post Code Input abc123 Genearate Validation Validation Generated Pass ContactNumber

    Input 987456321 Genearate Validation Allowed Pass

    Contact

    Number

    Input 98765-43210 Genearate Validation Allowed Pass

    ContactNumber

    Input 986532abc Genearate Validation Allowed Pass

    ContactNumber

    Input abcdef Genearate Validation Allowed Pass

    ContactNumber

    Input 98 98 98 98 98 Genearate Validation Allowed Pass

    ContactNumber

    Input 98*98* Genearate Validation Allowed Pass

    Contact

    Number Input 9876543210 Allow Data Allowed Pass

    Installment_Structure:

    Column Name OrControl Name

    Type Value Expected Output Original Output Result

    No Of Installments Input asd Cause Validation Caused Validation Pass No Of Installments Input *gh65 Cause Validation Caused Validation Pass No Of Installments Input Null Cause Validation Caused Validation Pass

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    266/289

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    267/289

    Column Name Or Control Name Type Value Expected Output Original Output Result Issue Note No Input Null Cause Validation Caused Validation Pass Quantity Input 1 Allow Caused Validation Fail Quantity Input 120 Allow Caused Validation Fail

    Quantity Input 120.25 Allow Caused Validation Fail Quantity Input abc Cause Validation Caused Validation Pass Quantity Input @ Cause Validation Caused Validation Pass Quantity Input -120 Cause Validation Caused Validation Pass Quantity Input 20.25.25 Cause Validation Caused Validation Pass

    Minimum_Stock:

    Column Name OrControl Name

    Type Value Expected Output Original Output Result

    Quantity Input abc Cause Validation Caused Validation Pass Quantity Input 125 Accept Data Accepted Data Pass Quantity Input 98 96 65

    63 21 Cause Validation Caused Validation Pass

    Item Name Input Null Cause Validation Caused Validation Pass Quantity Input Null Cause Validation Caused Validation Pass Item Name Input Bricks Accept Data Accepted Data Pass

    Add Item Limit Button Action Click Add Item MinimumStock Limit

    Added Item MinimumStock Limit

    Pass

    Material_Purchase:

    Column Name Or Control Name Type Value Expected Output Original Output Result Invoice No Input Null Cause Validation Caused Validation Pass Quantity Input Null Cause Validation Caused Validation Pass Rate Input Null Cause Validation Caused Validation Pass Quantity Input a Cause Validation Caused Validation Pass Rate Input a Cause Validation Caused Validation Pass Quantity Input 220 Allow Allowed Pass Rate Input 230 Allow Allowed Pass Quantity Input 220.5 Allow Allowed Fail Rate Input 230.5 Allow Allowed Fail

    Payment:

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    268/289

    Column Name Or ControlName

    Type Value ExpectedOutput

    Original Output Result

    Date Input Null CauseValidation

    CausedValidation

    Fail

    Date Input 13/10/1993 Accept Data Accepted Data Pass Installment No Input nj Cause

    Validation CausedValidation

    Pass

    Installment No Input 23 236 CauseValidation

    CausedValidation

    Pass

    Installment No Input 5 Accept Data Accepted Data Pass Make Payment Button Action Click With Full Data Make Payment Maked Payment Pass Make Payment Button Action Click With Null

    Values CauseValidation

    CausedValidation

    Pass

    Register Button Action Click Clear Data Cleared Data Pass

    Amount Input 1250000 Accept Data Accepted Data Pass Amount Input 98 96 65 63 21 Cause

    Validation CausedValidation

    Pass

    Amount Input ***bn90 CauseValidation

    CausedValidation

    Pass

    Project_Registeration:

    Column Name OrControl Name

    Type Value Expected Output Original Output Result

    Project Name Input Null Cause Validation Caused Validation Pass Project Name Input Prathna

    Shopping Mall Accept Data Accepted Data Pass

    Postal Code Input 123@8* Cause Validation Caused Validation Pass PostalCode Input 1250000 Cause Validation Caused Validation Pass PostalCode Input 90 89 0 Cause Validation Caused Validation Pass PostalCode Input 387002 Accept Data Accepted Data Pass View Records (Link)

    Action

    Click

    Navigate to PageProject_Edit.aspx

    Navigated to PageProject_Edit.aspx

    Pass

    Register Button Action Click With FullData

    Register Project Registered Project Pass

    Register Button Action Click With NullValues

    Cause Validation Caused Validation Pass

    Reset Button Action Click Clear Data Cleared Data Pass

    Supplier_Registeration:

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    269/289

    Column NameOr Control

    Name Type Value Expected Output Original Output Result

    CompanyName

    Input Null Cause Validation Caused Validation Pass

    Tin No Input Null Cause Validation Caused Validation Pass First Name Input Null Cause Validation Caused Validation Pass Last Name Input Null Cause Validation Caused Validation Pass ContactNumber

    Input Null Cause Validation Caused Validation Pass

    E Mail ID Input Null Allow Allowed Pass Fax ID Input Null Allow Allowed Pass Street Input Null Allow Allowed Pass Post Code Input Null Allow Allowed Pass

    ContactNumber

    Input 98 98 98 98 98 Cause Validation Caused Validation Pass

    ContactNumber

    Input 986532abc Cause Validation Caused Validation Pass

    ContactNumber

    Input 9856321456 Accept Data Accepted Data Pass

    ContactNumber

    Input 985 985 655 1 Cause Validation Caused Validation Pass

    ContactNumber

    Input 98*98* Cause Validation Caused Validation Pass

    ContactNumber

    Input 98765-43210 Cause Validation Caused Validation Pass

    E Mail ID Input abc123 Cause Validation Caused Validation Pass E Mail ID Input abcde@[email protected] Cause Validation Caused Validation Pass E Mail ID Input [email protected] Accept Data Accepted Data Pass E Mail ID Input abcdef Cause Validation Caused Validation Pass Fax ID Input 12345 Cause Validation Caused Validation Pass Fax ID Input 98 98 98 98 98 Cause Validation Caused Validation Pass Fax ID Input 9876543210123456 Allow Allowed Pass

    Fax ID Input 987463 987456 9874 Cause Validation Caused Validation Pass Fax ID Input abc123 Cause Validation Caused Validation Pass Post Code Input 3874563 Cause Validation Caused Validation Pass Post Code Input 987002 Accept Data Accepted Data Pass Post Code Input 38745 Cause Validation Caused Validation Pass Post Code Input 387a4 Cause Validation Caused Validation Pass Register Button Action With Null Values Check Validations Checked Validation Pass Reset Button Action Click Clear Data Cleared Data Pass Register Button Action With Full Data Register Supplier Registered Supplier Pass

    View Records(Link)

    Action Click Navigate toSupplier_Edit.aspx Navigate to PageSupplier_Edit.aspx

    Pass

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    270/289

    Add_Units:

    Column Name Or ControlName

    Type Value ExpectedOutput

    Original Output Result

    Unit Name Input Null CauseValidation

    CausedValidation

    Pass

    Unit Name Input Shop 9 Accept Data Accepted Data Pass Add Button Action Click With Full Data Add Unit Added Unit Pass Add Button Action Click With Null

    Values CauseValidation

    CausedValidation

    Pass

    Reset Button Action Click Clear Data Cleared Data Pass

    Miscellenous:

    Column Name Or ControlName

    Type Value ExpectedOutput

    Original Output Result

    Department Name Input Null CauseValidation

    Caused Validation Pass

    Department Name Input Marketing Accept Data Accepted Data Pass

    Add Department Button Action Click With Full Data AddDepartment AddedDepartment Pass

    Reset Button Action Click Clear Data Cleared Data Pass Project Type Input Null Cause

    Validation Caused Validation Pass

    Project Type Input Shopping Mall Accept Data Accepted Data Pass Add Project Type Button Action Click With Full Data Add Project

    Type Added ProjectType

    Pass

    Add Project Type Button Action Click With NullValues

    CauseValidation

    Caused Validation Pass

    Add Department Button Action Click With NullValues

    CauseValidation

    Caused Validation Pass

    State Name Input Null CauseValidation

    Caused Validation Pass

    State Name Input Aasam Accept Data Accepted Data Pass Add State Button Action Click With Full Data Add State Added State Pass Add State Button Action Click With Null

    Values CauseValidation

    Caused Validation Pass

    Country Name Input Null CauseValidation

    Caused Validation Pass

    Country Name Input Pakistan Accept Data Accepted Data Pass

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    271/289

    Column Name Or ControlName

    Type Value ExpectedOutput

    Original Output Result

    Add Country Button Action Click With Full Data Add Country Added Country Pass Add Country Button Action Click With Null

    Values CauseValidation

    Caused Validation Pass

    City Name Input Null CauseValidation

    Caused Validation Pass

    City Name Input Surat Accept Data Accepted Data Pass Add City Button Action Click With Full Data Add City added City Pass Add City Button Action Click With Null

    Values CauseValidation

    Caused Validation Pass

    Designation Name Input Null CauseValidation

    Caused Validation Pass

    Designation Name Input Accountant Accept Data Accepted Data Pass

    Add Designation Button Action Click With Full Data Add Designation addedDesignation

    Pass

    Add Designation Button Action Click With NullValues

    CauseValidation

    Caused Validation Pass

    Booking_Edit:

    Column Name OrControl Name Type Value Expected Output Original Output Result

    Filter (Link) Action Click Open Filter RecordPopup Menu

    Opened Filter RecordPopup Menu

    Pass

    Filter Button Action Click With FullData

    Display Filtered Data Displayed FilteredData

    Pass

    Filter Button Action Click With NullValues

    Display All Data Displayed All Data Pass

    UnFilter Button Action Click Display All Data Displayed All Data Pass Close Button Action Click Close Filter Record

    Popup Menu

    Closed Filter RecordPopup Menu

    Pass

    Value Input Sanjay With FirstName Field

    Accept Data Accepted Data Pass

    Value Input Null With FirstName Field

    Display All Data Displayed All Data Pass

    Amount Input abc Cause Validation Caused Validation Pass Amount Input 123gh Cause Validation Caused Validation Pass Amount Input Null Cause Validation Caused Validation Pass Amount Input 123@8* Cause Validation Caused Validation Pass Amount Input 1250000 Accept Data Accepted Data Pass Upadte BookingButton

    Action Click With FullData

    Update Booking Updated Booking Pass

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    272/289

    Column Name OrControl Name

    Type Value Expected Output Original Output Result

    Upadte BookingButton

    Action Click With NullValues

    Cause Validation Caused Validation Pass

    Delete BookingButton

    Action Click With FullData

    Delete Booking Deleted Booking Pass

    Delete BookingButton

    Action Click With NullValues

    Cause Validation Caused Validation Pass

    Cancel Button Action Click Display Booking List Displayed Booking List Pass

    Customer_Edit:

    Column Name OrControl Name Type Value Expected Output Original Output Result

    First Name Input Null Cause Validation Caused Validation Pass Last Name Input Null Cause Validation Caused Validation Pass DOB Input Null Cause Validation Allowed Fail E Mail ID Input Null Allow Allowed Pass Contact Number Input Null Cause Validation Allowed Pass Fax ID Input Null Allow Allowed Pass Street Input Null Allow Allowed Pass Postal Code Input Null Allow Allowed Pass E Mail ID Input abcde@[email protected] Cause Validation Caused Validation Pass E Mail ID Input Bc Cause Validation Caused Validation Pass E Mail ID Input [email protected] Accept Data Accepted Data Pass Contact Number Input 987456321 Cause Validation Caused Validation Pass Contact Number Input 986532abc Cause Validation Caused Validation Pass Contact Number Input 98-654-32-3241 Cause Validation Caused Validation Pass Contact Number Input 98 96 65 63 21 Cause Validation Caused Validation Pass Contact Number Input Abcde Cause Validation Caused Validation Pass Delete CustomerButton

    Action Click Delete Customer Deleted Customer Pass

    Contact Number Input 9876543210 Accept Data Caused Validation Pass Fax ID Input 9876543210123456 Accept Data Accepted Data Pass Fax ID Input 986532abc Cause Validation Caused Validation Pass Fax ID Input Abcdef Cause Validation Caused Validation Pass Fax ID Input 98765 pd Cause Validation Caused Validation Pass Fax ID Input 9827 6524 3221 0123 Cause Validation Caused Validation Pass Post Code Input 98653 Cause Validation Caused Validation Pass Post Code Input 387002 Accept Data Accepted Data Pass

    Post Code Input 9870100 Cause Validation Caused Validation Pass

    mailto:abcde@[email protected]:[email protected]:[email protected]:abcde@[email protected]
  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    273/289

    Column Name OrControl Name

    Type Value Expected Output Original Output Result

    Post Code Input Abcdef Cause Validation Caused Validation Pass Save ChangesButton

    Action Click With Full Data Save Changes InCustomer Records

    Saved Changes InCustomer Records

    Pass

    Cancel Button Action Click Display CustomerList

    Displayed CustomerList

    Pass

    Save ChangesButton

    Action Click With Null Values Cause Validation Caused Validation Pass

    Filter (Link) Action Click Open Filter RecordPopup Menu

    Opened FilterRecord PopupMenu

    Pass

    Filter Button Action Click With Full Data Display FilteredData

    DisplayedFiltered Data

    Pass

    Filter Button

    Action Click With Null Values

    Display All Data

    Displayed All Data

    Pass

    UnFilter Button Action Click Display All Data Displayed All Data Pass Close Button Action Click Close Filter Record

    Popup Menu Closed Filter RecordPopup Menu

    Pass

    Value Input Sanjay With First NameField

    Accept Data Accepted Data Pass

    Value Input Null With First NameField

    Display All Data Displayed All Data Pass

    Employee_Edit:

    Column Name OrControl Name

    Type Value Expected Output Original Output Result

    First Name Input Null Cause Validation Caused Validation Pass Last Name Input Null Cause Validation Caused Validation Pass DOB Input Null Cause Validation Allowed Fail E Mail ID Input Null Cause Validation Caused Validation Pass Street Input Null Allow Allowed Pass Contact Number Input Null Allow Allowed Pass Save ChangesButton

    Action Click With Null Values Cause Validation Caused Validation Pass

    Cancel Button Action Click Display AllEmployee List

    Displayed AllEmployee List

    Pass

    Save Changes

    Button

    Action Click With Full Data Save Changes In

    Employee Records

    Saved Changes In

    Employee Records

    Pass

    Reset Button Action Click Clear Data Cleared Data Pass

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    274/289

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    275/289

    ColumnName Or

    Control Name Type Value Expected Output Original Output Result

    First Name Input Null Cause Validation Caused Validation Pass Last Name Input Null Cause Validation Caused Validation Pass E Mail ID Input Null Cause Validation Caused Validation Pass ContactNumber

    Input Null Cause Validation Caused Validation Pass

    Street Input Null Allow Allowed Pass Post Code Input Null Allow Allowed Pass E Mail ID Input [email protected] Allow Allowed Pass E Mail ID Input abc123 Cause Validation Caused Validation Pass E Mail ID Input abcde Cause Validation Caused Validation Pass E Mail ID Input [email protected] Cause Validation Caused Validation Pass E Mail ID Input abcde@[email protected] Cause Validation Caused Validation Pass E Mail ID Input [email protected] Allow Allowed Pass ContactNumber

    Input 98 96 65 63 21 Cause Validation Caused Validation Pass

    ContactNumber

    Input 98*98* Cause Validation Caused Validation Pass

    ContactNumber

    Input +919865432 Cause Validation Caused Validation Pass

    ContactNumber

    Input 985 985 655 1 Cause Validation Caused Validation Pass

    ContactNumber

    Input 9856321456 Allow Allowed Pass

    ContactNumber

    Input 98-654-32-3241 Cause Validation Caused Validation Pass

    DeleteEnquiryButton

    Action Click Delete Enquiry Deleted Enquiry Pass

    ContactNumber

    Input 98765-43210 Cause Validation Caused Validation Pass

    Post Code Input 378001 Allow Allowed Pass Post Code Input 378-001 Cause Validation Caused Validation Pass Post Code Input 37856412 Cause Validation Caused Validation Pass Post Code Input 3875 Cause Validation Caused Validation Pass Post Code Input abcdef Cause Validation Caused Validation Pass Save ChangesButton

    Action Click With Null Values Cause Validation Caused Validation Pass

    Cancel Button Action Click Display List Of AllEnquiry

    Displayed List Of AllEnquiry

    Pass

    Save Changes

    Button

    Action Click With Full Data Save Changes In

    Enquiry Records

    Saved Changes In

    Enquiry Records

    Pass

    View Records Action Click Navigate to Page Navigated to Page Pass

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    276/289

    ColumnName Or

    Control Name Type Value Expected Output Original Output Result

    (Link) Enquiry_Edit.aspx Enquiry_Edit.aspx Filter (Link) Action Click Open Filter Record

    Popup Menu Opened Filter RecordPopup Menu

    Pass

    Filter Button Action Click With Full Data Display Filtered Data Displayed FilteredData

    Pass

    Filter Button Action Click With Null Values Display All Data Displayed All Data Pass UnFilterButton

    Action Click Display All Data Displayed All Data Pass

    Close Button Action Click Close Filter RecordPopup Menu

    Closed Filter RecordPopup Menu

    Pass

    Value Input Sanjay With First NameField

    Accept Data Accepted Data Pass

    Value Input Null With First NameField

    Display All Data Displayed All Data Pass

    Issue_Edit:

    Column Name OrControl Name

    Type Value Expected Output Original Output Result

    Delete Issue Button Action Click Delete Selected Issue Deleted Selected Issue Pass Issue Note No Input Null Cause Validation Caused Validation Pass Issue Note No Input A00023 Accept Data Accepted Data Pass Date Input Null Cause Validation Caused Validation Fail Date Input 23/05/14 Accept Data Accepted Data Pass Quantity Input Null Cause Validation Caused Validation Pass Quantity Input 25/3/12 Cause Validation Caused Validation Pass Quantity Input abd Cause Validation Caused Validation Pass Quantity Input 13 Accept Data Accepted Data Pass Upadte IssueRecord Button

    Action Click With Full Data

    Update Issue Record

    Update Issue Record

    Pass

    Upadte IssueRecord Button

    Action Click With NullValues

    Cause Validation Caused Validation Pass

    Delete SelectedItem Button

    Action Click Delete Selected ItemFrom Issue List

    Deleted Selected ItemFrom Issue List

    Pass

    Back To Issue ListButton

    Action Click Display Issue List Displayed Issue List Pass

    Filter (Link) Action Click Open Filter RecordPopup Menu

    Opened Filter RecordPopup Menu

    Pass

    Filter Button Action Click With Full Data Display Filtered Data Displayed FilteredData Pass

  • 8/12/2019 Project Report on ERP Modules for Construction Industry

    277/289

    Column Name OrControl Name

    Type Value Expected Output Original Output Result

    Filter Button Action Click With NullValues

    Display All Data Displayed All Data Pass

    UnFilter Button Action Click Display All Data Displayed All Data Pass Close Button Action Click Close Filter Record

    Popup Menu Closed Filter RecordPopup Menu

    Pass

    Value Input A00035 With IssueNote No Field

    Accept Data Accepted Data Pass

    Value Input Null With IssueNote No Field

    Display All Data Displayed All Data Pass

    Project_Edit:

    Column Name OrControl Name

    Type Value Expected Output Original Output Result

    Project Name Input Null Cause Validation Caused Validation Pass Project Name Input Access Shopping

    Mall Accept Data Accepted Data Pass

    Postal Code Input 123@8* Cause Validation Caused Validation Pass PostalCode Input 1250000 Cause Validation Caused Validation Pass PostalCode Input 90 89 0 Cause Validation Caused Validation Pass

    Reset Button Action Click Clear Data Cleared Data Pass Save ChangesButton

    Action Click With Full Data Register Project Registered Project Pass

    Save ChangesButton

    Action Click With NullValues

    Cause Validation Caused Validation Pass

    Delete ProjectButton

    Action Click Delete Project Deleted Project Pass