Transcript

DESIGNER/DRAFTER:

CHECKED BY:

PROJECT TITLE: TOWN:

DRAWING TITLE:

PROJECT NO.

DRAWING NO.

SHEET NO.

Filename:SHEET NO.REVISION DESCRIPTIONDATEREV.

DEPARTMENT OF TRANSPORTATION

STATE OF CONNECTICUT

OF WORK WHICH WILL BE REQUIRED.

THE CONDITIONS OF ACTUAL QUANTITIES

IN NO WAY WARRANTED TO INDICATE

INVESTIGATIONS BY THE STATE AND IS

SHEETS IS BASED ON LIMITED

QUANTITIES OF WORK, SHOWN ON THESE

THE INFORMATION, INCLUDING ESTIMATED

10/7/2011 ...\New_Revision_Sheet.dgnPlotted Date:

CONNECTICU

T

DE

PA

RT

ME

NT

O F TRANS

PO

RT

ATI

ON

SIGNATURE BLOCK:

BYNo.

REV. DATEdd/mm/yy

SHEET No.

NE

W

RE

V.

DE

L.

DESCRIPTION BYNo.

REV.mm/dd/yy

SHEET No.

NE

W

RE

V.

DE

L.

DESCRIPTIONDATE

BYNo.

REV.mm/dd/yy

SHEET No.

NE

W

RE

V.

DE

L.

DESCRIPTIONDATE

OFFICE OF ENGINEERING

mm/dd/yy

DATE

CONNECTICU

T

DE

PA

RT

ME

NT

O F TRANS

PO

RT

ATI

ON

02.01.A1

Recommended